CN107387023A - A kind of new dredger and method for well fixing applied to L-type horizontal well - Google Patents

A kind of new dredger and method for well fixing applied to L-type horizontal well Download PDF

Info

Publication number
CN107387023A
CN107387023A CN201710639128.6A CN201710639128A CN107387023A CN 107387023 A CN107387023 A CN 107387023A CN 201710639128 A CN201710639128 A CN 201710639128A CN 107387023 A CN107387023 A CN 107387023A
Authority
CN
China
Prior art keywords
well
end oil
plain end
oil well
well pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710639128.6A
Other languages
Chinese (zh)
Inventor
白杨
张江华
刘亮亮
秦玉霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201710639128.6A priority Critical patent/CN107387023A/en
Publication of CN107387023A publication Critical patent/CN107387023A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/16Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using gaseous fluids

Abstract

The invention belongs to coal bed gas workover process technical field, specifically a kind of new dredging and method for well fixing applied to L-type horizontal well.A kind of effect is provided to become apparent and lower-cost new method for well fixing, including supercharging equipment, liquid nitrogen pump vehicle, plain end oil well pipe and the high pressure line being connected with horizontal well, described liquid nitrogen pump vehicle is connected with supercharging equipment by high pressure line, supercharging equipment is connecting plain end oil well pipe by high pressure line, and plain end oil well pipe is extended into horizontal well.A diameter of 60mm of plain end oil well pipe, plain end oil well pipe bottom are tail band nib structure.The present invention more effectively improves production effect compared to more traditional workover process, reduces the fault rate in machine and well.

Description

A kind of new dredger and method for well fixing applied to L-type horizontal well
Technical field
The invention belongs to coal bed gas workover process technical field, specifically a kind of new dredging applied to L-type horizontal well And method for well fixing.
Background technology
Coal bed gas well well workover generally in a manner of water flushing.Water flushing is by well-flushing by horizontal segment production casing Coal dust and fracturing sand clear as far as possible, straight well is fully linked up with inclined shaft.According to the particularity of horizontal segment, structure is answered From the point of view of polygamy, husky and coal dust impurity power tool is dragged in work progress and is difficult to enter well from horizontal segment, upper lower tubular column resistance, is rubbed Power increase is wiped, surface torque, pulling force are larger, and horizontal segment easily forms sand bed, and inclination section easily forms husky bridge.According to conventional with clear The experience of well is washed, 1 mouthful of well, which is washed, at least needs thousands of Fang Shui, only draws water cost with regard to considerable, and using clear Water operation effectiveness is poor, and the big liquid level of water declines slow in original well, and aerogenesis is ineffective, if a large amount of water fillings into well again, is undoubtedly Make the matter worse, have a strong impact on gas production, at the same a large amount of water fillings to mine safety also with the presence of certain hidden danger.In this case, We need research effect to become apparent and lower-cost new workover process.Coal and coal bed gas Gong Cai National Key Laboratories Develop correlation technique.
The content of the invention
The present invention becomes apparent and lower-cost new method for well fixing to solve effect, there is provided one kind is applied to L-type The new dredging of horizontal well and method for well fixing.
The present invention takes following technical scheme:A kind of new dredger applied to L-type horizontal well, including with horizontal well Supercharging equipment, liquid nitrogen pump vehicle, plain end oil well pipe and the high pressure line of connection, described liquid nitrogen pump vehicle pass through high pressure with supercharging equipment Pipeline connects, and supercharging equipment is connecting plain end oil well pipe by high pressure line, and plain end oil well pipe is extended into horizontal well.Plain end oil well pipe A diameter of 60mm, plain end oil well pipe bottom are tail band nib structure.
A kind of method for well fixing of new dredger applied to L-type horizontal well, is comprised the following steps that,
(1)Water is blown out ground by lower 60mm plain end oil well pipe tail band nibs to corresponding roof above 1m;
(2)Using the method for segmentation well-flushing, using 20m as one section, coal dust Air blowing ground in Jiang Shui and well, as delivery port goes out Sand and powder amount are smaller, then increase the spacing transferred every time, if being hampered in decentralization process, stop decentralization, directly rinse;Rinse Process injects gas, circulation well cleanup, so repeatedly, under into well using liquid nitrogen pump vehicle pumping nitrogen by supercharging equipment Put depth to from cannula end 3m to stop, must not exceed 3m.
The present invention by into horizontal well gas injection coal seam is acted on by the power of continuation, can will by gas circulation The coal dust, rock dust etc. of alluvial and water take well head out of together in well.
Compared with prior art, the invention has the advantages that:
(1)Using water wisely cost of the present invention.
(2)The present invention more effectively improves production effect compared to more traditional workover process, reduces the failure in machine and well Rate.
(3)Security performance of the present invention is high, should not cause mine water disaster.
(4)The present invention reduces the injury that fluid column is brought to reservoir in well.
(5)Invention increases gas production.
Brief description of the drawings
Fig. 1 is new dredging and the workover process schematic diagram of L-type horizontal well;
Fig. 1-liquid nitrogen pump vehicle, 2- high pressure line, 3-4- supercharging equipments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As shown in figure 1, a kind of new dredger applied to L-type horizontal well, including the supercharging being connected with horizontal well are set Standby 3, liquid nitrogen pump vehicle 1, plain end oil well pipe 4 and high pressure line 2, described liquid nitrogen pump vehicle 1 pass through high pressure line 2 with supercharging equipment 3 Connection, supercharging equipment 3 are connecting plain end oil well pipe 4 by high pressure line 2, and plain end oil well pipe 4 is extended into horizontal well.Plain end oil well pipe 4 A diameter of 60mm, the bottom of plain end oil well pipe 4 is tail band nib structure.
A kind of method for well fixing of new dredger applied to L-type horizontal well, is comprised the following steps that,
(1)Water is blown out ground by lower 60mm plain end oil well pipe tail band nibs to corresponding roof above 1m.
(2)Using the method for segmentation well-flushing, using 20m as one section, coal dust Air blowing ground in Jiang Shui and well, such as water outlet Mouth shakes out smaller with powder amount, then increases the spacing transferred every time, if being hampered in decentralization process, stops decentralization, directly flushing; Flushing process injects gas into well using liquid nitrogen pump vehicle pumping nitrogen by supercharging equipment, circulation well cleanup, so repeatedly, directly Stop to decentralization depth to from cannula end 3m, must not exceed 3m.
It should be noted that in work progress of the present invention:
(1)Liquid nitrogen pump vehicle, supercharging equipment must be provided with special relief valve, must first be unloaded before dismounting air inlet is finished per subjob Pressure.
(2)The gas transmission high pressure line of connection liquid nitrogen pump vehicle, supercharging equipment and well head must is fulfilled for construction intensity.
(3)In addition to necessary operating personnel, liquid nitrogen pump vehicle, supercharging equipment and well head nearby forbid the people that stands for gas injection, release, Delivery port nearby forbids the people that stands.
(4)Well head must install 250 standard well heads, and construction every time will check the fine status of well head, serious wear after terminating When to change in time.
(5)Gas transmission, water outlet pipeline use elbow less as far as possible, must such as use the special after each end of job of elbow The abrasion condition of elbow Zhu Yi not be checked, once finding leakage, stops operation changed immediately.
(6)Water outlet pipeline bore is greater than well head outlet bore, and one goes out well head and strains into heavy-caliber pipeline in principle, use To reduce mill resistance and reduce flow velocity.
(7)Delivery port pipeline at least two above earth anchorage(Earth anchor length cannot be less than 1m).
(8)Special gas management equipment detection delivery port gas density must be used after each end of job, concentration is 2% Mechanical normal operation can be started below, otherwise must not be constructed.
(9)Daily construction must carry flow string in well more than supreme group of coal roof before terminating, and avoid for a long time It is parked in horizontal segment and sand occurs and buries.
(10)During construction, personnel must be away from higher-pressure region during construction, and No Open Flames in construction area.
Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc. With replacing, within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., this should be included in Within the protection domain of invention.

Claims (3)

  1. A kind of 1. new dredger applied to L-type horizontal well, it is characterised in that:Including the supercharging equipment being connected with horizontal well (3), liquid nitrogen pump vehicle(1), plain end oil well pipe(4)And high pressure line(2), described liquid nitrogen pump vehicle(1)With supercharging equipment(3)Pass through High pressure line(2)Connection, supercharging equipment(3)Passing through high pressure line(2)Connect plain end oil well pipe(4), plain end oil well pipe(4)Extend into In horizontal well.
  2. 2. the new dredger according to claim 1 applied to L-type horizontal well, it is characterised in that:Plain end oil well pipe(4) A diameter of 60mm, plain end oil well pipe(4)Bottom is tail band nib structure.
  3. 3. a kind of method for well fixing of the new dredger as claimed in claim 2 applied to L-type horizontal well, its feature exist In:Comprise the following steps that,
    (1)Water is blown out ground by lower 60mm plain end oil well pipe tail band nibs to corresponding roof above 1m;
    (2)Using the method for segmentation well-flushing, using 20m as one section, coal dust Air blowing ground in Jiang Shui and well, as delivery port goes out Sand and powder amount are smaller, then increase the spacing transferred every time, if being hampered in decentralization process, stop decentralization, directly rinse;Rinse Process injects gas, circulation well cleanup, so repeatedly, under into well using liquid nitrogen pump vehicle pumping nitrogen by supercharging equipment Put depth to from cannula end 3m to stop, must not exceed 3m.
CN201710639128.6A 2017-07-31 2017-07-31 A kind of new dredger and method for well fixing applied to L-type horizontal well Pending CN107387023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710639128.6A CN107387023A (en) 2017-07-31 2017-07-31 A kind of new dredger and method for well fixing applied to L-type horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710639128.6A CN107387023A (en) 2017-07-31 2017-07-31 A kind of new dredger and method for well fixing applied to L-type horizontal well

Publications (1)

Publication Number Publication Date
CN107387023A true CN107387023A (en) 2017-11-24

Family

ID=60341357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710639128.6A Pending CN107387023A (en) 2017-07-31 2017-07-31 A kind of new dredger and method for well fixing applied to L-type horizontal well

Country Status (1)

Country Link
CN (1) CN107387023A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138831A (en) * 2018-09-30 2019-01-04 山西晋城无烟煤矿业集团有限责任公司 A kind of fire-extinguishing integrated technique of New well drilling applied to mine fire rescue
CN109723399A (en) * 2018-12-24 2019-05-07 中国矿业大学 A kind of method of oil/gas well liquid nitrogen injection de-plugging anatonosis

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1587634A (en) * 2004-08-18 2005-03-02 中国石油天然气集团公司 Compressed air circulation sand cleaning process and matching device
CN202157771U (en) * 2011-07-25 2012-03-07 中国石油天然气股份有限公司 Spot liquid nitrogen evaporation low-density foam well washing system
CN105507871A (en) * 2016-01-06 2016-04-20 西南石油大学 Horizontal well liquid nitrogen ice crystal temperature plugging staged fracturing method for coalbed methane
CN106703772A (en) * 2016-12-01 2017-05-24 中国神华能源股份有限公司 Coal seam gas channel dredge method and coal seam gas channel dredge device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1587634A (en) * 2004-08-18 2005-03-02 中国石油天然气集团公司 Compressed air circulation sand cleaning process and matching device
CN202157771U (en) * 2011-07-25 2012-03-07 中国石油天然气股份有限公司 Spot liquid nitrogen evaporation low-density foam well washing system
CN105507871A (en) * 2016-01-06 2016-04-20 西南石油大学 Horizontal well liquid nitrogen ice crystal temperature plugging staged fracturing method for coalbed methane
CN106703772A (en) * 2016-12-01 2017-05-24 中国神华能源股份有限公司 Coal seam gas channel dredge method and coal seam gas channel dredge device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李宗源等: "煤层气可控水平井洗井工艺技术研究与应用", 《中国煤层气》 *
闫琪等: "连续油管在延安气田水平井井筒清理中的应用", 《石化技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138831A (en) * 2018-09-30 2019-01-04 山西晋城无烟煤矿业集团有限责任公司 A kind of fire-extinguishing integrated technique of New well drilling applied to mine fire rescue
CN109723399A (en) * 2018-12-24 2019-05-07 中国矿业大学 A kind of method of oil/gas well liquid nitrogen injection de-plugging anatonosis

Similar Documents

Publication Publication Date Title
CN105003220B (en) Coiled tubing Horizontal Well Drilling grinds pumped type composite bridge plug technique
CN102913166B (en) A kind of method of continuous tubing drill milling horizontal well sliding sleeve and ball seat
CN106030030A (en) Method for providing multiple fractures in a formation
CN105041243B (en) A kind of horizontal well concentric oil tubes continuous negative pressure takes out sand process pipe string
WO2015000446A1 (en) Method and device for extracting coalbed methane by discharging water and coal fines
CN204457590U (en) A kind of hole-sealing grouting device
CN103590817B (en) The abandoned oil gas well administering method in coal mining region
CN107387023A (en) A kind of new dredger and method for well fixing applied to L-type horizontal well
CN207194872U (en) One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas
CN104481549B (en) Bentonite injection method and system for blocking gushing water and sand
CN105951909B (en) Desilting utensil and its construction method below a kind of harbour
CN108374662A (en) The conduction method of artesian water tomography is crossed in a kind of tunnel
CN107630692A (en) The temporary stall of man-made fracture is to fracturing process in a kind of layer of coal bed gas well
CN113217043A (en) Efficient and rapid plugging method and construction method for water source with water inrush fault water guide zone
CN205605165U (en) A slip casting pipe for gushing prevent string thick liquid and overfall in gushing water slip casting punishment
CN203188949U (en) Safe sand draining manifold for gas drilling
CN108843371B (en) It is a kind of based on the coal seam subregion Dynamic Water Injection process for adopting release
CN106968664A (en) A kind of floor undulation destruction band deep drilling water filling detection method
CN110043218A (en) Gravel pack methods
CN101915062A (en) Glass reinforced plastic sleeve used for coal bed gas well
CN206309372U (en) A kind of horizontal well small displacement drag fracturing tubing string
CN209369865U (en) A kind of protected seam gas drainage structure
CN206681739U (en) Newly-built Coal Mine depth vertical pre grouting from the surface monitoring system under neighbouring existing wellbore conditions
CN106640090B (en) Newly-built Coal Mine depth vertical pre grouting from the surface monitoring system under neighbouring existing wellbore conditions
CN206902713U (en) Oblique cord pile pulling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication