CN207194872U - One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas - Google Patents

One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas Download PDF

Info

Publication number
CN207194872U
CN207194872U CN201720939398.4U CN201720939398U CN207194872U CN 207194872 U CN207194872 U CN 207194872U CN 201720939398 U CN201720939398 U CN 201720939398U CN 207194872 U CN207194872 U CN 207194872U
Authority
CN
China
Prior art keywords
well
type
bed gas
coal bed
dredging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720939398.4U
Other languages
Chinese (zh)
Inventor
任鸽
王争
周显俊
李超
郭向前
张文君
焦田丰
毕利丽
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201720939398.4U priority Critical patent/CN207194872U/en
Application granted granted Critical
Publication of CN207194872U publication Critical patent/CN207194872U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model belongs to coalbed gas in coal mine area and adopts well technical field, is specifically that one kind adopts well construction using high-pressure fluid dredging L-type coal bed gas.In order to improve the problem of coal bed gas adopts well extraction ability, well is adopted including L-type, L-type is adopted and is provided with screen casing inside well, pressure gauge is set at the well head of screen casing, screen casing is connected by high pressure tubing string with compressor, compressor is connected with fluid reservoir, and the outside that L-type adopts well horizontal segment is provided with sleeve pipe, and sleeve pipe connects through minery with goaf.The utility model has the advantages of effect is similar, cost is relatively low, safe and reliable.

Description

One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas
Technical field
The utility model belongs to coalbed gas in coal mine area and adopts well technical field, is specifically that one kind utilizes high-pressure fluid dredging L Type coal bed gas adopts well construction.
Background technology
Coal bed gas is adopted well and put into operation after a period of time, and with the digging in colliery, stratum has different degrees of sedimentation, coal seam Crack can be blocked by coal dust or other impurity, hinder coal bed gas parsing and migration, coal bed gas is adopted well capacity reduction.In addition, Stratum water penetration is into cracks in coal seam, it is impossible to discharge in time, can also block coal bed gas and adopt well.Well production is adopted in reduction, it is impossible to The gas of effective extraction working face, the colliery digging to the colliery later stage bring very big potential safety hazard.In order to be preferably colliery Service, improve coal bed gas and adopt well extraction ability, need to try every possible means the cracks in coal seam dredging of blocking.Coal adopts country altogether with coal bed gas Key lab develops correlation technique.
The content of the invention
The utility model is in order to improve the problem of coal bed gas adopts well extraction ability, there is provided one kind is dredged using high-pressure fluid L-type coal bed gas adopts well construction.
The utility model takes following technical scheme:One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas, wraps Include L-type and adopt well, L-type is adopted and screen casing is provided with inside well, and pressure gauge is set at the well head of screen casing, and screen casing passes through high pressure tubing string and pressure Contracting machine is connected, and compressor is connected with fluid reservoir, and the outside that L-type adopts well horizontal segment is provided with sleeve pipe, and sleeve pipe passes through minery Connected with goaf.
The length that described L-type adopts well horizontal segment is less than or equal to 1000m.
Deposited in fluid reservoir for clear water.Dredged with clear water, with the digging in colliery, stratum has different degrees of Sedimentation, cracks in coal seam can be blocked by coal dust or other impurity.Clear water is pressed into by coal bed gas well using high pressure pump truck, by the coal of blocking Slabbing gap is dredged again, and then coal bed gas is adopted well and resumed production ability.
Deposited in fluid reservoir for nitrogen.Dredged with nitrogen, when stratum water penetration is into cracks in coal seam, position is relatively low Place be easy to ponding, ponding row does not go out, and will block cracks in coal seam, the coal bed gas that working face loss comes can not pass through Discharge in crack.At this time, it may be necessary to after nitrogen is compressed with compressor, enter pit shaft through high pressure tubing string, the ponding at low-lying place dispelled, Again cracks in coal seam is dredged, coal bed gas is adopted well and resumes production.
Compared with prior art, the utility model has the advantages that:The high-pressure fluid of use can be according to actual stifled Reason is filled in, reasonably selects the fluid media (medium)s such as water, nitrogen, improves dredging effect.The utility model needs well Joint Implementation up and down, leads to Borehole observation high-pressure fluid direction of advance is crossed, can tentatively judge to dredge effect, and at down-hole coal excavation face roof can pass through It is artificial to manufacture the effect for press, reaching and reducing L-type well horizontal segment crustal stress, improve dredging chance of success.The utility model and coal Layer fracturing technique is compared, and has the advantages of effect is similar, cost is relatively low, safe and reliable.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
1- mineries in figure, 2- goafs, 3- sleeve pipes, 4- coal seams, 5- screen casings, 6- fluid reservoirs, 7- compressors, 8- are high Pressure pipe post.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1, a kind of adopt well construction using high-pressure fluid dredging L-type coal bed gas, including L-type adopts well 9, L-type To adopt the inside of well 9 and be provided with screen casing 5, pressure gauge is set at the well head of screen casing 5, screen casing 5 is connected by high pressure tubing string 8 with compressor 7, Compressor 7 is connected with fluid reservoir 6, and the outside that L-type adopts the horizontal segment of well 9 is provided with sleeve pipe 3, and sleeve pipe 3 is through minery 1 with adopting Dead zone 2 connects.
The length that described L-type adopts the horizontal segment of well 9 is less than or equal to 1000m.
Scheme one, deposit in fluid reservoir 6 for clear water.
Scheme two, deposit in fluid reservoir 6 for nitrogen.
Concrete operation step is as follows:
1. opening adopts well well head, connection high pressure tubing string 8 adopts screen casing 5 in the well head of well 9, the well head of screen casing 5 with L-type The pressure gauge that place's installation range is 0-3.2MPa.
2. for fluid reservoir 6 by compressor 7, the adjustment rotating speed of compressor 7 is 1800r/min, makes outlet pressure stability extremely More than 17Bar, rate of flow of fluid 30m3/min.The horizontal segment residual length 0-1000m of well 9 is adopted according to L-type, it is determined that when tentatively dredging Between 20-40min.
3. observing well head pressure change during preliminary dredging, pressure is higher before dredging, and pressure gradually decreases down 0Bar after dredging. If pressure does not decline during preliminary dredging, the rotating speed of compressor 7 is improved to 1900r/min, improves outlet pressure, rate of flow of fluid 35m3/ more than min, dredging time 20min or so.
4. dredging should change high-power compressor when ineffective, or wait weight after underground coal mine coal-face roof weighting Newly carry out dredging operation.
5. should carry out adopting the work of well extraction equipment test-run a machine immediately after dredging, avoid cracks in coal seam again by coal dust or other Impurity blocks.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent substitution, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., all should Within the scope of protection of the utility model.

Claims (4)

1. one kind adopts well construction using high-pressure fluid dredging L-type coal bed gas, it is characterised in that:Well is adopted including L-type(9), L-type Adopt well(9)Inside is provided with screen casing(5), screen casing(5)Well head at set pressure gauge, screen casing(5)Pass through high pressure tubing string(8)With pressure Contracting machine(7)Connection, compressor(7)With fluid reservoir(6)Connection, L-type adopt well(9)The outside of horizontal segment is provided with sleeve pipe(3), Sleeve pipe(3)Through minery(1)With goaf(2)Connection.
2. according to claim 1 adopt well construction using high-pressure fluid dredging L-type coal bed gas, it is characterised in that:It is described L-type adopt well(9)The length of horizontal segment is less than or equal to 1000m.
3. according to claim 2 adopt well construction using high-pressure fluid dredging L-type coal bed gas, it is characterised in that:Fluid Holding vessel(6)Middle storage for clear water.
4. according to claim 2 adopt well construction using high-pressure fluid dredging L-type coal bed gas, it is characterised in that:Fluid Holding vessel(6)Middle storage for nitrogen.
CN201720939398.4U 2017-07-31 2017-07-31 One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas Active CN207194872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720939398.4U CN207194872U (en) 2017-07-31 2017-07-31 One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720939398.4U CN207194872U (en) 2017-07-31 2017-07-31 One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas

Publications (1)

Publication Number Publication Date
CN207194872U true CN207194872U (en) 2018-04-06

Family

ID=61799569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720939398.4U Active CN207194872U (en) 2017-07-31 2017-07-31 One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas

Country Status (1)

Country Link
CN (1) CN207194872U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441533A (en) * 2018-10-25 2019-03-08 山西晋城无烟煤矿业集团有限责任公司 A kind of underground solves to adopt the stifled method of L-type well water
CN111022109A (en) * 2019-12-24 2020-04-17 山西晋城无烟煤矿业集团有限责任公司 Method for extracting gas in closed goaf
CN111236874A (en) * 2020-03-31 2020-06-05 应急管理部信息研究院 Method for cutting ground coal bed gas well casing pipe underground

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441533A (en) * 2018-10-25 2019-03-08 山西晋城无烟煤矿业集团有限责任公司 A kind of underground solves to adopt the stifled method of L-type well water
CN111022109A (en) * 2019-12-24 2020-04-17 山西晋城无烟煤矿业集团有限责任公司 Method for extracting gas in closed goaf
CN111236874A (en) * 2020-03-31 2020-06-05 应急管理部信息研究院 Method for cutting ground coal bed gas well casing pipe underground
CN111236874B (en) * 2020-03-31 2022-07-22 应急管理部信息研究院 Method for cutting ground coal bed gas well casing pipe underground

Similar Documents

Publication Publication Date Title
WO2019196503A1 (en) Drilling machine power-based downhole rapid slotting directional hydraulic fracturing system and method
CN107916953A (en) Gas drainage system, pumping method and construction technology based on roof horizontal drilling
CN207194872U (en) One kind adopts well construction using high-pressure fluid dredging L-type coal bed gas
CN109339746A (en) A kind of roof delamination water cooperates with white-out method with coal measure gas
CN102383828A (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
CN108894813B (en) Gas outburst elimination method combining underground drilling, ground fracturing and underground extraction
CN105507938A (en) Construction method of hydraulic flushing and presplit blasting combined permeability-increasing extraction system in drill holes
WO2019029178A1 (en) New gas control technology for ground pressure-relief borehole in abandoned coal mine
CN104879159A (en) Gas permeability-increase extraction device and method for soft coal seam stoping face
WO2015000446A1 (en) Method and device for extracting coalbed methane by discharging water and coal fines
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN112696182A (en) Drilling hole plugging, fracturing and water injection integrated structure and using method thereof
CN108756884A (en) Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN102913274B (en) System for increasing yield of gas excavation borehole and method thereof
CN107816365A (en) A kind of quick-fried pumping integration anti-burst method of coal seam drilling
CN111535848B (en) Broken soft coal seam horizontal well air coal-drawing roadway filling support gas extraction outburst elimination method
CN101915086A (en) Coal mine underground gas borehole fracturing method
CN114607338B (en) Coal mine underground coal rock gas prevention and control composite dynamic disaster method and device
CN102102503A (en) Sand prevention method for four-inch small hole
CN112593912B (en) Coal bed gas horizontal well power expanding, pressure relief and permeability increase extraction method
RU2387784C1 (en) Method for preliminary degassing of coal beds
RU2398971C1 (en) Method for preliminary degassing of coal beds
CN113217043A (en) Efficient and rapid plugging method and construction method for water source with water inrush fault water guide zone
CN109113701A (en) Using air as the anti-reflection technology of pulsating pressure-air creep pressure break and device of medium
CN110043218A (en) Gravel pack methods

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant