CN107386602A - A kind of building wall coating machine - Google Patents
A kind of building wall coating machine Download PDFInfo
- Publication number
- CN107386602A CN107386602A CN201710653655.2A CN201710653655A CN107386602A CN 107386602 A CN107386602 A CN 107386602A CN 201710653655 A CN201710653655 A CN 201710653655A CN 107386602 A CN107386602 A CN 107386602A
- Authority
- CN
- China
- Prior art keywords
- plate
- support arm
- support
- fixedly connected
- collecting box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
- E04F21/08—Mechanical implements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
- E04F21/08—Mechanical implements
- E04F21/12—Mechanical implements acting by gas pressure, e.g. steam pressure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/16—Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels
Abstract
The invention discloses a kind of building wall coating machine, including frame, support arm, casing, top-support, spray body, hoisting mechanism, universal wheel, casing side is provided with spray body, the blade coating mechanism includes scraper plate, side plate, cylinder II, supporting plate, sealing strip, lug, the scraper plate both sides are provided with side plate, the side plate is movably connected in by bearing pin on the lug of collecting box one end, the scraper plate bottom is provided with some cylinders II, the afterbody of cylinder II is fixedly connected on the supporting plate, supporting plate is fixedly connected on collecting box side wall, the scraper plate afterbody is provided with sealing strip;The frame side is provided with support arm, and support arm top is provided with top-support, and top-support bottom is provided with hoisting mechanism;The hoisting mechanism includes motor, reductor, synchronous pulley, timing belt, power transmission shaft, fixed seat, stripper plate.The present invention is effectively sprayed to inner wall of building wall so that wall surface levelling is smooth, time saving and energy saving.
Description
Technical field
The present invention relates to architectural finish equipment technical field, more particularly to a kind of building wall coating machine.
Background technology
At present, building metope when carrying out interior decoration needs brush powder of lacquer putty for use on and coating etc., traditional wall, top surface stone
The slurry being stirred is contained, brushed by hand, an artificial knife by the way of manually brushing by cream, putty spraying by keg
What one knife painted, this mode can be used in rural area or personal house decoration, but can not meet the development need of industry
To ask, occur flush coater in later industry, flush coater has larger lifting on operating efficiency, but effect is less desirable,
Poor flatness has a concave-convex sense, and Consumer's Experience is bad.
Existing mechanical putty painting device is brushed using push or roller coating, in manufacturing cost, product portability and makes
There is corresponding deficiency with efficiency aspect, increase increasingly in productivity cost, today of decoration industry technicalization development, an urgent demand
It is more efficient, more easily process equipment meets growing finishing requirements.
By retrieval, a kind of inside and outside wall covering coating roller of Application No. 2015107104148, including brush structure and
Material absorbing structure, described brushing structure are connected by a delivery pipe with material absorbing structure, wherein, described brushing structure includes roller
Brush, support bend pipe and pole;The present invention by rotary broom carry out inside and outside wall plaster, there is problems with:1) roller coating metope
Pressure be difficult to control, cause the overflow that coating is easily caused during rotary broom roller, paint waste, the roller coating of metope is uneven
Even, moisture content is inconsistent in drying process, and metope is easily cracking;2) during roller coating, delivery pipe at various height when hold
Easily cause it is deep-rooted, it is very chaotic, cause construction inconvenience, it is necessary to manually go arrange pipeline, waste time and energy.
The content of the invention
The purpose of the present invention is to overcome deficiency in the prior art, there is provided a kind of building wall coating machine, in building
Wall is effectively sprayed so that wall surface levelling is smooth, time saving and energy saving.
To achieve these goals, the technical solution adopted by the present invention is:
A kind of building wall coating machine, including frame, support arm, casing, top-support, spray body, hoisting mechanism,
Universal wheel, the upper rack are provided with casing, are used to place coating for wall surface in casing;The casing top is provided with batch mixing mouth, case
Body sidewall is provided with stirring motor, and stirring motor shaft end is provided with agitating shaft, and agitating shaft both ends are movably connected in by stirring bearing block
On wall box, the agitating shaft is provided with stirring leather sheath, and the stirring leather sheath is provided with some stirring vanes, and stirring vane is
Rubber tree leaf, rubber tree leaf can alleviate the pressure of stirring in whipping process, stress deformation occur in whipping process, so as to drop
The load of low stirring motor;The agitating shaft is provided with disk, and the disk side is provided with extrusion spring, and extrusion spring end face is set
There is sealing block, the sealing block snaps onto wall box, and when stirring motor drives agitating shaft rotation, sealing block is relative to case-side
Wall slides, so as to prevent the compound in casing from the overflow of agitating shaft shaft end, causing compound to waste, and stirring axle bearing
Abrasion;Stirring motor provides power, so that stirring vane carries out sufficiently effective mixing to compound, so that spraying
To wall face even application;Bottom half side is provided with overfall, and by filling flush water to batch mixing mouth, stirring motor drives and stirred
Mix blade and moving is carried out to the water in casing, so that box inside wall is effectively cleaned, keep the clean of batch mixing casing
Only, the operation of next construction operation is ensured;
Frame lower is provided with some universal wheels, and universal wheel is provided with brake, and casing side is provided with spray body, the spraying
Mechanism includes charging aperture, gear pump, pipeline, bearing box, nozzle holder, nozzle, collecting box, connecting plate, and the charging aperture is set
In in casing, for charging aperture by pipeline tooth connection wheel pump, gear pump is held by the work formed between pumping cylinder and meshing gear
Change and movement are accumulated to convey coating or be allowed to the drum pump being pressurized, two closings are formed by two gears, the pump housing and front and rear covers
Space, when pinion rotation, the volume in the space for the side that is out of gear becomes big from small, forms vacuum, coating is sucked, gear engagement
The volume in the space of side is squeezed into coating in pipeline from diminishing greatly, and suction chamber and discharge chamber are engaging by two gears
Line separates.The pressure of the outlet of gear pump depends entirely on the size of resistance at pump discharge;Gear pump is arranged at carrying
In case, a pair of pulleys are provided with bearing box, pipeline is S-type to be overlapped on pulley, and pulley top is provided with rubber strip, and rubber strip is fixed
It is connected on carrying box wall, gear pump connects nozzle by pipeline, and nozzle bottom is provided with nozzle holder, and nozzle holder is fixed
It is connected in collecting box, collecting box one end is provided with connecting plate, and the connecting plate is fixedly connected on power transmission shaft;
The collecting box side is provided with blade coating mechanism, and the blade coating mechanism includes scraper plate, side plate, cylinder II, supporting plate, close
Strip of paper used for sealing, lug, the scraper plate both sides are provided with side plate, and the side plate is movably connected in by bearing pin on the lug of collecting box one end,
The scraper plate bottom is provided with some cylinders II, and the afterbody of cylinder II is fixedly connected on the supporting plate, and supporting plate is fixedly connected on collection
Case side wall, wall face is effectively sprayed by nozzle, scraper plate immediately after, is effectively scratched to wall face so that
Wall surface levelling is smooth;The scraper plate afterbody is provided with sealing strip, and sealing strip carries out the gap being connected between scraper plate and collecting box, cylinder
II ejection scraper plate, is on the one hand effectively scratched to wall face, and on the other hand, scraper plate is kicked up unnecessary material being sent into and collected
Case is collected, and effectively saves coating.
The frame side is provided with support arm, and support arm top is provided with top-support, and top-support bottom is provided with elevator
Structure;The hoisting mechanism includes motor, reductor, synchronous pulley, timing belt, power transmission shaft, fixed seat, stripper plate, the motor
Top-support is arranged at, motor side is provided with reductor, and reductor shaft end is provided with synchronous pulley, and reductor shaft end synchronous pulley leads to
Synchronous band connection transmission shaft end synchronous pulley is crossed, power transmission shaft is fixedly connected on support arm by two end axles bearing, the branch
Brace side timing belt is provided with fixed seat, and fixed seat side is provided with stripper plate, and stripper plate extruding timing belt is fixed by screw
On connection fixing base, fixed seat center is provided with power transmission shaft, and fixed seat center driving axle passes through the side connecting plate of collecting box one, passes through electricity
Machine provides power, passes through toothed belt transmission so that collecting box moves up and down in the transmission process of timing belt, so that collecting
The nozzle of case side moves up and down in the transmission process of timing belt, it is achieved thereby that being sprayed to cover type above and below metope so that
Wall surface levelling is smooth, time saving and energy saving.
Preferably, the bottom half is provided with cylinder I, passes through the ejection of cylinder I so that casing tilts, so that case
Internal coating is effectively assembled, and spraying is convenient, so as to save coating.
Preferably, the connecting plate side is provided with support base, and support base passes through the power transmission shaft at fixed seat center, in fixed seat
The both ends of the drive shaft of the heart is provided with directive wheel, and the directive wheel side is provided with guide rail, and guide rail is fixedly connected on support arm;The branch
Support seat side is provided with spring, and spring center is provided with connecting rod, and connecting rod passes through support base, and connecting rod one end is provided with handle, the connecting rod other end
Provided with rotating shaft, rotating shaft one end is provided with pinch roller, and pinch roller is close to support arm side wall, passes through tension force of spring so that pinch roller is close to firmly prop up
Brace side wall, so that directive wheel smoothly slides up and down on guide rail, so that in spraying process, nozzle spraying is equal
It is even, further cause wall surface spraying flat smooth, it is time saving and energy saving.
Preferably, timing belt replaces with chain and chain gear transmission side with synchronous belt pulley transmission mode in the hoisting mechanism
Formula, so as to effectively realize the spraying up and down of nozzle action.
Preferably, timing belt replaces with hoist engine lifting mode with synchronous belt pulley transmission mode in the hoisting mechanism, from
And effectively realize the action of spraying up and down of nozzle.
Preferably, the support arm is movably connected in frame by bearing pin, and the support arm side is provided with cylinder III, top
Portion's support is provided with electro-optical distance measurement sensor, and electro-optical distance measurement sensor model number is CP35MHT80, is ejected and adjusted by cylinder III,
Support arm keeps relatively parallel with metope, and essence is measured to the distance between support arm and wall face by electro-optical distance measurement sensor
Really, so as to reducing relative pressure of the scraper plate to wall face so that wall face uniform force, further cause wall surface spraying, scrape
Apply flat smooth.
Beneficial effect is shown the present invention compared with prior art:
1) power is provided by motor, passes through toothed belt transmission so that collecting box is upper and lower in the transmission process of timing belt
It is mobile, so that the nozzle of collecting box side moves up and down in the transmission process of timing belt, it is achieved thereby that on metope
Lower cover type spraying so that wall surface levelling is smooth, time saving and energy saving;
2) tension force of spring is passed through so that pinch roller is close to support arm side wall, so that directive wheel is steady on guide rail
Slide up and down so that in spraying process, nozzle spraying is uniform, further causes wall surface spraying flat smooth, time saving
It is laborsaving;
3) timing belt replaces with chain and chain gear transmission mode with synchronous belt pulley transmission mode in hoisting mechanism, so as to realize
The action of spraying up and down of nozzle;Timing belt replaces with hoist engine lifting mode with synchronous belt pulley transmission mode in hoisting mechanism, from
And effectively realize the action of spraying up and down of nozzle;
4) a pair of pulleys are provided with bearing box, pipeline is S-type to be overlapped on pulley, and pulley top is provided with rubber strip, rubber
Bar is fixedly connected on carrying box wall, and while hoisting mechanism drive spray body moves up and down, pipeline is in bearing box
Pass in and out, the distance between pulley is changed by rubber strip elastic shrinkage, so that pipeline remains taut on pulley
Tight state, so as to effectively solve spraying, painting scrape during pipeline it is deep-rooted because being easily caused during different height, it is very mixed
Disorderly, construction inconvenience is caused, it is necessary to manually go to arrange pipeline, the problem of wasting time and energy;
5) scraper plate afterbody is provided with sealing strip, and sealing strip carries out the gap being connected between scraper plate and collecting box, and cylinder II ejects
Scraper plate, on the one hand wall face is effectively scratched, on the other hand, scraper plate, which is kicked up, send unnecessary material into collecting box progress
Collect, effectively save coating.
Brief description of the drawings
Accompanying drawing 1 is a kind of building wall coating machine structural representation of the present invention;
Accompanying drawing 2 is a kind of building wall coating machine internal structure schematic diagram of the present invention;
Accompanying drawing 3 is blade coating mechanism mplifying structure schematic diagram in a kind of building wall coating machine of the present invention;
Accompanying drawing 4 is bearing box schematic internal view in a kind of building wall coating machine of the present invention;
Accompanying drawing 5 is spray body structural representation in a kind of building wall coating machine of the present invention;
Accompanying drawing 6 is stripper plate mplifying structure schematic diagram in a kind of building wall coating machine of the present invention;
Accompanying drawing 7 is a kind of building wall coating machine second embodiment structural representation of the present invention;
In figure:11- frames, 12- support arms, 13- casings, 14- top-supports, 15- spray bodies, 16- hoisting mechanisms,
17- universal wheels, 18- blade coating mechanisms, 101- charging apertures, 102- gear pumps, 103- pipelines, 104- bearing boxes, 105- nozzle holders,
106- nozzles, 107- collecting boxs, 108- connecting plates, 109- pulleys, 110- rubber strips, 201- motors, 202- reductors, 203- are same
Walk belt wheel, 204- timing belts, 205- power transmission shafts, 206- fixed seats, 207- stripper plates, 208- directive wheels, 2081- guide rails, 209-
Pinch roller, 210- rotating shafts, 211- connecting rods, 212- support bases, 213- springs, 214- handles, 301- batch mixing mouths, 302- stirring motors,
303- agitating shafts, 304- stirring leather sheaths, 305- stirring vanes, 306- stirring bearing blocks, 307- disks, 308- extrusion springs,
309- sealing blocks, 310- overfalls, 311- cylinders I, 401- scraper plates, 402- side plates, 403- cylinders II, 404- supporting plates, 405-
Sealing strip, 406- lugs, 501- cylinders III, 502- electro-optical distance measurement sensors, 503- bearing pins.
Embodiment
For convenience of the understanding of those skilled in the art, 1-7 below in conjunction with the accompanying drawings, to the further tool of technical scheme
Body explanation.
Embodiment 1, as shown in figures 1 to 6:
A kind of building wall coating machine, including frame 11, support arm 12, casing 13, top-support 14, spray body
15th, hoisting mechanism 16, universal wheel 17, the top of frame 11 are provided with casing 13, are used to place coating for wall surface in casing 13;
The top of casing 13 is provided with batch mixing mouth 301, and the side wall of casing 13 is provided with stirring motor 302, the shaft end of stirring motor 302
Provided with agitating shaft 303, the both ends of agitating shaft 303 are movably connected in the side wall of casing 13 by stirring bearing block 306, the agitating shaft
303 are provided with stirring leather sheath 304, and the stirring leather sheath 304 is provided with some stirring vanes 305, and stirring vane 305 is rubber
Blade, rubber tree leaf can alleviate the pressure of stirring in whipping process, stress deformation occur in whipping process, is stirred so as to reduce
Mix the load of motor 302;The agitating shaft 303 is provided with disk 307, and the side of disk 307 is provided with extrusion spring 308, squeezes
The end face of pressing spring 308 is provided with sealing block 309, and the sealing block 309 snaps onto the side wall of casing 13, and stirring motor 302 drives stirring
When axle 303 rotates, sealing block 309 is relative to the side walls of casing 13, so as to prevent the compound in casing 13 in agitating shaft
303 shaft end overflows, cause compound to waste, and the abrasion of stirring axle bearing;Stirring motor 302 provides power, so that
Stirring vane 305 carries out sufficiently effective mixing to compound, so that spraying is to wall face even application;The bottom of casing 13
Side is provided with overfall 310, and by filling flush water to batch mixing mouth 301, stirring motor 302 drives stirring vane 305 to casing
Water in 13 carries out moving, so that the madial wall of casing 13 is effectively cleaned, keeps the cleaning of batch mixing casing 13, ensures
The operation of next construction operation.
The bottom of frame 11 is provided with some universal wheels 17, and universal wheel 17 is provided with brake, and the side of casing 13 is provided with spray body
15, the spray body 15 includes charging aperture 101, gear pump 102, pipeline 103, bearing box 104, nozzle holder 105, nozzle
106th, collecting box 107, connecting plate 108, the charging aperture 101 are arranged in casing 13, and charging aperture 101 is connected by pipeline 103
Gear pump 102, gear pump 102 are to convey coating by the swept volume change and movement that are formed between pumping cylinder and meshing gear
Or the drum pump being pressurized is allowed to, form two closing spaces, when pinion rotation, gear by two gears, the pump housing and front and rear covers
The volume for disengaging the space of side becomes big from small, forms vacuum, coating is sucked, and the volume in the space of gear engagement side becomes from big
Small, and coating is squeezed into pipeline, suction chamber and discharge chamber are separated by the path of contact of two gears.Gear pump 102
The pressure of outlet depend entirely on the size of resistance at pump discharge;Gear pump 102 is arranged in bearing box 104, bearing box
A pair of pulleys 109 are provided with 104, pipeline 103 is S-type to be overlapped on pulley 109, and the top of pulley 109 is provided with rubber strip 110, rubber
Adhesive tape 110 is fixedly connected on the madial wall of bearing box 104, and gear pump 102 connects nozzle 106 by pipeline 103, under nozzle 106
Portion is provided with nozzle holder 105, and nozzle holder 105 is fixedly connected in collecting box 107, and the one end of collecting box 107 is provided with connecting plate
108, the connecting plate 108 is fixedly connected on power transmission shaft 205.
The side of collecting box 107 is provided with blade coating mechanism 18, and the blade coating mechanism 18 includes scraper plate 401, side plate 402, gas
Cylinder II 403, supporting plate 404, sealing strip 405, lug 406, the both sides of scraper plate 401 are provided with side plate 402, and the side plate 402 is logical
Cross bearing pin to be movably connected on the lug 406 of the one end of collecting box 107, the bottom of scraper plate 401 is provided with some cylinders II 403, gas
The afterbody of cylinder II 403 is fixedly connected in supporting plate 404, and supporting plate 404 is fixedly connected on the side wall of collecting box 107, passes through nozzle 106
Wall face is effectively sprayed, scraper plate 401 immediately after, is effectively scratched so that wall surface levelling is smooth to wall face;
The afterbody of scraper plate 401 is provided with sealing strip 405, and sealing strip 405 carries out the gap being connected between scraper plate 401 and collecting box 107, gas
Cylinder II 403 ejects scraper plate 401, and on the one hand wall face is effectively scratched, and on the other hand, scraper plate is kicked up unnecessary material
It is sent into collecting box to be collected, effectively saves coating.
The side of frame 11 is provided with support arm 12, and the top of support arm 12 is provided with top-support 14, the bottom of top-support 14
Provided with hoisting mechanism 16;The hoisting mechanism 16 includes motor 201, reductor 202, synchronous pulley 203, timing belt 204, transmission
Axle 205, fixed seat 206, stripper plate 207, the motor 201 are arranged at top-support 14, and the side of motor 201 is provided with reductor
202, the shaft end of reductor 202 is provided with synchronous pulley 203, and the shaft end synchronous pulley 203 of reductor 202 is connected by timing belt 204 and passed
The shaft end synchronous pulley 203 of moving axis 205, power transmission shaft 205 are fixedly connected on support arm 12 by two end axles bearing, the support
204 are provided with fixed seat 206 on the side timing belt of arm 12, and the side of fixed seat 206 is provided with stripper plate 207, and stripper plate 207 extrudes synchronization
Band 204 is fixedly connected in fixed seat 206 by screw, and the center of fixed seat 206 is provided with power transmission shaft 205, and the center of fixed seat 206 passes
Moving axis 205 passes through the side connecting plate 108 of collecting box 107 1, provides power by motor 201, is driven by timing belt 204 so that
Collecting box 107 moves up and down in the transmission process of timing belt 204, so that the nozzle 106 of the side of collecting box 104 is in synchronization
Moved up and down in transmission process with 204, it is achieved thereby that being sprayed to cover type above and below metope so that wall surface levelling is smooth, saves
Shi Shengli.
The bottom of casing 13 is provided with cylinder I 311, passes through the ejection of cylinder I 311 so that and casing 13 tilts, so that
Coating in casing is effectively assembled, and spraying is convenient, so as to save coating.
The side of connecting plate 108 is provided with support base 212, and support base 212 passes through the power transmission shaft 205 at the center of fixed seat 206,
The both ends of power transmission shaft 205 at the center of fixed seat 206 are provided with directive wheel 208, and the side of directive wheel 208 is provided with guide rail 2081, guide rail
2081 are fixedly connected on support arm 12;The side of support base 212 is provided with spring 213, and the center of spring 213 is provided with connecting rod 211,
Connecting rod 211 passes through support base 212, and the one end of connecting rod 211 is provided with handle 214, and the other end of connecting rod 211 is provided with rotating shaft 210, rotating shaft 210
One end is provided with pinch roller 209, and pinch roller 209 is close to the side wall of support arm 12, passes through the tension force of spring 213 so that pinch roller 209 is close to firmly prop up
The side wall of brace 12, so that directive wheel 208 smoothly slides up and down on guide rail 2081, so that in spraying process, spray
Mouth 106 sprays uniformly, further causes wall surface spraying flat smooth, time saving and energy saving.
Timing belt 204 replaces with chain and chain gear transmission side with the kind of drive of synchronous pulley 203 in the hoisting mechanism 16
Formula, so as to effectively realize the spraying up and down of nozzle action.
Timing belt 204 replaces with hoist engine lifting mode with the kind of drive of synchronous pulley 203 in the hoisting mechanism 16, from
And effectively realize the action of spraying up and down of nozzle.
Embodiment 2, as shown in Figure 7:
With embodiment 1 except that:The support arm 12 is movably connected in frame 11 by bearing pin 503, the branch
The side of brace 12 is provided with cylinder III 501, and top-support 14 is provided with electro-optical distance measurement sensor 502, electro-optical distance measurement sensor 502
Model CP35MHT80, ejected and adjusted by cylinder III 501, support arm 12 keeps relatively parallel with metope, passes through electro-optical distance measurement
Sensor 502 is measured the distance between support arm 12 and wall face accurately, so as to reduce relative pressure of the scraper plate to wall face,
So that wall face uniform force, further causes wall surface spraying, blade coating flat smooth.
A kind of building wall coating machine, the course of work are as follows:The roller of bottom of the frame realizes that doctor knife coater moves freely, from
And effective adjustment position, the stirring motor in casing provide power, so that stirring vane is fully had to compound
The mixing of effect, so that spraying is to wall face even application;Hoisting mechanism motor provides power, by toothed belt transmission, makes
Obtain collecting box to move up and down in the transmission process of timing belt, so that transmission of the nozzle of collecting box side in timing belt
Move up and down in journey, it is achieved thereby that being sprayed to cover type above and below metope, wall face is effectively sprayed by nozzle, scraper plate
Immediately after, wall face is effectively scratched so that wall surface levelling is smooth.
Above content is only to structure example and explanation of the invention, affiliated those skilled in the art
Various modifications or supplement are made to described specific embodiment or is substituted using similar mode, without departing from invention
Structure or surmount scope defined in the claims, protection scope of the present invention all should be belonged to.
Claims (6)
1. a kind of building wall coating machine, including frame, support arm, casing, top-support, spray body, hoisting mechanism, ten thousand
To wheel, it is characterised in that the upper rack is provided with casing, and the casing top is provided with batch mixing mouth, and wall box is provided with stirring electricity
Machine, stirring motor shaft end are provided with agitating shaft, and agitating shaft both ends are movably connected on wall box by stirring bearing block, described to stir
Mix axle and be provided with stirring leather sheath, the stirring leather sheath is provided with some stirring vanes, and stirring vane is rubber tree leaf;The stirring
Axle is provided with disk, and the disk side is provided with extrusion spring, and extrusion spring end face is provided with sealing block, and the sealing block snaps onto
Wall box, bottom half side are provided with overfall;
Frame lower is provided with some universal wheels, and universal wheel is provided with brake, and casing side is provided with spray body, the spray body
Including charging aperture, gear pump, pipeline, bearing box, nozzle holder, nozzle, collecting box, connecting plate, the charging aperture is arranged at case
In vivo, charging aperture is arranged in bearing box by pipeline tooth connection wheel pump, gear pump, and a pair of pulleys, pipeline are provided with bearing box
S-type to be overlapped on pulley, pulley top is provided with rubber strip, and rubber strip is fixedly connected on carrying box wall, and gear pump leads to
Piping connects nozzle, and nozzle bottom is provided with nozzle holder, and nozzle holder is fixedly connected in collecting box, and collecting box one end is provided with
Connecting plate, the connecting plate are fixedly connected on power transmission shaft;
The collecting box side is provided with blade coating mechanism, and the blade coating mechanism includes scraper plate, side plate, cylinder II, supporting plate, sealing
Bar, lug, the scraper plate both sides are provided with side plate, and the side plate is movably connected in by bearing pin on the lug of collecting box one end, institute
State scraper plate bottom and be provided with some cylinders II, the afterbody of cylinder II is fixedly connected on the supporting plate, and supporting plate is fixedly connected on collecting box
Side wall, the scraper plate afterbody are provided with sealing strip;
The frame side is provided with support arm, and support arm top is provided with top-support, and top-support bottom is provided with hoisting mechanism;Institute
Stating hoisting mechanism includes motor, reductor, synchronous pulley, timing belt, power transmission shaft, fixed seat, stripper plate, and the motor is arranged at
Top-support, motor side are provided with reductor, and reductor shaft end is provided with synchronous pulley, and reductor shaft end synchronous pulley passes through synchronization
Band connection transmission shaft end synchronous pulley, power transmission shaft are fixedly connected on support arm by two end axles bearing, the support arm one
Side timing belt is provided with fixed seat, and fixed seat side is provided with stripper plate, and stripper plate extruding timing belt is fixedly connected by screw
In reservation, fixed seat center is provided with power transmission shaft, and fixed seat center driving axle passes through the side connecting plate of collecting box one.
2. a kind of building wall coating machine according to claim 1, it is characterised in that the bottom half is provided with cylinder
Ⅰ。
3. a kind of building wall coating machine according to claim 1, it is characterised in that the connecting plate side is provided with branch
Seat is supportted, support base passes through the power transmission shaft at fixed seat center, and the both ends of the drive shaft at fixed seat center is provided with directive wheel, the directive wheel
Side is provided with guide rail, and guide rail is fixedly connected on support arm;The support base side is provided with spring, and spring center is provided with connecting rod,
Connecting rod passes through support base, and connecting rod one end is provided with handle, and the connecting rod other end is provided with rotating shaft, and rotating shaft one end is provided with pinch roller, and pinch roller is close to
Support arm side wall.
A kind of 4. building wall coating machine according to claim 1, it is characterised in that timing belt in the hoisting mechanism
Chain and chain gear transmission mode are replaced with synchronous belt pulley transmission mode.
A kind of 5. building wall coating machine according to claim 1, it is characterised in that timing belt in the hoisting mechanism
Hoist engine lifting mode is replaced with synchronous belt pulley transmission mode.
6. a kind of building wall coating machine according to claim 1, it is characterised in that the support arm is lived by bearing pin
Dynamic to be connected in frame, the support arm side is provided with cylinder III, and top-support is provided with electro-optical distance measurement sensor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710653655.2A CN107386602B (en) | 2017-08-03 | 2017-08-03 | A kind of building wall coating machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710653655.2A CN107386602B (en) | 2017-08-03 | 2017-08-03 | A kind of building wall coating machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107386602A true CN107386602A (en) | 2017-11-24 |
CN107386602B CN107386602B (en) | 2019-05-24 |
Family
ID=60344129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710653655.2A Expired - Fee Related CN107386602B (en) | 2017-08-03 | 2017-08-03 | A kind of building wall coating machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107386602B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108114832A (en) * | 2017-12-21 | 2018-06-05 | 刘占明 | A kind of constructing tunnel metope line drawing device |
CN108678344A (en) * | 2018-05-13 | 2018-10-19 | 姜苏娟 | A kind of architectural decoration coating material spraying pipeline automatic cleaning equipment |
CN108756166A (en) * | 2018-07-24 | 2018-11-06 | 温龙龙 | A kind of building trade novel spraying brush device |
CN109083371A (en) * | 2018-08-12 | 2018-12-25 | 桑坡德 | The included lifting construction plastering equipment of one kind |
CN110107059A (en) * | 2019-05-15 | 2019-08-09 | 衢州枫婉智能设备科技有限公司 | A kind of Paint Adhesion can improve equipment |
CN110924643A (en) * | 2019-12-19 | 2020-03-27 | 罗登云 | Putty device is paintd to ceiling |
CN111395720A (en) * | 2020-03-30 | 2020-07-10 | 广东博智林机器人有限公司 | Scraper blade subassembly and have its coating device |
CN111749437A (en) * | 2020-07-06 | 2020-10-09 | 山东鼎鲁建筑有限公司 | Concrete vertical mud scraping device |
CN112324102A (en) * | 2020-11-08 | 2021-02-05 | 王立孟 | Automatic indoor intelligent plastering machine capable of uniformly and flatly plastering |
CN112459424A (en) * | 2020-12-02 | 2021-03-09 | 天津阳光力天装饰科技集团有限公司 | Device is paintd to coating for house decoration |
CN113878902A (en) * | 2021-09-30 | 2022-01-04 | 深圳雷木新材料科技有限公司 | Forming method and forming equipment for short carbon fiber composite material |
US20220220751A1 (en) * | 2019-06-18 | 2022-07-14 | R.U.R. Czech A.S. | Jet adapter for plastering machines |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040245355A1 (en) * | 2003-06-06 | 2004-12-09 | Fettig Drywall | Mixer and sprayer unit |
CN2863974Y (en) * | 2005-11-30 | 2007-01-31 | 戴如荣 | Miniature automatic sweep-out mechanism |
CN201148723Y (en) * | 2008-01-18 | 2008-11-12 | 张保军 | Full-automatic wall plastering machine |
CN202090571U (en) * | 2011-05-11 | 2011-12-28 | 朱立民 | Internal wall whitewashing machine |
CN205637513U (en) * | 2016-05-31 | 2016-10-12 | 青岛建设集团有限公司 | Simple and easy wall body plastering unit |
CN106150042A (en) * | 2016-08-24 | 2016-11-23 | 王春阳 | Gua Qiang robot |
CN205935577U (en) * | 2016-08-09 | 2017-02-08 | 滨州学院 | Remote control putty machine |
CN206110621U (en) * | 2016-09-30 | 2017-04-19 | 山东科技大学 | Intelligence whitewashing wall whitewashing machine |
-
2017
- 2017-08-03 CN CN201710653655.2A patent/CN107386602B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040245355A1 (en) * | 2003-06-06 | 2004-12-09 | Fettig Drywall | Mixer and sprayer unit |
CN2863974Y (en) * | 2005-11-30 | 2007-01-31 | 戴如荣 | Miniature automatic sweep-out mechanism |
CN201148723Y (en) * | 2008-01-18 | 2008-11-12 | 张保军 | Full-automatic wall plastering machine |
CN202090571U (en) * | 2011-05-11 | 2011-12-28 | 朱立民 | Internal wall whitewashing machine |
CN205637513U (en) * | 2016-05-31 | 2016-10-12 | 青岛建设集团有限公司 | Simple and easy wall body plastering unit |
CN205935577U (en) * | 2016-08-09 | 2017-02-08 | 滨州学院 | Remote control putty machine |
CN106150042A (en) * | 2016-08-24 | 2016-11-23 | 王春阳 | Gua Qiang robot |
CN206110621U (en) * | 2016-09-30 | 2017-04-19 | 山东科技大学 | Intelligence whitewashing wall whitewashing machine |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108114832A (en) * | 2017-12-21 | 2018-06-05 | 刘占明 | A kind of constructing tunnel metope line drawing device |
CN108678344A (en) * | 2018-05-13 | 2018-10-19 | 姜苏娟 | A kind of architectural decoration coating material spraying pipeline automatic cleaning equipment |
CN108756166A (en) * | 2018-07-24 | 2018-11-06 | 温龙龙 | A kind of building trade novel spraying brush device |
CN109083371A (en) * | 2018-08-12 | 2018-12-25 | 桑坡德 | The included lifting construction plastering equipment of one kind |
CN110107059A (en) * | 2019-05-15 | 2019-08-09 | 衢州枫婉智能设备科技有限公司 | A kind of Paint Adhesion can improve equipment |
US20220220751A1 (en) * | 2019-06-18 | 2022-07-14 | R.U.R. Czech A.S. | Jet adapter for plastering machines |
CN110924643A (en) * | 2019-12-19 | 2020-03-27 | 罗登云 | Putty device is paintd to ceiling |
CN111395720A (en) * | 2020-03-30 | 2020-07-10 | 广东博智林机器人有限公司 | Scraper blade subassembly and have its coating device |
CN111395720B (en) * | 2020-03-30 | 2022-01-25 | 广东博智林机器人有限公司 | Scraper blade subassembly and have its coating device |
CN111749437A (en) * | 2020-07-06 | 2020-10-09 | 山东鼎鲁建筑有限公司 | Concrete vertical mud scraping device |
CN112324102A (en) * | 2020-11-08 | 2021-02-05 | 王立孟 | Automatic indoor intelligent plastering machine capable of uniformly and flatly plastering |
CN112459424A (en) * | 2020-12-02 | 2021-03-09 | 天津阳光力天装饰科技集团有限公司 | Device is paintd to coating for house decoration |
CN113878902A (en) * | 2021-09-30 | 2022-01-04 | 深圳雷木新材料科技有限公司 | Forming method and forming equipment for short carbon fiber composite material |
CN113878902B (en) * | 2021-09-30 | 2023-12-01 | 深圳雷木新材料科技有限公司 | Forming method and forming equipment for short carbon fiber composite material |
Also Published As
Publication number | Publication date |
---|---|
CN107386602B (en) | 2019-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107386602A (en) | A kind of building wall coating machine | |
CN207609139U (en) | One kind is from loading type building wall paint brushing device | |
CN208168277U (en) | A kind of multi-functional painting device of indoor decoration | |
CN101538928A (en) | Multi-purpose wall machine | |
CN107780628A (en) | A kind of inner wall of building flour brush device | |
CN104675091A (en) | Full-automatic high-efficiency spray coating machine and spray coating method thereof | |
CN209093752U (en) | A kind of scalable mechanical arm of building water-proof spray robot | |
CN207609143U (en) | It is a kind of can be to the intelligent building decorating apparatus of the secondary painting of arc balcony exterior wall | |
CN216690241U (en) | Movable wall painting device for interior decoration | |
CN111701810B (en) | Chemical agent conveying pipeline rust-proof treatment device | |
CN207144415U (en) | A kind of uniform compo flush coater of building wall | |
CN207296316U (en) | A kind of building wall flush coater | |
CN110424689A (en) | A kind of Environment-friendlyexterior exterior wall paint constructing device and its construction technology | |
CN109279211A (en) | A kind of flock glue glue-pouring device | |
CN214917698U (en) | Compound rubber coating device of double-sided tape | |
CN212441526U (en) | A device is paintd in coating grinding for production of lamp house cloth | |
CN110778075B (en) | Wall painting device | |
CN210947615U (en) | Building wall brushing device | |
CN113931417A (en) | Full-automatic whitewashing device for high-bay building outer wall | |
CN209006020U (en) | A kind of slag-scraper for powder spraying chamber | |
CN2355035Y (en) | Putty supplying and skimming apparatus | |
CN218843653U (en) | Paint spraying apparatus is used in construction in room | |
CN213245299U (en) | Interior wall painting device for building engineering construction | |
CN218108176U (en) | Wear-resistant ceramic coating device for building curtain wall processing | |
CN218597646U (en) | Wall emulsion paint smearing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190417 Address after: 443000 No. 11-39-431 Chengdong Avenue, Yichang District, China (Hubei) Free Trade Zone, Yichang City, Hubei Province Applicant after: Hubei Yi Xia Feng Construction Engineering Company Limited Address before: 215316 Bailuxincun 7, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province Applicant before: Qi Feng |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190524 Termination date: 20200803 |
|
CF01 | Termination of patent right due to non-payment of annual fee |