CN107378407A - Construction method of large-section intersecting circular tube steel member - Google Patents

Construction method of large-section intersecting circular tube steel member Download PDF

Info

Publication number
CN107378407A
CN107378407A CN201710779384.5A CN201710779384A CN107378407A CN 107378407 A CN107378407 A CN 107378407A CN 201710779384 A CN201710779384 A CN 201710779384A CN 107378407 A CN107378407 A CN 107378407A
Authority
CN
China
Prior art keywords
steel member
pipe steel
cutting
construction method
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710779384.5A
Other languages
Chinese (zh)
Other versions
CN107378407B (en
Inventor
嵇雪飞
钱沨
沈培
郝旭珍
缪春燕
李季瑛
陆夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, First Construction Co Ltd of China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201710779384.5A priority Critical patent/CN107378407B/en
Publication of CN107378407A publication Critical patent/CN107378407A/en
Application granted granted Critical
Publication of CN107378407B publication Critical patent/CN107378407B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

A construction method of a large-section intersecting circular tube steel member comprises the following steps: firstly, performing three-dimensional full-true modeling on a circular tube steel member by adopting Creo software; step two: lofting and unfolding the three-dimensional full-true model; step three: importing the 1:1 plan view into Sinocam software to program a cutting program to obtain a steel plate cutting program file; step four: according to the cutting program file, accurate blanking is carried out by utilizing a full-automatic cutting machine tool; step five: then the steel plate is placed on a plate bending machine to be rolled and formed; step six: carrying out closing and longitudinal seam welding on the rolled round pipe steel member; step seven: placing the welded round pipe steel member on a plate bending machine for carrying out a rounding treatment; step eight: cutting the length allowance of the circular tube steel member, wherein the cutting end is positioned at the opposite side of one end of the penetration. The invention solves the technical problems of large material consumption, difficult guarantee of cutting quality and precision and low production efficiency of the traditional processing method.

Description

The construction method of pipe steel member is mutually passed through in a kind of heavy in section
Technical field
The invention belongs to steel member manufacture field, is related to a kind of heavy in section and mutually passes through pipe steel member and preparation method thereof.
Background technology
The common pipe that mutually passes through is processed using intersection-line cutting machine mostly now, this method is particularly suitable for use in into The intersecting mouth cutting of product pipe.But cutting is mutually passed through for heavy in section pipe, the material cut down is arc, it is difficult to again Component needs to rotate on large-scale moulding bed when utilizing, cause spillage of material larger, and cutting, and cut quality and precision are difficult to protect Card.Need one section of residue of pre-add straight in addition, traditional symmetrical three rolls plate bending machine of steel plate generally use is rolled, during blanking Side, cut off after remaining steel plate roll-forming, also result in spillage of material increasing, and add working procedure, reduce life Produce efficiency.
The content of the invention
It is an object of the present invention to provide a kind of heavy in section mutually to pass through pipe steel member and preparation method thereof, to solve traditional processing Method consumption of materials is big, cut quality and precision is difficult to ensure that and the technical problem of low production efficiency.
To achieve the above object, the present invention adopts the following technical scheme that.
The construction method of pipe steel member is mutually passed through in a kind of heavy in section, including step is as follows.
Step 1:Three-dimensional authentic modeling is first carried out to pipe steel member using Creo softwares;Three-dimensional authentic model during modeling Diameter DMouldActual pitch diameter equal to pipe steel member is:
DMould=DIt is real outer-tThickness of slab, wherein DIt is real outerFor the external diameter of pipe steel member, tThickness of slabFor the wall thickness of pipe steel member;
The length L of three-dimensional authentic modelMouldAdd 10 ~ 15mm surpluses for actual pipe steel member length.
Step 2:Three-dimensional authentic model is subjected to setting-out expansion, wherein on three-dimensional authentic model evolute starting opening Mutually passing through at the crest of end port for three-dimensional authentic model is arranged on, exports 1 after expansion:1 plan.
Step 3:By 1:1 plan imports in Sinocam softwares and works out cutting process, obtains cutting process file.
Step 4:Steel plate to be cut is placed in fully automatic cutting machine bed, according to cutting process file, is adjusted to be cut Steel plate position, and accurate blanking is carried out along line of cut using fully automatic cutting machine bed, obtain the steel plate that cutting is completed.
Step 5:The steel plate that cutting is completed is placed on roll-forming on veneer reeling machine.
Step 6:The pipe steel member of roll-forming is healed up and longitudinal seam welding.
Step 7:The pipe steel member being welded is placed on progress fourth contact processing on veneer reeling machine.
Step 8:The length surplus of pipe steel member after fourth contact processing is cut, cut end, which is located at, mutually passes through end Offside.
Preferably, three-dimensional authentic model axially elongated setting of the evolute along pipe steel member in step 2, evolute Tearing port width is 0.1mm ~ 0.5mm.
Preferably, the concrete operations of three-dimensional authentic model progress setting-out expansion are in step 2:After setting tearing port, choosing The face group that the three-dimensional authentic model of pipe steel member deploys as needs is selected, and selects a point on tearing port to consolidate as benchmark Pinpoint motionless, click face group expansion order.
Preferably, when cutting process is worked out in step 3,1:1 plan is placed on the steel plate of dimension, if Put cutting torch model, cutting speed, arcing point, cutting offset and gas pressure value.
Preferably, the veneer reeling machine in step 5 is symmetrical expression three rolls plate bending machine either asymmetric three rolls plate bending machine or four-roller Veneer reeling machine.
Preferably, healed up in step 6 and be with longitudinal seam welding specific method:When the pipe steel member two of roll-forming When side heals up, the gap at the place that heals up is subjected to spot welding, solder joint sets one every 800m ~ 1200mm, often locates fusion length not Less than 50mm;The gap at the place that heals up is welded after the completion of spot welding, weld reinforcement is not more than 2mm.
Preferably, longitudinal seam welding is used at the automatic welding center of the pipe steel member of roll-forming or special in step 6 Carried out with automatic welding moulding bed, outside is welded using automatic submerged arc welding in the pipe steel member of roll-forming.
Preferably, the pipe steel member being welded in step 7 fourth contact processing longitudinal seam welding complete 24 hours it is laggard OK, specific method is:The pipe steel member being welded is placed on veneer reeling machine rolling is repeated, eliminate remained straight edge, and profit The circularity for the pipe steel member being welded with arc model pattern inspection, arc model pattern is using computer lofting, full-automatic Numerical control cutting machine blanking.
Compared with prior art the invention has the characteristics that and beneficial effect.
1st, the present invention is mutually passed through pipe using Creo 3 d modeling softwares and three rolls plate bending machine improvement rolling technology Make, save steel plate materialses, reduce working procedure, improve construction quality and efficiency, technically reliable, economical rationality.
2nd, it is correspondingly placed in the present invention using cutting process file on steel plate to be cut, as the blanking punch of steel plate Type, make steel plate cutting more accurate, and the part cut away can secondary use to greatest extent, steel board has been saved from source Material, materials'use rate is improved, reduce spillage of material so that manufacturing cost reduces.
3rd, the construction method of pipe steel member is mutually passed through in heavy in section in the present invention, reduce the expensive intersecting cutter of buying into This, and preparation method mature and reliable can be widely popularized, and roll the steel plate materialses that the time saved remained straight edge in steel plate, be improved Stock utilization.
6th, the present invention organically combines 3 d modeling software, Numerical Control Programming Software into manufacture of steel structure technique, conscientiously solution The problem determined in constructing, improves construction precision and efficiency, has saved cost, and the solution for other follow-up techniques provides ginseng Examine, such as the making of hemispherical dome component, widened and solved the problems, such as thinking, add the method solved the problems, such as.
7th, the present invention in method compared with traditional preparation method, reduce working procedure, improve efficiency of construction with Quality.
8th, the present invention removes the operation in part workshop to office, completes on computers so that operation more standardizes, marked Standardization, become more meticulous, while will be by theoretical with actual unified, software combines with construction, has saved material from source, has reduced construction Process, the efficiency and quality of construction are ensure that, resolving ideas and method are provided for follow-up more complicated structure manufacture.
9th, in roll of steel plate bowlder, respectively there is a segment length at flat board both ends due to not reaching upper roller without bending, and are referred to as Remained straight edge, the minimum arm of force that flat board is started in technique bending are called theoretical remained straight edge, the size and equipment of this section of straight flange Structure and its curve form are relevant, usually treat coiled steel plate thickness of slab for 1.5 ~ 2.5 times;Traditional handicraft shares three kinds of modes and solves to remain The problem of remaining straight flange, first, carry out multiple bent into shape with universal mold on forcing press, shortcoming is that Forming Quality is poor, efficiency It is low, and need to be equipped with the equipment such as suitable forcing press;Second, particular manufacturing craft pre-bending is used on three rolls plate bending machine, shortcoming is desirable It is higher according to the made corresponding template of pipe diameter matches, cost;3rd, in blanking, steel plate lengthens formation process head, makes to remain Remaining straight flange is in technique head, and for cutting, shortcoming is to produce larger spillage of material;And the present invention, when rolling, steel plate is placed in volume Between the roll shaft up and down of trigger, when upper roll shaft declines, steel plate is just occured bending and deformation by the effect of moment of flexure, due to upper and lower The rotation of roll shaft, drive steel plate to move by the frictional force between roll shaft and steel plate, steel plate depressed position is continuously occurred Change, so as to form smooth curved surface, roll-forming work is completed, Forming Quality is good, efficiency high, solves traditional system technique The defects of cost is higher, Forming Quality is poor, efficiency is low and produces larger spillage of material.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the three-dimensional authentic model schematic of the pipe steel member established in the present invention in step 1.
Procedure chart when Fig. 2 is the three-dimensional authentic model expansion of pipe steel member of the present invention.
Fig. 3 is the state diagram that the plan after the three-dimensional authentic model expansion of the present invention is placed on steel plate to be cut.
Fig. 4 is that the steel plate that the cutting in the present invention is completed is placed on the procedure chart that veneer reeling machine is rolled.
Fig. 5 is the procedure chart to be healed up to roll-forming pipe steel member in the present invention.
Fig. 6 is to the procedure chart for the pipe steel member progress fourth contact processing being welded in the present invention.
Fig. 7 is the model pattern schematic diagram utilized in the step seven of the present invention.
Reference:1-three-dimensional authentic model, 2-evolute, 3-Xiang Guanduan, 4-plan, 5-steel to be cut Plate, 6-line of cut, 7-cutting the steel plate completed, 8-veneer reeling machine, the pipe steel member of 9-roll-forming, 10-are welded Pipe steel member, 11-model pattern.
Embodiment
The present embodiment is the construction method that pipe steel member is mutually passed through in heavy in section, first authentic to pipe steel member progress three-dimensional to build Mould, then setting-out expansion is carried out, derived information, cutting process is worked out, carry out blanking using fully automatic cutting machine bed, then steel plate is put Put on veneer reeling machine, rolled using the technique after improvement, finally carry out the longitudinal seam welding of pipe steel member and cut surplus.
The construction method of pipe steel member is mutually passed through in this heavy in section, including step is as follows.
Step 1:According to structural drawings, building for three-dimensional authentic model 1 is first carried out to pipe steel member using Creo softwares Mould;Establish 1:For 1 authentic three-dimensional authentic model 1 in order to improve oxygen evolution rate, the thickness of three-dimensional authentic model 1 elects t asThickness of slab=1mm; The diameter D of three-dimensional authentic model 1MouldEqual to the actual pitch diameter of pipe steel member, i.e.,:DMould=DIt is real outer-tThickness of slab;In practice of construction, steel plate Although having extended when rolling, pipe steel member has the radial welding contraction of part, theoretical calculation knot in longitudinal seam welding Practical experience is closed, steel plate extension is roughly the same with weld contraction value, therefore theoretical steel plate width can be as the reality of steel plate cutting Border width;The length L of three-dimensional authentic model 1MouldFor physical length plus 10 ~ 15mm surpluses;Prevention assembly error carries out cutting correction And axial shrinkage during longitudinal seam welding;Creo 3 d modeling softwares are opened, new established model is now soft into Element Design module Part default units are:Newton, millimeter, second, according to structural drawings, using functions such as the stretchings, cutting, rotation of software, accurately paint Rounding pipe steel member(Thin-wall circular tube).
Step 2:Three-dimensional authentic model 1 is subjected to setting-out expansion, wherein the starting of evolute 2 is opened on three-dimensional authentic model 1 Mouth is arranged on mutually the passing through at the crest of 3 ports of end of three-dimensional authentic model 1(The edge line that end 3 is mutually passed through after expansion is sine curve, is had Crest and trough);1 after export expansion:1 plan 4.
Step 3:By 1:1 plan 4 imports in Sinocam softwares and works out cutting process, obtains cutting process file, Include the profile etc. of steel plate after cutting path, cutting in cutting process file, during cutting, control cutting torch enters according to this route Row cutting.
Step 4:Steel plate 5 to be cut is placed in fully automatic cutting machine bed, it is to be cut according to cutting process file, adjustment The position of steel plate 5, and carry out accurate blanking along line of cut 6 using fully automatic cutting machine bed, obtain the steel plate 7 that cutting is completed;
Step 5:The steel plate 7 that cutting is completed is placed on roll-forming on veneer reeling machine 8.
Step 6:The pipe steel member 9 of roll-forming is healed up and longitudinal seam welding;When the pipe steel structure of roll-forming When 9 liang of sides of part heal up, the gap at the place that heals up is subjected to spot welding, solder joint sets one every 1000mm, often locates fusion length not Less than 50mm;The gap at the place that heals up is welded after the completion of spot welding, weld reinforcement is not more than 2mm.
Certainly in other embodiments, the distance of solder joint can according to construction environment in the range of 800m ~ 1200mm really It is fixed.
Step 7:After longitudinal seam welding is completed 24 hours, it is enterprising that the pipe steel member 10 being welded is placed on veneer reeling machine 8 The processing of row fourth contact;The pipe steel member 10 being welded is placed on veneer reeling machine 8 rolling is repeated, eliminate remained straight edge, and profit The circularity for the pipe steel member 10 being welded with the inspection of arc model pattern 11, the use of arc model pattern 11 computer lofting, Full-automatic numerical control cutting machine blanking.
Step 8:The length surplus of pipe steel member after fourth contact processing is cut, cut end, which is located at, mutually passes through end 3 Offside.
In the present embodiment, three-dimensional authentic model 1 axially elongated setting of the evolute 2 along pipe steel member, exhibition in step 2 The 2 tearing port width of bursting at the seams is 0.1mm ~ 0.5mm.
In the present embodiment, the concrete operations that three-dimensional authentic model 1 carries out setting-out expansion in step 2 are:Set tearing port Afterwards, the face group for selecting the three-dimensional authentic model 1 of pipe steel member to deploy as needs, and select a point conduct on tearing port Benchmark fixing point is motionless, clicks on the expansion order of face group.
When cutting process is worked out in the present embodiment, in step 3,1:1 plan 4 is placed on the steel plate of dimension On, cutting torch model, cutting speed, arcing point, cutting offset and gas pressure value are set.
In the present embodiment, the veneer reeling machine 8 in step 5 can use symmetrical expression three rolls plate bending machine to use asymmetric three rollers Veneer reeling machine can also use four-roll plate bending machine;It is as follows to cut rolling for the steel plate 7 of completion.
1st, equipment is rolled;Steel pipe processing typically has two ways, suppresses and rolls, because compacting has impression to surface of steel plate Damage and compacting internal stress are excessive, generally using roll-forming;Conventional veneer reeling machine has symmetrical expression three rolls plate bending machine, asymmetry Three rolls plate bending machine, four-roll plate bending machine, wherein symmetrical expression three rolls plate bending machine is because simple in construction, compact, in light weight, easy to operate, most It is conventional.
2nd, principle is rolled;When rolling, steel plate is placed between the roll shaft up and down of veneer reeling machine, and when upper roll shaft declines, steel plate is just Occured bending and deformation by the effect of moment of flexure, due to the rotation of upper and lower roll shaft, driven by the frictional force between roll shaft and steel plate Steel plate moves, and steel plate depressed position is continuously changed, and so as to form smooth curved surface, completes roll-forming work Make.
3rd, steel plate rolls;
a)It is D to internal diameter when symmetrical three rolls plate bending machine rolls1Pipe steel member, it is D to roll radius of curvature1/ 2+300mm, volume Shape is as shown in Figure 4 after system.
b)When the pipe steel member of roll-forming heals up, pushed in Fig. 4 opening positions, according to proper sequence principle, every time under Height 50mm is pressed, then carries out turning to both ends and heals up, shape is as shown in Figure 5 after healing up;When both ends remained straight edge is healed up, it is necessary to Guarantee is healed up, and place is smooth, and joint gap is controlled between 0 ~ 2mm, the defects of not allowing misalignment.
In the present embodiment, in step 6 longitudinal seam welding use roll-forming pipe steel member 9 automatic welding center Or carried out on Special Automatic welding positioner, outside is welded using automatic submerged arc welding in the pipe steel member 9 of roll-forming Connect.
Above-mentioned technique, by theoretical with actual unified, software combines with construction, has saved material from source, has reduced construction Process, the efficiency and quality of construction are ensure that, resolving ideas and method are provided for follow-up more complicated structure manufacture.

Claims (8)

1. the construction method of pipe steel member is mutually passed through in a kind of heavy in section, it is characterised in that as follows including step:
Step 1:Three-dimensional authentic modeling is first carried out to pipe steel member using Creo softwares;Three-dimensional authentic model during modeling(1)'s Diameter DMouldActual pitch diameter equal to pipe steel member is:
DMould=DIt is real outer-tThickness of slab, wherein DIt is real outerFor the external diameter of pipe steel member, tThickness of slabFor the wall thickness of pipe steel member;
Three-dimensional authentic model(1)Length LMouldAdd 10 ~ 15mm surpluses for actual pipe steel member length;
Step 2:By three-dimensional authentic model(1)Setting-out expansion is carried out, wherein three-dimensional authentic model(1)Upper evolute(2)Starting Opening is arranged on three-dimensional authentic model(1)Mutually pass through end(3)At the crest of port, 1 after export expansion:1 plan(4);
Step 3:By 1:1 plan(4)Import in Sinocam softwares and work out cutting process, obtain cutting process file;
Step 4:Steel plate to be cut is placed in fully automatic cutting machine bed(5), according to cutting process file, adjust to be cut Steel plate(5)Position, and fully automatic cutting machine bed is utilized along line of cut(6)Accurate blanking is carried out, obtains the steel plate that cutting is completed (7);
Step 5:The steel plate that cutting is completed(7)It is placed on veneer reeling machine(8)Upper roll-forming;
Step 6:To the pipe steel member of roll-forming(9)Healed up and longitudinal seam welding;
Step 7:The pipe steel member that will be welded(10)It is placed on veneer reeling machine(8)Upper progress fourth contact processing;
Step 8:The length surplus of pipe steel member after fourth contact processing is cut, cut end, which is located at, mutually passes through end(3)Pair Side.
2. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 1, it is characterised in that:Step 2 Middle evolute(2)Along the three-dimensional authentic model of pipe steel member(1)Axially elongated setting, evolute(2)Tearing port width be 0.1mm~0.5mm。
3. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 2, it is characterised in that:Step 2 The middle authentic model of three-dimensional(1)Carry out setting-out expansion concrete operations be:After setting tearing port, the three-dimensional of pipe steel member is selected Authentic model(1)The face group deployed as needs, and select a point on tearing port motionless as benchmark fixing point, click on face Group expansion order.
4. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 3, it is characterised in that:Step 3 During middle establishment cutting process, 1:1 plan(4)It is placed on the steel plate of dimension, cutting torch model, cutting speed is set Degree, arcing point, cutting offset and gas pressure value.
5. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 4, it is characterised in that:Step 5 In veneer reeling machine(8)For symmetrical expression three rolls plate bending machine either asymmetric three rolls plate bending machine or four-roll plate bending machine.
6. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 4, it is characterised in that:Step 6 In healed up and be with longitudinal seam welding specific method:When the pipe steel member of roll-forming(9)When two sides heal up, will heal up place Gap carry out spot welding, solder joint every 800m ~ 1200mm set one, often locate fusion length be not less than 50mm;After the completion of spot welding The gap at the place that heals up is welded, weld reinforcement is not more than 2mm.
7. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 6, it is characterised in that:Step 6 Middle longitudinal seam welding uses the pipe steel member in roll-forming(9)Automatic welding center or enterprising in Special Automatic welding positioner OK, the pipe steel member of roll-forming(9)Welded using automatic submerged arc welding in interior outside.
8. the construction method of pipe steel member is mutually passed through in a kind of heavy in section according to claim 7, it is characterised in that:Step 7 In the pipe steel member that is welded(10)Fourth contact processing longitudinal seam welding complete 24 hours after carry out, specific method is:Will weldering The pipe steel member connected(10)It is placed in veneer reeling machine(8)On be repeated rolling, eliminate remained straight edge, and lean on using arc model The pipe steel member that mould inspection is welded(10)Circularity, arc model pattern using computer lofting, full-automatic numerical control cut Machine blanking.
CN201710779384.5A 2017-09-01 2017-09-01 Construction method of large-section intersecting circular tube steel member Active CN107378407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710779384.5A CN107378407B (en) 2017-09-01 2017-09-01 Construction method of large-section intersecting circular tube steel member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710779384.5A CN107378407B (en) 2017-09-01 2017-09-01 Construction method of large-section intersecting circular tube steel member

Publications (2)

Publication Number Publication Date
CN107378407A true CN107378407A (en) 2017-11-24
CN107378407B CN107378407B (en) 2019-02-05

Family

ID=60348807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710779384.5A Active CN107378407B (en) 2017-09-01 2017-09-01 Construction method of large-section intersecting circular tube steel member

Country Status (1)

Country Link
CN (1) CN107378407B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109262205A (en) * 2018-09-14 2019-01-25 哈尔滨锅炉厂有限责任公司 Monocline roll system adapter tube manufacturing method
CN109396557A (en) * 2018-09-28 2019-03-01 北京市机械施工有限公司 A kind of intersection cutting method and device
CN113275841A (en) * 2021-05-26 2021-08-20 湖北三江航天江北机械工程有限公司 Method for processing cylinder of man-hole thin-wall vacuum tank for ship
CN113441810A (en) * 2021-06-02 2021-09-28 浙江交工路桥建设有限公司 Cutting device and method for curved surface of connecting steel pipe
CN114632967A (en) * 2022-03-24 2022-06-17 铜陵有色建安钢构有限责任公司 Pipe fitting intersecting line cutting method based on integral project
CN115319415A (en) * 2022-08-18 2022-11-11 十九冶成都建设有限公司 BIM-based large-diameter three-way pipeline manufacturing process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5212750A (en) * 1992-06-12 1993-05-18 Simmonds Precision Engine System, Inc. Fiber optic harness having reduced weight and bulk, and method
CN101364101A (en) * 2008-09-04 2009-02-11 上海交通大学 Numerical control plasma cutting machine trepanning modular system
CN101576746A (en) * 2009-06-12 2009-11-11 胡凤琴 Method for extension drawing of spatial multi-pipe intersecting line
CN101664845A (en) * 2009-10-12 2010-03-10 上海交通大学 Numerical control cutting system of intersecting steel structure of plurality of geometries on offshore oil platform
CN101961810A (en) * 2009-07-24 2011-02-02 王正怡 Construction method for manufacturing multi-pipe intersecting steel pipe component
CN106780763A (en) * 2016-12-31 2017-05-31 临沂市博信机械有限公司 Three-dimensional surface intersection section geometric figure and the space broken line method of development

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5212750A (en) * 1992-06-12 1993-05-18 Simmonds Precision Engine System, Inc. Fiber optic harness having reduced weight and bulk, and method
CN101364101A (en) * 2008-09-04 2009-02-11 上海交通大学 Numerical control plasma cutting machine trepanning modular system
CN101576746A (en) * 2009-06-12 2009-11-11 胡凤琴 Method for extension drawing of spatial multi-pipe intersecting line
CN101961810A (en) * 2009-07-24 2011-02-02 王正怡 Construction method for manufacturing multi-pipe intersecting steel pipe component
CN101664845A (en) * 2009-10-12 2010-03-10 上海交通大学 Numerical control cutting system of intersecting steel structure of plurality of geometries on offshore oil platform
CN106780763A (en) * 2016-12-31 2017-05-31 临沂市博信机械有限公司 Three-dimensional surface intersection section geometric figure and the space broken line method of development

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙艳秋: "钢制焊接管件制作放样下料新方法浅析", 《中国水能及电气化》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109262205A (en) * 2018-09-14 2019-01-25 哈尔滨锅炉厂有限责任公司 Monocline roll system adapter tube manufacturing method
CN109396557A (en) * 2018-09-28 2019-03-01 北京市机械施工有限公司 A kind of intersection cutting method and device
CN113275841A (en) * 2021-05-26 2021-08-20 湖北三江航天江北机械工程有限公司 Method for processing cylinder of man-hole thin-wall vacuum tank for ship
CN113441810A (en) * 2021-06-02 2021-09-28 浙江交工路桥建设有限公司 Cutting device and method for curved surface of connecting steel pipe
CN114632967A (en) * 2022-03-24 2022-06-17 铜陵有色建安钢构有限责任公司 Pipe fitting intersecting line cutting method based on integral project
CN114632967B (en) * 2022-03-24 2024-02-23 铜陵有色建安钢构有限责任公司 Pipe fitting intersecting line cutting method based on integral project
CN115319415A (en) * 2022-08-18 2022-11-11 十九冶成都建设有限公司 BIM-based large-diameter three-way pipeline manufacturing process
CN115319415B (en) * 2022-08-18 2024-01-19 十九冶成都建设有限公司 BIM-based large-diameter three-way pipeline manufacturing process

Also Published As

Publication number Publication date
CN107378407B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN107378407B (en) Construction method of large-section intersecting circular tube steel member
CN107263031A (en) Cylinder is without pre-bending edge rolling moulding process
CN100577347C (en) Method for molding double hyperbolic streamlined bridge pier coping circular arc section space surface
CN101956389B (en) Omega-shaped corner pile and continuous roll type cold bending formation method thereof
CN105171342B (en) The making manufacturing process of large pumping station siphon outlet conduit model
CN106180463A (en) The spin-on process of a kind of plate body composite molding and device
CN109604980A (en) A kind of manufacturing method of long cylindrical mould structural member
CN106933184A (en) A kind of prefabricated system of processing of nonstandard airduct and its method based on BIM
CN108994120A (en) It is applicable in superhigh intensity, the method for coiling of the small diameter cylinder of ultra-thick steel plates and system
CN102632086B (en) Method for controlling side waves of hot rolling strip steel
CN104493448B (en) Mold surface subsection machining method of aircraft composite material forming mold
CN203330694U (en) Spiral pipe production device
CN105522335A (en) Machining method for large-size stainless steel rotary screen
CN103075003B (en) The construction techniques of a kind of inner corner trim, external corner
CN108581378A (en) A kind of production method of hull elbow connection pipe
CN207628921U (en) A kind of steel pipe sky bending forming machine
CN104438480A (en) Machining method for incrementally forming complex part through engineering tailor-welded blanks
CN209664168U (en) A kind of engineering header shell tinuous production
CN209062546U (en) Nuclear power station steel lining reinforcing section forming device
CN107486724B (en) Logistics telescopic machine rack assembled formation system
CN203764701U (en) Edge folding machining device for step plate
CN212070009U (en) Rib inspection machine
CN105689463B (en) A kind of continuously shaped equipment of metallic plate and its forming method
CN108262592A (en) The manufacturing process of steel automobile mud guard
CN208146750U (en) A kind of angle bead molding machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant