CN107376622A - A kind of repair method of wet method fume desulfurizing system absorption tower spray system - Google Patents

A kind of repair method of wet method fume desulfurizing system absorption tower spray system Download PDF

Info

Publication number
CN107376622A
CN107376622A CN201710463085.0A CN201710463085A CN107376622A CN 107376622 A CN107376622 A CN 107376622A CN 201710463085 A CN201710463085 A CN 201710463085A CN 107376622 A CN107376622 A CN 107376622A
Authority
CN
China
Prior art keywords
branch pipe
spray system
absorption tower
access hole
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710463085.0A
Other languages
Chinese (zh)
Other versions
CN107376622B (en
Inventor
陈伟利
魏建鹏
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Environment Industry Group Co Ltd
Original Assignee
Datang Environment Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Environment Industry Group Co Ltd filed Critical Datang Environment Industry Group Co Ltd
Priority to CN201710463085.0A priority Critical patent/CN107376622B/en
Publication of CN107376622A publication Critical patent/CN107376622A/en
Application granted granted Critical
Publication of CN107376622B publication Critical patent/CN107376622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/80Semi-solid phase processes, i.e. by using slurries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/48Sulfur compounds
    • B01D53/50Sulfur oxides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2251/00Reactants
    • B01D2251/40Alkaline earth metal or magnesium compounds
    • B01D2251/404Alkaline earth metal or magnesium compounds of calcium
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2258/00Sources of waste gases
    • B01D2258/02Other waste gases
    • B01D2258/0283Flue gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Treating Waste Gases (AREA)

Abstract

The present invention provides a kind of repair method of wet method fume desulfurizing system absorption tower spray system, comprises the following steps:Judge each nozzle pass blocking state, and the pass blocking state of each nozzle is marked;Access hole is opened up in each branch pipe, each branch pipe pass blocking state is checked using pipe endoscopic monitoring device, and mark blocking position;Access hole is opened up in main pipe, main pipe is overhauled with reference to abovementioned steps;4) nozzle blocked is changed or repaired, dredge outlet is opened up in blocking position, tamper is removed by dredge outlet;5) access hole and dredge outlet are closed.Maintenance step arrangement is had clear presentation, and comprehensively without dead angle, can efficiently realize the maintenance to absorption tower spray system, and repair quality is high, overhaul efficiency is high, effectively excludes potential risk, greatly reduces the cost of overhaul.

Description

A kind of repair method of wet method fume desulfurizing system absorption tower spray system
Technical field
The present invention relates to wet process of FGD field, more particularly to a kind of wet method fume desulfurizing system absorption tower spray system Repair method.
Background technology
On September 12nd, 2014, National Development and Reform Commission, Environmental Protection Department, National Energy Board, which combine, to be issued《Coal electricity section Can emission reduction upgrading and transformation action plan (2014-2020)》(hair changes the energy (2014) 2093), this action requirements of plan east Portion's area (provinces and cities of Liaoning, Beijing, Tianjin, Hebei, Shandong, Shanghai, Jiangsu, Zhejiang, Fujian, Guangdong, Hainan etc. 11) newly-built combustion Coal power generation unit Air Pollutant Emission concentration basically reaches gas turbine group emission limit (i.e. in the condition of benchmark oxygen content 6% Under, flue dust, sulfur dioxide, discharged nitrous oxides concentration are respectively no higher than 10,35,50 milligrams/cubic metre), middle part (black dragon The province of river, Jilin, Shanxi, Anhui, Hubei, Hunan, Henan, Jiangxi etc. 8) new-built unit is in principle close to or up gas turbine group Emission limit, west area new-built unit is encouraged close to or up gas turbine group emission limit.It is existing to the year two thousand twenty, eastern region Use as a servant 300,000 kilowatts and the public Thermal generation unit of the above, 100,000 kilowatts and the above provide Thermal generation unit for oneself and other are had ready conditions Thermal generation unit, Air Pollutant Emission concentration basically reaches gas turbine group emission limit after transformation.In view of China's combustion Coal quality, flue gas caused by all coal-burning power plants is required for carry out desulfurization process, and makes the sulfur dioxide in flue gas of discharge Content meets above-mentioned related environmental requirement.
Desulfurization process generally uses wet desulfurization of flue gas by limestone-gypsum method system at present, wherein, spray system is wet method cigarette Very important core apparatus, is mainly made up of shower and nozzle in desulfurization system, and spray system is arranged in desulfurization absorption The spraying layer of tower, is properly termed as liquid distribution trough again, and slurries reach equally distributed each spray by the distributional effects of shower Mouth, then sprayed by nozzle, fully contacted with the flue gas of reverse flow, sulfur dioxide pollution gas absorbs herein.If spray Shower pipe road and spray nozzle clogging, must influence slurry circulating pump output, reduce desulfuration efficiency, thus spray system must ensure it is unimpeded State.
After blocking occurs in spray system, investigate in time and maintenance is just particularly important, also, due to desulphurization system Operative relation the operation of main brand-name computer group, its downtime is unsuitable long, and therefore, maintenance to spray system must quick height Effect, and potential hidden danger is investigated out as far as possible.
And existing conventional maintenance mode is often difficult to quickly investigate hidden danger, below with an actual Engineering Projects explanation often Advise the deficiency of maintenance mode.
By taking the operation troubles maintenance of a certain generator set desulfurization system in a power plant as an example, failure is presented as:Slurry circulating pump Output is gradually reduced, until more slurry circulating pumps can not all meet that design load is contributed, exports SO2Exceeded phenomenon occurs often, Nozzle check is carried out after shutdown and finds that spray piping blocks seriously, the abrasionproof that plugging reason is done by 3 serum recycle pump cases All come off and cause, conventional means can only be taken in face of this hard tamper for being not easy dredging, i.e. cutting spray main pipe, branch Pipe is taken out the operation of tamper.And because maintainer tends not to directly judge from outside the position of tamper, this Just need to arrange cutting position as far as possible if sample, thoroughly to understand tamper, it is difficult will necessarily to increase maintenance for so operation Degree and repair time.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides a kind of inspection of wet method fume desulfurizing system absorption tower spray system Repair method, can be faced after operation troubles using unit stop, big light maintenance when to absorption tower spray system carry out Quick overhaul.Maintenance step It is rapid to arrange to have clear presentation, comprehensively without dead angle, can efficiently realize the maintenance to absorption tower spray system, and repair quality it is high, Overhaul efficiency is high, effectively excludes potential risk, the cost of overhaul is greatly reduced, so that it is guaranteed that realizing slurry circulating pump according to design Run value stabilization, realize and save power consumption and equipment loss, improve the purpose of desulfuration efficiency.
In order to reach above-mentioned technical purpose, type of the present invention uses technical scheme as follows:
A kind of repair method of wet method fume desulfurizing system absorption tower spray system, the spray system include multiple parts, Part is selected from main pipe, branch pipe and nozzle, comprises the following steps:
1) judge each nozzle pass blocking state, and the pass blocking state of each nozzle is marked;
2) access hole is opened up in each branch pipe, each branch pipe pass blocking state is checked using pipe endoscopic monitoring device, and mark and block position Put;
3) access hole is opened up in main pipe, main pipe is overhauled with reference to step 2);
4) nozzle blocked is changed or repaired, dredge outlet is opened up in blocking position, tamper is removed by dredge outlet;
5) access hole and dredge outlet are closed.
Also include:Draw spray system layout drawing and each part is classified, sorted and marking serial numbers, Organizational Parts row Table;The pass blocking state is recorded while each nozzle pass blocking state is marked in step 1) in list of parts;In step 2) While marking blocking position the blocking position is recorded in list of parts;In step 4), the record in list of parts is changed Or the nozzle that maintenance blocks, and dredge outlet is opened up according to the blocking position recorded in list of parts.
Further, by being ventilated to spray system in step 1), detection jet expansion blast judges nozzle pass blocking state.
Further, access hole is opened up in step 2) includes:
Closure plate is overhauled as branch pipe in the non-next complete plate of one end cutting connected with main pipe of branch pipe, forms access hole; Deposited after marking corresponding branch pipe sequence number to branch pipe maintenance closure plate.
Further, access hole is opened up in step 3) includes:
In one end that main pipe connects with branch pipe, the next complete plate of cutting overhauls closure plate as main pipe, forms access hole;It is right Main pipe maintenance closure plate is deposited after marking corresponding main pipe sequence number.
Further, opening up dredge outlet in blocking position in step 4) includes:
In the next complete plate of blocking position cutting as dredge outlet closure plate, dredge outlet is formed, to the dredge outlet closure plate mark Deposited after remembering corresponding branch pipe or main pipe sequence number and dredging mark.
Further, access hole is closed by the access hole closure plate of storage in step 5), passes through the dredge outlet closure plate of storage Close dredge outlet.
Further, pipe endoscopic monitoring device described in step 2) includes an image collecting device, an image display device, letter Number connection described image harvester and image display device a signal wire, wrap up and support a support of the signal wire Pipe, the support tube have the rigidity of radial direction and the flexibility of axial direction.
Further, the support tube is selected from metal hose or flexure spring or bellows.
Further, check that each branch pipe pass blocking state is included image collecting device using pipe endoscopic monitoring device in step 2) Branch pipe is stretched into by access hole, by pass blocking state inside image display device Real Time Observation branch pipe, branch pipe is stretched into according to support tube Length judges image capture position.
By using above technical scheme, the present invention detects the pass blocking state of spray branch pipe and main pipe by endoscope and image processing device, Reduce and blindly cut and detect, avoid the confusion of Overhaul site.And by the way that maintenance craft is standardized, ordering, carry High repair quality, simplify maintenance process, improve overhaul efficiency height, reduce the cost of overhaul.So that it is guaranteed that desulphurization system absorption tower Run up to design load, save power consumption and equipment loss, improve desulfuration efficiency.
Brief description of the drawings
Fig. 1 is the absorption tower spray system layout drawing drawn in one embodiment of the invention.
Fig. 2 is the list of parts that corresponding diagram 1 is worked out in one embodiment of the invention.
Fig. 3 is that the flow of the repair method of wet method fume desulfurizing system absorption tower spray system in one embodiment of the invention is shown It is intended to.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Whole description, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Based on this Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained under the premise of creative work is not made Example is applied, belongs to the scope of protection of the invention.Institute's accompanying drawing is coordinated to elaborate the features and advantages of the present invention below.
As shown in figure 3, in one embodiment, there is provided a kind of maintenance side of wet method fume desulfurizing system absorption tower spray system Method,
The spray system includes multiple parts, and part is selected from main pipe, branch pipe and nozzle, comprised the following steps:
1) draw spray system layout drawing and each part is classified, sorted and marking serial numbers, Organizational Parts list;
2) judge each nozzle pass blocking state, and the pass blocking state of each nozzle is marked, while remember in list of parts Record;
3) access hole is opened up in each branch pipe, each branch pipe pass blocking state is checked using pipe endoscopic monitoring device, and mark and block position Put, while the blocking position is recorded in list of parts;
4) access hole is opened up in main pipe, main pipe is overhauled with reference to step 3);
5) dredge outlet is opened up in blocking position, tamper is removed by dredge outlet;
6) access hole and dredge outlet are closed.
First determine whether nozzle has blocking, then judge whether that branch pipe has blocking, finally judge whether main pipe has blocking, After judging spray nozzle clogging simultaneously, it is impossible to by nozzle dredge must carry out that branch pipe is carried out opening up dredge outlet clear up, such as Fruit tamper is larger to be got lodged at main pipe and branch pipe interface, then just dredge outlet must be opened up in main pipe and be cleared up.
With reference to figure 1, exemplified by only one simple spray system, depict and install four with a main pipe, four branch pipes, each branch pipe The spray system of nozzle, and each part is sorted respectively, define sequence number.Spray system form, the structure of reality may become Change, refer to Fig. 1 and be further improved and adjust, specifically with reference to practical structures, sort successively, numbering.With machinery The Chang Shizhe of design field, above-mentioned modifications and adaptations can be carried out with reference to figure 1 and other guide disclosed by the invention, herein not Repeat again.
Then list of parts as shown in Figure 2 is worked out for Fig. 1 again, list of parts includes but is not limited to herein below:Respectively Component names, each component serial numbers, each part pass blocking state and pass blocking position.It can further include, the repair time, overhaul people The information such as member.Further multiple list of parts can also be integrated, statistics blocking position distribution, the same area or same The parameters such as relation duration of congestion interval, reference is provided so as to improve or optimize for further equipment.
So as to it is clear, record each unit status in an orderly manner.The inspection of follow-up each step can be recorded in the list of parts As a result.And after maintenance terminates, can also be using the list of parts as complete record of examination.
Wherein, by being ventilated to spray system in step 2), detection jet expansion blast judges nozzle pass blocking state.
Nozzle pass blocking state is marked by different colours mark in step 2).
Access hole is opened up in step 3) to be included:
Closure plate is overhauled as branch pipe in the non-next complete plate of one end cutting connected with main pipe of branch pipe, forms access hole; Deposited after marking corresponding branch pipe sequence number to branch pipe maintenance closure plate.
Access hole is opened up in step 4) to be included:
In one end that main pipe connects with branch pipe, the next complete plate of cutting overhauls closure plate as main pipe, forms access hole;It is right Main pipe maintenance closure plate is deposited after marking corresponding main pipe sequence number.
Opening up dredge outlet in blocking position in step 5) includes:
In the next complete plate of blocking position cutting as dredge outlet closure plate, dredge outlet is formed, to the dredge outlet closure plate mark Deposited after remembering corresponding branch pipe or main pipe sequence number and dredging mark.
Access hole is closed by the access hole closure plate of storage in step 6), dredging is closed by the dredge outlet closure plate of storage Mouthful.
Pipe endoscopic monitoring device described in step 3) includes an image collecting device, an image display device, signal connection institute A signal wire of image collecting device and image display device is stated, wraps up and supports a support tube of the signal wire, the branch Stay tube has the rigidity of radial direction and the flexibility of axial direction.
The support tube is selected from metal hose or flexure spring or bellows.
Check that each branch pipe pass blocking state is included image collecting device by access hole using pipe endoscopic monitoring device in step 3) Branch pipe is stretched into, by pass blocking state inside image display device Real Time Observation branch pipe, branch length of tube is stretched into according to support tube and judged Image capture position.
Below, incorporation engineering is actual, and the repair method of the present invention is described further.With to Henan power plant Two units gas desulfurization engineerings of 350MW and 660MW are used by Zhejiang Insigma Electrical Engineering Co., Ltd's EPC over contracts Lime stone-gypsum wet flue gas desulfurizing technique, desulfurizing agent is lime stone, desulfurizing byproduct is gypsum, and the tower of a stove one, every is inhaled Tower is received with three slurry circulating pumps, two oxidation fans.Absorbent supplying system, FGD gypsum slurries processing system, technique water system System, waste water drainage system are that two units are public.SO in original design desulfurization inlet flue gas2Concentration is 2229mg/Nm3, export SO2 Concentration of emission is 111mg/Nm3, design desulfuration efficiency is more than 95%.The model LC700/900II of 3 slurry circulating pumps, flow For 8680m3/h。
By taking the maintenance of 350MW units absorption tower spray system as an example, 3 layers of spray spout, the desulfurization of branch pipe abrasionproof block serious, nothing Method is dredged in nozzle and come out, can only be by carrying out cleaning tamper in cutting spray branch pipe.Conventional method is empirically carried out Cutting, cutting under nozzle, skylight block (it is empirically random to be cut, cut it is not in place if cut again again, i.e., Waste the time reduces the intensity of spray branch pipe again) mix and put together, return during filling and be typically unable to first wife, not if first wife Can produce bonding it is insecure, nozzle or skylight block so not only add back ETL estimated time of loading but also not had using being come off after a period of time Spraying effect, while the lease time and expense of scaffold are virtually added, just slightly an absorption tower spray system is overhauled in estimation System needs to spend more than 80,000 yuan of all round victory shelf, artificial, more than 30,000 yuan of fee of material.Not only reduced and cut using the repair method of the present invention The blindness of spray branch pipe is cut, and reduces back the tedious work of dress, the intensity of spray branch pipe is both ensure that, in turn ensure that spray Mouth, the firm intensity for blocking plate.Just slightly one absorption tower spray system of estimation maintenance needs to spend all round victory shelf more than 70,000 Member, artificial, more than 1.5 ten thousand yuan of fee of material.
Most of all, synchronously forming the record of examination of perfect form during maintenance, work progress is available for Middle guidance, it is available for retaining after the completion of construction, and Feedback Design link, it is most valuable reference.

Claims (10)

1. a kind of repair method of wet method fume desulfurizing system absorption tower spray system, the spray system includes multiple parts, portion Part is selected from main pipe, branch pipe and nozzle, comprises the following steps:
1) judge each nozzle pass blocking state, and be marked;
2) access hole is opened up in each branch pipe, each branch pipe pass blocking state is checked using pipe endoscopic monitoring device, and mark blocking position;
3) access hole is opened up in main pipe, main pipe is overhauled with reference to step 2);
4) nozzle blocked is changed or repaired, dredge outlet is opened up in blocking position, tamper is removed by dredge outlet;
5) access hole and dredge outlet are closed.
2. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 1 spray system, it is characterised in that also Including:Draw spray system layout drawing and each part is classified, sorted and marking serial numbers, Organizational Parts list;Step 1) In the pass blocking state is recorded in list of parts while each nozzle pass blocking state is marked;Mark blocks position in step 2) While putting the blocking position is recorded in list of parts;In step 4), the record in list of parts is changed or maintenance blocks Nozzle, and dredge outlet is opened up according to the blocking position recorded in list of parts.
3. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 1 spray system, it is characterised in that step It is rapid 1) in by being ventilated to spray system, detection jet expansion blast judges nozzle pass blocking state.
4. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 1 spray system, it is characterised in that step It is rapid 2) in open up access hole and include:
Closure plate is overhauled as branch pipe in the non-next complete plate of one end cutting connected with main pipe of branch pipe, forms access hole;To this Branch pipe maintenance closure plate is deposited after marking corresponding branch pipe sequence number.
5. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 4 spray system, it is characterised in that step It is rapid 3) in open up access hole and include:
In one end that main pipe connects with branch pipe, the next complete plate of cutting overhauls closure plate as main pipe, forms access hole;To the mother Pipe maintenance closure plate is deposited after marking corresponding main pipe sequence number.
6. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 5 spray system, it is characterised in that step It is rapid 4) in open up dredge outlet in blocking position and include:
In the next complete plate of blocking position cutting as dredge outlet closure plate, dredge outlet is formed, phase is marked to the dredge outlet closure plate Deposited after answering branch pipe or main pipe sequence number and dredging mark.
7. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 6 spray system, it is characterised in that step It is rapid 5) in access hole closed by the access hole closure plate of storage, the dredge outlet closure plate for passing through storage closes dredge outlet.
8. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 1 spray system, it is characterised in that step It is rapid 2) described in pipe endoscopic monitoring device include an image collecting device, an image display device, signal connection described image collection One signal wire of device and image display device, wrap up and support a support tube of the signal wire, the support tube has footpath To rigidity and axial direction flexibility.
9. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 8 spray system, it is characterised in that institute State support tube and be selected from metal hose or flexure spring or bellows.
10. the repair method of wet method fume desulfurizing system absorption tower as claimed in claim 8 spray system, it is characterised in that Check that each branch pipe pass blocking state includes image collecting device stretching into branch pipe by access hole using pipe endoscopic monitoring device in step 2), By pass blocking state inside image display device Real Time Observation branch pipe, branch length of tube is stretched into according to support tube and judges IMAQ position Put.
CN201710463085.0A 2017-06-19 2017-06-19 Overhauling method of absorption tower spraying system of wet flue gas desulfurization system Active CN107376622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710463085.0A CN107376622B (en) 2017-06-19 2017-06-19 Overhauling method of absorption tower spraying system of wet flue gas desulfurization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710463085.0A CN107376622B (en) 2017-06-19 2017-06-19 Overhauling method of absorption tower spraying system of wet flue gas desulfurization system

Publications (2)

Publication Number Publication Date
CN107376622A true CN107376622A (en) 2017-11-24
CN107376622B CN107376622B (en) 2020-06-26

Family

ID=60333386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710463085.0A Active CN107376622B (en) 2017-06-19 2017-06-19 Overhauling method of absorption tower spraying system of wet flue gas desulfurization system

Country Status (1)

Country Link
CN (1) CN107376622B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1251781A (en) * 1998-10-15 2000-05-03 巴陵石化鹰山石油化工厂 Method for cleaning tail pipe under hydrogen-making converter and its plug
CN202173874U (en) * 2011-07-05 2012-03-28 中环(中国)工程有限公司 Internal monitoring device for wet method flue gas desulfurization facility
CN202400491U (en) * 2012-01-17 2012-08-29 哈尔滨润河科技有限公司 Coal chute pneumatic unblocking device capable of realizing automatic control
CN105854576A (en) * 2016-05-30 2016-08-17 万亨 Flue gas treatment tower and treatment system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1251781A (en) * 1998-10-15 2000-05-03 巴陵石化鹰山石油化工厂 Method for cleaning tail pipe under hydrogen-making converter and its plug
CN202173874U (en) * 2011-07-05 2012-03-28 中环(中国)工程有限公司 Internal monitoring device for wet method flue gas desulfurization facility
CN202400491U (en) * 2012-01-17 2012-08-29 哈尔滨润河科技有限公司 Coal chute pneumatic unblocking device capable of realizing automatic control
CN105854576A (en) * 2016-05-30 2016-08-17 万亨 Flue gas treatment tower and treatment system

Also Published As

Publication number Publication date
CN107376622B (en) 2020-06-26

Similar Documents

Publication Publication Date Title
CH703770A1 (en) Method for flushing abgasrezirkulationsleitungen a gas turbine.
CN109046023A (en) A kind of SCR reactor soot blower system and method
CN107376622A (en) A kind of repair method of wet method fume desulfurizing system absorption tower spray system
CN205796897U (en) Two-way Cycle reducing desulfurizing adsorption system
CN207838701U (en) A kind of cement kiln desulfurizer
CN205607481U (en) Take slurry tank liquid level measurement device of sparge water
CN212349731U (en) Purging device of on-line monitoring equipment for coal-fired boiler desulphurization device
CN205127726U (en) Double tower is two -way to spray multicycle desulfurization absorption tower
CN105889963B (en) A kind of heat-exchanger rig for wet desulfurization system
CN205607588U (en) Take sparge water to prevent desulfurization line pressure changer measuring device who blocks up
CN207980820U (en) A kind of kiln desulfurization and dedusting cooling system
CN205055803U (en) Flue gas containing sulphur prewashing spray set
CN205586798U (en) Take sparge water to prevent desulfurization pipeline thick liquid pH analysis meter measuring device who blocks up
CN106334433A (en) Desulfuration absorption tower and tray device for desulfuration absorption tower
CN206897180U (en) Heterogeneity injection apparatus for SCR cold simulation tests
CN205607585U (en) Take sparge water to prevent absorption tower defroster differential pressure measuring device who blocks up
CN206404492U (en) A kind of air type deduster of cement dust
CN205607494U (en) Take slurry tank radar charge level indicator liquid level measurement device of sparge water
CN201811836U (en) Experimental facility for simulating pressure release performance of explosion relief valve
CN205340500U (en) High -efficient multi -functional flue gas discharging equipment in absorption tower
CN110388651A (en) Boiler exhaust gas bridge type bypasses fine filtering device
CN205155998U (en) A flue system for export of tower furnace air heater of thermal power factory
CN205586762U (en) Take sparge water to prevent desulfurization pipeline area circulation groove pH measuring device who blocks up
CN206018678U (en) Synthesis ammonia system desulfurization regeneration discharges gas recycle device
CN205127727U (en) Efficient desulfurizing absorption tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Weili

Inventor after: Wei Jianpeng

Inventor after: Yang Dazhou

Inventor after: Zhang Pengfei

Inventor before: Chen Weili

Inventor before: Wei Jianpeng

Inventor before: Zhang Pengfei

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant