CN107371018A - Television set early stage endurance testing device and method - Google Patents

Television set early stage endurance testing device and method Download PDF

Info

Publication number
CN107371018A
CN107371018A CN201710641697.4A CN201710641697A CN107371018A CN 107371018 A CN107371018 A CN 107371018A CN 201710641697 A CN201710641697 A CN 201710641697A CN 107371018 A CN107371018 A CN 107371018A
Authority
CN
China
Prior art keywords
main controller
test
television set
early stage
timer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710641697.4A
Other languages
Chinese (zh)
Inventor
张东海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Sailing Detection Technology Co Ltd
Original Assignee
Shenzhen Sailing Detection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Sailing Detection Technology Co Ltd filed Critical Shenzhen Sailing Detection Technology Co Ltd
Priority to CN201710641697.4A priority Critical patent/CN107371018A/en
Publication of CN107371018A publication Critical patent/CN107371018A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N17/00Diagnosis, testing or measuring for television systems or their details
    • H04N17/04Diagnosis, testing or measuring for television systems or their details for receivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Testing, Inspecting, Measuring Of Stereoscopic Televisions And Televisions (AREA)
  • Measurement Of Unknown Time Intervals (AREA)

Abstract

The present invention relates to a kind of television set early stage endurance testing device and method.The test device includes:Main controller, including for providing the timer of time base;The main controller is used to perform test program, selects and perform corresponding testing procedure according to the test total time being calculated based on the time base, exports break-make electric signal;Power control circuit, it is connected with the main controller, receives the break-make electric signal, controls whether external power source accesses television set as television set power supply;Wherein, the power control circuit includes optical coupling switching device.The method of testing includes:Start timer when receiving test instruction;Periodically obtain the test total time that the time base based on the timer is calculated;According to the test total time obtained, the testing procedure performed required for judging;The testing procedure performed required for calling is tested.Above-mentioned test device and method can be not limited to test step number, and efficiency is higher.

Description

Television set early stage endurance testing device and method
Technical field
The present invention relates to tv test technical field, more particularly to a kind of television set early stage endurance testing device and side Method.
Background technology
Television set will be ensured up-to-standard before dispatching from the factory by various tests.The wherein early stage life test of television set It is an important test.
Early stage life test for television set, tradition is general to control TV set power using Programmable AC Power Source Whether connect, to realize control system of switching on or off electricity, and then carry out various tests.Tv test species is more, and rate-determining steps are more, therefore journey Sequence expansion editor's step number is a lot, and many variable-frequency power sources can not once edit so more step numbers, and most AC powers are limited to step number, To complete in batches.
The content of the invention
Based on this, it is necessary to provide a kind of television set early stage endurance testing device that can accurately control the power on/off time.
A kind of television set early stage endurance testing device, including:
Main controller, including for providing the timer of time base;The main controller is used to perform test program, according to base Corresponding testing procedure is selected and performed in the test total time that the time base is calculated, exports break-make electric signal;
Power control circuit, it is connected with the main controller, receives the break-make electric signal, whether control external power source accesses Television set is powered for television set;
Wherein, the power control circuit includes optical coupling switching device.
In one of the embodiments, the main controller uses STM32F103 chips, and the break-make electric signal passes through The input and output pin output of STM32F103 chips.
In one of the embodiments, the main controller is also connected with crystal oscillating circuit;It is main controller that the crystal oscillating circuit, which is used for, Clock signal is provided.
In one of the embodiments, in addition to warning circuit;The warning circuit is connected with main controller, by main controller root Alarm is controlled according to the condition of setting.
In one of the embodiments, the warning circuit includes the buzzer and transistor being connected with each other, the crystal Pipe is connected with main controller, for receiving the alarm signal of main controller.
In one of the embodiments, in addition to key circuit;The key circuit is connected with main controller, is pressed for exporting Key signals make main controller perform test program according to push button signalling to main controller.
In one of the embodiments, the key circuit includes multiple button branch roads, each button branch road and main controller An input port connection.
A kind of television set early stage life testing method, based on above-mentioned test device, including:
Start timer when receiving test instruction;
Periodically obtain the test total time that the time base based on the timer is calculated;
According to the test total time obtained, the testing procedure performed required for judging;
The testing procedure performed required for calling is tested.
In one of the embodiments, the test being calculated in time base of the periodicity acquisition based on the timer In the step of total time, in addition to:
Judge whether the timer is suspended, if so, then stopping timing, otherwise continue timing;
When timer stopping timing being suspended, test total time is constant.
In one of the embodiments, the timing time step of the periodicity acquisition timer includes:
The timer timing is sent for 1 second once to be interrupted, and the main controller control timer adds 1.
Above-mentioned television set early stage endurance testing device, main controller include being used for the timer for providing time base, and can The test total time being calculated based on the time base, corresponding test step is then selected and performed according to test total time Suddenly, therefore test can be carried out automatically, be not limited to test step number.All tests can be completed disposably, improve testing efficiency.
In addition, timer can also be suspended, the test process based on timer is set to suspend.Test is more square Just.
Brief description of the drawings
Fig. 1 is the television set early stage endurance testing device module map of an embodiment;
Fig. 2 is the schematic diagram of the power control circuit in Fig. 1;
Fig. 3 is the warning circuit schematic diagram in Fig. 1;
Fig. 4 is the key circuit schematic diagram in Fig. 1;
Fig. 5 is the television set early stage life testing method flow chart of an embodiment.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1 is the television set early stage endurance testing device of an embodiment.The television set early stage endurance testing device 10 includes Main controller 100 and power control circuit 200.Main controller 100 includes being used for the timer (not shown) for providing time base.It is described Main controller 100 is used to perform test program, is selected and performed according to the test total time being calculated based on the time base Corresponding testing procedure, export break-make electric signal.Power control circuit 200 is connected with the main controller 100, receives the break-make It is that television set 30 is powered that whether electric signal, control external power source 20, which access television set 30,.Wherein, the power control circuit 200 Including optical coupling switching device (with reference to figure 2).External power source 20 is usually civil power.
The test program that main controller 100 performs is primarily referred to as the correlation of the switch testing for television set in the present embodiment Program, including break-make electrical testing.Break-make electrical testing can test the power on/off of various different situations, such as be powered 1 minute, break Electricity 1 minute, is then performed repeatedly;Or be powered 1 minute, power off 30 seconds, then perform repeatedly etc..These test programs can be with Performed successively by main controller 100, or the selection according to tester, perform a part therein.
Main controller 100 can generate the break-make telecommunications for controlling power control circuit 200 when performing test program Number, it belongs to electric signal, such as can be low and high level signal.In one of the embodiments, the main controller 100 can be with Using STM32F103 chips, the break-make electric signal is exported by the input and output pin of STM32F103 chips.STM32F103 Chip is singlechip chip, can load good test program prepared in advance, exports break-make electric signal.
As shown in Fig. 2 power control circuit 200 includes optocoupler part U1 and switch block.Wherein optocoupler part U1's is defeated Enter end to be connected with main controller 100, receive break-make electric signal, controlled by optocoupler, realize the switch of switch block.Switch block with The power end connection of television set 30.
Above-mentioned television set early stage endurance testing device 10, main controller 100 include being used for the timer for providing time base, and It can then be surveyed based on the test total time that the time base is calculated according to the selection of test total time and execution are corresponding Try is rapid, therefore test can be carried out automatically, is not limited to test step number.All tests can be completed disposably, improve test effect Rate.
Further, the main controller 100 can also connect crystal oscillating circuit 300.It is master control that the crystal oscillating circuit 300, which is used for, Device 100 provides clock signal.The more accurate external crystal oscillation circuit 300 of clock can also be used, is provided for main controller 100 more smart True clock signal.
Further, television set early stage endurance testing device 10 can also include warning circuit 400.Warning circuit 400 with Main controller 100 electrically connects.Main controller 100 is additionally operable to control warning circuit 400 to alarm according to the condition of setting.Such as test program Start, terminate, interrupting etc..
Specifically, as shown in figure 3, the warning circuit 400 can include buzzer and transistor Q1.Main controller 100 is defeated Go out alarm signal to warning circuit 400, controlling transistor Q1 on or off, buzzer is sent alarm sound.It is appreciated that In other embodiment or other alarm forms, such as luminous alarm, audio alert etc..
Further, television set early stage endurance testing device 10 can also include key circuit 500.Key circuit 500 with Main controller 100 connects.The push button signalling that the main controller 100 exports according to key circuit 500 performs test program.Key circuit The push button signalling of 500 outputs can include starting test program, pause test program, close test program and selection test item Mesh etc..
Specifically, as shown in figure 4, the key circuit can include multiple button branch roads, each button branch road and master control The input port connection of device 100, when the button on button branch road is pressed, provides different test signals respectively.
Based on identical inventive concept, there is provided a kind of television set early stage life testing method.This method is filled based on above-mentioned test 10 are put, as shown in figure 5, comprising the following steps S110~S140.
Step S110:Start timer when receiving test instruction.Test instruction can operate test device by user When produce, produced after can also being set out according to the condition of setting.Test instruction is to proceed by television set early stage life test Enabled instruction.After test instruction is received, test device starts to be started and carried out test program.It is wherein to start timer One step.
Step S120:Periodically obtain the test total time that the time base based on the timer is calculated.Timing Benchmark is set by timer, for example, it can be set to 1 second.Timer is when the time base of setting reaches, in producing Break signal is sent to the central processing unit of main controller.The time base set according to timer, by constantly triggering interrupt signal, Main controller can be made to carry out timing.Such as:The timer timing is sent for 1 second once to be interrupted, and the main controller controls timer Add 1.Cumulative timing in seconds can thus be formed.
Up to the present test total time that each cycle statistics of main controller is once spent, it will be appreciated that test process.
Step S130:According to the test total time obtained, the testing procedure performed required for judging.As described above, survey Examination can reflect test process at total time, according to the test total time spent so far, it can be determined that currently perform Testing procedure, and the testing procedure next to be performed.
Step S140:The testing procedure performed required for calling is tested.
Further, can also include in above-mentioned steps S120:
Judge whether the timer is suspended, if so, then stopping timing, otherwise continue timing.
When timer stopping timing being suspended, test total time is constant.
Therefore, when timer is controlled by main controller to be suspended, because test total time does not become, test program is just stopped and held OK, it is suspended equivalent to test.Therefore, the method for testing can be suspended halfway, more convenient.
Above-mentioned television set early stage life testing method, main controller include being used for the timer for providing time base, and can The test total time being calculated based on the time base, corresponding test step is then selected and performed according to test total time Suddenly, therefore test can be carried out automatically, be not limited to test step number.All tests can be completed disposably, improve testing efficiency.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

  1. A kind of 1. television set early stage endurance testing device, it is characterised in that including:
    Main controller, including for providing the timer of time base;The main controller is used to perform test program, according to based on institute State and the test total time that time base is calculated select and perform corresponding testing procedure, export break-make electric signal;
    Power control circuit, it is connected with the main controller, receives the break-make electric signal, whether control external power source accesses TV Machine is powered for television set;
    Wherein, the power control circuit includes optical coupling switching device.
  2. 2. television set early stage endurance testing device according to claim 1, it is characterised in that the main controller uses STM32F103 chips, the break-make electric signal are exported by the input and output pin of STM32F103 chips.
  3. 3. television set early stage endurance testing device according to claim 2, it is characterised in that the main controller is also connected with crystalline substance Shake circuit;The crystal oscillating circuit is used to provide clock signal for main controller.
  4. 4. television set early stage endurance testing device according to claim 1, it is characterised in that also including warning circuit;Institute State warning circuit to be connected with main controller, controlled and alarmed according to the condition of setting by main controller.
  5. 5. television set early stage endurance testing device according to claim 4, it is characterised in that the warning circuit includes phase The buzzer and transistor to connect, the transistor AND gate main controller connection, for receiving the alarm signal of main controller.
  6. 6. television set early stage endurance testing device according to claim 1, it is characterised in that also including key circuit;Institute State key circuit to be connected with main controller, for output key signal to main controller, main controller is performed test according to push button signalling Program.
  7. 7. television set early stage endurance testing device according to claim 6, it is characterised in that the key circuit includes more Individual button branch road, the input port connection of each button branch road and main controller.
  8. 8. a kind of television set early stage life testing method, based on the test device described in claim 1, including:
    Start timer when receiving test instruction;
    Periodically obtain the test total time that the time base based on the timer is calculated;
    According to the test total time obtained, the testing procedure performed required for judging;
    The testing procedure performed required for calling is tested.
  9. 9. television set early stage life testing method according to claim 8, it is characterised in that obtained in periodicity and be based on institute In the step of stating the test total time that the time base of timer is calculated, in addition to:
    Judge whether the timer is suspended, if so, then stopping timing, otherwise continue timing;
    When timer stopping timing being suspended, test total time is constant.
  10. 10. television set early stage life testing method according to claim 8, it is characterised in that the periodicity obtains fixed When device timing time step include:
    The timer timing is sent for 1 second once to be interrupted, and the main controller control timer adds 1.
CN201710641697.4A 2017-07-31 2017-07-31 Television set early stage endurance testing device and method Pending CN107371018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710641697.4A CN107371018A (en) 2017-07-31 2017-07-31 Television set early stage endurance testing device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710641697.4A CN107371018A (en) 2017-07-31 2017-07-31 Television set early stage endurance testing device and method

Publications (1)

Publication Number Publication Date
CN107371018A true CN107371018A (en) 2017-11-21

Family

ID=60310136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710641697.4A Pending CN107371018A (en) 2017-07-31 2017-07-31 Television set early stage endurance testing device and method

Country Status (1)

Country Link
CN (1) CN107371018A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5353240A (en) * 1993-03-22 1994-10-04 Dell Usa, L.P. Apparatus and method for automatically testing computing equipment
US5486726A (en) * 1992-08-13 1996-01-23 Samsung Electronics Co., Ltd. Power-supply control system of peripheral equipment of computer
CN102256156A (en) * 2011-07-13 2011-11-23 广东长虹电子有限公司 Method and system for controlling power-on and power-off test of television
CN103347194A (en) * 2013-01-22 2013-10-09 深圳创维数字技术股份有限公司 Method, apparatus and system for starting-up and shut-down testing
CN104394406A (en) * 2014-11-19 2015-03-04 四川长虹电器股份有限公司 Detection system and method applicable to AC startup and shutdown test of television
CN106791826A (en) * 2017-03-02 2017-05-31 深圳创维-Rgb电子有限公司 A kind of test system, method and apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5486726A (en) * 1992-08-13 1996-01-23 Samsung Electronics Co., Ltd. Power-supply control system of peripheral equipment of computer
US5353240A (en) * 1993-03-22 1994-10-04 Dell Usa, L.P. Apparatus and method for automatically testing computing equipment
CN102256156A (en) * 2011-07-13 2011-11-23 广东长虹电子有限公司 Method and system for controlling power-on and power-off test of television
CN103347194A (en) * 2013-01-22 2013-10-09 深圳创维数字技术股份有限公司 Method, apparatus and system for starting-up and shut-down testing
CN104394406A (en) * 2014-11-19 2015-03-04 四川长虹电器股份有限公司 Detection system and method applicable to AC startup and shutdown test of television
CN106791826A (en) * 2017-03-02 2017-05-31 深圳创维-Rgb电子有限公司 A kind of test system, method and apparatus

Similar Documents

Publication Publication Date Title
CN110716126A (en) Chip aging test system, method and device
CN110532141A (en) A kind of automatization test system and method, a kind of storage medium of intelligent display terminal
CN105067928A (en) Automobile electronic product dark current automatic test method and device
CN108645532B (en) Temperature testing device with temperature testing and alarming functions and temperature testing method
CN104932335B (en) Control method and device for jack working state
US7877638B2 (en) Apparatus and method for testing computer
CN204068986U (en) Error detection equipment and system
CN104410549A (en) Test system and method of router
CN106371938A (en) Automatic intelligent delaying shutdown system and method
CN105910620B (en) The processing method and processing device of step counting data
CN107371018A (en) Television set early stage endurance testing device and method
CN107255788B (en) Power supply on-off impact test method and system and intelligent socket
CN106791826A (en) A kind of test system, method and apparatus
CN1983810A (en) Method and device for repeated switching cell-phone
CN106899996A (en) The hardware fault detection method and device of a kind of base station single-board
CN103067991A (en) Cell reselection method and device
CN104243058A (en) Error code detection device, system and method and optimal sensitivity detection device and method
CN109189201A (en) Condition control method, control circuit and the mobile terminal of processor
CN109765452B (en) Single-wire communication automatic aging tester
CN111103495A (en) Automatic test system and method for field debugging of cross-interval relay protection equipment
CN103592527A (en) Test system
CN110164343A (en) A kind of reverse-timing display device detection method, device, system and control system
CN203365564U (en) Automatic testing system of remote controller
CN107025350B (en) Digital sampling value playback method
CN107241596A (en) Television set switch test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171121