CN107367636A - 对调压变及补偿变同时进行热态电阻测量的装置及方法 - Google Patents
对调压变及补偿变同时进行热态电阻测量的装置及方法 Download PDFInfo
- Publication number
- CN107367636A CN107367636A CN201710486000.0A CN201710486000A CN107367636A CN 107367636 A CN107367636 A CN 107367636A CN 201710486000 A CN201710486000 A CN 201710486000A CN 107367636 A CN107367636 A CN 107367636A
- Authority
- CN
- China
- Prior art keywords
- resistance
- winding
- current
- transformer
- measuring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Measurement Of Resistance Or Impedance (AREA)
Abstract
本发明涉及一种对调压变及补偿变同时进行热态电阻测量的装置,包括两台直流电阻测试仪,通过设计方案、连接线路、进行测量来同时进行热态电阻的测量。本发明在调压补偿变压器测量绕组平均温升阶段,只需在施加1小时额定电流后,便可同时测量两台变压器的绕组热态电阻,时间短,效率高;免去了绕组温升测试阶段中来回更改试验线路的工作,大大减少了工作量,节约了大量工时,降低了试验成本;提高了绕组热态电阻测量、绕组平均及热点温升推算的准确度,绕组温升反推曲线可信度高。
Description
技术领域
本发明涉及一种对双百万调压变压器和补偿变压器同时进行热态电阻测量的装置及方法。
背景技术
为了满足我国经济社会可持续发展的用电需求,从提高国家能源资源优化配置能力和建设节约型社会的高度出发,建设以特高压电网为骨干网架的电网,对于我国电力工业实现自主创新、提高能源资源使用效率、保障我国能源安全具有十分重要的意义。其中特高压交流1000000kVA/1000kV变压器作为特高压线路重要的变电设备,在国家电网中的地位显得越来越重要。双百万特高压变压器包括主体变压器和调压补偿变压器,调压补偿变压器则是由调压变和补偿变构成,组装在一个油箱内,共用一套冷却系统。温升试验是一种型式试验,其目的是检验规定状态下变压器绕组、铁心和变压器油温升;油箱、结构件、引线和套管以及引线和分接开关的连接处有无局部过热。
在对调补变压器进行温升试验时,需要对调压变压器和补偿变压器同时进行,以便测量顶层油温升,在测量绕组平均温升阶段,其他变压器厂家均是对调压变和补偿变分别施加1小时额定电流,依次测量绕组热态电阻。这种试验方法是传统的,具体是在温升总损耗阶段结束后,重新进行接线,单独对调压变或补偿变施加额定电流,1小时候测量热态电阻,测试结束之后,再次更改试验接线,对另一(补偿变或调压变)变压器施加额定电流,1小时后再测量热态电阻。该试验过程繁杂,重复接线作业,效率低下,由于接线复杂,时间冗长,导致在施加总损耗之后,油温下降较快,测试的绕组热态电阻及反推曲线的准确度不高,从经济效益上来说也不划算。
发明内容
针对上述问题,本发明提供一种对调压变及补偿变同时进行热态电阻测量的装置。
为解决上述问题,本发明采取的技术方案为:一种对调压变及补偿变同时进行热态电阻测量的装置,包括两台直流电阻测试仪,所述的第一直流电阻测试仪I+端、U1+连接AO2端,I-端、U2-接a端,U1-接AO端,U2+接x2端;第二直流电阻测试仪I+端、U1+连接AO3端,I-端、U2-接x端,U1-接AO端,U2+接x2端;连接AO端与x2端;
其中,AO:调压变压器调压线圈首端、补偿变压器激磁线圈尾端,
AO2:调压变压器调压线圈尾端,
AO3:补偿变压器激磁线圈首端,
a:调压变压器激磁线圈首端,
x2:调压变压器激磁线圈尾端、补偿变压器补偿绕组首端,
x:补偿变压器补偿绕组尾端,
I+:电流输入端,
I-:电流输出端,
所述的一种对调压变及补偿变同时进行热态电阻测量的装置的测量方法,包括以下步骤:
S1、设计方案
首先要需保证绕组励磁方向的一致性,同时满足电流方向与各自铁芯磁饱和相配合;
第二直流电阻测试仪直流电流从补偿变压器AO3端输入,AO端输出,若使补偿绕组、励磁绕组两个线圈电流方向一致,则AO端输出电流必须进入AO3端的同名端fa,则AO端与x2端之间需要导线连接,电流即可进入fa端,从fx端输出进入第二直流电阻测试仪的I-端,形成回路;
调压变压器的电流方向需要参考补偿变压器施加直流电流的方向,由于短接线AO-x2中,电流方向是从AO端流向x2端,则第一直流电阻测试仪的输出电流只能从AO2端流入,从AO端流出,和补偿变压器回路共用AO-x2,激磁线圈电流从x2端流入,从a端流出至第一直流电阻测试仪的I-端;其中,调压变压器的AO2端与x2端互为同名端;
S2、连接引线
第一直流电阻测试仪I+端、U1+连接AO2端,I-端、U2-接a端,U1-接AO端,U2+接x2端;第二直流电阻测试仪I+端、U1+连接AO3端,I-端、U2-接x端,U1-接AO端,U2+接x2端;连接AO端与x2端;
S3、进行测量
引线连接完毕后进行测量,施加1个小时额定电流后,便可同时测量调压变压器、补偿变压器的绕组热态电阻。
本发明具有以下优点:
调压补偿变压器测量绕组平均温升阶段,只需在施加1小时额定电流后,便可同时测量两台变压器的绕组热态电阻,时间短,效率高;
免去了绕组温升测试阶段中来回更改试验线路的工作,大大减少了工作量,节约了大量工时,降低了试验成本;
提高了绕组热态电阻测量、绕组平均及热点温升推算的准确度,绕组温升反推曲线可信度高。
附图说明
图1为本发明的接线原理图。
具体实施方式
如图1所示,一种对调压变及补偿变同时进行热态电阻测量的装置,包括两台直流电阻测试仪,所述的第一直流电阻测试仪I+端、U1+连接AO2端,I-端、U2-接a端,U1-接AO端,U2+接x2端;第二直流电阻测试仪I+端、U1+连接AO3端,I-端、U2-接x端,U1-接AO端,U2+接x2端;连接AO端与x2端。
Claims (2)
1.一种对调压变及补偿变同时进行热态电阻测量的装置,其特征在于:包括两台直流电阻测试仪,所述的第一直流电阻测试仪I+端、U1+连接AO2端,I-端、U2-接a端,U1-接AO端,U2+接x2端;第二直流电阻测试仪I+端、U1+连接AO3端,I-端、U2-接x端,U1-接AO端,U2+接x2端;连接AO端与x2端;
其中,AO:调压变压器调压线圈首端、补偿变压器激磁线圈尾端,
AO2:调压变压器调压线圈尾端,
AO3:补偿变压器激磁线圈首端,
a:调压变压器激磁线圈首端,
x2:调压变压器激磁线圈尾端、补偿变压器补偿绕组首端,
x:补偿变压器补偿绕组尾端。
2.根据权利要求1所述的一种对调压变及补偿变同时进行热态电阻测量的装置的测量方法,其特征在于包括以下步骤:
S1、设计方案
首先要需保证绕组励磁方向的一致性,同时满足电流方向与各自铁芯磁饱和相配合;
第二直流电阻测试仪直流电流从补偿变压器AO3端输入,AO端输出,若使补偿绕组、励磁绕组两个线圈电流方向一致,则AO端输出电流必须进入AO3端的同名端fa,则AO端与x2端之间需要导线连接,电流即可进入fa端,从fx端输出进入第二直流电阻测试仪的I-端,形成回路;
调压变压器的电流方向需要参考补偿变压器施加直流电流的方向,由于短接线AO-x2中,电流方向是从AO端流向x2端,则第一直流电阻测试仪的输出电流只能从AO2端流入,从AO端流出,和补偿变压器回路共用AO-x2,激磁线圈电流从x2端流入,从a端流出至第一直流电阻测试仪的I-端;其中,调压变压器的AO2端与x2端互为同名端;
S2、连接引线
第一直流电阻测试仪I+端、U1+连接AO2端,I-端、U2-接a端,U1-接AO端,U2+接x2端;第二直流电阻测试仪I+端、U1+连接AO3端,I-端、U2-接x端,U1-接AO端,U2+接x2端;连接AO端与x2端;
S3、进行测量
引线连接完毕后进行测量,施加1个小时额定电流后,便可同时测量调压变压器、补偿变压器的绕组热态电阻。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486000.0A CN107367636B (zh) | 2017-06-23 | 2017-06-23 | 对调压变及补偿变同时进行热态电阻测量的装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486000.0A CN107367636B (zh) | 2017-06-23 | 2017-06-23 | 对调压变及补偿变同时进行热态电阻测量的装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107367636A true CN107367636A (zh) | 2017-11-21 |
CN107367636B CN107367636B (zh) | 2023-09-26 |
Family
ID=60306560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710486000.0A Active CN107367636B (zh) | 2017-06-23 | 2017-06-23 | 对调压变及补偿变同时进行热态电阻测量的装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107367636B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110609173A (zh) * | 2018-06-15 | 2019-12-24 | 马勒国际有限公司 | 用于操作热电模块的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1488262A (en) * | 1975-04-03 | 1977-10-12 | Ti Ltd | Measuring direct current |
CN103293385A (zh) * | 2013-05-14 | 2013-09-11 | 国家电网公司 | 变压器温升试验直流电阻快速测试装置 |
CN104730402A (zh) * | 2015-04-17 | 2015-06-24 | 山东电力设备有限公司 | 一种对调压变压器和补偿变压器同时进行温升试验的装置 |
CN207114633U (zh) * | 2017-06-23 | 2018-03-16 | 山东电力设备有限公司 | 对调压变及补偿变同时进行热态电阻测量的装置 |
-
2017
- 2017-06-23 CN CN201710486000.0A patent/CN107367636B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1488262A (en) * | 1975-04-03 | 1977-10-12 | Ti Ltd | Measuring direct current |
CN103293385A (zh) * | 2013-05-14 | 2013-09-11 | 国家电网公司 | 变压器温升试验直流电阻快速测试装置 |
CN104730402A (zh) * | 2015-04-17 | 2015-06-24 | 山东电力设备有限公司 | 一种对调压变压器和补偿变压器同时进行温升试验的装置 |
CN207114633U (zh) * | 2017-06-23 | 2018-03-16 | 山东电力设备有限公司 | 对调压变及补偿变同时进行热态电阻测量的装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110609173A (zh) * | 2018-06-15 | 2019-12-24 | 马勒国际有限公司 | 用于操作热电模块的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107367636B (zh) | 2023-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109733217A (zh) | 一种电动汽车无线充电谐振线圈及其设计方法 | |
CN100362727C (zh) | 从电力线磁场获取能量的自励电源装置 | |
CN109543246A (zh) | 一种确定变压器直流偏磁温度场分布的方法和系统 | |
CN110611323A (zh) | 一种电气化铁路同相供电综合补偿装置及其综合补偿方法 | |
CN111044828B (zh) | 基于正、负序方程组的三相变压器绕组参数在线监测方法 | |
CN101303394A (zh) | 水轮发电机组发电机定子铁芯试验装置及方法 | |
CN207114633U (zh) | 对调压变及补偿变同时进行热态电阻测量的装置 | |
CN101975896B (zh) | 一种直流换流阀饱和电抗器热等效试验方法 | |
CN101557109A (zh) | 三相和四线配电系统和在其中布置平衡器的方法 | |
CN107367636A (zh) | 对调压变及补偿变同时进行热态电阻测量的装置及方法 | |
Lee et al. | An integrated transformer design with a center-core air-gap for DAB converters | |
Zhu et al. | Research on temperature field of large capacity bridge arm reactor's busbar based on circuit-magnetic-thermal field coupling calculation | |
CN210350799U (zh) | 一种电气化铁路同相供电综合补偿装置 | |
CN201222093Y (zh) | 水轮发电机定子铁芯试验装置 | |
CN204256110U (zh) | 用于长时感应电压和局放测量试验的测试装置 | |
CN116095895A (zh) | 电池电芯加热装置和锂电设备 | |
CN114883081A (zh) | 一种宽量程电流互感器及其误差补偿方法 | |
CN103323722A (zh) | 一种变压器的直流偏磁故障模拟结构 | |
CN110133547B (zh) | 一种精确测量磁芯损耗的方法 | |
CN207489617U (zh) | 一种带绝缘垫压块的干式变压器 | |
CN207909673U (zh) | 一种三相变单相变压器 | |
CN203117407U (zh) | 电流互感器剩磁测量系统 | |
CN112906254A (zh) | 一种变压器绕组漏磁场仿真建模方法 | |
CN104302022B (zh) | 一种大功率电加热管式预热器 | |
CN105551772A (zh) | 大电流变压器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |