CN107366542A - A kind of grouting method for having been equipped with pit shaft - Google Patents

A kind of grouting method for having been equipped with pit shaft Download PDF

Info

Publication number
CN107366542A
CN107366542A CN201610314043.6A CN201610314043A CN107366542A CN 107366542 A CN107366542 A CN 107366542A CN 201610314043 A CN201610314043 A CN 201610314043A CN 107366542 A CN107366542 A CN 107366542A
Authority
CN
China
Prior art keywords
grouting
cage
slurries
pit shaft
folding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610314043.6A
Other languages
Chinese (zh)
Inventor
朱世阳
刘庆利
李良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610314043.6A priority Critical patent/CN107366542A/en
Publication of CN107366542A publication Critical patent/CN107366542A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention provides a kind of grouting method for having been equipped with pit shaft, including step are as follows:(1) transformation of slip casting platform;(2) selection of grouting sequence and injected hole;(3) configuration of injecting paste material and slurries;(4) selection of grouting pressure;It is characterized in that, it is necessary to which existing cage is transformed into slip casting platform, grouting pressure is controlled in below 5Mpa, using slurries bucket is put on cage, is first pumped into from surface grout injection place slurries in bucket, then slurries are injected the borehole wall with the grouting pump on cage.The present invention is simple to operate, easily implement, folding is connected on cage, job platform area can effectively be increased, but do not have to dismounting cage and reinstall hanging scaffold, after the slurries that surface grout injection pump exports are input in cage top slurry bucket, grouting pressure control can be made in below 5Mpa, the borehole wall can not be destroyed, it is ensured that pit shaft safety.

Description

A kind of grouting method for having been equipped with pit shaft
Technical field
Grouting and sealing technique field of the present invention, and in particular to have been equipped with the grouting method of pit shaft.
Background technology
As coal mining gradually extends to deep, some pit mining depth already exceed 1000m, and most pitshafts cause pit shaft to be continuously increased by the number of plies in water-bearing layer, constantly threatened by water damage more than more than 400m, the increase of mine shaft depth.The pit shaft being particularly already equipped with, the borehole wall elapse that water yield is increasing over time, and the water having has corrosivity, has stronger corrosiveness to the equipment such as mounted buntons, cage, cable in pit shaft, and serious security threat is formed to mine.
Typically use hanging scaffold to carry out slip casting to borehole wall rear as slip casting platform during shaft building, play a part of support with backfilling, it is safe and efficient using hanging scaffold as slip casting platform, more typhoon hammers can be met while worked, perforating quality is high.
Stratum is aqueous constantly to be washed away to the borehole wall, corrodes, carrying out Water outburst treatment to the pit shaft being already equipped with but turns into technical barrier, because can not be by the cage dismounting and change in pit shaft into hanging scaffold, and various kinds of equipment in pit shaft and pipeline have strict size requirement and safety clearance, particularly the position of cage and width are restricted, even if standing at the top of cage, can not also perforating be carried out to any position in pit shaft, while the equipment that can be put is also seldom.
The content of the invention
To solve the above problems, the present invention proposes a kind of grouting method for having been equipped with pit shaft, comprise the following steps that:(1) transformation of slip casting platform needs the fixed equipment related to slip casting and various slip casting pipelines, it is necessary to cage is transformed into slip casting platform on platform;(2) selection of grouting sequence and injected hole;(3) configuration of injecting paste material and slurries;(4) selection of grouting pressure.
The specific method of the step (1) is:The transformation of cage includes installation folding on the outside of cage, weld angle steel and be flexibly connected in folding bottom, so that folding is packed up or is sprawled, guardrail is welded in folding, and is covered using belt, belt must be close to borehole wall arrangement, it must assure that simultaneously very close to each other between the borehole wall and folding, prevent Work tool from falling, after folding expansion, the area of whole platform is not less than the 75% of pit shaft area.
The selection of the grouting sequence and injected hole of the step (2), grouting sequence is totally using the method for first descending rear upstriker, point horizontal operation.Injected hole is arranged as plum blossom arrangement, and interlamellar spacing is 2.5 ~ 3.5m, and per collar aperture spacing 1m, slip casting hole depth includes 1.2 ~ 1.4m of short slip casting hole depth, 2.2 ~ 2.7m of long slip casting hole depth.
The inner injecting paste material of the step (3) includes:UF20 Lauxites, oxalic acid, high-early (strength) cement, waterglass.
The River Bank Stability includes slurries 1 and slurries 2, slurry configurations 1:Cement uses water with water:Cement=1:1 is configured to cement mortar(Solution A), waterglass(Second liquid), last solution A is 1 with second liquid ratio:0.5;River Bank Stability 2:Modified urea-formaldehyde resin chemical grout is by UF20 modified urea-formaldehyde resins(Solution A)And oxalic acid solution(Second liquid)Prepare, solution A is 1 with second liquid ratio:0.2~0.4. wherein second liquid is 1:3 or so oxalic acid and the aqueous solution.The slip casting of pit shaft table soil section using based on cement list slurries, water shutoff after the method wall supplemented by slurries 1.Rock section slip casting mainly carries out water shutoff after wall using the method based on slurries 1, supplemented by slurries 2.
The selection of step (4) grouting pressure, the pit shaft stress distribution having had been equipped with varies widely, to ensure sidewall safety, grouting pressure requires control in below 5Mpa, slurries bucket is put on cage, first it is pumped into from surface grout injection place slurries in bucket, then slurries is injected the borehole wall with the grouting pump on cage, can be so reduced and destroy the borehole wall because directly the injection borehole wall increases grouting pressure from ground.
The present invention has advantages below compared with prior art:It is simple to operate, easily implement;Folding is connected on cage, can effectively increase job platform area, does not have to dismounting cage but and reinstalls hanging scaffold, can safe putting equipment, long short-bore, which combines, carries out slip casting;After the slurries of surface grout injection pump output are input in cage top slurry bucket, grouting pressure can be made to control in below 5Mpa, the borehole wall can not be destroyed, it is ensured that pit shaft safety.
Brief description of the drawings
Fig. 1 is the flow chart of the present invention.
Fig. 2 is the structure chart that slip casting platform is transformed into example.
Embodiment
Example is that certain ore deposit auxiliary shaft mortar depositing construction, auxiliary shaft are had been equipped with completing, including a pair of size cages, and according to Fig. 1, cage is transformed into slip casting workbench by step 1 first, and folding is mainly installed in the transformation of cage on the outside of cage.
As shown in Figure 2, the folding is made using 3mm steel plates, folding is hanged with 10mm steel wire rope to be moved on cage hoisting rope, weld angle bar in folding bottom, pack up and sprawl so as to folding, guardrail is welded in folding, and covered using belt, belt must be close to borehole wall arrangement, and belt must be higher by folding 200-300mm in addition.The improved area coverage of folding is 44.8 ㎡, accounts for the 79% of auxiliary shaft area, while must assure that very close to each other between the borehole wall and folding, prevents Work tool from falling.
Step 2 is to the ore deposit auxiliary shaft slip casting totally using the method for first descending rear upstriker, point horizontal operation;Injected hole is arranged as plum blossom arrangement, and interlamellar spacing 3.5m often encloses 25 holes, and slip casting hole depth is divided into:Short slip casting hole depth 1.4m, long slip casting hole depth 2.7m.
Determine that pulp material is as follows according to step 3:UF20 Lauxites, oxalic acid, high-early (strength) cement, waterglass, the River Bank Stability include slurries 1 and slurries 2.
Slurry configurations 1:Cement uses water with water:Cement=1:1 is configured to cement mortar(Solution A), waterglass(Second liquid), last solution A is 1 with second liquid ratio:0.5.
River Bank Stability 2:Modified urea-formaldehyde resin chemical grout is by UF20 modified urea-formaldehyde resins(Solution A)And oxalic acid solution(Second liquid)Prepare, solution A is 1 with second liquid ratio:0.3, wherein second liquid is 3:1 or so oxalic acid and the aqueous solution.
The pit shaft mainly has 5 water-bearing layer water outlets, and topsoil is Quaternary aquifer water outlet, and rock section has four water-bearing layer water outlets.The slip casting of auxiliary shaft table soil section carries out water shutoff after wall using the method based on cement list slurries, supplemented by slurries 1.Rock section slip casting mainly carries out water shutoff after wall using the method based on slurries 1, supplemented by slurries 2.
Selection of the step (4) to grouting pressure, the ore deposit auxiliary shaft be single layer well wall and in water-bearing layer rock section using for plain concrete supporting, more borehole wall joint part water drenching is serious in pit shaft, to ensure sidewall safety, using the storing slurries bucket on cage, first it is pumped into from surface grout injection place slurries in bucket, then slurries is injected the borehole wall with the grouting pump on cage, is controlled in rock section grouting pressure in 2Mpa.
Described above, the embodiment for the preferred version of the present invention, but the present invention is not limited to examples detailed above.

Claims (5)

1. a kind of grouting method for having been equipped with pit shaft, including step are as follows:(1) transformation of slip casting platform;(2) selection of grouting sequence and injected hole;(3) configuration of injecting paste material and slurries;(4) selection of grouting pressure;It is characterized in that, it is necessary to which existing cage is transformed into slip casting platform, grouting pressure is controlled in below 5Mpa.
2. a kind of grouting method for having been equipped with pit shaft according to claim 1, it is characterised in that the transformation of the step 1 slip casting platform, folding is connected on the outside of cage, folding bottom welding angle steel is simultaneously flexibly connected, so that folding is packed up or is sprawled.
A kind of 3. grouting method for having been equipped with pit shaft according to claim 1 or claim 2, it is characterized in that, guardrail is welded in folding, it must assure that simultaneously very close to each other between the borehole wall and the folding as workbench, prevent Work tool from falling, after folding expansion, the area of whole platform is not less than the 75% of pit shaft area.
4. a kind of grouting method for having been equipped with pit shaft according to claim 1, it is characterised in that the selection of the grouting sequence and injected hole of the step (2), grouting sequence is totally using the method for first descending rear upstriker, point horizontal operation.
A kind of 5. grouting method for having been equipped with pit shaft according to claim 1, it is characterized in that, the selection of step (4) grouting pressure, the pit shaft stress distribution having had been equipped with varies widely, to ensure sidewall safety, grouting pressure requires to control in below 5Mpa, using the storing slurries bucket on cage, first it is pumped into from surface grout injection place slurries in bucket, then slurries is injected the borehole wall with the grouting pump on cage.
CN201610314043.6A 2016-05-13 2016-05-13 A kind of grouting method for having been equipped with pit shaft Pending CN107366542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610314043.6A CN107366542A (en) 2016-05-13 2016-05-13 A kind of grouting method for having been equipped with pit shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610314043.6A CN107366542A (en) 2016-05-13 2016-05-13 A kind of grouting method for having been equipped with pit shaft

Publications (1)

Publication Number Publication Date
CN107366542A true CN107366542A (en) 2017-11-21

Family

ID=60304515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610314043.6A Pending CN107366542A (en) 2016-05-13 2016-05-13 A kind of grouting method for having been equipped with pit shaft

Country Status (1)

Country Link
CN (1) CN107366542A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709216A (en) * 2020-12-22 2021-04-27 河北工程大学 Cement grouting construction method applied to underground engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094658A (en) * 2011-02-01 2011-06-15 北京交通大学 Method for directed induction fracturing grouting in shallow tunnel
CN102852532A (en) * 2012-10-09 2013-01-02 冀中能源股份有限公司东庞矿 Grouting method for preventing rib walk caving
CN202832551U (en) * 2012-08-23 2013-03-27 洛阳龙门煤业有限公司 Vertical shaft pitshaft and shaft bottom water spraying prevention device
CN103046932A (en) * 2012-12-22 2013-04-17 中冶集团武汉勘察研究院有限公司 Pre-grouting and water plugging method for permeable layer in vertical shaft
CN103161478A (en) * 2013-03-25 2013-06-19 中国矿业大学 Impulse-type grouting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094658A (en) * 2011-02-01 2011-06-15 北京交通大学 Method for directed induction fracturing grouting in shallow tunnel
CN202832551U (en) * 2012-08-23 2013-03-27 洛阳龙门煤业有限公司 Vertical shaft pitshaft and shaft bottom water spraying prevention device
CN102852532A (en) * 2012-10-09 2013-01-02 冀中能源股份有限公司东庞矿 Grouting method for preventing rib walk caving
CN103046932A (en) * 2012-12-22 2013-04-17 中冶集团武汉勘察研究院有限公司 Pre-grouting and water plugging method for permeable layer in vertical shaft
CN103161478A (en) * 2013-03-25 2013-06-19 中国矿业大学 Impulse-type grouting method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李强等: "默勒二矿副井井筒渗水治理", 《青海科技》 *
王祥河等: "生产矿井井筒注浆安全高效的实践与突破", 《山东煤炭科技》 *
田道春: "井筒出水的注浆治理技术", 《山东煤炭科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709216A (en) * 2020-12-22 2021-04-27 河北工程大学 Cement grouting construction method applied to underground engineering
CN112709216B (en) * 2020-12-22 2022-09-13 中铁十九局集团第二工程有限公司 Cement grouting construction method applied to underground engineering

Similar Documents

Publication Publication Date Title
US9995086B2 (en) Center-pillared full-face shaft drilling machine
CN103195467B (en) Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method
CN106050300B (en) A kind of Tight filling method for owing to adopt to route superelevation on
CN106121722A (en) A kind of method quickly constructing fire dam
CN103510957A (en) Combined rock cross-cut coal uncovering method
CN108386193A (en) A kind of hard integrality top plate chemically expansible pressure break pressure relief method in end
CN103362117A (en) Full-section grouting method for grouting section
CN103643994A (en) Method for controlling water inrush and sand inrush under coal mine
CN206408628U (en) Diaphram wall Large Copacity mud recycles equipment
CN106089027B (en) A kind of construction method using anti-well rig maintenance drop shaft
CN104047620A (en) Underground tunnel large dynamic water plugging method
CN106223978A (en) Overall downstriker metal form construction coal bunker construction technology
CN101806223A (en) Method for reinforcing return channel
CN105221157B (en) WSS grouting and reinforcings assist gas pressure cutter replacing method in shield tunnel
CN103775102B (en) Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method
CN107366542A (en) A kind of grouting method for having been equipped with pit shaft
CN110130978A (en) A kind of small kiln destruction area high seam break up coal side method for blocking of filling second mining
CN105862862A (en) Salvage method for large-diameter pile buried hammer
CN105134125B (en) Annular space bottom end construction technology for plugging after gas vertical wall
CN109184752A (en) A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf
CN105134069B (en) One kind is related to gas vertical and passes through the anti-well method construction technology in strong rich water rock stratum
CN107859532B (en) A kind of discarded shaft of vertical well processing method of the coal seam stope above and below short distance
CN105156148B (en) Gas vertical gas tube mounting process
CN105156113B (en) Annular pack grouting construction process after gas vertical wall
CN103088813A (en) Reinforcing cage anchoring method for manufacturing cast-in-situ bored pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171121