- CN107364789A CN107364789A CN201710757192.4A CN201710757192A CN107364789A CN 107364789 A CN107364789 A CN 107364789A CN 201710757192 A CN201710757192 A CN 201710757192A CN 107364789 A CN107364789 A CN 107364789A
- Authority
- CN
- China
- Prior art keywords
- tie
- reactor
- hawser
- suspender
- star
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
- B66C1/16—Slings with load-engaging platforms or frameworks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The present invention relates to reactor technical field, a kind of more particularly to large-scale reactor star suspender, including centre mount, at least five tie-beams are welded with around the centre mount, linked together between two adjacent tie-beams by connecting plate, the upper weld of each tie-beam has a hanger, the bottom of the tie-beam is welded with adjustable plate, institute's adjustable plate is provided with adjustment hole, the adjustment hole is connected by steady pin with tee girder, the bottom of the tee girder is provided with hawser via, and hawser is passed through in the hawser via.Relative to prior art, the present apparatus devises star-shaped suspender according to the shape of reactor, is finally connected together in hanger through rope with the suspension hook of overhead traveling crane, a umbrella shape is formed, it is more firm, improve the stability of lifting, make reactor movement more steady, it is safer.
Description
Technical field
The present invention relates to reactor technical field, more particularly to a kind of large-scale reactor star suspender.
Background technology
All more than several tons of the weight of large-scale reactor, needs to be assembled by different workshops during making, passes
In the technology of system directly by the way of overhead traveling crane lifting, shifting is hooked due to the cylinder that is shaped as of reactor, thus using overhead traveling crane
Reactor is very unstable when dynamic, and due to the limitation in workshop, an overhead traveling crane also is difficult to handling and plays greater levels of electricity now
Anti- device, thus be badly in need of designing a kind of suspender, and then suitable for current large-scale reactor.
The content of the invention
It is an object of the invention to overcome the shortcomings of above-mentioned technology, and provide a kind of large-scale reactor star suspender.
The present invention to achieve the above object, using following technical scheme:
A kind of large-scale reactor star suspender, it is characterised in that:Including centre mount, be welded with around the centre mount to
Lack five tie-beams, linked together between adjacent two tie-beams by connecting plate, the upper weld of each tie-beam has
One hanger, the bottom of the tie-beam are welded with adjustable plate, and institute's adjustable plate is provided with adjustment hole, and the adjustment hole passes through fixation
Pin is connected with tee girder, and the bottom of the tee girder is provided with hawser via, and hawser is passed through in the hawser via.Relative to existing skill
Art, the present apparatus devise star-shaped suspender according to the shape of reactor, are finally connected in hanger through rope with the suspension hook of overhead traveling crane
To together, a umbrella shape is formed, more firm, tee girder can be adjusted for the adjustable plate of the bottom of tie-beam, tee girder root
It is adjusted according to the diameter of reactor, hawser enters through the hawser via that tee girder bottom is then passed through after the connecting hole on reactor
Row is fixed, and tee girder can rotate, and a umbrella shape is also formed in the bottom of centre mount during lifting, so as to improve the stabilization of lifting
Property, make reactor movement more steady, it is safer.
Preferably, the upper weld of the centre mount has two pieces of installing plates, and reduction box is fixed with two pieces of installing plates, slows down
The output end of case is connected with telescopic pin.Reduction box is adopted manually, and can just telescopic pin be moved by rotating handwheel, be done
For another connected mode with crown block hook of the invention, it is only necessary to a rope can.
The beneficial effects of the invention are as follows:Relative to prior art, the present apparatus devises star-shaped according to the shape of reactor
Suspender, hanger is interior finally to be connected together through rope with the suspension hook of overhead traveling crane, forms a umbrella shape, more firm, tie-beam
Tee girder can be adjusted for the adjustable plate of bottom, and tee girder is adjusted according to the diameter of reactor, and hawser passes through reactor
On connecting hole after be then passed through the hawser via of tee girder bottom and be fixed, tee girder can rotate, in centre mount during lifting
One umbrella shape is also formed on bottom, so as to improve the stability of lifting, makes reactor movement more steady, safer.
Brief description of the drawings
Fig. 1 is the top view of the present invention;
Fig. 2 is the side view of tie-beam in the present invention.
Embodiment
Below in conjunction with the accompanying drawings and preferred embodiment describes the embodiment of the present invention in detail.As shown in Figure 1-2, it is a kind of
Large-scale reactor star suspender, including centre mount 1, are welded with least five tie-beams 2 around the centre mount, and adjacent two
Linked together between root tie-beam by connecting plate, the upper weld of each tie-beam has a hanger 3, the tie-beam
Bottom is welded with adjustable plate 4, and institute's adjustable plate is provided with adjustment hole 5, and the adjustment hole is connected by steady pin with tee girder 6, institute
The bottom for stating tee girder is provided with hawser via 7, and hawser 8 is passed through in the hawser via.The present apparatus designs according to the shape of reactor
Star-shaped suspender, is finally connected together through rope with the suspension hook of overhead traveling crane in hanger, forms umbrella shape, more consolidate,
Tee girder can be adjusted for the adjustable plate of the bottom of tie-beam, and tee girder is adjusted according to the diameter of reactor, and hawser is worn
Cross after the connecting hole on reactor and be then passed through the hawser via of tee girder bottom and be fixed, tee girder can rotate, during lifting
One umbrella shape is also formed on the bottom of centre mount, so as to improve the stability of lifting, makes reactor movement more steady, more pacifies
Entirely.
As further improvement of the present invention, the upper weld of the centre mount has two pieces of installing plates 9, on two pieces of installing plates
Reduction box 10 is fixed with, the output end of reduction box is connected with telescopic pin 11.Reduction box is adopted manually, rotates handwheel with regard to energy
Enough move telescopic pin, as another connected mode with crown block hook of the invention, it is only necessary to a rope can.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (2)
- A kind of 1. large-scale reactor star suspender, it is characterised in that:Including centre mount, it is welded with least around the centre mount Five tie-beams, linked together by connecting plate between adjacent two tie-beams, the upper weld of each tie-beam has one Individual hanger, the bottom of the tie-beam are welded with adjustable plate, and institute's adjustable plate is provided with adjustment hole, and the adjustment hole passes through steady pin It is connected with tee girder, the bottom of the tee girder is provided with hawser via, and hawser is passed through in the hawser via.
- 2. large-scale reactor star suspender according to claim 1, it is characterised in that:The upper weld of the centre mount has Two pieces of installing plates, reduction box are fixed with two pieces of installing plates, the output end of reduction box is connected with telescopic pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710757192.4A CN107364789A (en) | 2017-08-29 | 2017-08-29 | Large-scale reactor star suspender |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710757192.4A CN107364789A (en) | 2017-08-29 | 2017-08-29 | Large-scale reactor star suspender |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107364789A true CN107364789A (en) | 2017-11-21 |
Family
ID=60310910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710757192.4A Pending CN107364789A (en) | 2017-08-29 | 2017-08-29 | Large-scale reactor star suspender |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107364789A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117800209A (en) * | 2024-03-02 | 2024-04-02 | 江苏坚力电子科技股份有限公司 | Large-scale reactor lifting device in extra-high voltage 1100kVGIS alternating-current withstand voltage test |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100129590A (en) * | 2009-06-01 | 2010-12-09 | 두산중공업 주식회사 | Turbine bucket pulling up jig |
CN201980847U (en) * | 2011-03-22 | 2011-09-21 | 余姚市电力设备修造厂 | Hoisting device of box substation |
CN202687751U (en) * | 2012-08-08 | 2013-01-23 | 大唐南京环保科技有限责任公司 | Denitration catalyst module lifting device with positioning devices |
CN202687781U (en) * | 2012-08-06 | 2013-01-23 | 大唐南京环保科技有限责任公司 | Lifting device with spring inserted pin |
CN207293924U (en) * | 2017-08-29 | 2018-05-01 | 天津经纬正能电气设备有限公司 | Large-scale reactor star suspender |
-
2017
- 2017-08-29 CN CN201710757192.4A patent/CN107364789A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100129590A (en) * | 2009-06-01 | 2010-12-09 | 두산중공업 주식회사 | Turbine bucket pulling up jig |
CN201980847U (en) * | 2011-03-22 | 2011-09-21 | 余姚市电力设备修造厂 | Hoisting device of box substation |
CN202687781U (en) * | 2012-08-06 | 2013-01-23 | 大唐南京环保科技有限责任公司 | Lifting device with spring inserted pin |
CN202687751U (en) * | 2012-08-08 | 2013-01-23 | 大唐南京环保科技有限责任公司 | Denitration catalyst module lifting device with positioning devices |
CN207293924U (en) * | 2017-08-29 | 2018-05-01 | 天津经纬正能电气设备有限公司 | Large-scale reactor star suspender |
Non-Patent Citations (1)
Title |
---|
宋涛: "±1100kV直流平波电抗器吊装方法研究", 《电力与能源》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117800209A (en) * | 2024-03-02 | 2024-04-02 | 江苏坚力电子科技股份有限公司 | Large-scale reactor lifting device in extra-high voltage 1100kVGIS alternating-current withstand voltage test |
CN117800209B (en) * | 2024-03-02 | 2024-05-03 | 江苏坚力电子科技股份有限公司 | Large-scale reactor lifting device in extra-high voltage 1100kVGIS alternating-current withstand voltage test |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107338733A (en) | A kind of hanging apparatus and hanging method for adjusting and positioning for steel box arch rib aerial statue | |
CN207244465U (en) | A kind of hanging apparatus for adjusting and positioning for steel box arch rib aerial statue | |
CN202672832U (en) | Rotatable seat double rocker arm and inner/outer stay wire suspension mixed derrick | |
CN106429791B (en) | A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module | |
CN109502480A (en) | The hoisting that high building turns over | |
CN203895908U (en) | Balance cross-arm | |
CN202181165U (en) | Cross lifting beam for box type transformer | |
CN108275561B (en) | Active lower shaft rotation hoisting tool | |
CN107364789A (en) | Large-scale reactor star suspender | |
CN207293924U (en) | Large-scale reactor star suspender | |
CN106744251B (en) | A kind of hanging apparatus for steel structure modularization unit | |
CN206244301U (en) | A kind of architectural engineering tower crane anti-sway control device | |
CN204371545U (en) | A kind of power station impeller apparatus for examination and repair | |
CN208321687U (en) | A kind of wind-power tower flange ovality apparatus for correcting | |
CN207228750U (en) | Become length section triple strain combination emergent repairing tower | |
CN201247939Y (en) | Anti-dance weight dropper of high voltage overhead transmission line | |
CN207061793U (en) | Anchor crimping platform is faced in a kind of high-altitude | |
CN206665948U (en) | Multi-function chain type anchor ear | |
CN206625585U (en) | A kind of carrying pole device of purlin installation | |
CN207098443U (en) | A kind of helicopter live-line maintenance operation hanging basket | |
CN208024047U (en) | A kind of steel pipe tower structure of scalable installation | |
CN206144127U (en) | Simple and easy butt clamp integral type operation platform | |
CN205187695U (en) | Steel construction has hoisted gallows | |
CN201236098Y (en) | Combined pressure bar sling | |
CN207932896U (en) | Ring beam and ring rail integral hoisting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171121 |