CN107359629B - A kind of low-voltage network electrical load equalization methods and its device - Google Patents

A kind of low-voltage network electrical load equalization methods and its device Download PDF

Info

Publication number
CN107359629B
CN107359629B CN201710673193.0A CN201710673193A CN107359629B CN 107359629 B CN107359629 B CN 107359629B CN 201710673193 A CN201710673193 A CN 201710673193A CN 107359629 B CN107359629 B CN 107359629B
Authority
CN
China
Prior art keywords
separate
branch line
power
adjustment
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710673193.0A
Other languages
Chinese (zh)
Other versions
CN107359629A (en
Inventor
陈鸽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Zhi Tuo Energy Saving Technology Co., Ltd.
Original Assignee
Zhao Ming Bo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhao Ming Bo filed Critical Zhao Ming Bo
Priority to CN201710673193.0A priority Critical patent/CN107359629B/en
Publication of CN107359629A publication Critical patent/CN107359629A/en
Application granted granted Critical
Publication of CN107359629B publication Critical patent/CN107359629B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/26Arrangements for eliminating or reducing asymmetry in polyphase networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks

Abstract

The invention discloses a kind of low-voltage network electrical load equalization methods and its devices.Main line power load generation is unbalanced, determines the separate adjustment pair and corresponding adjustment magnitude of main line;The selection adjustment branch line in the separate adjustment each branch line big to the load of the separate general power in source, not making a check mark to the commutation device for being built-in with the power supply of magnetic moving component load device on separate to adjustment branch line source, commutation device needed for being selected in identified commutation device, if identified commutation device is not enough, then selects commutation device in not identified commutation device;Make the suitable with the adjustment magnitude of main line of the power termination of commutation device selected in each adjustment branch line, the separate target that is switched to of the access of the commutation device selected on branch line is separate, so that main line and branch line electrical load is reached equalization request.It favorably reduces and avoids the load device for being built-in with magnetic moving component of user terminal that commutation vibration occurs, generate noise, and keep steadily running.

Description

A kind of low-voltage network electrical load equalization methods and its device
Technical field
The present invention relates to low-voltage network load-balancing techniques, and in particular to a kind of low-voltage network electrical load equilibrium side Method and a kind of low-voltage network electrical load balancer for being adapted to carry out load-balancing method, the invention belongs to low pressure Power distribution network distribution technique field.
Background technique
The load of low-voltage network, which is generally mixed by threephase load with single-phase load, to be formed, and residential electricity consumption is single-phase negative It carries, distribution is more complicated, the distribution system of especially a large amount of single-phase load access low-voltage networks, and payload size is different and uses The electric time is different, so, the unbalanced situation irregularities of the three-phase of power distribution network can not be predicted in advance, result in power distribution network three-phase The chronicity of load is unbalanced.Application No. is 201510229756.8 Chinese patent applications to disclose one kind for low-voltage distribution The equal balance system of the electrical load of net, as shown in Figure 1, it is specifically disclosed: controlling master station according to the phase total load of branch route Information carries out calculation process, in the case where keeping the threephase load equilibrium of the branch route, determines the branch route needs The commutation device of separate switching, and manipulate electrical load equalization subsystem by identified commutation device switch it is separate, make trunk Route reaches threephase load equalization request.The technical solution of above-mentioned patent application publication does not consider its confession when selecting commutation device The load characteristic of the load device of electricity, if load device is built-in with the motor of magnetic moving component, in separate switching, phase of powering Mutation causes magnetic moving component that commutation vibration occurs, generates noise, and load device is unable to stable operation.Therefore, exploitation one is needed Kind low-voltage network electrical load equalization methods and its device, to solve the above technical problems.
Summary of the invention
For shortcomings existing in the prior art and deficiency, it is an object of the present invention to provide a kind of low-voltage network electric power Load-balancing method, for this method when selecting commutation device, preferential selection is not to being built-in with the power supply of magnetic moving component load device Commutation device, the generation of the load device stable operation of the separate switching of commutation device to user terminal can be decreased or even eliminated Adverse effect.
One embodiment of the present invention provides a kind of low-voltage network electrical load equalization methods, designing points in, The following steps are included:
S1, it is based on the preset control period, obtains the phase general power load of each each phase of branch line of low-voltage network;
S2, the phase general power load based on each phase of each branch line calculate main line power load imbalance degree;
S3, when the main line power load imbalance degree is less than the first unbalanced threshold value, execute S9 step, otherwise, hold Row S4 step;
S4, the phase general power load based on each phase of each branch line, calculate the phase general power load for determining main line The separate separate adjustment pair and separate adjustment for needing to load the separate adjustment power termination of small target to phase general power in big source Pair main line adjustment magnitude;It is negative to need to carry out power for selection in each big branch line of the separate phase general power load in the source The adjustment branch line of adjustment is carried, and in the case where keeping adjustment branch line electrical load balanced, determines the adjustment branch line Branch line adjustment magnitude;The sum of described branch line adjustment magnitude is suitable with the main line adjustment magnitude;
S5, to adjustment branch line separate adjustment it is separate to source on not to be built-in with magnetic moving component load device supply The commutation device of electricity is identified;
S6, in the case where keeping that the adjustment branch line electrical load is unbalanced to spend less than the second unbalanced threshold value, base It determines that the source described in the adjustment branch line is separate identified in the general power load calculating of adjustment each user terminal of branch line to change Commutation device is selected in phase device, if the sum of separate identified power termination of commutation device in the source is less than the adjustment branch line The branch line adjustment magnitude on road, then selection needs separate switching in the separate remaining not identified commutation device in the source again Commutation device, keep the sum of power termination of commutation device of selection suitable with the branch line adjustment magnitude of the adjustment branch line; The first unbalanced threshold value is less than the second unbalanced threshold value;Keep the power of selected commutation device on each adjustment branch line negative The sum of load is suitable with main line adjustment magnitude, so that main line power load imbalance degree is less than the first unbalanced threshold value;
S7, it separate is cut from the source of separate adjustment pair by the access of the commutation device selected on the adjustment branch line is separate The target changed to is separate;
If S8, in current control period, based on the adjustment situation of power termination on each adjustment branch line, updates and correspond to The phase general power load for adjusting each phase of branch line, executes S2 step, if control end cycle, executes S9 step;
S9, it serves into next control period, executes S1 step.
The technical solution of present embodiment considers the load of its power supply when selection needs the commutation device of separate switching The load characteristic of device, preferential selection is not to the commutation device for being built-in with the power supply of magnetic moving component load device, in separate switching When, reduce and even avoid the load device generation commutation vibration, generate noise, can steadily run.
Another embodiment is modification of the embodiment above, increases commutation device access branch line to be accessed Method, designing points are, comprising the following steps:
Step 1, the commutation device to be accessed issue the access request of access branch line;
Step 2, the first predetermined period power termination based on the commutation device to be accessed, calculate the commutation device most The power mean value of second close preset quantity the first predetermined period power termination;
Step 3, the general power including low power load portion and high power load portion for obtaining each user terminal of branch line Load;
Step 4 is loaded according to the general power of acquired each user terminal, is calculated and is determined that the phase general power of the branch line is negative It carries small separate;The commutation device to be accessed is tried, and it is small separate to load into the phase general power, is based on each use The general power at family end loads and the power mean value of commutation device to be accessed, and it is uneven to calculate the branch line electrical load after trying Weighing apparatus degree;
Step 5, when the branch line electrical load it is unbalanced degree less than the second unbalanced threshold value when, execute step 7, it is no Then, step 6 is executed;
Step 6, the general power based on each user terminal loads and the power mean value of commutation device to be accessed, calculates true It is fixed to load the separate separate trial cut of the separate target for needing power termination to adjust in small source from the branch line phase general power and change pair And the access adjustment magnitude that the separate trial cut changes pair, need separate trial cut to change in the separate upper selection in source that the separate trial cut changes pair Commutation device, the sum of power termination of selected commutation device is suitable with the access adjustment magnitude so that trial cut change and The unbalanced degree of branch line electrical load after trying is less than the second unbalanced threshold value;By the access phase of selected commutation device The separate switching in the source that do not change pair from separate trial cut is mutually separate to target;
The phase general power that step 7, commutation device to be accessed access the branch line loads small separate.
The technical solution of present embodiment is to determine it according to the estimated value of the examination access power of commutation device to be accessed Access branch line target it is separate, access branch line, do not easily lead to branch line threephase load generation it is unbalanced, in power distribution network In load balancing control process, the quantity for needing to carry out the commutation device of separate switching is few.
It is separate to load big source in branch line phase general power for low-voltage network electrical load equilibrium treatment in the prior art Selection needs the commutation device of separate switching, does not account for the bad shadow that the separate switching of commutation device generates load device It rings, if load device is built-in with magnetic moving component (such as motor), in separate switching, SPA sudden phase anomalies of powering, magnetic direction mutation, Cause load device that commutation vibration occurs, generate noise, load device is unable to stable operation.In addition, mutually negative device to be accessed A wherein phase for random access branch line, easily causes branch line electrical load unbalanced, keeps electrical load balanced, needs separate The quantity of the commutation device of switching is more.Compared to the prior art, technical solution of the present invention has following beneficial technical effect:
It reduces and even avoids separate switching that load device is caused to generate commutation vibration, issue noise, be conducive to load device Stable operation.When power distribution network main line power load imbalance occurs, the adjustment branch line for needing adjustment of load is determined, to adjustment Not making a check mark to the commutation device for being built-in with the power supply of magnetic moving component load device on the source of branch line is separate is keeping adjusting Under branch line electrical load equilibrium situation, the commutation for needing separate switching is first selected from the separate identified commutation device in source Device, if the power termination of all identified commutation devices is not enough, then in the separate remaining not identified commutation in source Selection needs the commutation device of separate switching in device, and it is separate that selected commutation device is switched to target, matches low pressure The load of power grid main line power reaches equalization request.In separate handoff procedure, reduce to the maximum extent to be built-in with magnetic fortune The commutation device of dynamic component load device power supply, which carries out separate switching or even the commutation device, to be had to avoid separate switching Benefit makes the load device for being built-in with magnetic moving component avoid that separate switching vibration occurs, and keeps stable operation, prolongs the service life.
Commutation device pre-selects access target when accessing branch line is separate, and the survivable branch line electrical load is equal Weighing apparatus state needs the quantity of the commutation device of separate switching few.Commutation device to be accessed is changed when accessing branch line based on this The load of the general power of the power-estimation value of phase device and each user terminal of the branch line try determining that it needs to access into calculating Target it is separate, so that branch line threephase load is reached equalization request, commutation device to be accessed finally accessed into the branch line Target it is separate.So not easily leading to branch line threephase load after commutation device access branch line to be accessed and generating unevenness Weighing apparatus, in power distribution network load balancing control process, the quantity for needing to carry out the commutation device of separate switching is few, to the humorous of power distribution network Wave interference and smaller to the adverse effect of the load device stable operation of user, is conducive to load device and steadily runs.
Detailed description of the invention
The schematic diagram that the low-voltage distribution host of Fig. 1 prior art, branch line are routed.
A kind of control flow chart of low-voltage network electrical load equilibrium of Fig. 2.
A kind of control flow chart of commutation device access branch line to be accessed of Fig. 3.
The schematic diagram that a kind of low-voltage distribution host of Fig. 4, branch line are routed.
The schematic diagram of branch line wiring in Fig. 5 Fig. 4.
A kind of block diagram of low-voltage network electrical load balancer of Fig. 6.
Specific embodiment
In order to clarify the technical solutions and technical objectives of the present invention, with reference to the accompanying drawing and specific embodiment is to the present invention It is described further.
Low-voltage distribution host, branch line power wiring
The low pressure outlet side of low-tension transformer uses three-phase four-wire system, is routed to residential neighborhoods, is used for resident Electric energy is provided.The low pressure outlet side can be regarded as power distribution network, low-voltage network, hereinafter referred to as low-voltage network.The low pressure Power distribution network, as shown in figure 4, including the main line and m branch line drawn from low-tension transformer low-pressure side, respectively branch line Road 1, branch line 2 ..., branch line m.The branch line 1, branch line 2 ..., branch line m respectively with main line be electrically connected, For the electric power of main line to be respectively delivered to each electricity consumption area, to customer power supply.It should be noted that branch line described in any bar Next stage branch line can also be connected, which can also connect again next stage branch line ... so one by one Topology.Can be understood as " main line " shown in Fig. 4 is to draw from low-tension transformer low-pressure side, can also be powered from a certain item Drawn on route (such as certain branch line), such " main line ", " branch line " have a more general sense, " main line " no It is confined to the extraction of low-tension transformer low-pressure side again, it can be by any bar power supply line that branch line connects.Next for table The case where stating conveniently, only considering to connect a plurality of " branch line " on " main line ", and do not reconnect " branch line " on " branch line ", such as Shown in Fig. 4.
The power termination of each resident's (abbreviation user terminal) is classified as daily low power load portion and high power load Portion.Low power load portion mainly includes that normal lighting, refrigerator, washing machine, gas heater and gas cooker etc. are low power The electricity consumption of load device, if power is in tens watts of load devices to two or three hectowatt or so.Low power load portion directly enters low pressure In a wherein phase for power distribution network branch line, the three-phase of low-voltage network branch line is equably accessed by number of users, it will be appreciated that be low The quantity for being press-fitted the user accessed in each phase of power grid branch line is equal, since the power in the low power load portion at each family is big It is small substantially the same, so the threephase load in low power load portion can substantially reach electrical load equalization request.High power is negative Load portion includes the use of the big load device of the power consumptions such as air-conditioning, electromagnetic oven, resistance furnace, electric heating fan, micro-wave oven, electric heater Electricity, if power is in 500 watts or more of load device.High power load portion is electrically connected to low-voltage network branch line by commutation device Road, it will be appreciated that for the output end electrical connection of high power load portion and commutation device, three input terminals of commutation device respectively and The triple line of low-voltage network branch line is electrically connected, and commutation device only accesses wherein the one of power distribution network branch line at any one time Phase can only take electricity from a wherein phase for low-voltage network branch line, convey electric energy to the load device in high power load portion.Low pressure One branch line of power distribution network, such as the m articles branch line, power, as shown in Figure 4, Figure 5, it is assumed that the m articles branch line to a plurality of clients Road direction n user terminal power supply, n are the integer greater than 0, be individually identified as user terminal m1, user terminal m2 ... user terminal mn-1, User terminal mn.The low power load portion of each user terminal is directly accessed on the three-phase of low-voltage network branch line, has n/3 in every phase A user terminal access;The high power load portion of each user terminal is electrically connected by the three-phase of commutation device and low-voltage network branch line It connects, only accesses a wherein phase for branch line at any one time.User terminal m1, user terminal m2 ... user terminal mn-1, user terminal mn Respectively correspond the commutation device m1 being electrically connected with low-voltage network branch line m, commutation device m2 ..., commutation device mn-1, change The load device of phase device mn (not identifying in figure), the high power load portion of user terminal are taken from branch line by commutation device Electricity.Commutation device is mainly used for access, disconnects branch line and separate switching, and judge commutation device whether there is or not transport to being built-in with magnetic The load device of dynamic component (such as motor) is powered, and is made a check mark.Load-monitoring device is configured on branch line, for measuring the branch The threephase load situation of route, and control substation, it is balanced for controlling the branch line electrical load.Branch line load monitoring dress It sets and is electrically connected with control substation.It is provided with load-monitoring device on the main line, for measuring the threephase load feelings of main line Condition, and control main website, it is balanced for the electrical load of main control line road.The control substation of each branch line respectively and control Master station communication connection, by the control of control main website.It should be noted that commutation device is conveyed to the load device in high power load portion Power termination, for the ease of statement, be expressed as the power termination of commutation device herein.
Low-voltage network electrical load equalization methods
It is separate to load big source in branch line phase general power for low-voltage network electrical load Balance route in the prior art Selection needs the commutation device of separate switching, does not account for the difference of the loadtype for the load device that commutation device is powered, If load device is built-in with motor, electromagnetic drive mechanism equimagnetic moving component, in separate switching, SPA sudden phase anomalies of powering, magnetic field Direction mutation causes magnetic moving component to generate commutation vibration, noise is issued, prevent load device is from stable operation.
A kind of low-voltage network electrical load equalization methods of present embodiment, as shown in Fig. 2, can well solve Problems of the prior art are stated, the preset control period is based on, it is balanced real to low-voltage distribution host, branch line electrical load Apply real-time control, low-voltage distribution host, branch line electrical load made to respectively reach equalization request, specifically the following steps are included:
S1 obtains each each phase of branch line of low-voltage network in current control period based on the preset control period The load of phase general power.The phase general power load of each phase of branch line can be obtained from the control substation of branch line;In addition on branch line Configured with load-monitoring device, the phase general power that the branch line three-phase can also be obtained by the load-monitoring device of branch line is negative It carries;Main line is equipped with load-monitoring device, can acquire the mutually total of main line three-phase by the load-monitoring device of main line Power termination.Phase general power load includes power termination value and corresponding separate.Power termination value can use current loading Table is asked, and can also be indicated with power termination, if power termination value not specified (NS) herein refers both to current loading, the area Wen Zhongjiangbu Divide power termination and current loading.
S2, the phase general power load based on each phase of each branch line, which calculates, obtains each phase of low-voltage network main line The load of phase general power and main line power load imbalance degree.According to the mutually total of each every phase of branch line acquired in step S1 Power termination value and corresponding separate, the phase general power load of the determining each phase of low-voltage network main line of calculating and main line electricity Power load imbalance degree.
S3 executes S9 step, otherwise, holds when the main line power load imbalance degree is less than the first unbalanced threshold value Row S4 step;
S4, the phase general power load based on each phase of each branch line, i.e. power termination value and corresponding separate, calculating Determine that main line phase general power loads that big source is separate to be needed to load the separate adjustment power of small target to main line phase general power The separate adjustment pair of the separate adjustment pair and main line of load needs power termination to adjust from source is separate to target is separate Main line adjustment magnitude, so that main line power load imbalance degree is less than the first unbalanced threshold value.For example, the A phase of main line Phase general power load maximum, the phase general power of B phase loads minimum, needs the Partial Power load in A phase being transferred to B phase On, the adjustment magnitude for the power termination shifted from A phase in B phase is W, referred to as main line adjustment magnitude W, so that main line The unbalanced degree of electrical load is less than the first unbalanced threshold value.Then the separate adjustment of main line is constituted to by A phase with B phase, can be marked For (A, B), main line adjustment magnitude is W.The first unbalanced threshold value can be lower than power distribution network equalization request with value for 10% National standard 15%.The quantity of separate adjustment pair is one, it is also possible to there are two, as low-voltage network is wherein two separate On multiple commutation devices simultaneously switch off branch line, cause power distribution network electrical load seriously unbalanced, at this time, it may be necessary to will be another One it is separate on multiple commutation devices simultaneously to another two separate switchings, form two separate adjustment pair.
Selection in each big branch line of the separate phase general power load in the source needs to carry out power termination adjustment Branch line is adjusted, and determines the branch of the adjustment branch line in the case where keeping adjustment branch line electrical load to reach equalization request Line adjustment magnitude, the sum of each branch line adjustment magnitude for adjusting branch line is suitable with the main line adjustment magnitude, so that main Line power load reaches equalization request.In the selection of adjustment branch line, those branch line phases are preferentially selected from branch line General power loads the separate identical branch line in source of the maximum separate separate adjustment pair with main line.For example, the phase of main line Not Tiao Zheng source to (A, B) it is separate be A phase, it is B phase that target is separate, the phase general power of main line A phase load it is maximum, then in each item It selects the phase general power of A phase to load big branch line in branch line, as adjustment branch line, can make to adjust branch line quantity most It is few.
S5, adjustment branch line described in it is separate adjustment it is separate to source on not to the load device for being built-in with magnetic moving component The commutation device of power supply is identified.For example, to adjustment branch line A it is separate on not to be built-in with magnetic moving component load dress The commutation device for setting power supply makes a check mark, and can be suitable for separate handover operation using 1 mark, expression.Identified commutation device Since, without magnetic moving component, separate switching not will lead to load device generation and mutually change vibration, issues in the load device of its power supply Noise, so that load device remains to steadily run, thus, identified commutation device is best suited for carrying out commutation operation.
S6, the general power including low power load portion and high power load portion for obtaining each user terminal of adjustment branch line are negative It carries, is keeping the unbalanced feelings spent less than the second unbalanced threshold value (reaching equalization request) of adjustment branch line electrical load Under condition, determined on the source of the adjustment branch line is separate based on the general power load calculating of each user terminal of adjustment branch line Selection needs the commutation device of separate switching in identified commutation device, if the separate identified all commutation devices in the source The sum of power termination be less than the branch line adjustment magnitude of the adjustment branch line, then remaining be not identified the source is separate again Commutation device in selection need the commutation device of separate switching, make the sum of power termination of commutation device of selection and the adjustment The branch line adjustment magnitude of branch line is suitable;The first unbalanced threshold value is less than the second unbalanced threshold value;Make each adjustment branch line The sum of power termination of selected commutation device is suitable with main line adjustment magnitude on the road, so that main line power load is uneven Weighing apparatus degree is less than the first unbalanced threshold value.Second unbalanced threshold value is used to evaluate whether branch line threephase load reaches equalization request, Such as, can be with value for 15%, this is the national standard of power distribution network load balancing.Keep the adjustment branch line electrical load uneven In the case that weighing apparatus degree is less than the second unbalanced threshold value, the calculating of three phase power adjustment of load is carried out to each adjustment branch line, is determined The adjustment magnitude for needing to adjust in B phase from A phase, referred to as branch line adjustment magnitude can be to make to adjust branch line with value Electrical load is kept in balance the maximum value of requirement, with the quantity of adjustment branch line required for reducing.If having chosen k tune altogether Whole branch line, then branch line adjustment magnitude is respectively w1, w2 ... wk, and the sum of described w1, w2 ... wk is suitable with w, so that main Route threephase load reaches equalization request.
K item adjust branch line, for each adjust branch line, the choosing method of commutation device is identical, next only with The commutation device of the separate switching of selection needs from the adjustment branch line is wherein illustrated how for a certain item adjustment branch line.Such as Branch line is adjusted to kth item, needs to be switched to B phase, branch line adjustment by A phase the access of the part commutation device of A phase is separate Magnitude is wk.When the sum of the power termination of commutation device being identified in separate adjustment A phase separate to source is greater than or equal to the tune When the branch line adjustment magnitude wk of whole branch line, keep the unbalanced degree of kth item adjustment branch line electrical load uneven less than second In the case where the threshold value 15% that weighs, commutation device is selected in identified commutation device in A phase, makes selected commutation device The sum of power termination is suitable with the kth item adjustment branch line adjustment magnitude wk of branch line, such as thinks phase less than 5% when relative error When;When the sum of power termination of commutation device being identified in the separate A phase in source is less than the branch line adjustment amount of the adjustment branch line When value wk, in the case where making the unbalanced degree of kth item adjustment branch line electrical load less than the second unbalanced threshold value 15%, first exist Selection needs the commutation device of separate switching in the commutation device being identified in A phase, i.e., the commutation device being identified in A phase is complete Portion is selected, then selects commutation device in the remaining not identified commutation device in A phase, makes selected commutation twice The sum of power termination of device is suitable with the kth item adjustment branch line adjustment magnitude wk of branch line.In the same way, at remaining The adjustment branch line selection of k-1 item need the commutation device of separate switching.Make to adjust selected on branch line 1- adjustment branch line k The sum of the power termination of commutation device it is suitable with main line adjustment magnitude w so that main line power load imbalance degree is less than First unbalanced threshold value 10%.
S7, by the separate source phase from the separate adjustment pair of the access of the commutation device selected on the adjustment branch line Be not switched to that target is separate, the access as adjusted selected commutation device on branch line 1- adjustment branch line k it is separate respectively from The source of separate adjustment pair is separate, and to be switched to target separate.
S8, if, based on the adjustment situation of power termination on each adjustment branch line, updating and corresponding in current control period Adjustment each phase of branch line phase general power load, execute S2 step, carry out the control of main line power load balance optimization, if control End cycle then executes S9 step;
S9 is based on the preset control period, serves into next control period, executes S1-S8 step, carries out a new control The distribution host in period, branch line electrical load Balance route.
The technical solution of present embodiment needs separate switching in the separate adjustment of adjustment branch line upper selection separate to source Commutation device when, consider the commutation device of user terminal whether there is or not to the load device power supply for being built-in with magnetic moving component, to adjustment Not making a check mark to the commutation device for being built-in with the power supply of magnetic moving component load device on branch line source is separate, identifies and is suitable for The mutually commutation device of operation.First selection needs to carry out separate switching from the adjustment separate identified commutation device in branch line source Commutation device, and by the sum of the power termination of selected commutation device reach it is described adjustment branch line branch line adjustment amount Value, if separate identified the sum of the power termination of all commutation devices cannot reach the adjustment branch to adjustment branch line in a steady stream The branch line adjustment magnitude of route, then reselection needs in the separate remaining not identified commutation device in adjustment branch line source The commutation device of separate switching is wanted, so that the sum of the power termination of selected commutation device reaches the adjustment branch line twice Branch line adjustment magnitude, by selected commutation device access it is separate be switched to it is separate adjustment pair target it is separate, make low Press-fitting power grid master, branch line electrical load reach equalization request.Identified commutation device is not to being built-in with magnetic moving component Load device power supply, separate switching, SPA sudden phase anomalies of powering, magnetic field mutate, but load device will not generate commutation vibration, still It can steadily run;It in this way can be to avoid in separate handoff procedure, the load device for being built-in with magnetic moving component generates commutation Vibration, favorable loads device, which is able to maintain, steadily to be run.
The load device in the high power load portion of user terminal is not to be used always, the high power load portion of user terminal After load device all deactivates, the output power of the phase commutation device of the user terminal is 0, can be considered that it is disconnected from power distribution network branch line It opens.When the load device in the high power load portion of user is activated again, access power distribution network branch line is issued through commutation device Access request, commutation device access power distribution network branch line a wherein phase, in order to make commutation device access power distribution network branch line Not destroying the branch line electrical load equilibrium state afterwards, commutation device to be accessed can access branch line with the following method, As shown in figure 3, specifically including following steps.
Step 1, commutation device to be accessed issues the access request of access power distribution network branch line.When user terminal is to high power Load device when having demand, high power load device is activated, which triggers commutation device and issue access power distribution network The access request of branch line.
Step 2, based on the first predetermined period power termination of the commutation device to be accessed, the commutation device is calculated most The power mean value of second close preset quantity the first predetermined period power termination, the power mean value are tried as it into branch line Try the estimated value of access power.
The first predetermined period power termination include in the first predetermined period commutation device access low-voltage network Average value of the non-zero realtime power load aggregate-value of each sampling period of branch line relative to the non-zero power integration time, preferably Time weighted average.The power mean value of the first predetermined period of second preset quantity power termination includes commutation device most The average value of first predetermined period power termination of the second preset quantity closely recorded.Preferably, in present embodiment, First predetermined period is 1;Second preset quantity be 5, can also with 10 or other it is any be greater than 2 number.Therefore, being computed can To obtain the average value of day power termination in nearest 5 days of commutation device to be accessed, i.e. power mean value on the 5th, the power on the 5th is equal It is worth the estimated value of the examination access power of the commutation device to be accessed as this.
Step 3, the total work including low power load portion and high power load portion of each user terminal of the branch line is obtained Rate load.The general power load includes the power termination value in the low power load portion of the user terminal, accesses separate and Gao Gong The power termination value of rate load portion, access are separate.The power termination can be " electric current ", " power ", " electric current, voltage " and Any one of " electric current, voltage and phase ".
Step 4, it is loaded according to the general power of acquired each user terminal, calculates and determine the low-voltage network branch line Phase general power loads small separate.I.e. the power termination value in the low power load portion based on each user terminal, access are separate and high The power termination value in power termination portion, access are separate, calculate the phase general power load of low-voltage network branch line three-phase, and determine Phase general power loads small separate.Phase general power load it is small it is separate as commutation device to be accessed try into target access It is separate.
Commutation device to be accessed is tried, and it is small separate to load into the branch line phase general power, is based on the branch line The general power load of each user terminal and trying into power-estimation value, such as power mean value on the 5th for commutation device to be accessed, calculate institute State the unbalanced degree of branch line electrical load after branch line is tried.
Step 5, when it is described try into after branch line electrical load it is unbalanced degree be less than or equal to the second unbalanced threshold value When, step 7 is executed, otherwise, executes step 6.
Step 6;The power mean value of general power load and commutation device to be accessed based on acquired each user terminal, Such as power mean value on the 5th, calculates and determine and load that small source is separate to be adjusted to mutually total for power termination from the branch line phase general power The separate separate trial cut of the big target of power termination change to and the separate trial cut change pair need function to target is separate from source is separate The access adjustment magnitude of rate adjustment of load.The commutation that separate upper selection needs separate trial cut to change in the source that the separate trial cut changes pair Device, the sum of power termination of the selected commutation device is suitable with the access adjustment magnitude, so that trial cut changes and tries The unbalanced degree of branch line electrical load after entering is less than the second unbalanced threshold value.By the separate trial cut of the access of selected commutation device It changes to separate, the to be accessed commutation device of target that separate trial cut the changes pair phase general power into determined by of trying and loads small phase Not, the unbalanced degree of low-voltage network branch line electrical load after trial cut is changed, tried is calculated, so that after trial cut is changed, tried The low-voltage network branch line electrical load it is unbalanced degree less than the second unbalanced threshold value, reach branch line electrical load Equalization request.Finally target phase is switched to by the separate source changed pair from separate trial cut of the access of selected commutation device is separate Not, determine that the target access of commutation device to be accessed is separate.It should be noted that working as the function that the commutation shape to be accessed is set When rate mean value (i.e. power-estimation value) is larger, the quantity that the separate trial cut changes pair is possible to be two, i.e., phase general power loads The separate Partial Power load in small source needs simultaneously to the separate adjustment of another two.
Step 7, the commutation device to be accessed access determined by branch line phase general power load it is small separate.Extremely This, commutation device to be accessed is successfully accessing a wherein phase for power distribution network branch line, and survivable power distribution network branch after access Line power load balancing state.
It waits next commutation device to be accessed to issue the access request of access power distribution network branch line, re-execute the steps Commutation device to be accessed is accessed power distribution network branch line, and so that the branch line threephase load is reached equilibrium and want by 1- step 7 It asks.
The method of above-mentioned access branch line, each use of power-estimation value and the branch line based on commutation device to be accessed The target that the general power load at family end try determining that its needs is accessed into calculating is separate, reaches branch line electrical load Equalization request after commutation device to be accessed is accessed branch line, does not easily lead to branch line electrical load and generates unbalanced, matching During network load Balance route, the quantity for needing to carry out the commutation device of separate switching is few, influences on the harmonic wave of power distribution network And it is smaller to the adverse effect of the load device stable operation of user, be conducive to load device and steadily run.
In practical applications, default all in order to more just calculate nearest second preset quantity first of commutation device to be accessed The power mean value of phase power termination and to not to be built-in with magnetic moving component load device power commutation device be identified, Each branch line needs to be respectively configured three tables, respectively the first power meter, the second power meter and loadtype table.First power Table, the second power meter and loadtype are associated by user identification field.
First power meter, the reality of the commutation device for each user terminal by record branch line of preset sampling period When power termination;Including for distinguishing and identifying the user identification field and the first power field of user terminal, the first power field Realtime power load value of the commutation device in each sampling period is recorded, as shown in Table 1.In present embodiment, the first power meter Sampling period is 1 minute, and the realtime power load value of primary each commutation device was recorded every 1 minute, preferably only records non-zero value Realtime power value.
Table one, the first power meter example/sampling period 1 divide
Second power meter, for record branch line user terminal commutation device the first predetermined period average function Rate;Including the user identification field and the second power field, as shown in Table 2.Second power field record is based on pre- first If the realtime power load value that the first power field of first power meter is recorded in the period (1 day) is relative to non-zero value function The average value of the power of rate cumulative time (i.e. number), referred to as the first predetermined period (day) power termination value, such as day power termination. First predetermined period of the second power meter is 1, i.e. the commutation of the user terminal recorded in the second power field of the second power meter The per day power of device, this day power termination;The sampling period of first power meter is 1 minute.Thus, the first power meter is every The big record number of the amount of each power field of a user is that 1440 (24x60) are a, as shown in Table 1.First power meter continuous sampling Cumulative time reaches the first predetermined period, i.e., at 1 day, that is, completes 1440 sub-samplings, the first power word based on the first power meter The realtime power load value that section is recorded calculates the mean power of each user terminal power supply period, the power termination of abbreviation day, the day Power termination is recorded in the second power field of the corresponding user terminal of the second power meter, as shown in Table 2.
Table two, the second power meter example/the first predetermined period 1 day
The loadtype table, as shown in Table 7, including user identification field, magnetic motion fields, magnetic motion fields are used for Whether there is or not power to the load device of built-in magnetic moving component for the commutation device at identity user end.The magnetic motion fields of loadtype table The characteristic of value load device based on determined by commutation device be updated.Value based on loadtype table can be to branch The commutation device of each phase is identified on route, marks the commutation device for being suitable for commutation operation.
The step 6 of above-mentioned commutation device access power distribution network branch line path method to be accessed, there are also improve further below The main case of technology.On the source that the value of magnetic motion fields based on loadtype table changes pair the separate trial cut is separate not inwardly The commutation device for being equipped with the power supply of magnetic moving component load device is identified, and identifies the commutation device for being suitable for commutation operation. When the sum of separate identified power termination of commutation device in source that the separate trial cut changes pair is greater than or equal to the access When adjustment magnitude, selection needs separate trial cut to change in the separate identified commutation device in source that separate trial cut changes pair commutation Device, the sum of power termination of the selected commutation device is suitable with the access adjustment magnitude, so that branch line power load Unbalanced degree is carried less than the second unbalanced threshold value;When the function for the separate identified commutation device in source that the separate trial cut changes pair When the sum of rate load is less than the adjustment magnitude, i.e., source it is separate on without enough identified commutation devices, then first in the phase The separate identified commutation device in source that other trial cut changes pair is all selected, then on the source that separate trial cut changes pair is separate not Selection needs to carry out the commutation device that separate trial cut changes in identified commutation device, makes the function of selected commutation device twice The sum of rate load is suitable with the access adjustment magnitude, so that the unbalanced degree of branch line electrical load is less than the second unbalanced threshold Value.So that not destroying branch line electrical load equilibrium state after commutation device access power distribution network branch line to be accessed.
During commutation device to be accessed accesses power distribution network, pay the utmost attention on the source that separate trial cut changes pair is separate The identified commutation device of selection, if identified commutation device is not enough, then remaining is not identified as the source is separate Commutation device in select commutation device, make the sum of power termination of selected commutation device twice and access adjustment magnitude phase When by the separate switching of selected phase device progress, so that low-voltage network electric power phase load is balanced.It in this way can be to greatest extent Ground, which is reduced, even avoids the load device containing magnetic moving component, such as washing machine, air-conditioning, when carrying out separate switching, power supply Commutation vibration occurs for SPA sudden phase anomalies, the mutation of magnetic moving component magnetic field, magnetic moving component, so that load device is generated commutation vibration, no It can steadily run.
Low-voltage network electrical load balancer
Present embodiment provides a kind of balanced for realizing the low-voltage network electrical load of low-voltage network load balancing Device, as shown in fig. 6, including following Component units:
Acquiring unit is suitable for being based on the preset control period, obtains the phase total work of each each phase of branch line of low-voltage network Rate load;
Computing unit calculates suitable for the phase general power load based on each phase of each branch line and obtains low-voltage distribution host The phase general power of each phase of route loads and main line power load imbalance degree;
Judging unit is suitable for when the main line power load imbalance degree is less than the first unbalanced threshold value, and execution is watched Unit is waited, otherwise, executes adjustment branch line selecting unit
Branch line selecting unit is adjusted, suitable for the phase general power load based on each phase of each branch line, calculates and determines The phase general power of main line loads the separate phase for needing to load the separate adjustment power termination of small target to phase general power in big source Not Tiao Zheng pair and it is separate adjustment pair main line adjustment magnitude;Each big branch line of separate phase general power load in the source Selection needs to carry out the adjustment branch line of power termination adjustment in road, and in the situation for keeping adjustment branch line electrical load equilibrium Under, determine the branch line adjustment magnitude of the adjustment branch line;The sum of described branch line adjustment magnitude and the main line adjustment amount Value is suitable;
Identify unit, suitable for adjustment branch line described in source it is separate on not to the load device for being built-in with magnetic moving component The commutation device of power supply is identified;
Commutation device selecting unit is being kept suitable for the commutation device of the separate switching of selection needs on adjustment branch line In the case that the unbalanced degree of adjustment branch line electrical load is less than the second unbalanced threshold value, each use based on adjustment branch line The general power load at family end, which calculates in the determining separate identified commutation device in the source described in the adjustment branch line, selects commutation Device, if the sum of separate identified power termination of commutation device in the source is less than the branch line adjustment amount of the adjustment branch line Value then selects the commutation device for needing separate switching in the separate remaining not identified commutation device in the source again, makes to select The sum of power termination of commutation device selected is suitable with the branch line adjustment magnitude of the adjustment branch line;The first unbalanced threshold Value is less than the second unbalanced threshold value;Make the sum of power termination of selected commutation device and main line tune on each adjustment branch line Whole magnitude is suitable, so that main line power load imbalance degree is less than the first unbalanced threshold value;
Separate switch unit, suitable for being switched to mesh for the access of commutation device selected on the adjustment branch line is separate It marks separate;
Period control unit, if being suitable in current control period, the tune based on power termination on each adjustment branch line Whole situation updates the phase general power load of each item adjustment each phase of branch line, executes computing unit, if control end cycle, holds Row serves unit;
Unit is served, suitable for serving into next control period, executes acquiring unit.
Specific application example
In order to make those skilled in the art be better understood when technical solution of the present invention, an application example pair is named Above-mentioned low-voltage network electrical load equalization methods are described further.In this example, a main line is connected with 6 branch lines Road, as shown in figure 4, wherein the value of m is taken as 6.The power termination of each user terminal of each branch line include low power load portion and High power load portion, low power load portion directly accesses in a wherein phase for branch line, and is evenly distributed in branch line In triple line, as shown in Fig. 4 and table seven, high power load portion accesses a wherein phase for branch line by commutation device.In this example The unbalanced threshold value of the second of branch line is set as 15%, and the unbalanced threshold value of the first of main line is set as 5%, main line have than Branch line more preferably electrical load equilibrium state.Within a certain control period, the phase general power for obtaining 6 each phases of branch line is negative It carries, the unbalanced degree of branch line electrical load, as shown in following table three.
Branch line A phase B phase C phase Unbalanced degree It is separate right to calculate
1 95 87 100 13.0% C, B
2 150 130 145 13.1% A, B
3 100 90 95 10.0% A, B
4 200 175 195 13.1% A, B
5 130 111 128 14.6% A, B
6 200 170 195 15.0% A, B
Main line 875 763 858 12.8% A, B
Table three
Table three shows that the unbalanced degree of the electrical load of 6 branch lines of low-voltage network is respectively less than the second unbalanced threshold value 15%, reach load balancing requirement;The unbalanced degree of the electrical load of power distribution network main line is 12.8%, and it is unbalanced to be greater than first Threshold value 5%, then main line power load do not reach equalization request.
The phase general power load of the A phase, B phase, C phase of low-voltage network main line is respectively 875,763,858, main line The load of phase average general power is 832, is computed processing, and determination loads big source phase from the phase general power of low-voltage network main line The separate switching pair of the separate adjustment power termination of small target, referred to as separate adjustment pair, Yi Jizhu are not loaded to phase general power The separate adjustment pair of route it is separate to the separate adjustment magnitude for needing to adjust power termination of target, referred to as main line tune from source Whole magnitude.Further, wherein general power loads the separate phase general power load for referring to low-voltage network main line in big source and is greater than The phase average general power of main line loads separate, then it is A phase and C phase that source is separate;General power loads the separate assignment of small target The phase general power load of power grid main line is less than the separate of the phase average general power load of main line, then it is B phase that target is separate.Its In, main line adjustment magnitude is the separate adjustment pair that low-voltage network main line phase average general power loads (832) and main line The separate B phase general power load (763) of target difference (69) and the main line separate adjustment pair the separate A phase in source General power loads the minimum value in the difference (43) of (875) and main line phase average general power load (832).I.e. main line from The main line adjustment magnitude that the opposite B phase of A needs to adjust is the minimum value 43 in 69 (832-763) and 43 (875-832);Based on same The algorithm of sample, the main line adjustment magnitude for needing to adjust from the opposite B phase of C are the minimum in 69 (832-763) and 26 (858-832) Value 26.So the separate adjustment of low-voltage network main line is to being 43 and separate adjustment for (A, B), main line adjustment magnitude To being 26 for (C, B), main line adjustment magnitude, main line adjustment information 1:(A, B, 43 can be respectively labeled as) and main line tune Whole information 2:(C, B, 26).
According to main line adjustment information 1:(A, B, 43) in branch line 1-6 branch line is selected, due to the A phase function of main line Rate load is maximum, the power termination of B phase is minimum, the preferential selection A phase power termination maximum, the smallest branch line of B phase power termination Road, so that the negligible amounts of selected branch line can choose branch line 6 and branch line 4 in this example, keep branch line 6 and branch line 4 electrical load it is unbalanced degree less than the second unbalanced threshold value in the case where, determine branch line 6 and branch line 4 from It is respectively 20 and 21, the adjustment magnitude of branch line 6 and branch line 4 that the opposite B phase of A, which needs the adjustment magnitude for carrying out power termination adjustment, The sum of 20 and 21 be 41, close to main line adjustment magnitude 43.So the separate adjustment of branch line 6 is to for (A, B), branch line Adjustment magnitude is 20, is marked as branch line adjustment information: (A, B, 20), the separate adjustment of branch line 4 is to for (A, B), branch line Road adjustment magnitude is 21, is marked as branch line adjustment information: (A, B, 21).It is separate to the branch line 6 and branch line 4 respectively Not being identified to the commutation device that the load device for being built-in with magnetic moving component is powered in A phase separate to source is adjusted, is based on The value of the magnetic motion fields of loadtype table is identified operation, identifies the commutation device for being suitable for commutation.In branch line 6 Select commutation device in the commutation device being identified in A phase, if the sum of identified power termination of commutation device less than 20, Commutation device is selected in the commutation device not being identified in the A phase of branch line 6 again, makes the selected commutation device in A phase The sum of power termination with 6 adjustment magnitude 20 of branch line quite.It is selected in the commutation device being identified in the A phase of branch line 4 Commutation device is selected, if identified the sum of the power termination of commutation device is not marked less than 21, then in the A phase of branch line 4 Commutation device is selected in the commutation device of knowledge, makes the sum of power termination of selected commutation device and the branch line 4 in A phase Adjustment magnitude 21 is suitable.The commutation device of the branch line 6 and branch line 4 selected access it is separate from it is separate adjustment pair A phase is switched to B phase, and after the threephase load adjustment of branch line 6 and branch line 4, main line power load imbalance degree is 6.3%, Greater than the first unbalanced threshold value, still without reaching equalization request.It is as shown in Table 4:
Branch line A phase B phase C phase Unbalanced degree It is separate right to calculate
1 95 87 100 13.0% C, B
2 150 130 145 13.1% A, B
3 100 90 95 10.0% A, B
4 179 196 195 8.7% C, A
5 130 111 128 14.6% A, B
6 180 190 195 7.7% C, A
Main line 834 804 858 6.3% C, B
Table four
According to main line adjustment information 2:(C, B, 26) in non-selected branch line 1,2,3,5 branch line is selected, it is excellent The biggish branch line of difference of choosing selection C phase load and B phase load, has branch line 5,2,1 selective, selects the branch of one of them Route 2, the adjustment magnitude that branch line 2 is adjusted from the opposite B phase of C are 26;So the separate adjustment of branch line 2 to for (C, B), branch Line adjustment magnitude is 26, is marked as branch line adjustment information: (A, B, 26).Magnetic motion fields based on loadtype table Value, not powering to the load device for being built-in with magnetic moving component in C phase separate to source to the separate adjustment of the branch line 2 Commutation device is identified.Commutation device is selected in the commutation device being identified in C phase, if the function of identified commutation device The sum of rate load then selects commutation device in commutation device not identified in C phase again, fills selected commutation less than 26 The sum of power termination set is suitable with 2 adjustment magnitude 26 of branch line.Due to the smallest two commutation of power termination on branch line 2 The power termination of device is respectively 50,14, and is identified, so power termination is the smallest changes for selection in the C phase of branch line 2 Phase device, the sum of power termination of commutation device selected are 14, and 26 immediate numerical value, and 14 power termination adjustment The threephase load equilibrium state of branch line 2 is not destroyed afterwards.The access for the commutation device that the branch line 2 is selected is separate from C phase It is switched to B phase, after the threephase load adjustment of the branch line 2, the unbalanced degree of the electrical load of main line is 3.1%, less than the One unbalanced threshold value, reaches equalization request, no longer adjusts other branch lines.Shown in table five specific as follows.
Branch line A phase B phase C phase Unbalanced degree It is separate right to calculate
1 95 87 100 13.0% C, B
2 150 144 131 12.7% A, C
3 100 90 95 10.0% A, B
4 179 196 195 8.7% B, A
5 130 111 128 14.6% A, B
6 180 190 195 7.7% C, A
Main line load 834 818 844 3.1% C, B
Table five
The access of selected commutation device on route 2, branch line 4, branch line 6 is separate respectively from current separate switching It is mutually separate to target, realize that distribution host, branch line threephase load respectively reach equalization request after adjustment, shown in table five as above.
During the threephase load of above-mentioned branch line adjustment, for each branch line, adjustment judges principle and mode It is all the same, below will be by taking a wherein branch line 4 as an example, how the commutation device of detailed description branch line 4 adjusts.Assuming that branch line Road 4 shares 12 user terminal access power distribution networks, and the low power load portion of each user terminal directly enters branch line 4, is evenly distributed in In the triple line of branch line 4, a wherein phase of the high power load portion through commutation device access branch line 4.Each use of branch line 4 The low power load portion at family end, the power termination value in high power load portion and access are separate, as shown in Table 6, branch line power load Carrying unbalanced degree is 13.1%, less than 15%, reaches equalization request.
Table six
To make main line threephase load reach equalization request, it has been determined that the separate adjustment of branch line 4 is to for (A, B), branch line Road adjustment magnitude is 21.The loadtype table of branch line 4, as shown in Table 7.
User identifier 41 42 43 44 45 46 47 48 49 410 411 412
Magnetic movement 0 0 1 0 1 0 1 0 1 0 0 1
Table seven
Commutation device in the value of loadtype table based on branch line 4 A phase separate to source to the separate adjustment of branch line 4 It makes a check mark.It is identified as 1 commutation device on the A of branch line 4 is separate not to the power supply of magnetic moving component load device is built-in with, indicates It is suitable for commutation operation;To be built-in with magnetic moving component load device power commutation device without mark, default value 0.Branch The A phase of route 4 accesses the 41st, 44,45,48, the commutation devices of 412 user terminals, wherein the commutation device of the 45th, 412 user terminals It is identified, ident value is updated to 1.Be identified in A phase the 45th, selection needs to carry out phase in the commutation devices of 412 user terminals The commutation device not switched, since the adjustment magnitude of branch line 4 is 21, thus, the commutation device of the 412nd user terminal is selected, the The commutation device power termination value of 412 user terminals is 22 suitable with the adjustment magnitude 21, and the commutation dress of the 412nd user terminal After the separate A phase trial cut by separate adjustment pair of the access set changes to B phase, the unbalanced degree of the electrical load of branch line 4 is 9.4%, As shown in Table 8, the electrical load equilibrium of branch line 4 still reaches equalization request.
User terminal Low function portion Low function portion connects phase A phase B phase C phase
41 2 A 44
42 2.1 A 54
43 2.5 A 46
44 2.4 A 40
45 2.1 B 51
46 2 B 51
47 2.7 B 49
48 2.2 B 35
49 2.3 C 88
410 2.4 C 49
411 2.3 C 15
412 2 C 0 22
Phase total load 179 197 195
Table eight
It should be noted that if without enough identified commutation devices in A phase, then remaining in A phase it is not identified Commutation device in selection need to carry out the commutation device of separate switching so that the power termination of selected commutation device twice The sum of it is suitable with the adjustment magnitude 21 of branch line 4.
In a certain control period, the commutation device request that access has been disconnected on certain branch line accesses branch line again.In order to Description is convenient, and for choosing 12 user terminals, it is negative that the low power load portion of 12 user terminals is directly accessed branch line, high power Load portion passes through commutation device and branch line electrical connection respectively, wherein the commutation device of the 11 of user terminal 1- user terminal 11 user terminal A wherein phase for branch line is accessed.The separate and power termination value of 12 user terminal access branch lines, as shown in following table nine, the The commutation device of 12 user terminals is state to be accessed.The unbalanced degree of branch line electrical load at this time is 13.3%, less than the One unbalanced threshold value 15%, reaches electrical load equalization request.
User terminal Low function portion Low function portion connects phase A phase B phase C phase
1 2 A 10
2 2.3 A 18
3 3 A 5
4 2.4 A 7
5 2.1 B 17
6 2 B 17
7 3.3 B 3
8 2.2 B 5
9 2.3 C 30
10 2.4 C 8
11 2.8 C 5
12 2 C
Phase total load 48.7 49.6 55.5
The access situation of 12 table nine, branch line user terminals
The work and rest habit of user day by day, so that the electricity consumption of user terminal has apparent date periodicity, it is therefore, described First predetermined period value be 1 day, then the second power field of the second power meter recorded be each user terminal commutation dress Set the power average value of the total accumulated time of non-zero electricity consumption in 1 day, referred to as day power termination.Second power meter of the example As shown in following table ten, since this example uses power mean value trying into performance number as the commutation device on the 5th of commutation device Estimate, thus, wherein only having recorded day performance number most in the past 7 days, as shown in Table 10.
The day power termination value of the commutation device of each user terminal of table ten, branch line
It is asked according to the electricity consumption of the 12nd user terminal needs, at a certain moment, needs to enable high-power load device, commutation device Again the branch line for accessing low-voltage network, is realized by following steps and is accessed, do not destroy the balanced shape of branch line electrical load State.
Step 1, the commutation device to be accessed of the 12nd user terminal issue the access request of access branch line.In some time It carves, the 12nd user terminal has demand to high-power load device, enables high-power load device, manipulates the commutation dress being connected Set the access request for issuing access low-voltage network branch line.
Step 2, the day power termination of the commutation device to be accessed of the 12nd user terminal based on the second power meter record, meter The average value for calculating the commutation device to be accessed day power termination in nearest 5 days obtains power mean values on the 5th of the commutation device, It is 10.1, the estimated value as examination access power.
Step 3 obtains the general power load of 12 user terminals of access power distribution network branch line.General power load includes each The branch line identification number of user terminal, the power termination value in low power load portion, separate and high power load portion the power of access Load value, access are separate.
Step 4 loads according to the general power of 12 acquired user terminals and calculates the phase total work for determining power distribution network branch line Rate load it is small separate, as try into target access it is separate.General power load based on 12 acquired user terminals, such as Shown in table nine, it is 48.7, B phase that the phase general power load for being computed acquisition branch line three-phase, which is respectively as follows: the phase general power load of A phase, It is 49.6, C phase is 55.5.Wherein, it is small separate to be that branch line phase general power loads for A phase, and be it is the smallest separate, because And A phase be used as try required for the commutation device of the 12nd user terminal into target access it is separate;If desired power is negative after trying Adjustment is carried, then the minimum number of required commutation device.Nearly power mean value on the 5th of the commutation device of 12nd user terminal is 10.1, In this, as the commutation device try into power termination estimated value.
The commutation device of 12nd user terminal to be accessed is tried separate, the base that loads small A of the phase general power into determined by The general power of each user terminal in the table nine loads and power mean values on the 5th of the commutation device of the 12nd user terminal to be accessed It calculates and determines the unbalanced degree of branch line electrical load, the unbalanced degree of the branch line electrical load after trying is 18.4%.
Step 5, it is described try after branch line electrical load it is unbalanced degree 18.4%, be greater than the second unbalanced threshold value 15%, 6 are thened follow the steps, otherwise, executes step 7;
Step 6,5 days of general power load and commutation device to be accessed based on 12 user terminals documented in table nine Power mean value 10.1, the slave phase general power for being computed the determining branch line, which loads, to be needed in the separate A phase in small source by Partial Power Adjustment of load loads that the separate separate trial cut of big target changes pair and that the separate trial cut changes pair is separate from source to phase general power To the separate access adjustment magnitude for needing to adjust power termination of target, needed in the separate upper selection in source that separate trial cut changes pair separate The commutation device that trial cut changes keeps the sum of power termination of selected commutation device suitable with the adjustment magnitude, so that branch line Road electrical load reaches equalization request, and the separate trial cut of access of selected commutation device is changed to the mesh that separate trial cut changes pair It marks separate, the described commutation device to be accessed and tries and load small separate branch line after changing trial cut, trying into phase general power Road electrical load is balanced.Determine that the separate trial cut is changed to for (A, B) after being computed, i.e., it is A phase that source is separate, and target is separate for B Phase, the adjustment magnitude of separate switching pair are 6.3, that is, the load capacity for needing to try adjustment from the opposite B phase of A is 6.3.In table nine the 4th, The commutation device of 8th user terminal it is optional be A it is separate on need to carry out the commutation device that separate trial cut changes, the target phase of access Not Wei B phase, due to by the access of the commutation device of the 8th user terminal it is separate from A it is separate on be switched in B phase, branch line have more Good equilibrium degree, so B phase preferably is switched to from A is separate by the access of the commutation device of the 8th user terminal is separate in this example, Determine that the target that the commutation device of the 12nd user terminal to be accessed accesses separate A phase.The commutation device of 12nd user terminal accesses A phase On actual power load be 11, the unbalanced degree 1.6% of branch line electrical load at this time, less than the second unbalanced threshold value 15%, Reach electrical load equalization request, does not destroy power distribution network branch line electrical load equilibrium state.
The commutation device to be accessed of 12nd user terminal is accessed identified phase general power and loads small A phase by step 7 Not.Threephase load situation after the commutation device access of 12nd user terminal, as shown in table 11.
User terminal Low function portion Low function portion connects phase A phase B phase C phase
1 2 A 10
2 2.3 A 18
3 3 A 5
4 2.4 A 7
5 2.1 B 17
6 2 B 17
7 3.3 B 3
8 2.2 B 0 5
9 2.3 C 30
10 2.4 C 8
11 2.8 C 5
12 2 C 11
Phase total load 48.7 49.6 55.5
Table 11
The loadtype table of the branch line, as shown in table 12, the commutation device for recording each user terminal has undirected It is built-in with the load device power supply of magnetic moving component comprising user identification field and magnetic motion fields, wherein magnetic motion fields The commutation device that value is 1 is not powered to the load device for being built-in with magnetic moving component.
User identifier 1 2 3 4 5 6 7 8 9 10 11 12
Magnetic movement 0 0 1 1 1 0 1 0 1 1 1 0
Table 12
" commutation device that separate upper selection needs separate trial cut to change in the source that separate trial cut changes pair " also in above-mentioned step 6 Preferred technical solution further below.The value of branch line loadtype table based on table 12, the source phase that separate trial cut changes pair In other A phase the 1st, 4,5, the values of the magnetic motion fields of the commutation devices of 8 user terminals be respectively 0,1,1,0, show the separate A phase in source On the 4th, the commutation devices of 5 user terminals do not power to the load device for being built-in with magnetic moving component, then in A phase separate to source 4th, the commutation device of 5 user terminals makes a check mark.The separate A phase in source be identified the 4th, select in two commutation devices of 5 user terminals Commutation device is selected, wherein the power termination amount of the commutation device of the 4th user terminal is 7, quite with 6.3, so on selection A is separate The commutation device of 4th user terminal, as the commutation device for needing separate trial cut to change.By the access of the commutation device of the 4th user terminal It is separate changed in B phase by A phase trial cut, the commutation device of the 12nd user terminal is tried into A Xiang Shanghou, the electrical load of power distribution network is uneven Weighing apparatus degree is 8.9%, is less than trimming threshold 15%, reaches equalization request.So by the commutation device of the 4th user terminal in A phase Access it is separate B phase is switched to, by the commutation device of the 12nd user terminal access A phase by A phase, as shown in following table 13, realizing will The commutation device of 12nd user terminal is successfully accessed branch line, and it is balanced not destroy branch line electrical load.12nd user terminal changes The load of phase device actual power is 11, then obtains the general power load of each user terminal of branch line, calculates branch line electrical load not Equilibrium degree is 7.1%, less than the first unbalanced threshold value 15%, reaches equalization request.
User terminal Low function portion Low function portion connects phase A phase B phase C phase
1 2 A 10
2 2.3 A 18
3 3 A 5
4 2.4 A 0 7
5 2.1 B 17
6 2 B 17
7 3.3 B 3
8 2.2 B 5
9 2.3 C 30
10 2.4 C 8
11 2.8 C 5
12 2 C 11
Phase total load 48.7 49.6 55.5
Table 13
The above-mentioned commutation device in the 12nd user terminal is tried into a wherein phase for low-voltage network, to reduce separate switching pair The load device stable operation of user terminal has a adverse impact, and preferentially selects not in the separate A phase in source changed pair from separate trial cut The commutation device powered to built-in magnetic moving component load device, such as selects the commutation device of the 4th user terminal, without selecting the 8th user Commutation device, keep the access of the commutation device separate and be switched to target B phase from A phase, the commutation device of the 12nd user terminal connects Enter A phase, so that electrical load reaches equalization request, the commutation device for completing the 12nd user terminal accesses low-voltage network.4th user The commutation device at end is not powered to the load device of built-in magnetic moving component, and commutation vibration does not occur for separate switching, makes user terminal Load device energy stable operation.It should be noted that the power termination amount for the commutation device being identified in the separate A phase in source If enough, the commutation device being identified is not selected all, then selection needs are separate in the commutation device not being identified in A phase The commutation device of switching.
The prior art is that commutation device to be accessed is first randomly accessed to a wherein phase for power distribution network branch line, then again Branch line electrical load equilibrium treatment is carried out, phase general power is loaded into the Partial Power adjustment of load on greatly separate to phase total work Rate load small target it is separate on so that branch line electrical load is balanced.Therefore, usually will appear when commutation device to be accessed After accessing branch line, the phase general power as accessed branch line is loaded on greatly separate, causes branch line electrical load uneven immediately Weighing apparatus needs the quantity of the commutation device of separate switching more, on the one hand matches to low pressure to keep the electrical load of power distribution network branch line balanced Power grid causes harmonic wave interference, on the other hand also influences the steadily operation of the load device of user terminal, is such as built-in with the sky of motor The load devices such as tune machine, washing machine generate commutation vibration, and making air conditioner, washing machine etc., stabilizability is not run, or even causes to damage It is bad.
In another control period, the high-power load device in part of the 2nd user terminal of above-mentioned branch line deactivates suddenly, the The high power load value of 2 user terminals drops to 6 from 18.The low power load portions of current 12 user terminals and high power load portion Load state and access are separate as shown in following table 14, and the unbalanced degree of branch line electrical load at this time is 21.4%, are greater than not Trimming threshold 15%, does not meet equalization request.
User terminal Low function portion Low function portion connects phase A phase B phase C phase
1 2 A 10
2 2.3 A 6
3 3 A 5
4 2.4 A 7
5 2.1 B 17
6 2 B 17
7 3.3 B 3
8 2.2 B 5
9 2.3 C 30
10 2.4 C 8
11 2.8 C 5
12 2 C 11
Phase total load 52.7 44.6 55.5
Table 14
The unbalanced degree needs of low-voltage network branch line electrical load carry out the following processing, so that branch line electrical load is not Equilibrium degree reaches equalization request.
SS1, the general power including low power load portion and high power load portion for 12 user terminals for obtaining branch line are negative It carries, as shown in table 14.
SS2, the general power load based on each user terminal obtained shown in table 14, are computed the phase of A, B, C three-phase General power load value is respectively 52.7,44.6,55.5, and the unbalanced degree of branch line electrical load is 21.4%.
SS3, the unbalanced degree 21.4% of the branch line electrical load are greater than the first unbalanced threshold value 15%, then execute SS4 Otherwise step executes SS6 step;
SS4, the general power load of 12 user terminals based on branch line shown in table 14, is computed and determines that needs are total from phase The big source of power termination it is separate by power termination be adjusted to phase general power load the separate separate switching of small target to and should The adjustment magnitude for needing to adjust from the separate power termination separate to target in source of separate switching pair.A, the phase total work of B, C three-phase Rate load is respectively 52.7,44.6,55.5, and the load of the phase average general power of three-phase is 50.6, and separate switching is to for (C phase, B Phase), the adjustment magnitude for the power termination for needing to adjust is 4.6, so that the load of A, B, C three-phase power is reached equalization request, then It needs for 4.6 power termination in C phase to be adjusted in B phase.The value such as following table 15 of the loadtype table of the current branch line It is shown.
User identifier 1 2 3 4 5 6 7 8 9 10 11 12
Magnetic movement 0 0 1 1 1 0 1 0 1 1 0 0
Table 15
The value of user identification field, magnetic motion fields based on loadtype table, in the separate C phase in source of separate switching pair The 7th, 9, the commutation devices of 10 user terminals makes a check mark.Be identified in the separate C phase in source the 7th, 9, the commutations of 10 user terminals dress The middle commutation device for selecting to need to carry out separate switching is set, wherein the commutation device of the 10th user terminal of selection, the 10th user terminal Commutation device power termination and the adjustment magnitude 4.6 are suitable, and the commutation device of the 10th user changes to B phase by C phase trial cut Afterwards, the unbalanced degree of branch line electrical load is 10.2%.It should be noted that if without enough identified in the separate C phase in source Commutation device first all selects identified commutation device, then selects to need in the not identified commutation device of the separate C in source The commutation device of separate switching is wanted, so that the sum of power termination of selected commutation device twice and the adjustment magnitude phase When, make branch line electrical load it is unbalanced degree reach equalization request.
SS5, the separate separate target that is switched in source from separate switching pair of the access of selected commutation device is separate, i.e., B phase is switched to by current C phase by the access of the commutation device of selected 10th user is separate, branch line electrical load is uneven Weighing apparatus degree is 10.2%, less than the first unbalanced threshold value 15%, reaches electrical load equalization request.After separate switching, if current It controls in the period, then current separate, switching access the separate and power termination based on selected commutation device, updates institute The general power load of each user terminal obtained, executes SS2 step, if control end cycle, executes SS6 step.Commutation device connects After entering separate adjustment, the power termination situation of each user terminal is as shown in following table 16.
User terminal Low function portion Low function portion connects phase A phase B phase C phase
1 2 A 10
2 2.3 A 6
3 3 A 5
4 2.4 A 7
5 2.1 B 17
6 2 B 17
7 3.3 B 3
8 2.2 B 5
9 2.3 C 30
10 2.4 C 8 0
11 2.8 C 5
12 2 C 11
Phase total load 52.7 52.6 47.5
Table 16
SS6 re-executes S1 step into next control period according to the preset control period, carries out new control week The branch line electrical load Balance route of phase.
Compared to the prior art, the present invention has the following technical progress.
It reduces and even avoids separate switching that load device is caused to generate commutation vibration, issue noise, be conducive to load device Stable operation.When power distribution network main line power load imbalance occurs, the adjustment branch line for needing adjustment of load is determined, to adjustment Not making a check mark to the commutation device for being built-in with the power supply of magnetic moving component load device on the source of branch line is separate is keeping adjusting Under branch line electrical load equilibrium situation, the commutation for needing separate switching is first selected from the separate identified commutation device in source Device, if the power termination of all identified commutation devices is not enough, then in the separate remaining not identified commutation in source Selection needs the commutation device of separate switching in device, and it is separate that selected commutation device is switched to target, matches low pressure The load of power grid main line power reaches equalization request.In separate handoff procedure, reduce to the maximum extent to be built-in with magnetic fortune The commutation device of dynamic component load device power supply, which carries out separate switching or even the commutation device, to be had to avoid separate switching Benefit makes the load device for being built-in with magnetic moving component avoid that separate switching vibration occurs, and keeps stable operation, prolongs the service life.
Commutation device pre-selects access target when accessing branch line is separate, and the survivable branch line electrical load is equal Weighing apparatus state needs the quantity of the commutation device of separate switching few.Commutation device to be accessed is changed when accessing branch line based on this The load of the general power of the power-estimation value of phase device and each user terminal of the branch line try determining that it needs to access into calculating Target it is separate, so that branch line threephase load is reached equalization request, commutation device to be accessed finally accessed into the branch line Target it is separate.So not easily leading to branch line threephase load after commutation device access branch line to be accessed and generating unevenness Weighing apparatus, in power distribution network load balancing control process, the quantity for needing to carry out the commutation device of separate switching is few, to the humorous of power distribution network Wave interference and smaller to the adverse effect of the load device stable operation of user, is conducive to load device and steadily runs.
The basic principles, main features and advantages of the present invention have been shown and described above.

Claims (10)

1. a kind of low-voltage network electrical load equalization methods, which is characterized in that the described method includes:
S1, it is based on the preset control period, obtains the phase general power load of each each phase of branch line of low-voltage network;
S2, the phase general power load based on each phase of each branch line calculate main line power load imbalance degree;
S3, when the main line power load imbalance degree is less than the first unbalanced threshold value, execute S9 step, otherwise, execute S4 Step;
S4, the phase general power load based on each phase of each branch line, calculate and determine that the phase general power of main line loads big Source is separate to need to load the separate adjustment pair and separate adjustment pair of small target separate adjustment power termination to phase general power Main line adjustment magnitude;Selection needs to carry out power termination tune in each big branch line of the separate phase general power load in the source Whole adjustment branch line, and in the case where keeping adjustment branch line electrical load balanced, determine the branch line of the adjustment branch line Road adjustment magnitude;The sum of described branch line adjustment magnitude is suitable with the main line adjustment magnitude;
S5, to adjustment branch line separate adjustment it is separate to source on not to be built-in with magnetic moving component load device power Commutation device is identified;
S6, in the case where keeping the unbalanced degree of the adjustment branch line electrical load less than the second unbalanced threshold value, based on tune The general power load of whole each user terminal of branch line calculates the separate identified commutation dress in the source described in the adjustment branch line of determination Middle selection commutation device is set, if the sum of separate identified power termination of commutation device in the source is less than the adjustment branch line Branch line adjustment magnitude, then selection needs changing for separate switching in the separate remaining not identified commutation device in the source again Phase device keeps the sum of power termination of commutation device of selection suitable with the branch line adjustment magnitude of the adjustment branch line;It is described First unbalanced threshold value is less than the second unbalanced threshold value;Make it is each adjustment branch line on selected commutation device power termination it It is suitable with main line adjustment magnitude, so that main line power load imbalance degree is less than the first unbalanced threshold value;
S7, it separate is switched to from the source of separate adjustment pair by the access of the commutation device selected on the adjustment branch line is separate Target it is separate;
If S8, in current control period, based on the adjustment situation of power termination on each adjustment branch line, corresponding adjustment is updated The phase general power of each phase of branch line loads, and executes S2 step, if control end cycle, executes S9 step;
S9, it serves into next control period, executes S1 step.
2. low-voltage network electrical load equalization methods according to claim 1, it is characterised in that:
The general power load of the user terminal includes that the power in the low power load portion for being directly accessed power distribution network of the user terminal is negative The power termination of load and the high power load portion through commutation device access power distribution network.
3. low-voltage network electrical load equalization methods according to claim 2, which is characterized in that the branch line also wraps Include the method that commutation device to be accessed accesses the branch line, comprising:
Step 1, the commutation device to be accessed issue the access request of access branch line;
It is nearest to calculate the commutation device for step 2, the first predetermined period power termination based on the commutation device to be accessed The power mean value of second preset quantity the first predetermined period power termination;
Step 3, the general power load including low power load portion and high power load portion for obtaining each user terminal of branch line;
Step 4 is loaded according to the general power of acquired each user terminal, is calculated and is determined that the phase general power load of the branch line is small It is separate;The commutation device to be accessed is tried, and it is small separate to load into the phase general power, is based on each user terminal General power load and commutation device to be accessed power mean value, calculate try after branch line electrical load it is unbalanced Degree;
Step 5, when the branch line electrical load it is unbalanced degree less than the second unbalanced threshold value when, execute step 7 otherwise hold Row step 6;
Step 6, based on each user terminal general power load and commutation device to be accessed power mean value, calculate determine from The branch line phase general power loads the separate separate separate trial cut of target for needing power termination to adjust in small source and changes pair and should The access adjustment magnitude that separate trial cut changes pair needs what separate trial cut changed to change in the separate upper selection in source that the separate trial cut changes pair Phase device, the sum of power termination of selected commutation device is suitable with the access adjustment magnitude, so that trial cut changes and tries The unbalanced degree of branch line electrical load after entering is less than the second unbalanced threshold value;By the access of selected commutation device it is separate from It is separate that target is mutually arrived in the separate switching in the source that separate trial cut changes pair;
The phase general power that step 7, commutation device to be accessed access the branch line loads small separate.
4. low-voltage network electrical load equalization methods according to claim 3, which is characterized in that described described separate The commutation device that the separate upper selection in the source that trial cut changes pair needs separate trial cut to change, specifically includes following sub-step:
Not doing to the commutation device for being built-in with the power supply of magnetic moving component load device on separate to source is changed to the separate trial cut Mark;
When the sum of separate all identified power terminations of commutation device in the source are greater than the access adjustment magnitude, Selection needs the commutation device of separate switching in the separate identified commutation device in source that the separate trial cut changes pair;
It, will when the sum of separate all identified power terminations of commutation device in the source are less than the access adjustment magnitude The separate identified commutation device in source that the separate trial cut changes pair is all selected, then in the source that the separate trial cut changes pair Selection needs the commutation device of separate switching in separate remaining not identified commutation device.
5. low-voltage network electrical load equalization methods according to claim 2, it is characterised in that:
The low power load portion includes that normal lighting, refrigerator, washing machine, gas heater and gas cooker are low power negative Carry the electricity consumption set;
High power load portion includes the big load of air-conditioning, electromagnetic oven, resistance furnace, electric heating fan, micro-wave oven, electric heater power consumption The electricity consumption of device.
6. low-voltage network electrical load equalization methods described in -5 any claims according to claim 1, it is characterised in that:
Each user terminal general power load include the user terminal low power load portion power termination value, access it is separate, The power termination value in high power load portion, access are separate;
The phase general power load of each phase of branch line includes branch line identification number, phase general power load value and separate.
7. low-voltage network electrical load equalization methods according to claim 3, it is characterised in that:
The first predetermined period power termination includes the non-zero real-time of each sampling period of the commutation device in the first predetermined period Average value of the power termination value aggregate-value relative to the non-zero power integration time;
The power mean value of the first predetermined period of second preset quantity power termination includes commutation device in recorded recently The average value of first predetermined period power termination of two preset quantities.
8. low-voltage network electrical load equalization methods according to claim 7, it is characterised in that:
The main line includes the power supply line for being electrically connected with branch line;
The branch line includes power supply line that is being electrically connected with main line and being electrically connected with branch line or the branch line includes The power supply line powered to each user terminal.
9. requiring the low-voltage network electrical load equalization methods according to claim 8, it is characterised in that:
The branch line is configured with loadtype table respectively, and the commutation device that loadtype table has recorded the branch line has undirected It is built-in with the load device power supply of magnetic moving component;
Value based on loadtype table to the separate trial cut change it is separate to source, adjustment branch line separate adjustment it is separate to source on Not to be built-in with magnetic moving component load device power commutation device identify, identify be suitable for commutation operation commutation Device.
10. a kind of low-voltage network electrical load balancer, which is characterized in that including with lower unit:
Acquiring unit is suitable for being based on the preset control period, and the phase general power for obtaining each each phase of branch line of low-voltage network is negative It carries;
Computing unit, the phase general power load based on each phase of each branch line calculate main line power load imbalance degree;
Judging unit is suitable for when the main line power load imbalance degree is less than the first unbalanced threshold value, and list is served in execution Otherwise member executes adjustment branch line selecting unit;
Branch line selecting unit is adjusted, suitable for the phase general power load based on each phase of each branch line, calculates and determines main line The phase general power on road loads the separate separate tune for needing to load the separate adjustment power termination of small target to phase general power in big source The main line adjustment magnitude of whole right and separate adjustment pair;In each big branch line of the separate phase general power load in the source Selection needs to carry out the adjustment branch line of power termination adjustment, and in the case where keeping adjustment branch line electrical load balanced, Determine the branch line adjustment magnitude of the adjustment branch line;The sum of described branch line adjustment magnitude and the main line adjustment magnitude phase When;
Identify unit, suitable for adjustment branch line separate adjustment it is separate to source on not to the load for being built-in with magnetic moving component The commutation device of device power supply is identified;
Commutation device selecting unit is suitable in the unbalanced degree of the holding adjustment branch line electrical load less than the second unbalanced threshold In the case where value, determine that the source described in the adjustment branch line is separate based on the general power load calculating of adjustment each user terminal of branch line Commutation device is selected in upper identified commutation device, if the sum of separate identified power termination of commutation device in the source is small In the branch line adjustment magnitude of the adjustment branch line, then selected in the separate remaining not identified commutation device in the source again The commutation device for needing separate switching makes branch line tune of the sum of the power termination of commutation device of selection with the adjustment branch line Whole magnitude is suitable;The first unbalanced threshold value is less than the second unbalanced threshold value;Make selected commutation on each adjustment branch line The sum of power termination of device is suitable with main line adjustment magnitude, so that main line power load imbalance degree is less than the first unevenness Weigh threshold value;
Separate switch unit, the access of the commutation device suitable for will be selected on the adjustment branch line are separate from separate adjustment pair The separate target being switched in source it is separate;
Period control unit, if being suitable in current control period, the adjustment feelings based on power termination on each adjustment branch line Condition updates the phase general power load of corresponding adjustment each phase of branch line, executes computing unit, if control end cycle, execution are watched Wait unit;
Unit is served, suitable for serving into next control period, executes acquiring unit.
CN201710673193.0A 2017-08-08 2017-08-08 A kind of low-voltage network electrical load equalization methods and its device Active CN107359629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710673193.0A CN107359629B (en) 2017-08-08 2017-08-08 A kind of low-voltage network electrical load equalization methods and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710673193.0A CN107359629B (en) 2017-08-08 2017-08-08 A kind of low-voltage network electrical load equalization methods and its device

Publications (2)

Publication Number Publication Date
CN107359629A CN107359629A (en) 2017-11-17
CN107359629B true CN107359629B (en) 2019-08-23

Family

ID=60287307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710673193.0A Active CN107359629B (en) 2017-08-08 2017-08-08 A kind of low-voltage network electrical load equalization methods and its device

Country Status (1)

Country Link
CN (1) CN107359629B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110261733B (en) * 2019-06-14 2022-03-29 国网安徽省电力有限公司电力科学研究院 Method, system and machine readable storage medium for sensing low voltage user faults
CN110768249B (en) * 2019-10-29 2021-07-16 国网浙江省电力有限公司杭州供电公司 Method for optimizing operation balance of main transformer of power distribution network

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1026234A1 (en) * 1981-10-08 1983-06-30 Институт Электродинамики Ан Усср Device for automatic switching of single-phase loads in low-voltage distributing network
CN102354999A (en) * 2011-10-13 2012-02-15 张颢 Balanced distribution method of single-phase load in low-voltage distribution network
CN104092229B (en) * 2014-07-14 2016-08-24 山东卓尔电气有限公司 Distributed district's branch road three-phase load current balance type monitoring method and supervising device
CN104852395B (en) * 2015-05-07 2017-12-29 青岛微电网能源装备科技有限公司 A kind of electrical load equalizing system for low-voltage network

Also Published As

Publication number Publication date
CN107359629A (en) 2017-11-17

Similar Documents

Publication Publication Date Title
CN104852394B (en) A kind of equal balance system of electrical load suitable for low-voltage network
US9546795B2 (en) Arrangement for managing data center operations to increase cooling efficiency
CN104037834B (en) Method and system of dynamically charging electric vehicle
CN104852396A (en) Power load balancing method and device for low-voltage power distribution network
US8648499B2 (en) Systems, methods, and apparatus for accelerating volt/VAR load flow optimization
CN104852395B (en) A kind of electrical load equalizing system for low-voltage network
CN107359629B (en) A kind of low-voltage network electrical load equalization methods and its device
CN106067837A (en) Multi-variable air conditioning unit and address setting method thereof and device
CN104852397A (en) Power load balancing method and device applicable to low-voltage power distribution network
Xu et al. State estimation of systems with UPFCs using the interior point method
Elsayed et al. Smart residential load management technique for distribution systems' performance enhancement and consumers' satisfaction achievement
CN107591826B (en) A kind of distribution host, the equal balance system of branch line threephase load
Xia et al. Local measurements and virtual pricing signals for residential demand side management
CN107359631B (en) A kind of distribution host, branch line threephase load balance method and its device
CN111935952B (en) Large machine room energy consumption regulation and control method and device
CN107591827A (en) A kind of power distribution network threephase load balance control method
CN107359632A (en) A kind of power distribution network electrical load balance method and its device
CN107591813A (en) A kind of power termination access distribution network method and load-balancing method
CN116094017B (en) Energy storage equipment alternating current multiphase system and electric quantity balance control method thereof
CN107359630A (en) A kind of low-voltage network threephase load balance control system
CN109756010A (en) For the three phase dynamic balance control method of one master and multiple slaves framework AC charging system
CN107359628A (en) A kind of low-voltage network threephase load equalizing system
CN107425532B (en) A kind of power distribution network load-leveling system
CN115278779A (en) Rendering perception-based dynamic placement method for VR service module in MEC network
Yolcu et al. Adaptation of the simplex algorithm to modeling of cold load pickup of a large secondary network distribution system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190724

Address after: 253000 Building No. 18, 10 Huaxing Road, Decheng District, Dezhou City, Shandong Province, Unit 3, 101

Applicant after: Zhao Mingbo

Address before: The new town of Fengtai County in Anhui province 232170 city of Huainan Chen Xiang Cun Hou Xiang Zi No. 112

Applicant before: Chen Ge

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190919

Address after: 264200 Room 1904, 109 Qingdao Middle Road, Weihai Economic and Technological Development Zone, Shandong Province

Patentee after: Weihai Zhi Tuo Energy Saving Technology Co., Ltd.

Address before: 253000 Building No. 18, 10 Huaxing Road, Decheng District, Dezhou City, Shandong Province, Unit 3, 101

Patentee before: Zhao Ming Bo

TR01 Transfer of patent right