CN107355964A - Air conditioning unit and overvoltage protection method and device thereof - Google Patents

Air conditioning unit and overvoltage protection method and device thereof Download PDF

Info

Publication number
CN107355964A
CN107355964A CN201710616133.5A CN201710616133A CN107355964A CN 107355964 A CN107355964 A CN 107355964A CN 201710616133 A CN201710616133 A CN 201710616133A CN 107355964 A CN107355964 A CN 107355964A
Authority
CN
China
Prior art keywords
value
unit
peak
brownout
root
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710616133.5A
Other languages
Chinese (zh)
Other versions
CN107355964B (en
Inventor
庞维容
周葆林
陈万兴
唐政清
黄宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201710616133.5A priority Critical patent/CN107355964B/en
Publication of CN107355964A publication Critical patent/CN107355964A/en
Application granted granted Critical
Publication of CN107355964B publication Critical patent/CN107355964B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses an air conditioning unit and a method and a device for protecting the over-low voltage of the air conditioning unit. The air conditioning unit overvoltage protection method comprises the following steps: calculating the effective value of the unit voltage according to the root mean square; calculating a unit voltage effective value according to the peak value; and judging whether to carry out undervoltage protection on the unit according to the comparison result of the root-mean-square value, the peak-peak effective value and the undervoltage protection value, wherein the root-mean-square value is the unit voltage effective value calculated according to the root-mean-square, and the peak-peak effective value is the unit voltage effective value calculated according to the peak-peak. The method carries out the over-low voltage protection by combining two methods of calculating the effective value by the root mean square and calculating the effective value by the peak-to-peak value, thereby not only ensuring the over-low normal voltage protection in the running process of the unit, but also avoiding the over-low voltage protection of false alarm in the starting process.

Description

Air-conditioner set and its brownout guard method and device
Technical field
The present invention relates to field of air conditioning, more particularly to a kind of air-conditioner set and its brownout guard method and device.
Background technology
Electric current is big during Large Central Air Conditioning System unit starting, duration length, and causing to start voltage (root-mean-square value) has quite Long a period of time is in the brownout protection device protection compared with low state, ultimately resulted on air-conditioner set, prevents unit from complete Into launching into normal operation.
It is as follows to solve this problem existing method:Increase brownout protection detection time, avoid start-up course.
But the shortcomings that existing solution method is, guard time too low if occurring supply voltage in unit normal operation It is longer, it is impossible to protection in time.
The content of the invention
In view of above technical problem, the invention provides a kind of air-conditioner set and its brownout guard method and device, Both the too low protection of normal voltage in unit running process had been ensure that, it also avoid reporting brownout protection in start-up course by mistake.
According to an aspect of the present invention, there is provided a kind of air-conditioner set brownout guard method, including:
According to root mean square calculation unit voltage effective value;
Unit voltage effective value is calculated according to peak-to-peak value;
According to root-mean-square value and peak peak virtual value and the comparative result of brownout protection value, judge whether to carry out unit Brownout is protected, wherein, root-mean-square value is the unit voltage effective value according to root mean square calculation, and peak virtual value in peak is according to peak The unit voltage effective value of peak computational.
In one embodiment of the invention, it is described according to root-mean-square value and peak peak virtual value and brownout protection value Comparative result, judges whether unit needs progress brownout protection to include:
If meeting condition one, brownout protection is carried out to unit, wherein:
Condition one is:Detect that root-mean-square value and peak peak virtual value are respectively less than and are equal to voltage mistake in continuous first scheduled time Minimum living shield value, wherein first scheduled time be less than the unit starting time.
In one embodiment of the invention, it is described according to root-mean-square value and peak peak virtual value and brownout protection value Comparative result, judges whether unit needs progress brownout protection to include:
If meeting any one of condition one and condition two, brownout protection is carried out to unit, wherein:
Condition two is:Detect that root-mean-square value is less than or equal to brownout protection value in continuous second scheduled time, wherein Second scheduled time is more than the unit starting time.
In one embodiment of the invention, after starting to carry out brownout protection to unit, methods described is also wrapped Include:
Prompting message is sent out, to prompt user's unit to be in brownout protected mode.
In one embodiment of the invention, methods described also includes:
During unit starting, brownout protection is not carried out to unit;
In unit normal operation, in the case that mains voltage waveform is standard sine wave and supply voltage reduces, energy Brownout protection is carried out according to a pair of units of condition.
In one embodiment of the invention, methods described also includes:In unit normal operation, work as mains voltage waveform In the case of having distortion and supply voltage reduction, brownout protection can be carried out to unit according to condition two.
According to another aspect of the present invention, there is provided a kind of air-conditioner set brownout protection device, including:
Root-mean-square value computing module, for according to root mean square calculation unit voltage effective value;
Peak peak virtual value computing module, for calculating unit voltage effective value according to peak-to-peak value;
Brownout protection module, for according to root-mean-square value and peak peak virtual value and the comparison knot of brownout protection value Fruit, judges whether unit carries out brownout protection to unit, wherein, root-mean-square value is the unit voltage according to root mean square calculation Virtual value, peak peak virtual value are the unit voltage effective value calculated according to peak-to-peak value.
In one embodiment of the invention, brownout protection module is used in the case of the condition that meets one, to machine Group carries out brownout protection, wherein, condition one is:Root-mean-square value and peak peak virtual value are detected in continuous first scheduled time Respectively less than it is equal to brownout protection value, wherein first scheduled time is less than the unit starting time.
In one embodiment of the invention, brownout protection module is used for appointing in the condition that meets one and condition two In the case of one, brownout protection is carried out to unit, wherein, condition two is:Detected in continuous second scheduled time Root value is less than or equal to brownout protection value, wherein second scheduled time is more than the unit starting time.
In one embodiment of the invention, described device also includes:
Reminding module, after starting to carry out brownout protection to unit in brownout protection module, to outgoing Prompting message is sent, to prompt user's unit to be in brownout protected mode.
In one embodiment of the invention, brownout protection module is used for during unit starting, unit is not entered Row brownout is protected;And in unit normal operation, when mains voltage waveform is standard sine wave and supply voltage reduction In the case of, brownout protection can be carried out according to a pair of units of condition.
In one embodiment of the invention, brownout protection module is used in unit normal operation, when power supply electricity In the case that corrugating has distortion and supply voltage reduction, brownout protection can be carried out to unit according to condition two.
According to another aspect of the present invention, there is provided a kind of air-conditioner set brownout protection device, including memory, processing Device and storage are realized on a memory and the computer program that can run on a processor, during the computing device described program Method and step described in any of the above-described embodiment.
According to another aspect of the present invention, there is provided a kind of air-conditioner set, including the air-conditioning as described in above-mentioned any embodiment Unit brownout protection device.
The present invention calculates two methods of virtual value and carries out brownout by combining root mean square calculation virtual value and peak-to-peak value Protection, both ensure that the too low protection of normal voltage in unit running process, and it also avoid reporting brownout in start-up course by mistake Protection.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the schematic diagram of air-conditioner set brownout guard method one embodiment of the present invention.
Fig. 2 is the schematic diagram of air-conditioner set brownout protection device first embodiment of the present invention.
Fig. 3 is the schematic diagram of air-conditioner set brownout protection device second embodiment of the present invention.
Fig. 4 is the schematic diagram of air-conditioner set brownout protection device 3rd embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Below Description only actually at least one exemplary embodiment is illustrative, is never used as to the present invention and its application or makes Any restrictions.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Unless specifically stated otherwise, the part and positioned opposite, the digital table of step otherwise illustrated in these embodiments Do not limited the scope of the invention up to formula and numerical value.
Simultaneously, it should be appreciated that for the ease of description, the size of the various pieces shown in accompanying drawing is not according to reality Proportionate relationship draw.
It may be not discussed in detail for technology, method and apparatus known to person of ordinary skill in the relevant, but suitable In the case of, the technology, method and apparatus should be considered as authorizing part for specification.
In shown here and discussion all examples, any occurrence should be construed as merely exemplary, without It is as limitation.Therefore, the other examples of exemplary embodiment can have different values.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined, then it need not be further discussed in subsequent accompanying drawing in individual accompanying drawing.
Fig. 1 is the schematic diagram of air-conditioner set brownout guard method one embodiment of the present invention.Preferably, the present embodiment It can be performed by air-conditioner set brownout protection device of the present invention.This method comprises the following steps:
Step 11, according to root mean square calculation unit voltage effective value, wherein, setting root-mean-square value VVirtual value 1For according to square The unit voltage effective value that root calculates.
In one embodiment of the invention, step 11 can specifically include:Continuous high speed gather a power cycle or Instantaneous voltage V1, V2 of the several power cycles of person, V3 ..., Vn;These are worth the squared and last evolution that is averaged again, finally Obtained value is exactly unit voltage effective value.Referring specifically to formula (1).
Step 12, unit voltage effective value is calculated according to peak-to-peak value, wherein, set peak peak virtual value VVirtual value 2For according to peak The unit voltage effective value of peak computational.
In one embodiment of the invention, step 11 can specifically include:Continuous high speed one power cycle of collection Instantaneous voltage V1, V2, V3 ..., Vn, take out the minimum value Vin and maximum Vmax in these values;Calculate peak-to-peak value VPP= Vmax-Vmin;Peak virtual value V in peak is calculated according to formula (2)Virtual value 2
Step 13, according to root-mean-square value VVirtual value 1With peak peak virtual value VVirtual value 2With brownout protection value Vs comparative result, Judge whether to carry out brownout protection to unit.
It is found by the applicant that:Calculating voltage effective value typically has a two methods, and one kind is by the use of root-mean-square value as virtual value one Kind is to calculate virtual value with peak-to-peak value, and when voltage waveform is standard sine wave, the virtual value result that both approaches calculate is The same.But when voltage waveform produces distortion, then both results can differ larger, because root-mean-square value is closer to authentic and valid Value, so general make virtual value using root-mean-square value.
Applicant studies air-conditioner set and is starting, running the voltage feature of different phase, proposes air-conditioner set electricity of the present invention Press through minimum living maintaining method.
The air-conditioner set brownout guard method provided based on the above embodiment of the present invention, can combine root mean square calculation Virtual value and peak-to-peak value calculate two methods of virtual value and carry out brownout protection, exist so as to solve Large Central Air Conditioning System unit Due to the reduction of electric current excessive voltage, the technical problem for easily causing brownout to be protected during startup.Thus above-mentioned implementation of the invention Example, which both ensure that in unit running process, is normally carried out brownout protection, it also avoid reporting brownout in start-up course by mistake Protection.
In one embodiment of the invention, after starting to carry out brownout protection to unit, methods described may be used also With including:Prompting message is sent out, to prompt user's unit to be in brownout protected mode.
The above embodiment of the present invention can also be sent out prompting message, to prompt to use after brownout protection is started Family unit is in brownout protected mode.User's operation is thereby facilitating, improves Consumer's Experience.
Air-conditioner set brownout guard method of the present invention is further described below by specific embodiment.
First specific embodiment
In the first specific embodiment of the present invention, the step 13 of Fig. 1 embodiments can specifically include:
If meeting condition one, brownout protection is carried out to unit, wherein:
Condition one is:Root-mean-square value V is detected in continuous first scheduled time t1Virtual value 1With peak peak virtual value VVirtual value 2It is small In equal to brownout protection value, wherein first scheduled time t1 is less than the unit starting time.
Unit Voltage Peak peak-fall in start-up course is few, but root-mean-square value drops more;Work as electricity in normal operation When source voltage reduces, voltage peak-to-peak value and root-mean-square value decline simultaneously.
For this feature, the above embodiment of the present invention is by root-mean-square value VVirtual value 1The virtual value V calculated with peak-to-peak valueVirtual value 2Together Shi Zuowei brownout conditions.
It can thus be appreciated that according to the above embodiment of the present invention, due to virtual value V that peak-to-peak value calculates during unit startingVirtual value 2 It is larger, therefore brownout protective condition will not be entered;During normal operation, if supply voltage reduces, root-mean-square value and peak Peak virtual value declines, and can reach brownout protective condition.
Specifically, during unit starting, during unit starting, root-mean-square value VVirtual value 1≤ Vs can be dropped to, and is continued Time may be more than the t1 seconds;But the virtual value V that peak-to-peak value calculatesVirtual value 2≤ Vs is unsatisfactory for, therefore will not be entered according to condition one Enter protection.
In unit normal operation, such as power quality preferably (standard sine wave), when the supply voltage decreases, root-mean-square value VVirtual value 1With peak peak virtual value VVirtual value 2≤ Vs can be dropped to, therefore can an according to condition entrance protection.
Thus the above embodiment of the present invention, which both ensure that in unit running process, is normally carried out brownout protection, also keeps away Exempt to report brownout protection in start-up course by mistake.
In a specific example of the invention, for a certain particular rack, the first scheduled time t1 is 10 seconds, unit starting Time is about 10~15 seconds.
Second specific embodiment
In the second specific embodiment of the present invention, the step 13 of Fig. 1 embodiments can specifically include:
If meeting any one of condition one and condition two, brownout protection is carried out to unit, wherein:
Condition one is:Root-mean-square value V is detected in continuous first scheduled time t1Virtual value 1With peak peak virtual value VVirtual value 2It is small In equal to brownout protection value, wherein first scheduled time t1 is less than the unit starting time.
Condition two is:Root-mean-square value V is detected in continuous second scheduled time t2Virtual value 1Protected less than or equal to brownout It is worth, wherein second scheduled time t2 is more than the unit starting time.
During unit starting, root-mean-square value VVirtual value 1≤ Vs can be dropped to, and the duration may be more than the t1 seconds;But The virtual value V that peak-to-peak value calculatesVirtual value 2≤ Vs is unsatisfactory for, therefore will not be entered according to condition one and protected;When continuing due to low-voltage Between be less than the t2 seconds, therefore will not also be entered according to condition two and protected.Therefore brownout will not be entered in start-up course to protect.
In unit normal operation, as power quality preferably (standard sine wave), when the supply voltage decreases, root-mean-square value with Peak virtual value in peak can drop to≤Vs, therefore can an according to condition entrance protection.
In unit normal operation, as power quality is bad, (voltage waveform has a distortion, and the virtual value that possible peak-to-peak value calculates is big In root-mean-square value).When mains voltage waveform has distortion, in the case of due to voltage spikes, peak-to-peak value is larger, therefore according to peak peak It is worth the virtual value V calculatedVirtual value 2Also can be larger.In this case, when the supply voltage decreases, root-mean-square value VVirtual value 1≤ Vs is dropped to, And the virtual value V that peak-to-peak value calculatesVirtual value 2≤ Vs is not dropped to, is unsatisfactory for condition one;But it can meet that condition two is protected.
The above embodiment of the present invention both ensure that unit running process power quality preferably or voltage waveform has the feelings of distortion Brownout protection is normally carried out under condition, it also avoid reporting brownout protection in start-up course by mistake.
In a specific example of the invention, for a certain particular rack, the first scheduled time t1 is 10 seconds, and second is predetermined Time t2 is 20 seconds, and the unit starting time is about 10~15 seconds.
Fig. 2 is the schematic diagram of air-conditioner set brownout protection device first embodiment of the present invention.It is as shown in Fig. 2 described Air-conditioner set brownout protection device can include root-mean-square value computing module 21, peak peak virtual value computing module 22 and voltage Too low protection module 23, wherein:
Root-mean-square value computing module 21, for according to root mean square calculation unit voltage effective value, wherein, set root-mean-square value VVirtual value 1For the unit voltage effective value according to root mean square calculation.
In one embodiment of the invention, root-mean-square value computing module 21 specifically can be used for continuous high speed collection one Instantaneous voltage V1, V2 of power cycle or several power cycles, V3 ..., Vn;These values are squared and average last again Evolution, the value finally obtained are exactly unit voltage effective value.Referring specifically to formula (1).
Peak peak virtual value computing module 22, for calculating unit voltage effective value according to peak-to-peak value, wherein, setting peak peak has Valid value VVirtual value 2For the unit voltage effective value calculated according to peak-to-peak value.
In one embodiment of the invention, peak peak virtual value computing module 22 specifically can be used for continuous high speed collection one Instantaneous voltage V1, V2 of individual power cycle, V3 ..., Vn, take out the minimum value Vin and maximum Vmax in these values;Calculate Peak-to-peak value VPP=Vmax-Vmin;Peak virtual value V in peak is calculated according to formula (2)Virtual value 2
Brownout protection module 23, for according to brownout protection value Vs and root-mean-square value VVirtual value 1It is effective with peak peak Value VVirtual value 2Comparative result, judge unit whether to unit carry out brownout protection.
The air-conditioner set brownout protection device provided based on the above embodiment of the present invention, can combine root mean square calculation Virtual value and peak-to-peak value calculate two methods of virtual value and carry out brownout protection, exist so as to solve Large Central Air Conditioning System unit Due to the reduction of electric current excessive voltage, the technical problem for easily causing brownout to be protected during startup.Thus above-mentioned implementation of the invention Example, which both ensure that in unit running process, is normally carried out brownout protection, it also avoid reporting brownout in start-up course by mistake Protection.
Fig. 3 is the schematic diagram of air-conditioner set brownout protection device second embodiment of the present invention.With embodiment illustrated in fig. 2 Compare, in the embodiment shown in fig. 3, the air-conditioner set brownout protection device can also include reminding module 24:
Reminding module 24, after starting to carry out brownout protection to unit in brownout protection module 23, to Outer transmission prompting message, to prompt user's unit to be in brownout protected mode.
The above embodiment of the present invention can also be sent out prompting message, to prompt to use after brownout protection is started Family unit is in brownout protected mode.User's operation is thereby facilitating, improves Consumer's Experience.
Air-conditioner set brownout protection device of the present invention is further described below by specific embodiment.
3rd specific embodiment
In the 3rd specific embodiment of the invention, brownout protection module 23 is specifically used for the situation in the condition that meets one Under, brownout protection is carried out to unit, wherein, condition one is:Root-mean-square value is detected in continuous first scheduled time t1 VVirtual value 1With peak peak virtual value VVirtual value 2Respectively less than it is equal to brownout protection value Vs, wherein first scheduled time t1 is less than machine Group starts the time.
Unit Voltage Peak peak-fall in start-up course is few, but root-mean-square value drops more;Work as electricity in normal operation When source voltage reduces, voltage peak-to-peak value and root-mean-square value decline simultaneously.
For this feature, the above embodiment of the present invention is by root-mean-square value VVirtual value 1The virtual value V calculated with peak-to-peak valueVirtual value 2Together Shi Zuowei brownout conditions.
It can thus be appreciated that according to the above embodiment of the present invention, due to virtual value V that peak-to-peak value calculates during unit startingVirtual value 2 It is larger, therefore brownout protective condition will not be entered;During normal operation, if supply voltage reduces, root-mean-square value and peak Peak virtual value declines, and can reach brownout protective condition.
Specifically, during unit starting, during unit starting, root-mean-square value VVirtual value 1≤ Vs can be dropped to, and is continued Time may be more than the t1 seconds;But the virtual value V that peak-to-peak value calculatesVirtual value 2≤ Vs is unsatisfactory for, therefore will not be entered according to condition one Enter protection.
In unit normal operation, such as power quality preferably (standard sine wave), when the supply voltage decreases, root-mean-square value VVirtual value 1With peak peak virtual value VVirtual value 2≤ Vs can be dropped to, therefore can an according to condition entrance protection.
Thus the above embodiment of the present invention, which both ensure that in unit running process, is normally carried out brownout protection, also keeps away Exempt to report brownout protection in start-up course by mistake.
In a specific example of the invention, for a certain particular rack, the first scheduled time t1 is 10 seconds, unit starting Time is about 10~15 seconds.
4th specific embodiment
In the 4th specific embodiment of the invention, brownout protection module 23 specifically can be used in the He of the condition that meets one In the case of any one of condition two, brownout protection is carried out to unit.Its conditional one is:Continuous first scheduled time Root-mean-square value V is detected in t1Virtual value 1With peak peak virtual value VVirtual value 2Respectively less than it is equal to brownout protection value, wherein described first Scheduled time t1 is less than the unit starting time;Condition two is:Root-mean-square value V is detected in continuous second scheduled time t2Virtual value 1It is small In equal to brownout protection value Vs, wherein second scheduled time t2 is more than the unit starting time.
In unit normal operation, as power quality preferably (standard sine wave), when the supply voltage decreases, root-mean-square value with Peak virtual value in peak can drop to≤Vs, therefore can an according to condition entrance protection.
In unit normal operation, as power quality is bad, (voltage waveform has a distortion, and the virtual value that possible peak-to-peak value calculates is big In root-mean-square value).When mains voltage waveform has distortion, in the case of due to voltage spikes, peak-to-peak value is larger, therefore according to peak peak It is worth the virtual value V calculatedVirtual value 2Also can be larger.In this case, when the supply voltage decreases, root-mean-square value VVirtual value 1≤ Vs is dropped to, And the virtual value V that peak-to-peak value calculatesVirtual value 2≤ Vs is not dropped to, is unsatisfactory for condition one;But it can meet that condition two is protected.
The above embodiment of the present invention both ensure that unit running process power quality preferably or voltage waveform has the feelings of distortion Brownout protection is normally carried out under condition, it also avoid reporting brownout protection in start-up course by mistake.
In a specific example of the invention, for a certain particular rack, the first scheduled time t1 is 10 seconds, and second is predetermined Time t2 is 20 seconds, and the unit starting time is about 10~15 seconds.
Fig. 4 is the schematic diagram of air-conditioner set brownout protection device 3rd embodiment of the present invention.It is as shown in figure 4, described Air-conditioner set brownout protection device can include memory 41, processor 42 and be stored on memory 41 and can handle The computer program run on device 42, the processor 42 realize the method described in any of the above-described embodiment when performing described program Step.
The air-conditioner set brownout protection device provided based on the above embodiment of the present invention, can combine root mean square calculation Virtual value and peak-to-peak value calculate two methods of virtual value and carry out brownout protection, exist so as to solve Large Central Air Conditioning System unit Due to the reduction of electric current excessive voltage, the technical problem for easily causing brownout to be protected during startup.Thus above-mentioned implementation of the invention Example, which both ensure that in unit running process, is normally carried out brownout protection, it also avoid reporting brownout in start-up course by mistake Protection.
According to another aspect of the present invention, there is provided a kind of air-conditioner set, including the air-conditioning as described in above-mentioned any embodiment Unit brownout protection device.
The air-conditioner set provided based on the above embodiment of the present invention, can combine root mean square calculation virtual value and peak-to-peak value meter Calculate two methods of virtual value and carry out brownout protection, so as to solve Large Central Air Conditioning System unit on startup due to electric current mistake The technical problem that big voltage reduces, easily causes brownout to be protected.Thus the above embodiment of the present invention both ensure that unit was transported Brownout protection is normally carried out during row, it also avoid reporting brownout protection in start-up course by mistake.
Air-conditioner set brownout protection device described above can be implemented as described herein for performing General processor, programmable logic controller (PLC) (PLC), digital signal processor (DSP), the application specific integrated circuit of function (ASIC), field programmable gate array (FPGA) either other PLDs, discrete gate or transistor logic, Discrete hardware components or it is any appropriately combined.
So far, the present invention is described in detail.In order to avoid the design of the masking present invention, it is public that this area institute is not described Some details known.Those skilled in the art as described above, can be appreciated how to implement technology disclosed herein completely Scheme.
One of ordinary skill in the art will appreciate that hardware can be passed through by realizing all or part of step of above-described embodiment To complete, by program the hardware of correlation can also be instructed to complete, described program can be stored in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only storage, disk or CD etc..
Description of the invention provides for the sake of example and description, and is not exhaustively or by the present invention It is limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Select and retouch State embodiment and be to more preferably illustrate the principle and practical application of the present invention, and one of ordinary skill in the art is managed The present invention is solved so as to design the various embodiments with various modifications suitable for special-purpose.

Claims (14)

  1. A kind of 1. air-conditioner set brownout guard method, it is characterised in that including:
    According to root mean square calculation unit voltage effective value;
    Unit voltage effective value is calculated according to peak-to-peak value;
    According to root-mean-square value and peak peak virtual value and the comparative result of brownout protection value, judge whether to carry out voltage to unit Too low protection, wherein, root-mean-square value is the unit voltage effective value according to root mean square calculation, and peak virtual value in peak is according to peak-to-peak value The unit voltage effective value of calculating.
  2. 2. according to the method for claim 1, it is characterised in that described according to root-mean-square value and peak peak virtual value and voltage mistake The comparative result of minimum living shield value, judges whether unit needs progress brownout protection to include:
    If meeting condition one, brownout protection is carried out to unit, wherein:
    Condition one is:Detect that root-mean-square value and peak peak virtual value are respectively less than and are equal to brownout guarantor in continuous first scheduled time Shield value, wherein first scheduled time be less than the unit starting time.
  3. 3. according to the method for claim 2, it is characterised in that described according to root-mean-square value and peak peak virtual value and voltage mistake The comparative result of minimum living shield value, judges whether unit needs progress brownout protection to include:
    If meeting any one of condition one and condition two, brownout protection is carried out to unit, wherein:
    Condition two is:Detect that root-mean-square value is less than or equal to brownout protection value in continuous second scheduled time, wherein described Second scheduled time was more than the unit starting time.
  4. 4. according to the method any one of claim 1-3, it is characterised in that starting to carry out brownout guarantor to unit After shield, in addition to:
    Prompting message is sent out, to prompt user's unit to be in brownout protected mode.
  5. 5. according to the method in claim 2 or 3, it is characterised in that also include:
    During unit starting, brownout protection is not carried out to unit;
    , can basis in the case that mains voltage waveform is standard sine wave and supply voltage reduces in unit normal operation A pair of units of condition carry out brownout protection.
  6. 6. according to the method for claim 3, it is characterised in that also include:
    , can be according to condition two in the case that mains voltage waveform has distortion and supply voltage reduces in unit normal operation Brownout protection is carried out to unit.
  7. A kind of 7. air-conditioner set brownout protection device, it is characterised in that including:
    Root-mean-square value computing module (21), for according to root mean square calculation unit voltage effective value;
    Peak peak virtual value computing module (22), for calculating unit voltage effective value according to peak-to-peak value;
    Brownout protection module (23), for according to root-mean-square value and peak peak virtual value and the comparison knot of brownout protection value Fruit, judges whether unit carries out brownout protection to unit, wherein, root-mean-square value is the unit voltage according to root mean square calculation Virtual value, peak peak virtual value are the unit voltage effective value calculated according to peak-to-peak value.
  8. 8. device according to claim 7, it is characterised in that
    Brownout protection module (23) is used in the case of the condition that meets one, and brownout protection is carried out to unit, wherein, Condition one is:Detect that root-mean-square value and peak peak virtual value are respectively less than and are equal to brownout protection in continuous first scheduled time It is worth, wherein first scheduled time is less than the unit starting time.
  9. 9. device according to claim 8, it is characterised in that
    Brownout protection module (23) is used in the case of any one of the condition that meets one and condition two, and unit is carried out Brownout is protected, wherein, condition two is:Detect that root-mean-square value is protected less than or equal to brownout in continuous second scheduled time Shield value, wherein second scheduled time be more than the unit starting time.
  10. 10. according to the device any one of claim 7-9, it is characterised in that also include:
    Reminding module (24), after starting to carry out brownout protection to unit in brownout protection module (23), to Outer transmission prompting message, to prompt user's unit to be in brownout protected mode.
  11. 11. device according to claim 8 or claim 9, it is characterised in that
    Brownout protection module (23) is used for during unit starting, does not carry out brownout protection to unit;And in unit , can be according to a pair of machines of condition in the case that mains voltage waveform is standard sine wave and supply voltage reduces in normal operation Group carries out brownout protection.
  12. 12. device according to claim 9, it is characterised in that
    Brownout protection module (23) is used in unit normal operation, when mains voltage waveform has distortion and supply voltage drop In the case of low, brownout protection can be carried out to unit according to condition two.
  13. 13. a kind of air-conditioner set brownout protection device, including memory (41), processor (42) and it is stored in memory (41) on and the computer program that can be run on processor (42), it is characterised in that the processor (42) performs the journey The method and step any one of claim 1-6 is realized during sequence.
  14. 14. a kind of air-conditioner set, it is characterised in that including the air-conditioner set voltage mistake as any one of claim 7-13 Minimum living protection unit.
CN201710616133.5A 2017-07-26 2017-07-26 Air conditioning unit and overvoltage protection method and device thereof Active CN107355964B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710616133.5A CN107355964B (en) 2017-07-26 2017-07-26 Air conditioning unit and overvoltage protection method and device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710616133.5A CN107355964B (en) 2017-07-26 2017-07-26 Air conditioning unit and overvoltage protection method and device thereof

Publications (2)

Publication Number Publication Date
CN107355964A true CN107355964A (en) 2017-11-17
CN107355964B CN107355964B (en) 2019-08-20

Family

ID=60286470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710616133.5A Active CN107355964B (en) 2017-07-26 2017-07-26 Air conditioning unit and overvoltage protection method and device thereof

Country Status (1)

Country Link
CN (1) CN107355964B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111473464A (en) * 2020-04-07 2020-07-31 海信(广东)空调有限公司 Air conditioner control method and air conditioner

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2456171Y (en) * 2000-12-18 2001-10-24 无锡市斯达自控设备厂 On line ripple determiner
CN2533472Y (en) * 2001-12-14 2003-01-29 艾默生网络能源有限公司 AC three-phase voltage monitor
CN102135562A (en) * 2011-02-22 2011-07-27 南京邮电大学 Three-phase alternating-current detecting method and detecting device
KR20110129671A (en) * 2010-05-26 2011-12-02 (주)삼대전기 System for accident prevention and accident cause analysis of transformer and method therefor
CN102478285A (en) * 2010-11-25 2012-05-30 Lg电子株式会社 Air conditioner and method for controlling the same
CN203231468U (en) * 2013-05-08 2013-10-09 苏州昆拓热控系统股份有限公司 Cabinet air conditioner having direct-current reverse connection resisting and alternating-current voltage offset detecting functions
US20140334049A1 (en) * 2013-05-08 2014-11-13 Harmander Singh Voltage detector with high voltage protection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2456171Y (en) * 2000-12-18 2001-10-24 无锡市斯达自控设备厂 On line ripple determiner
CN2533472Y (en) * 2001-12-14 2003-01-29 艾默生网络能源有限公司 AC three-phase voltage monitor
KR20110129671A (en) * 2010-05-26 2011-12-02 (주)삼대전기 System for accident prevention and accident cause analysis of transformer and method therefor
CN102478285A (en) * 2010-11-25 2012-05-30 Lg电子株式会社 Air conditioner and method for controlling the same
CN102135562A (en) * 2011-02-22 2011-07-27 南京邮电大学 Three-phase alternating-current detecting method and detecting device
CN203231468U (en) * 2013-05-08 2013-10-09 苏州昆拓热控系统股份有限公司 Cabinet air conditioner having direct-current reverse connection resisting and alternating-current voltage offset detecting functions
US20140334049A1 (en) * 2013-05-08 2014-11-13 Harmander Singh Voltage detector with high voltage protection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王会来等: "《电工基础》", 30 September 2016, 清华大学出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111473464A (en) * 2020-04-07 2020-07-31 海信(广东)空调有限公司 Air conditioner control method and air conditioner
CN111473464B (en) * 2020-04-07 2022-01-28 海信(广东)空调有限公司 Air conditioner control method and air conditioner

Also Published As

Publication number Publication date
CN107355964B (en) 2019-08-20

Similar Documents

Publication Publication Date Title
CN104362843B (en) Parallel inverter system and its halt control method and stop control apparatus
CN106230244B (en) A kind of frequency converter over-current protection method, device and frequency converter
CN103888322B (en) The monitoring method and monitoring system of motor
JP2008513925A5 (en)
CN106054016B (en) The judgment method of inverter short circuit failure
CN104564638A (en) Compressor overload protection control method and device
CN105301478B (en) A kind of detection means and detection method of 3.7V batteries list string protection board
CN107634504A (en) Protection control device, the protection controller of PFC pfc circuit
CN104020391A (en) Method for detecting input outage of frequency converter
CN105743062B (en) The method and apparatus that zero energy protection is carried out to electricity generation system
CN107355964A (en) Air conditioning unit and overvoltage protection method and device thereof
CN205959155U (en) Automatic system and electronic equipment who restarts in back crashes
CN107635343A (en) Input detection protection circuit and HID lamp AC electronic ballast
CN103872649A (en) Overload protection method used for electric tool and circuit thereof
CN108227775A (en) A kind of detection method of temperature, temperature control system and electronic equipment
CN104049143B (en) A kind of city's electric detection means and detection method
CN205565685U (en) Three phase current phase sequence and scarce looks fault monitoring and protection circuit
CN206236064U (en) A kind of computer glitch detection means
CN205160355U (en) Surge protection circuit, IGBT circuit and heater
CN106655932A (en) Dual low excitation restriction method for generator depth phase leading of overseas small power grid project
CN206602352U (en) Earth leakage protective chip circuit with fixed response time function
CN104793147A (en) Battery, electronic equipment and method for detecting standard battery of electronic equipment
CN104779592A (en) DER containing dotted network reverse power protection method based on sequence current break variable and power direction thereof
CN106410759B (en) A kind of method and device thereof of exchange line control machine communication overcurrent protection
CN104577945B (en) A kind of directionality current protection method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant