CN107354857A - A kind of high-speed railway repairing combined box beam and its assemble method - Google Patents

A kind of high-speed railway repairing combined box beam and its assemble method Download PDF

Info

Publication number
CN107354857A
CN107354857A CN201710765078.6A CN201710765078A CN107354857A CN 107354857 A CN107354857 A CN 107354857A CN 201710765078 A CN201710765078 A CN 201710765078A CN 107354857 A CN107354857 A CN 107354857A
Authority
CN
China
Prior art keywords
box beam
segment
main body
segment body
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710765078.6A
Other languages
Chinese (zh)
Inventor
徐升桥
金令
高静青
李先婷
简方梁
刘明伟
冯祁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN201710765078.6A priority Critical patent/CN107354857A/en
Publication of CN107354857A publication Critical patent/CN107354857A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

The invention discloses a kind of high-speed railway repairing combined box beam, its second box beam main body for including the first box beam main body and splicing side by side with the first box beam main body;The first box beam main body and the second box beam main body include:At least one first segment body, the first edge of a wing component being detachably connected with the first segment body sidepiece;And/or the second edge of a wing component that at least one second segment body and the second segment body sidepiece are detachably connected.The present invention can significantly shorten emergency repair time;Stability Analysis of Structures, road speed is can guarantee that and improved, and can finally recover to design speed per hour;It can accomplish to face combination forever, avoid secondary disrupted circuit, reduce the interference to runing in the future;Effect on environment is small, can improve economic results in society.

Description

A kind of high-speed railway repairing combined box beam and its assemble method
Technical field
The present invention relates to science of bridge building field, and in particular to a kind of high-speed railway repairing combined box beam and its assembling side Method.
Background technology
At present, China, which is used for railroad bridge repairing standard equipment, mainly includes assembled truss beam, type-64 military beam With eight or seven type railway composed with emergency beams;The predominantly military pier of six or five formula railways and eight or three formula railways for Railway Bridges And Piers repairing Light military pier.
Although China's deposit has a large amount of railroad bridge rush repair equipments and equipment, it is limited to the scientific and technological level and reality for developing the age Need, the driving of existing railway recovery girder steel limits speed all than relatively low, the driving limitation speed of such as six or four military beams across Spend for 24m and it is following when be 40km/h, span is 30km/h when being 32m to 40m, and span is 10km/h when being more than 40m;Reassembling type Trusses is designed as not speed limit, but not speed limit at that time also can only achieve 50~60km/h;Eight or seven type railway composed with emergency beams Road speed is limited, according to the difference of bridge-type and span between 15~40km/h.The middle span emergency steel girder limit of recent studies on Road speed processed is 45km/h, but this is the index request of charter, not yet by trial Run Test.It can be seen that the row of emergency steel girder Car limits speed and differs larger with current and future railroad train road speed, can not meet that new period high-speed railway is rushed to repair Needs.Also, existing bridge rush-repair equipment equipment and damage repair technology are only used for the repairing of common railway, but how at a high speed Railway Concrete Bridge carries out the repairing after calamity, also needs to carry out special in-depth study, currently for high-speed railway coagulation after calamity Research or a blank in terms of native bridge emergency first-aid repair technology and equipment.
Therefore, it is necessary to provide a kind of high-speed railway repairing combined box beam and its assemble method.
The content of the invention
For above-mentioned problems of the prior art, the invention provides a kind of high-speed railway repairing combined box beam and Its assemble method, it can realize that high-speed railway Common Span concrete-bridge emergency first-aid repair beam is crossed over from scratch.
It is as follows that the present invention solves the scheme that above-mentioned technical problem is provided:
On the one hand, there is provided a kind of high-speed railway repairing combined box beam, it includes the first box beam main body and with described The second box beam main body that one box beam main body is spliced side by side;The first box beam main body and the second box beam main body include:At least One the first segment body, the first edge of a wing component being detachably connected with the first segment body sidepiece;
And/or second edge of a wing that at least one second segment body and the second segment body sidepiece are detachably connected Component.
Preferably, the bottom of first segment body and the second segment body is steel construction, and top is coagulation Body structure.
Preferably, the steel construction is molded with coagulation body structural integrity.
Preferably, the steel construction of first segment body is identical with the height of the steel construction of second segment body, And it is 2500-3000mm;The width phase of the steel construction of first segment body and the steel construction of second segment body Together, and it is 4800-5200mm;The length of the steel construction of first segment body is 10000-13000mm;Described second point The length of the steel construction of section main body is 5000-10000mm;
The concrete structure of first segment body is identical with the height of the concrete structure of second segment body, And it is 200-500mm;The concrete structure of first segment body and the concrete structure of second segment body Width is identical, and is 4800-5200mm;The length of the concrete structure of first segment body and the length of its steel construction It is identical;The length of the concrete structure of second segment body is identical with the length of its steel construction.
Preferably, the section of shown first edge of a wing component and the second flange structural is right-angled trapezium, and the right angle The trapezoidal top margin length of side is that 500-800mm, the base length of side are that equal 600-1000mm, the right-angle side length of side are 1000-1500mm; The length of first edge of a wing component is identical with the length of the steel construction of first segment body, second edge of a wing component Length is identical with the length of the steel construction of second segment body.
Preferably, the first segment body sidepiece is connected with the first edge of a wing component by the first high-strength bolt;Described Two-section body side is connected with the second edge of a wing component by the second high-strength bolt.
Preferably, connected between the first box beam main body and the second box beam main body by the 3rd high-strength bolt.
Preferably, the first box beam main body includes some first segment bodies and/or some second segment bodies, And on the combined box beam bearing of trend, some first segment bodies and/or some second segment bodies are removable successively Connect with unloading, and each junction is equipped with for installing the joint forever without slag track plates;
The second box beam main body includes some first segment bodies and/or some second segment bodies, and in institute State on combined box beam bearing of trend, some first segment bodies and/or some second segment bodies removably connect successively Connect, and each junction is equipped with for installing the joint forever without slag track plates.
Preferably, it is described when there is first segment body with the second segment body simultaneously in same box beam main body First segment body is arranged at intervals with the second segment body.
On the other hand, a kind of assemble method of above-mentioned high-speed railway repairing combined box beam is also provided, it includes following step Suddenly:
S1, on the bearing of trend of the combined box beam, first segment body and/or the second segment body successively may be used Releasably connect, form the first box beam main body and the second box beam main body respectively;
S2, the first box beam main body and the second box beam main body spliced side by side;
S3, in detachably connected first edge of a wing component of the first segment body sidepiece, and/or described second segmentation Detachably connected second edge of a wing component of body side.
Effect caused by technical solution of the present invention:
The present invention can significantly shorten emergency repair time;Stability Analysis of Structures, road speed is can guarantee that and improves, and finally can be extensive Multiple extremely design speed per hour;It can accomplish to face combination forever, avoid secondary disrupted circuit, reduce the interference to runing in the future;Effect on environment It is small, economic results in society can be improved.
Brief description of the drawings
Fig. 1 is the sectional view of combined box beam in embodiment one;
Fig. 2 is the only case of the first box beam main body comprising the first segment body or the second segment body/second in embodiment one The top view of beam;
Fig. 3 is the sectional view of the first segment body and the second segment body in embodiment one;
Fig. 4 is the connection schematic cross-section of adjacent two steel construction in embodiment one;
Fig. 5 is the sectional view of the edge of a wing component of the first edge of a wing component in embodiment one/second;
Fig. 6 is the box beam of the first box beam main body comprising the first segment body and the second segment body in embodiment one/second Top view;
Fig. 7 is the first box beam main body and the second case in embodiment one only comprising the first segment body or the second segment body The splicing top view of beam;
Fig. 8 is the first box beam main body and the second box beam comprising the first segment body and the second segment body in embodiment one Splicing top view;
Fig. 9 is the flow chart of the assemble method of combined box beam in embodiment two.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Embodiment one:
As shown in figure 1, the high-speed railway repairing in the present invention is included with combined box beam:First box beam main body 100 and with The second box beam main body 200 that the first box beam main body 100 is spliced side by side.
Specifically, as shown in Fig. 2 the composition of the first box beam main body 100 includes following several situations:
(1) the first edge of a wing group that the first segment body A and the first segment body A sidepieces are detachably connected only is included Part 110, and the first segment body A at least one, when need extend combined box beam apart from when, it is described first segmentation master Body A can have several, and several described the first segment body A are (i.e. in Fig. 1 vertical in the bearing of trend of the combined box beam In the direction of paper inwards, and the arrow direction in Fig. 2) on be detachably connected, head and the tail connect successively.
Wherein, as shown in figure 3, the first segment body A bottoms are steel construction 101, top is coagulation body structure 102, For ease of assembling, the steel construction 101 is integrally formed with coagulation body structure 102, and the height H of the steel construction 101 is 2500- 3000mm (being preferably 2700mm), width W are that 4800-5200mm (being preferably 5000mm), length L1 are 10000-13000mm (being preferably 12300mm) (length L1 is as shown in Fig. 2 identical with the combined box beam bearing of trend);The concrete structure Height H1 is that 200-500mm (being preferably 285mm), width W1 are 4800-5200mm (being preferably 4725mm), length and its steel knot The length L1 of structure 101 is identical.
Further, as shown in figure 4, adjacent the first segment body A of each two steel construction 101 is at described group Connected on the bearing of trend of mould assembling beam by fastener 103 (such as high-strength bolt) successively head and the tail, and the steel construction 101 is upper Surface is additionally provided with the upper junction plate 104 for connecting adjacent steel construction 101, and the lower surface of the steel construction 101, which is additionally provided with, to be used for The lower connecting plate 105 of adjacent steel construction 101 is connected, the upper junction plate 104 and/or lower connecting plate 105 are steel plate, successively to institute The the first box beam main body 100 for stating the first segment body A compositions is reinforced.
Meanwhile as shown in figure 5, the section of first edge of a wing component 110 is right-angled trapezium, and the top margin of the right-angled trapezium The S1 length of sides are 500-800mm (being preferably 687mm), the base S2 length of sides are 600-1000mm (being preferably 816mm), right-angle side S3 sides A length of 1000-1500mm (being preferably 1300mm);And the length of first edge of a wing component 110 and the first segment body A Steel construction 101 length L1 it is identical, more specifically, as shown in figure 1, the right-angled trapezium, longer base S2 and institute The sidepiece for stating the first segment body A steel construction 101 is detachably connected by the first high-strength bolt (not shown).
In addition, after some first segment body A are sequentially connected, each junction is equipped with for installing forever without slag Track plates P joint, it thus can recover gapless track, train operation is rapidly achieved desin speed.
(2) as shown in Fig. 2 only including what the second segment body B and the first segment body B sidepieces were detachably connected Second edge of a wing component 120.The second segment body B, the second edge of a wing component 120 structure setting mode in, except described second Segment body B steel construction 101, the length of concrete structure 102 are 5000-10000mm (being preferably 8000mm), two phases Adjacent the second segment body B steel construction 101 is on the bearing of trend of the combined box beam by fastener 103 (such as height Strength bolt etc.) successively head and the tail connections, second edge of a wing component B length and the second segment body B steel construction 101 Length is identical and the second segment body B and the right-angled trapezium, longer base S2 leads with the described second segmentation The sidepiece of body B steel construction 101 is detachably connected outer by the second high-strength bolt, and other are identical with (1), herein not Repeating.
(3) as shown in fig. 6, including at least one first segment body A, at least one second segment body B and institute simultaneously State the first edge of a wing component 110 that the first segment body A sidepieces are detachably connected and removable with the second segment body B sidepieces Unload the second edge of a wing component 120 of connection.Wherein, above-mentioned first segment body A, the second segment body B, the first edge of a wing component 110 And second edge of a wing component 120 structure setting mode it is identical with (1)-(2) respectively, will not be repeated here.Difference only exists In, when with some first segment body A and some second segment body B, on the combined box beam bearing of trend, Some first segment body A and some second segment body B pass sequentially through fastener 103 and connected from beginning to end, and each connection Place is equipped with for installing the joint forever without slag track plates.Particularly preferred, the segmentations of the first segment body A and second are led Body B space sets.
Likewise, the composition situation of the composition situation of the second box beam main body 200 and above-mentioned first box beam main body 100 is complete It is exactly the same, three kinds of (1)-(3) situation is likewise supplied with, it is necessary to explanation, three kinds of combination situations of above-mentioned first box beam main body 100 It can be combined with three kinds of composition situations of the second box beam main body 200, and all technical schemes that combination is obtained belong to In protection scope of the present invention.
On the basis of the above, as Figure 7-8, the first box beam main body 100 and the second box beam main body 200 splice side by side, specifically, can be seen that the box beam master of steel construction 101 and second of the first box beam main body 100 with reference to Fig. 1 Connected between the steel construction 101 of body 200 by the 3rd high-strength bolt 130, so that whole combined girder steel globality is more preferable, beam Body rigidity strengthens, and can properly transit to permanent structure from temporary structure, can be quick without secondary interruption high-speed railway operation Reach high-speed railway to recover to the strict demand of designed driving speed.
Further, by using big section box girder, i.e. the first segment body A and/or the second segment body B, substitute existing Some truss-like rod members, joints quantity can be reduced, raising splicing speed is fast, further greatly improves and robs logical speed;Meanwhile It can be realized by edge of a wing component and be arranged with former concrete Common Span Beam identical bridge floor, accomplish the seamless rank with existing bridge Connect.
In addition, as shown in figure 1, first edge of a wing component 110 and the first segment body A are detachably connected, and/ Or after second edge of a wing component 120 and the second segment body B is detachably connected, first edge of a wing component 110 is remote The side for the stitching portion spliced side by side from the first box beam main body 100 and the second box beam main body 200 is additionally provided with the first sound Barrier 140, and/or second edge of a wing component 120 is away from the first box beam main body 100 and the second box beam main body 200 The side for the stitching portion spliced side by side is additionally provided with the second sound barrier 150.
Embodiment two:
As shown in figure 9, the present invention also provides a kind of assemble method of above-mentioned high-speed railway repairing combined box beam, it includes Following steps:
S1, on the bearing of trend of the combined box beam, can by first segment body and second segment body Releasably connect, form the first box beam main body and the second box beam main body respectively;
S2, the first box beam main body and the second box beam main body spliced;
S3, in detachably connected first edge of a wing component of the first segment body sidepiece, and described second segmentation Detachably connected second edge of a wing component of body side.
It should be noted that the technical characteristic in listing embodiment one, two can be combined, while combination is obtained All technical schemes belong to protection scope of the present invention.
In summary, high-speed railway repairing combined box beam and its assemble method provided by the invention, can meet at a high speed The requirement of emergency first-aid repair and fast quick-recovery, has filled up domestic blank after railway Common Span bridge calamity, and it has below beneficial to effect Fruit:
1) it makes full use of existing railway flat board vehicle transport, has transport flexibility.
2) big prefabricated subsection is used, reduces joint quantity, spelling speed is fast, with the repairing need for meeting quick-assembling, setting up Ask.
3) new model separated using attached edge of a wing component is carried with segment body, main structure size is reduced.
4) segment body and edge of a wing component are easy to deposit in the size and weight range that existing haulage vehicle can undertake Storage and transport.
5) by modularization idea, high-speed railway 32m and 24m standard spans beam repairing demand is taken into account, reduces storage specification Species, improve standby beam flexibility.
6) beam body can be quickly spliced into, completion circuit is robbed logical;Subsequently permanent fragment-free track slab can be installed by reserved joint, Recover gapless track, train operation is reached desin speed.
7) first lead to and be apt to afterwards, face combination forever, can quick restoration designing speed per hour, change beam without secondary, economical, societal benefits are notable.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (10)

1. a kind of high-speed railway repairing combined box beam, it include the first box beam main body and with the first box beam main body side by side Second box beam main body of splicing;Characterized in that, the first box beam main body and the second box beam main body include:It is at least one First segment body, the first edge of a wing component being detachably connected with the first segment body sidepiece;
And/or the second edge of a wing group that at least one second segment body and the second segment body sidepiece are detachably connected Part.
2. combined box beam as claimed in claim 1, it is characterised in that first segment body and the second segment body Bottom is steel construction, and top is coagulation body structure.
3. combined box beam as claimed in claim 2, it is characterised in that the steel construction is molded with coagulation body structural integrity.
4. combined box beam as claimed in claim 2, it is characterised in that the steel construction of first segment body and described second The height of the steel construction of segment body is identical, and is 2500-3000mm;The steel construction of first segment body and described the The width of the steel construction of two-section main body is identical, and is 4800-5200mm;The length of the steel construction of first segment body For 10000-13000mm;The length of the steel construction of second segment body is 5000-10000mm;
The concrete structure of first segment body is identical with the height of the concrete structure of second segment body, and For 200-500mm;The width of the concrete structure of first segment body and the concrete structure of second segment body It is identical, and be 4800-5200mm;The length of the concrete structure of first segment body and the length phase of its steel construction Together;The length of the concrete structure of second segment body is identical with the length of its steel construction.
5. combined box beam as claimed in claim 4, it is characterised in that shown first edge of a wing component and the second flange structural Section is right-angled trapezium, and the top margin length of side of the right-angled trapezium is that 500-800mm, the base length of side are equal 600- 1000mm, the right-angle side length of side are 1000-1500mm;The steel of the length of first edge of a wing component and first segment body The length of structure is identical, and the length of second edge of a wing component is identical with the length of the steel construction of second segment body.
6. combined box beam as claimed in claim 1, it is characterised in that the first segment body sidepiece and the first edge of a wing component Connected by the first high-strength bolt;The second segment body sidepiece is connected with the second edge of a wing component by the second high-strength bolt.
7. combined box beam as claimed in claim 1, it is characterised in that the first box beam main body and the second box beam main body Between pass through the 3rd high-strength bolt connect.
8. combined box beam as claimed in claim 1, it is characterised in that the first box beam main body includes some described first points Section main body and/or some second segment bodies, and on the combined box beam bearing of trend, some first segment bodies And/or some second segment bodies are detachably connected successively, and each junction is equipped with for installing forever without slag track The joint of plate;
The second box beam main body includes some first segment bodies and/or some second segment bodies, and at described group On mould assembling beam bearing of trend, some first segment bodies and/or some second segment bodies are detachably connected successively, and Each junction is equipped with for installing the joint forever without slag track plates.
9. combined box beam as claimed in claim 1, it is characterised in that when in same box beam main body simultaneously there is described first point When section main body is with the second segment body, first segment body is arranged at intervals with the second segment body.
10. a kind of assemble method of high-speed railway repairing combined box beam as described in claim any one of 1-9, its feature exist In comprising the following steps:
S1, on the bearing of trend of the combined box beam, first segment body and/or the second segment body are detachable successively Ground connects, and forms the first box beam main body and the second box beam main body respectively;
S2, the first box beam main body and the second box beam main body spliced side by side;
S3, in detachably connected first edge of a wing component of the first segment body sidepiece, and/or in second segment body Detachably connected second edge of a wing component of sidepiece.
CN201710765078.6A 2017-08-30 2017-08-30 A kind of high-speed railway repairing combined box beam and its assemble method Pending CN107354857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710765078.6A CN107354857A (en) 2017-08-30 2017-08-30 A kind of high-speed railway repairing combined box beam and its assemble method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710765078.6A CN107354857A (en) 2017-08-30 2017-08-30 A kind of high-speed railway repairing combined box beam and its assemble method

Publications (1)

Publication Number Publication Date
CN107354857A true CN107354857A (en) 2017-11-17

Family

ID=60289003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710765078.6A Pending CN107354857A (en) 2017-08-30 2017-08-30 A kind of high-speed railway repairing combined box beam and its assemble method

Country Status (1)

Country Link
CN (1) CN107354857A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487291A (en) * 2018-03-23 2018-09-04 中铁二院工程集团有限责任公司 The installation method of contact net upright post basic on a kind of railway steel reinforced concrete bondbeam
CN109629398A (en) * 2018-12-26 2019-04-16 石家庄铁道大学 A kind of external prestressing strengthening device of type-64 military beam
CN112239991A (en) * 2020-09-01 2021-01-19 中铁工程设计咨询集团有限公司 Common span emergency repair simply-supported steel-concrete combined beam for railway

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010084349A (en) * 2008-09-30 2010-04-15 Ihi Corp Reinforcing construction method of box girder end
CN105155399A (en) * 2015-07-31 2015-12-16 中铁第四勘察设计院集团有限公司 Small box girder bridge and building method thereof
CN204940101U (en) * 2015-07-31 2016-01-06 中铁第四勘察设计院集团有限公司 A kind of small box girder bridge lateral connecting sealed structure and small box girder
CN105735101A (en) * 2016-05-11 2016-07-06 石家庄铁道大学 High-speed railway rush repair beam capable of being converted into permanent bridge structure, and rush repair method of high-speed railway rush repair beam
CN207295407U (en) * 2017-08-30 2018-05-01 中铁工程设计咨询集团有限公司 A kind of high-speed railway repairing combined box beam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010084349A (en) * 2008-09-30 2010-04-15 Ihi Corp Reinforcing construction method of box girder end
CN105155399A (en) * 2015-07-31 2015-12-16 中铁第四勘察设计院集团有限公司 Small box girder bridge and building method thereof
CN204940101U (en) * 2015-07-31 2016-01-06 中铁第四勘察设计院集团有限公司 A kind of small box girder bridge lateral connecting sealed structure and small box girder
CN105735101A (en) * 2016-05-11 2016-07-06 石家庄铁道大学 High-speed railway rush repair beam capable of being converted into permanent bridge structure, and rush repair method of high-speed railway rush repair beam
CN207295407U (en) * 2017-08-30 2018-05-01 中铁工程设计咨询集团有限公司 A kind of high-speed railway repairing combined box beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487291A (en) * 2018-03-23 2018-09-04 中铁二院工程集团有限责任公司 The installation method of contact net upright post basic on a kind of railway steel reinforced concrete bondbeam
CN109629398A (en) * 2018-12-26 2019-04-16 石家庄铁道大学 A kind of external prestressing strengthening device of type-64 military beam
CN112239991A (en) * 2020-09-01 2021-01-19 中铁工程设计咨询集团有限公司 Common span emergency repair simply-supported steel-concrete combined beam for railway

Similar Documents

Publication Publication Date Title
CN107354857A (en) A kind of high-speed railway repairing combined box beam and its assemble method
CN201144398Y (en) Straddling type track traffic elevated 'bridge-build' structure
CN207295407U (en) A kind of high-speed railway repairing combined box beam
CN203639802U (en) Large-span railway cable-stayed bridge girder structure
CN102268856A (en) Box-truss combined structured girder of large-span railway cable-stayed bridge and construction method of box-truss combined structured girder
CN108867334A (en) A kind of suspension type monorail vehicle and its matched guideway beam
CN106978777A (en) A kind of make-shift bridge device
CN104018426A (en) Steel truss installation method
CN107905121A (en) Tire transportation technology under a kind of whole segment of Steel Bridge
CN203320392U (en) Six-line double-layer railway bridge variable section steel truss girder structure
CN110359355A (en) Combine beam section in the case of rail-road mixed-arrangement-purlin
CN203603030U (en) Steel box truss beam
CN205529840U (en) Steel case concrete combination cell type beam bridge
CN206828889U (en) Suspension type monorail traffic track beam attachment structure
CN203834340U (en) Open type bond beam truss bridge
CN102926326B (en) Wheeled guide beam bridging machine and section beam installation process
CN103696367B (en) A kind of composite material structural member and preparation method thereof
CN103437274A (en) Bridge structure with combination of stiffening steel truss and concrete beam
CN207891720U (en) A kind of straddle-type monorail rectilinear orbit girder construction with lateral connection component
CN106284100B (en) The assembling method of steel truss girder segment and used assembled place
CN205024591U (en) Logical pier is robbed to motor -driven formula
CN104088232B (en) A kind of emergency first-aid repair method of concrete box girder
CN210458908U (en) Box-truss combined beam section with highway and railway mixed arrangement
Hołowaty Removing weak spots from Polish railways
CN202187282U (en) Box-purlin combined structure girder of large-span railway cable-stayed bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination