CN107342942A - A kind of information transferring method and device of more piece base site controller cluster - Google Patents

A kind of information transferring method and device of more piece base site controller cluster Download PDF

Info

Publication number
CN107342942A
CN107342942A CN201710541787.6A CN201710541787A CN107342942A CN 107342942 A CN107342942 A CN 107342942A CN 201710541787 A CN201710541787 A CN 201710541787A CN 107342942 A CN107342942 A CN 107342942A
Authority
CN
China
Prior art keywords
control node
binary tree
balanced binary
event
request information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710541787.6A
Other languages
Chinese (zh)
Other versions
CN107342942B (en
Inventor
崔波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Inspur Intelligent Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201710541787.6A priority Critical patent/CN107342942B/en
Publication of CN107342942A publication Critical patent/CN107342942A/en
Application granted granted Critical
Publication of CN107342942B publication Critical patent/CN107342942B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/48Routing tree calculation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/30Routing of multiclass traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/302Route determination based on requested QoS
    • H04L45/308Route determination based on user's profile, e.g. premium users
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/104Peer-to-peer [P2P] networks
    • H04L67/1044Group management mechanisms 

Abstract

The invention discloses a kind of information transferring method and device of more piece base site controller cluster, based on the balanced binary tree according to each control node ID dynamic formations, by event request information transfer caused by control node to main control node;Wherein, event request information is specially along the transmitting procedure of balanced binary tree:When each control node in balanced binary tree receives event request information, judge whether itself is main control node;If it is not, event request information is forwarded to specified control node by control node according to from the position in balanced binary tree.The application specify that transmission path by the balanced binary tree of dynamic formation, and when control node occurs abnormal, can also the new balanced binary tree of dynamic formation again, i.e., plan transmission path again, improve the validity of transmission path and the reliability of data transfer;Meanwhile path finding expense can be saved by balanced binary tree strategy transmission event information, ensure the correctness of event transmission.

Description

A kind of information transferring method and device of more piece base site controller cluster
Technical field
The present invention relates to server storage technical field, more particularly to a kind of information transfer side of more piece base site controller cluster Method and device.
Background technology
As every profession and trade needs the increase of processing data, and the raising of data processing real-time, the storage of single-unit base site controller System can not meet user's request.
The group system being made up of more piece base site controller is arisen at the historic moment, and more piece base site controller group system has high sexual valence The characteristics of than, high availability and high scalability, mass data processing real-time demand can be met in performance.By multiple controls Device is got up by fiber optic network interconnection, forms a group system being made up of multiple controllers, as a generally user Application service is provided.In more piece base site controller group system, to ensure the uniformity of processing information in clustered node, it is necessary to please Ask and be sent to boss nodes, by boss node initiated event implementation procedures, this is finally determined according to the implementing result of each node Implementing result success and failure are taken turns, to determine to handle next event or perform rolling back action.
Event message transmission in existing more piece base site controller cluster is generally based on route, i.e., each control node passes through Routing mode is by event message transmission to boss nodes.But route transmission needs to find route, it is necessary to which extra route is opened Pin, and the uncertainty of routed path, reduce the validity of transmission path and the correctness of event transmission.
The content of the invention
It is an object of the invention to provide a kind of information transferring method and device of more piece base site controller cluster, it is therefore intended that solution The event transmission correctness of certainly existing multi-controller cluster is relatively low and the problem of transmission path validity is relatively low.
In order to solve the above technical problems, the present invention provides a kind of information transferring method of more piece base site controller cluster, the party Method includes:
Based on the balanced binary tree according to each control node ID dynamic formations, event request caused by control node is believed Breath is transmitted to main control node;
Wherein, transmitting procedure of the event request information along the balanced binary tree is specially:
When each control node in the balanced binary tree receives the event request information, judge itself whether be The main control node;
If it is not, position of the control node according to oneself in the balanced binary tree, by the event request information Specified control node is forwarded to, the specified control node is father's control node or left sub- control node.
Alternatively, it is described also to include after event request information transfer caused by control node to main control node:
Event request information described in the main control node processing, execute instruction is broadcasted to each control node.
Alternatively, in event request information described in the main control node processing, held to each control node broadcast Also include after row instruction:
Each control node according to the execute instruction, perform the event request information corresponding to event, draw Implementing result;
Each control node transmits the implementing result to the main control node along the balanced binary tree.
Alternatively, the implementing result is transmitted to institute along the balanced binary tree in each control node State main control node also includes afterwards:
The main control node judges whether the event runs succeeded according to the implementing result received;
If so, perform next event;
If it is not, perform rolling back action.
In addition, present invention also offers a kind of information carrying means of more piece base site controller cluster, the device includes:
Balanced binary tree transmission policy module, for based on the balanced binary according to each control node ID dynamic formations Tree, by event request information transfer caused by control node to main control node;
Wherein, transmitting procedure of the event request information along the balanced binary tree is specially:
When each control node in the balanced binary tree receives the event request information, judge itself whether be The main control node;
If it is not, position of the control node according to oneself in the balanced binary tree, by the event request information Specified control node is forwarded to, the specified control node is father's control node or left sub- control node.
Alternatively, in addition to:
Main control node broadcasts module, for handling the event request information, held to each control node broadcast Row instruction.
Alternatively, in addition to:
Control node execution module, for according to the execute instruction, performing event corresponding to the event request information, Draw implementing result;
Control node result feedback module, for the implementing result to be transmitted to the master along the balanced binary tree Control node.
Alternatively, in addition to:
Main control node judge module, for according to the implementing result received, judging whether the event performs Success;
Execution module, for if so, performing next event;
Roll-back module, for if it is not, performing rolling back action.
The information transferring method and device of a kind of more piece base site controller cluster provided by the present invention, based on according to each control The balanced binary tree of node ID dynamic formation processed, by event request information transfer caused by control node to main control node;Its In, event request information is specially along the transmitting procedure of balanced binary tree:Each control node in balanced binary tree receives During to event request information, judge whether itself is main control node;If it is not, control node is according to from balanced binary tree Position, event request information is forwarded to specified control node, specified control node is father's control node or left sub- control section Point.The application specify that transmission path, and when control node occurs abnormal, also may be used by the balanced binary tree of dynamic formation With the new balanced binary tree of dynamic formation again, i.e., transmission path is planned again, improve the validity and data of transmission path The reliability of transmission;Meanwhile the expense of path finding can be saved by balanced binary tree strategy transmission event information, ensure thing The correctness of part transmission.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of specific embodiment party of the information transferring method of more piece base site controller cluster provided in an embodiment of the present invention The schematic flow sheet of formula;
Fig. 2 is a kind of balanced binary tree schematic diagram provided in an embodiment of the present invention;
Fig. 3 is the structural schematic block diagram of the information carrying means of more piece base site controller cluster provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is refer to, Fig. 1 is one kind of the information transferring method of more piece base site controller cluster provided in an embodiment of the present invention The schematic flow sheet of embodiment, this method comprise the following steps:
Step 101:Based on the balanced binary tree according to each control node ID dynamic formations, by thing caused by control node Part request message transmission is to main control node;
Wherein, transmitting procedure of the event request information along the balanced binary tree is specially:
When each control node in the balanced binary tree receives the event request information, judge itself whether be The main control node;
If it is not, position of the control node according to oneself in the balanced binary tree, by the event request information Specified control node is forwarded to, the specified control node is father's control node or left sub- control node.
It is appreciated that above-mentioned main control node is the control node that ID is minimum in balanced binary tree;Above-mentioned balanced binary tree Each control node ID dynamic formations that can be in cluster, and above-mentioned control node ID can be specially to number, for example, Node 1, node 2 etc..After forming balanced binary tree, transmission path is also just accordingly planned.Specific to may refer to Fig. 2, Fig. 2 is this A kind of balanced binary tree schematic diagram that inventive embodiments provide.
As shown in Fig. 2 the balanced binary tree includes 7 control nodes, and 1,2,3,4,6,7,8 respectively in figure, 1 is Boss nodes are main control node, and 2 be 1,3 father's control node, and 7 be 6,8 father's control node, and 4 control section for 2,7 father Point, it is the root node of balanced binary tree.When 8 produce request event, it is necessary to which event request information is sent into 7;Then 7 basis The position judgment of itself itself is not boss nodes, and event request information is sent into 4;Then 4 event request information is sent To left child node 2;Finally, 2 event request information is sent to boss nodes 1, completes the transmitting procedure of event information.
And when some in more piece base site controller cluster or multiple nodes occur abnormal, balanced binary tree can root again According to normal node, the new balanced binary tree of dynamic formation, i.e., transmission path is planned again, to ensure the reliability of information transfer And validity.
Above-mentioned control node can be specially that the control node is on a left side for balanced binary tree in the position of balanced binary tree Side or right side, and be specifically which position be located at.Specifically, each control node can obtain the balanced binary of formation Tree, to learn itself present position, and then may determine that whether itself is boss nodes, and event request information is transmitted into father's control Node processed, still it is transmitted to left child node.For example, the node 7 in Fig. 2 then believes event request according to the location of itself Breath is forwarded to father's control node 4, and event request information is then forwarded to left sub- control node by node 2.
Main control node is receiving the event request information of control node transmission, in that case it can be decided that whether performing the event please Event corresponding to information is sought, therefore in some embodiments of the invention, above-mentioned by event request information caused by control node It can also include after transmitting to main control node:Event request information described in the main control node processing, to each described Control node broadcasts execute instruction.
It is appreciated that main control node can be as needed, decision is to perform corresponding thing by event request information producer Part, or it is performed both by the event by all nodes in cluster.
Each control node in cluster receives the execute instruction of main control node transmission, can perform corresponding event, Implementing result is drawn, therefore in some embodiments of the invention, in event request information described in above-mentioned main control node processing, to It can also include after each control node broadcast execute instruction:Each control node according to the execute instruction, Event corresponding to performing the event request information, draws implementing result;Each control node is by the implementing result edge The balanced binary tree to transmit to the main control node.
Multiple control nodes are performed both by corresponding event, it can be deduced that multiple implementing results, this multiple implementing result can edge Balanced binary tree and return to main control node, and transmitting procedure of the implementing result in balanced binary tree can and event request The transmitting procedure of information is similar, and therefore not to repeat here.
Distribution of the main control node to event is succession, i.e., only an event performs every time, therefore main control node Case distribution can be judged whether to according to the implementing result received, therefore in some embodiments of the invention, above-mentioned Each control node may be used also after the implementing result is transmitted to the main control node along the balanced binary tree With including:The main control node judges whether the event runs succeeded according to the implementing result received;If so, Perform next event;If it is not, perform rolling back action.
The information transferring method for the more piece base site controller cluster that the present embodiment is provided, based on according to each control node ID The balanced binary tree of dynamic formation, by event request information transfer caused by control node to main control node;Wherein, event please The information is asked to be specially along the transmitting procedure of balanced binary tree:Each control node in balanced binary tree receives event request During information, judge whether itself is main control node;If it is not, position of the control node according to oneself in balanced binary tree, will Event request information is forwarded to specified control node, and specified control node is father's control node or left sub- control node.This method By the balanced binary tree of dynamic formation, transmission path is specify that, and when control node occurs abnormal, can also again dynamically Form new balanced binary tree, i.e., plan transmission path again, improve transmission path validity and data transfer it is reliable Property;Meanwhile the expense of path finding can be saved by balanced binary tree strategy transmission event information, the event transmission of guarantee is just True property.
A kind of information carrying means of more piece base site controller cluster provided in an embodiment of the present invention is introduced below, under A kind of information carrying means of more piece base site controller cluster of text description and a kind of above-described more piece base site controller cluster Information transferring method can be mutually to should refer to.
Fig. 3 is refer to, Fig. 3 is the structure of the information carrying means of more piece base site controller cluster provided in an embodiment of the present invention Schematic block diagram, the device include:
Balanced binary tree transmission policy module 31, for based on the balanced binary according to each control node ID dynamic formations Tree, by event request information transfer caused by control node to main control node;
Wherein, above-mentioned event request information is specially along the transmitting procedure of balanced binary tree:
When each control node in balanced binary tree receives event request information, judge whether itself is main control section Point;
If it is not, event request information is forwarded to specified control by control node according to from the position in balanced binary tree Node processed, specified control node are father's control node or left sub- control node.
In some embodiments of the invention, said apparatus can also include:
Main control node broadcasts module, for handling event request information, execute instruction is broadcasted to each control node.
In some embodiments of the invention, said apparatus can also include:
Control node execution module, for according to execute instruction, event corresponding to execution event request information, drawing execution As a result;
Control node result feedback module, for implementing result to be transmitted to main control node along balanced binary tree.
In some embodiments of the invention, said apparatus can also include:
Main control node judge module, for according to the implementing result received, judging whether event runs succeeded;
Execution module, for if so, performing next event;
Roll-back module, for if it is not, performing rolling back action.
The information carrying means for the more piece base site controller cluster that the present embodiment is provided, passes through the balanced binary of dynamic formation Tree, specify that transmission path, and when control node occurs abnormal, can also the new balanced binary tree of dynamic formation again, i.e., Again transmission path is planned, improves the validity of transmission path and the reliability of data transfer;Meanwhile pass through balanced binary tree Strategy, which transmits event information, can save the expense of path finding, ensure the correctness of event transmission.
Each embodiment is described by the way of progressive in specification, and what each embodiment stressed is and other realities Apply the difference of example, between each embodiment identical similar portion mutually referring to.For device disclosed in embodiment Speech, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is referring to method part illustration .
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and The interchangeability of software, the composition and step of each example are generally described according to function in the above description.These Function is performed with hardware or software mode actually, application-specific and design constraint depending on technical scheme.Specialty Technical staff can realize described function using distinct methods to each specific application, but this realization should not Think beyond the scope of this invention.
Directly it can be held with reference to the step of method or algorithm that the embodiments described herein describes with hardware, processor Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
Detailed Jie has been carried out to the information transferring method and device of more piece base site controller cluster provided by the present invention above Continue.Specific case used herein is set forth to the principle and embodiment of the present invention, and the explanation of above example is only It is the method and its core concept for being used to help understand the present invention.It should be pointed out that for those skilled in the art For, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these improve and repaiied Decorations are also fallen into the protection domain of the claims in the present invention.

Claims (8)

  1. A kind of 1. information transferring method of more piece base site controller cluster, it is characterised in that including:
    Based on the balanced binary tree according to each control node ID dynamic formations, event request information caused by control node is passed Transport to main control node;
    Wherein, transmitting procedure of the event request information along the balanced binary tree is specially:
    When each control node in the balanced binary tree receives the event request information, judge whether itself is described Main control node;
    If it is not, the control node forwards the event request information according to from the position in the balanced binary tree To specified control node, the specified control node is father's control node or left sub- control node.
  2. 2. information transferring method according to claim 1, it is characterised in that described by event request caused by control node Also include after information transfer to main control node:
    Event request information described in the main control node processing, execute instruction is broadcasted to each control node.
  3. 3. information transferring method according to claim 2, it is characterised in that in event described in the main control node processing Solicited message, also include after broadcasting execute instruction to each control node:
    Each control node according to the execute instruction, perform the event request information corresponding to event, draw execution As a result;
    Each control node transmits the implementing result to the main control node along the balanced binary tree.
  4. 4. information transferring method according to claim 3, it is characterised in that in each control node by described in Implementing result also includes after being transmitted along the balanced binary tree to the main control node:
    The main control node judges whether the event runs succeeded according to the implementing result received;
    If so, perform next event;
    If it is not, perform rolling back action.
  5. A kind of 5. information carrying means of more piece base site controller cluster, it is characterised in that including:
    Balanced binary tree transmission policy module, for based on the balanced binary tree according to each control node ID dynamic formations, inciting somebody to action Event request information transfer caused by control node is to main control node;
    Wherein, transmitting procedure of the event request information along the balanced binary tree is specially:
    When each control node in the balanced binary tree receives the event request information, judge whether itself is described Main control node;
    If it is not, the control node forwards the event request information according to from the position in the balanced binary tree To specified control node, the specified control node is father's control node or left sub- control node.
  6. 6. information carrying means according to claim 5, it is characterised in that also include:
    Main control node broadcasts module, for handling the event request information, refer to each control node broadcast execution Order.
  7. 7. information carrying means according to claim 6, it is characterised in that also include:
    Control node execution module, for event corresponding to according to the execute instruction, performing the event request information, draw Implementing result;
    Control node result feedback module, for the implementing result to be transmitted to the main control along the balanced binary tree Node.
  8. 8. information carrying means according to claim 7, it is characterised in that also include:
    Main control node judge module, for according to the implementing result received, judging whether the event runs succeeded;
    Execution module, for if so, performing next event;
    Roll-back module, for if it is not, performing rolling back action.
CN201710541787.6A 2017-07-05 2017-07-05 Information transmission method and device for multi-node controller cluster Active CN107342942B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710541787.6A CN107342942B (en) 2017-07-05 2017-07-05 Information transmission method and device for multi-node controller cluster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710541787.6A CN107342942B (en) 2017-07-05 2017-07-05 Information transmission method and device for multi-node controller cluster

Publications (2)

Publication Number Publication Date
CN107342942A true CN107342942A (en) 2017-11-10
CN107342942B CN107342942B (en) 2020-09-18

Family

ID=60217979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710541787.6A Active CN107342942B (en) 2017-07-05 2017-07-05 Information transmission method and device for multi-node controller cluster

Country Status (1)

Country Link
CN (1) CN107342942B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108874322A (en) * 2018-06-29 2018-11-23 郑州云海信息技术有限公司 A kind of event-handling method, device and computer readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5544154A (en) * 1995-03-09 1996-08-06 Telefonaktiebolaget Lm Ericsson Method for determining the load induced by a routing verification test on a network
CN101047563A (en) * 2007-04-20 2007-10-03 北京航空航天大学 System, method and loading uniform method for implementing network resource adaptive
EP2621130A2 (en) * 2011-05-25 2013-07-31 Huawei Technologies Co., Ltd. Route calculation method and master node device in virtual network element
CN103780615A (en) * 2014-01-20 2014-05-07 五八同城信息技术有限公司 Sharing method of client conversation data among multiple servers
CN103780497A (en) * 2013-12-30 2014-05-07 华中科技大学 Expandable distributed coordination service management method under cloud platform
CN106227736A (en) * 2016-07-11 2016-12-14 乐视控股(北京)有限公司 A kind of logic flow implementation method based on list structure and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5544154A (en) * 1995-03-09 1996-08-06 Telefonaktiebolaget Lm Ericsson Method for determining the load induced by a routing verification test on a network
CN101047563A (en) * 2007-04-20 2007-10-03 北京航空航天大学 System, method and loading uniform method for implementing network resource adaptive
EP2621130A2 (en) * 2011-05-25 2013-07-31 Huawei Technologies Co., Ltd. Route calculation method and master node device in virtual network element
CN103780497A (en) * 2013-12-30 2014-05-07 华中科技大学 Expandable distributed coordination service management method under cloud platform
CN103780615A (en) * 2014-01-20 2014-05-07 五八同城信息技术有限公司 Sharing method of client conversation data among multiple servers
CN106227736A (en) * 2016-07-11 2016-12-14 乐视控股(北京)有限公司 A kind of logic flow implementation method based on list structure and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108874322A (en) * 2018-06-29 2018-11-23 郑州云海信息技术有限公司 A kind of event-handling method, device and computer readable storage medium

Also Published As

Publication number Publication date
CN107342942B (en) 2020-09-18

Similar Documents

Publication Publication Date Title
US20200374288A1 (en) Block chain-based multi-chain management method and system, electronic device, and storage medium
JP3861559B2 (en) Mobile agent control method
CN109213900B (en) Data modification method, device, equipment and medium for block chain
CN102204188B (en) Routing computation method and host node device in virtual network element
CN108769150A (en) Data processing method, device, clustered node and the storage medium of block chain network
CN108124003A (en) Network management device connection processing method, apparatus and system
CN106453625B (en) Information synchronization method and high availability cluster system
CN102647323B (en) Flow control method and device as well as clustering system
CN102200901A (en) Image transfer method, image transfer system, and projector
CN101406060A (en) Time-delay video downloading service by using P2P content distribution network
CN109819048A (en) Method of data synchronization, device, terminal and storage medium
CN109474449A (en) A kind of method and device of processing network slice example
EP2916522A1 (en) File transmission method and system thereof
CN106059936B (en) The method and device of cloud system Multicast File
CN104182283B (en) A kind of task synchronization method
CN106777164A (en) A kind of Data Migration cluster and data migration method
CN103281356A (en) File distribution method and system
CN109274778A (en) Dispatching method, device and the equipment of http request access file system resource
CN107222316B (en) Chat room configuration method and chat room system adaptive to number of people in room
CN112351106B (en) Service grid platform containing event grid and communication method thereof
CN110213359A (en) A kind of car networking networking data delivery system and method based on D2D
CN107342942A (en) A kind of information transferring method and device of more piece base site controller cluster
CN104301439A (en) Load balancing method, device and system
CN106210053A (en) A kind of electrical power system wide-area information management method
CN201387555Y (en) Comprehensive remote control monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200821

Address after: 215100 No. 1 Guanpu Road, Guoxiang Street, Wuzhong Economic Development Zone, Suzhou City, Jiangsu Province

Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: 450018 Henan province Zheng Dong New District of Zhengzhou City Xinyi Road No. 278 16 floor room 1601

Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant