CN107338956A - A kind of hole to be provided sleeve pipe and its application method - Google Patents

A kind of hole to be provided sleeve pipe and its application method Download PDF

Info

Publication number
CN107338956A
CN107338956A CN201710601990.8A CN201710601990A CN107338956A CN 107338956 A CN107338956 A CN 107338956A CN 201710601990 A CN201710601990 A CN 201710601990A CN 107338956 A CN107338956 A CN 107338956A
Authority
CN
China
Prior art keywords
chain
arc
shaped
central rod
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710601990.8A
Other languages
Chinese (zh)
Inventor
屈建国
王友明
高存金
朱峰
程广仁
李云
贾红卫
栗祥
田宁
邵娜
刘运成
王广涛
李明华
张超
张光博
陶文荣
朱正军
申继光
王超
阴启东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201710601990.8A priority Critical patent/CN107338956A/en
Publication of CN107338956A publication Critical patent/CN107338956A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of hole to be provided sleeve pipe and its application method, its structure includes 2N pieces arc shrouds, fagging, fagging is in hub-and-spoke configuration and is configured with 2N extension, each extension in a tubular form and corresponding supports a piece of arc shrouds, it is used cooperatively with the extension of the fagging, it is each equipped with inserting the projection of extension inner chamber on the inwall of every arc shrouds, after the fagging is installed, all arc shrouds scrabble up circular tube shaped, that is every arc shrouds are to piece together 2N/mono- of rear pipe, and N here is >=1 natural number.A kind of hole to be provided sleeve pipe and its application method of the present invention compared with prior art, high recycling rate, effectively improves efficiency of construction, shortens worker and guards the time, saves material, practical, applied widely, has good application value.

Description

一种预留洞套管及其使用方法A bushing with reserved holes and its application method

技术领域technical field

本发明涉及市政施工设备技术领域,具体地说是一种预留洞套管及其使用方法。The invention relates to the technical field of municipal construction equipment, in particular to a bushing with reserved holes and its usage method.

背景技术Background technique

现有技术的机电工程施工中,均需要预留大量穿楼板洞口,尤其是给水、排水、雨水、空调水系统较为常见。前期预留洞口质量高低对后期机电安装是否顺利进行起着至关重要的作用。目前常规的预留洞施工工艺通常采用PVC、钢制套管直接预埋或由此加工而成的普通手提套管。对于直埋套管需要用钉子及扎丝等辅件将其固定到模板上,而且直埋套管与常规手提套管必须在混凝土浇筑完并达到一定强度后拔出,对时间要求严,在提取套管过程中会在混凝土完成面上留下人为痕迹。预埋过程中经常出现混凝土进入套管内或套管取不出的情况,需要采用敲击的方式将套管取出,这样既会破坏预留洞口,又会对套管本身造成损坏,使套管不能重复利用。传统的施工方法耗时、耗力、耗材,已不符合绿色施工的要求。In the construction of mechanical and electrical engineering in the prior art, it is necessary to reserve a large number of openings through the floor slab, especially for water supply, drainage, rainwater, and air-conditioning water systems. The quality of the openings reserved in the early stage plays a vital role in the smooth progress of the electromechanical installation in the later stage. The current conventional construction technology for reserved holes usually uses PVC and steel casings to be directly embedded or ordinary portable casings processed therefrom. For the direct buried casing, it needs to be fixed to the formwork with nails and tie wires and other accessories, and the direct buried casing and the conventional portable casing must be pulled out after the concrete is poured and reaches a certain strength. The time requirement is strict. The process of extracting the casing leaves artifacts on the concrete finish. During the pre-embedding process, it often happens that the concrete enters the casing or the casing cannot be taken out. It is necessary to take out the casing by tapping, which will not only destroy the reserved hole, but also cause damage to the casing itself, making the casing Cannot be reused. Traditional construction methods are time-consuming, labor-intensive, and consumable, which no longer meet the requirements of green construction.

基于上述问题,本发明提出了一种预留洞套管及其使用方法,来解决现有的技术缺陷。Based on the above problems, the present invention proposes a bushing with reserved holes and its usage method to solve the existing technical defects.

发明内容Contents of the invention

本发明的技术任务是针对以上不足之处,提供一种能够克服现有技术重复利用率低、看守时间长、预留洞口质量差问题的预留洞套管及其使用方法。The technical task of the present invention is to address the above deficiencies, to provide a reserved hole casing and its use method that can overcome the problems of low reuse rate, long guard time, and poor quality of reserved holes in the prior art.

一种预留洞套管,其结构包括2N片弧形套管、撑板,撑板呈星型结构并配置有2N个延长段,每个延长段均呈管状并对应支撑一片弧形套管,与该撑板的延长段配合使用的,在每片弧形套管的内壁上均配置有可置入延长段内腔的凸块,安装该撑板后,所有弧形套管拼凑成圆管状,即每片弧形套管为拼凑后圆管的2N分之一,这里的N为≥1的自然数。A bushing with a reserved hole, its structure includes 2N arc-shaped bushings and braces, the braces are star-shaped and equipped with 2N extensions, each extension is tubular and supports a corresponding arc-shaped bushing , used in conjunction with the extension of the brace, the inner wall of each arc-shaped sleeve is equipped with a bump that can be inserted into the inner cavity of the extension. After installing the brace, all the arc-shaped casings are pieced together to form a circle Tubular, that is, each piece of arc-shaped casing is 1/2N of the round pipe after assembly, where N is a natural number ≥ 1.

每两片相邻弧形套管之间均通过链状连接件或活页活动连接,当采用链状连接件连接时,该链状连接件的两端分别通过螺栓固定在两片相邻的弧形套管上。Every two adjacent arc-shaped sleeves are connected by chain connectors or loose-leaf joints. When chain connectors are used, the two ends of the chain connectors are respectively fixed on two adjacent arc-shaped sleeves by bolts. shaped casing.

每片弧形套管上用于与相邻弧形套管相连接的两连接面均为倾斜面,该两连接面分别为倾斜面一、倾斜面二,每片弧形套管的两连接面可配合使用,即每片弧形套管的倾斜面一与相邻弧形套管的倾斜面二配合连接。The two connecting surfaces used to connect with adjacent arc-shaped casings on each piece of arc-shaped casing are inclined surfaces, and the two connecting surfaces are respectively inclined surface one and inclined surface two. The surfaces can be used together, that is, the inclined surface one of each arc-shaped sleeve is connected with the inclined surface two of the adjacent arc-shaped sleeve.

所有弧形套管均连接到放置在拼凑后圆管内的提拉机构上,该提拉机构由中心杆、链状连接件组成,链状连接件的一端固定在上述弧形套管的内壁上、另一端则通过铁环固定在中心杆的外壁上,该链状连接件分成长度顺序递减的N种:第一链条、第二链条……第N链条,且顺序连接在弧形套管与中心杆之间,即连接弧形套管与中心杆的链状连接件分别为第一链条、第二链条……第N链条、第一链条、第二链条……第N链条。All the arc-shaped sleeves are connected to the lifting mechanism placed in the assembled round tube. The lifting mechanism is composed of a central rod and a chain-shaped connector. One end of the chain-shaped connector is fixed on the inner wall of the above-mentioned arc-shaped sleeve. , and the other end is fixed on the outer wall of the central rod through an iron ring. The chain-like connectors are divided into N types in descending order of length: the first chain, the second chain...the Nth chain, and are sequentially connected between the arc sleeve and the Between the central rods, that is, the chain-like connectors connecting the arc-shaped sleeve and the central rod are respectively the first chain, the second chain...the Nth chain, the first chain, the second chain...the Nth chain.

所有弧形套管均连接到放置在拼凑后圆管内的提拉机构上,该提拉机构由中心杆、中心管、链状连接件组成,中心杆套接在中心管内,在中心杆的下侧焊接配置有凸条,与该凸条配合使用的,中心管的下侧开设有滑道,该中心管的长度与弧形套管长度相同,该中心套管放置在拼凑后的圆管内后,其顶部、底部均与拼凑后的圆管相平齐;所述链状连接件的一端固定在上述弧形套管的内壁上、另一端则通过铁环固定在中心管的外壁上,该链状连接件分成长度顺序递减的N种:第一链条、第二链条……第N链条,且顺序连接在弧形套管与中心管之间,即连接弧形套管与中心管的链状连接件分别为第一链条、第二链条……第N链条、第一链条、第二链条……第N链条。All arc-shaped sleeves are connected to the lifting mechanism placed in the round tube after patchwork. The lifting mechanism is composed of a central rod, a central tube, and a chain connector. The central rod is sleeved in the central tube. The side welding is equipped with convex strips, and the lower side of the central tube is provided with a slideway for use with the convex strips. The length of the central tube is the same as that of the arc-shaped sleeve, and the central sleeve is placed in the round tube after assembly. , the top and bottom of which are flush with the pieced round tube; one end of the chain connector is fixed on the inner wall of the above-mentioned arc-shaped sleeve, and the other end is fixed on the outer wall of the central tube through an iron ring. The chain connectors are divided into N types in descending order of length: the first chain, the second chain...the Nth chain, and they are sequentially connected between the arc-shaped sleeve and the center tube, that is, the chain connecting the arc-shaped sleeve and the center tube The connectors are respectively the first chain, the second chain...the Nth chain, the first chain, the second chain...the Nth chain.

当提拉机构由中心杆、链状连接件组成时,撑板上开设有放置中心杆的凹口;当提拉机构由中心杆、中心管、链状连接件组成时,撑板上开设有放置中心杆的凹口。When the lifting mechanism is composed of a central rod and a chain-shaped connector, a notch for placing the central rod is provided on the support plate; Place the notch for the center pole.

所述中心杆的顶部配置有抓手,该抓手与中心杆配合呈“T”字形;该中心杆的底部则配置有螺纹钻头,该中心杆的顶部、底部均伸出拼凑后的圆管。The top of the central rod is equipped with a gripper, and the gripper cooperates with the central rod to form a "T" shape; the bottom of the central rod is equipped with a threaded drill bit, and the top and bottom of the central rod protrude out of the pieced round tube .

所述拼凑后的圆管顶部配置有圆形盖板,该盖板套接在中心杆上并通过螺母固定,相对应的,中心杆的上部设置有与螺母配合使用的螺纹,盖板固定后,其外圆周与拼凑后的圆管外圆周相平齐。The top of the patched round tube is equipped with a circular cover plate, which is sleeved on the central rod and fixed by a nut. Correspondingly, the upper part of the central rod is provided with a screw thread used in conjunction with the nut. After the cover plate is fixed , and its outer circumference is flush with the outer circumference of the pieced circular tube.

所述弧形套管设置有四片,每片弧形套管为拼凑后圆管的四分之一,相对应的,撑板配置有四个延长段,提拉机构的链状连接件分成长度不同的两种:第一链条、第二链条。The arc-shaped sleeve is provided with four pieces, and each piece of arc-shaped sleeve is a quarter of the circular tube after being pieced together. Correspondingly, the support plate is equipped with four extension sections, and the chain-like connectors of the lifting mechanism are divided into Two different lengths: the first chain and the second chain.

本发明还提供一种预留洞套管的使用方法,该使用方法的实现过程为:The present invention also provides a method for using the bushing with reserved holes, the implementation process of the method is as follows:

查阅图纸,根据梁或墙体位置,弹线确定预留洞口中心位置。Consult the drawing, and determine the center position of the reserved opening according to the position of the beam or wall and the spring line.

首先弹线确定预留洞口中心位置;First, determine the center position of the reserved hole by snapping the line;

确定预留洞口中心位置后,将拼凑后的圆管放置平稳,中心杆下方的螺纹钻头放置在预留洞口中心位置上;After determining the center position of the reserved hole, place the pieced round pipe stably, and place the threaded drill bit under the center rod on the center position of the reserved hole;

转动抓手,将中心杆下方的螺纹钻头钻入模板,牢固固定后用撑板将套管撑开,使弧形套管放置在预留洞口位置处;Turn the gripper, drill the threaded drill bit under the center rod into the formwork, and then use the support plate to spread the casing after it is firmly fixed, so that the arc-shaped casing is placed at the reserved hole position;

弧形套管按规定位置放置后,旋转盖板上方螺母,将盖板向下压紧,弧形套管完成固定;After the arc-shaped sleeve is placed at the specified position, rotate the nut above the cover plate to press the cover plate downward, and the arc-shaped sleeve is fixed;

待混凝土凝固后,松动螺母,提起盖板,将撑板取出;After the concrete is solidified, loosen the nuts, lift the cover plate, and take out the support plate;

旋转抓手,将中心杆的螺纹钻头从模板内钻出;Rotate the gripper to drill the threaded drill bit of the central rod out of the formwork;

提起中心杆的抓手,将套管从混凝土洞口内整体提出。Lift the gripper of the center rod, and lift the casing out of the concrete hole as a whole.

本发明的一种预留洞套管及其使用方法和现有技术相比,具有以下有益效果:Compared with the prior art, a reserved hole sleeve and its application method of the present invention have the following beneficial effects:

本发明的一种预留洞套管及其使用方法具有投入少、安拆方便、操作便捷、移动方便、经济适用等特点,本装置重复利用率高,有效提高施工效率,缩短工人看守时间,节约材料;混凝土凝固后无需敲打,提取方便,操作简单,可提高预留洞口质量,不破坏混凝土完成面,避免杂物进入套管;固定牢固,防止套管移位;本装置缩短了作业时间,节省了人工成本,减少了材料浪费,创造较好的经济效益,实用性强,适用范围广泛,具有很好的推广应用价值。A bushing with a reserved hole in the present invention and its use method have the characteristics of less investment, convenient installation and disassembly, convenient operation, convenient movement, and economical application. Save material; after the concrete is solidified, there is no need to beat it, it is convenient to extract, and the operation is simple, which can improve the quality of the reserved hole, does not damage the finished surface of the concrete, and prevents debris from entering the casing; it is firmly fixed to prevent the casing from shifting; this device shortens the working time , saving labor costs, reducing material waste, creating better economic benefits, strong practicability, wide application range, and good promotion and application value.

附图说明Description of drawings

附图1为本发明的俯面结构示意图。Accompanying drawing 1 is the top structure diagram of the present invention.

附图2为本发明的A-A剖视图。Accompanying drawing 2 is A-A sectional view of the present invention.

附图3为本发明的B-B剖视图。Accompanying drawing 3 is B-B sectional view of the present invention.

附图4为本发明的C向剖视图。Accompanying drawing 4 is the C sectional view of the present invention.

附图5为本发明的撑板示意图。Accompanying drawing 5 is the schematic diagram of the brace plate of the present invention.

附图中的标记分别表示:The marks in the accompanying drawings indicate respectively:

1、抓手,2、螺母,3、盖板,4、弧形套管,5、螺栓,6、链状连接件,7、第一链条,8、撑板,9、凸块,10、中心管,11、中心杆,12、第二链条,13、铁环,14、凸条,15、滑道, 16、倾斜面一,17、倾斜面二,18、凹口。1. Gripper, 2. Nut, 3. Cover plate, 4. Arc sleeve, 5. Bolt, 6. Chain connector, 7. First chain, 8. Support plate, 9. Bump, 10. Center tube, 11, center rod, 12, second chain, 13, hoop, 14, raised bar, 15, slideway, 16, inclined surface one, 17, inclined surface two, 18, notch.

具体实施方式detailed description

下面结合附图及具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

如附图1、图2、图3、图4、图5所示,一种预留洞套管,其结构包括2N片弧形套管4、撑板8,撑板8呈星型结构并配置有2N个延长段,每个延长段均呈管状并对应支撑一片弧形套管4,与该撑板8的延长段配合使用的,在每片弧形套管4的内壁上均配置有可置入延长段内腔的凸块9,安装该撑板8后,所有弧形套管4拼凑成圆管状,即每片弧形套管4为拼凑后圆管的2N分之一,这里的N为≥1的自然数。As shown in Figure 1, Figure 2, Figure 3, Figure 4, and Figure 5, a sleeve with reserved holes has a structure including 2N arc-shaped sleeves 4 and braces 8, and the braces 8 are in a star-shaped structure and There are 2N extension sections, and each extension section is tubular and supports an arc-shaped sleeve 4 correspondingly. For use with the extension section of the support plate 8 , each arc-shaped sleeve 4 is equipped with a The protrusion 9 that can be placed in the inner cavity of the extension section, after installing the support plate 8, all the arc-shaped sleeves 4 are assembled into a circular tube shape, that is, each piece of arc-shaped sleeve 4 is 1/2N of the assembled round tube, here N is a natural number ≥ 1.

每两片相邻弧形套管4之间均通过链状连接件6或活页活动连接,当采用链状连接件6连接时,该链状连接件6的两端分别通过螺栓5固定在两片相邻的弧形套管4上。Every two adjacent arc-shaped sleeves 4 are movably connected by a chain connector 6 or loose-leaf. On the adjacent arc sleeve 4 of the sheet.

每片弧形套管4上用于与相邻弧形套管4相连接的两连接面均为倾斜面,该两连接面分别为倾斜面一16、倾斜面二17,每片弧形套管4的两连接面可配合使用,即每片弧形套管4的倾斜面一16与相邻弧形套管4的倾斜面二17配合连接。The two connection surfaces that are used to connect with the adjacent arc casing 4 on each piece of arc casing 4 are inclined surfaces, and the two connection surfaces are respectively inclined surface one 16 and inclined surface two 17. The two connection surfaces of the pipe 4 can be used in conjunction, that is, the inclined surface one 16 of each arc-shaped sleeve 4 is connected with the inclined surface two 17 of the adjacent arc-shaped sleeve 4 .

所有弧形套管4均连接到放置在拼凑后圆管内的提拉机构上,该提拉机构由中心杆11、链状连接件组成,链状连接件的一端固定在上述弧形套管4的内壁上、另一端则通过铁环13固定在中心杆11的外壁上,该链状连接件分成长度顺序递减的N种:第一链条、第二链条……第N链条,且顺序连接在弧形套管4与中心杆11之间,即连接弧形套管4与中心杆11的链状连接件分别为第一链条、第二链条……第N链条、第一链条、第二链条……第N链条。All the arc-shaped sleeves 4 are connected to the lifting mechanism placed in the round tube after patching together. The lifting mechanism is composed of a central rod 11 and a chain-shaped connector. One end of the chain-shaped connector is fixed on the above-mentioned arc-shaped sleeve 4 The other end is fixed on the outer wall of the central rod 11 through an iron ring 13. The chain-like connectors are divided into N types in descending order of length: the first chain, the second chain...the Nth chain, and are connected in sequence Between the arc-shaped sleeve 4 and the center rod 11, that is, the chain-like connectors connecting the arc-shaped sleeve 4 and the center rod 11 are respectively the first chain, the second chain...the Nth chain, the first chain, and the second chain ... the Nth chain.

或:or:

所有提拉机构由中心杆11、中心管10、链状连接件组成,中心杆11套接在中心管10内,在中心杆11的下侧焊接配置有凸条14,与该凸条14配合使用的,中心管10的下侧开设有滑道15,该凸条14与滑道15和实现下述盖板3的相对固定,该中心管10的长度与弧形套管4长度相同,该中心套管放置在拼凑后的圆管内后,其顶部、底部均与拼凑后的圆管相平齐;所述链状连接件的一端固定在上述弧形套管4的内壁上、另一端则通过铁环13固定在中心管10的外壁上,该链状连接件分成长度顺序递减的N种:第一链条、第二链条……第N链条,且顺序连接在弧形套管4与中心管10之间,即连接弧形套管4与中心管10的链状连接件分别为第一链条、第二链条……第N链条、第一链条、第二链条……第N链条。All lifting mechanisms are composed of a central rod 11, a central tube 10, and a chain connector. The central rod 11 is sleeved in the central tube 10, and a convex strip 14 is welded on the lower side of the central rod 11 to cooperate with the convex strip 14. For use, the lower side of the central tube 10 is provided with a slideway 15, and the convex strip 14 is relatively fixed with the slideway 15 and the cover plate 3 described below. The length of the central tube 10 is the same as that of the arc sleeve 4. After the center sleeve is placed in the pieced round tube, its top and bottom are flush with the pieced up round tube; one end of the chain-like connector is fixed on the inner wall of the above-mentioned arc-shaped sleeve 4, and the other end is Fixed on the outer wall of the central tube 10 by an iron ring 13, the chain-like connectors are divided into N types in descending order of length: the first chain, the second chain...the Nth chain, and are sequentially connected between the arc-shaped sleeve 4 and the center Between the pipes 10, that is to say, the chain-shaped connectors connecting the arc-shaped casing 4 and the central pipe 10 are respectively the first chain, the second chain...the Nth chain, the first chain, the second chain...the Nth chain.

当提拉机构由中心杆11、链状连接件组成时,撑板8上开设有放置中心杆11的凹口18;当提拉机构由中心杆11、中心管10、链状连接件组成时,撑板8上开设有放置中心杆11的凹口18。When the lifting mechanism is composed of a central rod 11 and a chain connector, the support plate 8 is provided with a notch 18 for placing the central rod 11; when the lifting mechanism is composed of a central rod 11, a central tube 10 and a chain connector , The support plate 8 is provided with a notch 18 for placing the central rod 11 .

所述中心杆11的顶部配置有抓手1,该抓手1与中心杆11配合呈“T”字形;该中心杆11的底部则配置有螺纹钻头,该中心杆11的顶部、底部均伸出拼凑后的圆管。The top of the central rod 11 is equipped with a handle 1, which is in the shape of a "T" with the central rod 11; The assembled round tube is produced.

所述拼凑后的圆管顶部配置有圆形盖板3,该盖板3套接在中心杆11上并通过螺母2固定,相对应的,中心杆11的上部设置有与螺母2配合使用的螺纹,盖板3固定后,其外圆周与拼凑后的圆管外圆周相平齐。The top of the pieced round tube is equipped with a circular cover plate 3, which is sleeved on the central rod 11 and fixed by the nut 2. Correspondingly, the upper part of the central rod 11 is provided with a thread, after the cover plate 3 is fixed, its outer circumference is flush with the outer circumference of the round pipe after patching together.

下面以N=2为例,也就是说,在本发明中的弧形套管4设置有四片,每片弧形套管4为拼凑后圆管的四分之一,相对应的,撑板8配置有四个延长段,提拉机构的链状连接件分成长度不同的两种:第一链条7、第二链条12。Take N=2 as an example below, that is to say, the arc-shaped casing 4 in the present invention is provided with four pieces, and each piece of arc-shaped casing 4 is a quarter of the round pipe after patching together. Correspondingly, the brace The plate 8 is configured with four extensions, and the chain connectors of the lifting mechanism are divided into two types with different lengths: the first chain 7 and the second chain 12 .

所述链状连接件为铁链,该铁链及上述铁环13均为钢制,弧形套管4及螺栓、螺母2为镀锌构件,其余均为铁质材料,具体连接可采用焊接方式实现。The chain connector is an iron chain, the iron chain and the above-mentioned iron ring 13 are all made of steel, the arc-shaped sleeve 4 and the bolts and nuts 2 are galvanized components, and the rest are iron materials. The specific connection can be made by welding way to achieve.

对于四瓣四分之一圆弧套管均为等弧长等圆心角的弧形套管4,各弧形套管4的弧长边缘角均呈45°。For the arc sleeves 4 with the four petals and quarter arc sleeves having equal arc lengths and equal central angles, the arc lengths and edge angles of each arc sleeve 4 are all 45°.

对于圆弧套管间的铁链及其固定螺栓,各圆弧套管接口处两侧各15°圆心角位置,上下均匀设置两个固定螺栓,使用链状连接件,即较细铁链与固定螺栓固定,将各圆弧套管连接。For the iron chains and their fixing bolts between the arc casings, two fixing bolts are evenly arranged on the upper and lower sides at the central angle of 15° on both sides of the interface of each arc casing, and chain connectors are used, that is, thinner iron chains and The fixing bolts are fixed to connect the arc sleeves.

对于圆弧套管与中心管10之间相连的第一链条7、第二链条12的连接端均处于同一水平面上,上下均匀设置固定螺栓。图2中绘出的第一链条7较图3中绘出的第二链条12稍长,且第一链条7的富余长度均为其本身长度的1/3,达到提升固定杆的过程中,图2中的第一链条7先受力,图3中的第二链条12后受力,圆弧套管间的链状连接件不受力的目的。The connecting ends of the first chain 7 and the second chain 12 connected between the arc sleeve and the central pipe 10 are all on the same horizontal plane, and the fixing bolts are evenly arranged up and down. The first chain 7 drawn in Fig. 2 is slightly longer than the second chain 12 drawn in Fig. 3, and the surplus length of the first chain 7 is 1/3 of its own length, reaching the process of lifting the fixed rod, The first chain 7 in Fig. 2 is stressed first, the second chain 12 in Fig. 3 is stressed first, and the purpose of the chain-like connectors between the arc sleeves not being stressed.

对于中心管10,中心管10长度与套管高度相等,且可满足中心杆11盛放空间,材质选用Ø20焊管。如图2所示,中心管10下方两侧各预留高4cm圆弧角为90°的空间。For the central tube 10, the length of the central tube 10 is equal to the height of the casing, and can meet the storage space of the central rod 11, and the material is a Ø20 welded pipe. As shown in FIG. 2 , a space with a height of 4 cm and an arc angle of 90° is reserved on both sides below the central tube 10 .

对于铁环13,铁环13位置与弧形套管4的固定螺栓水平位置相同,由上下两个限位点将铁环13限定在固定水平面,铁环13大小较中心管10管径大1号。For the iron ring 13, the position of the iron ring 13 is the same as the horizontal position of the fixing bolt of the arc-shaped sleeve 4, and the iron ring 13 is limited to a fixed horizontal plane by the upper and lower limit points, and the size of the iron ring 13 is larger than the diameter of the center pipe 10 by 1 No.

对于撑板8及凸块9,凸块9位于各弧形套管4垂直方向的中心,且4个支持点均匀分布,如图1-图4所示,使撑板8可以水平放置,如图5为撑板8形状。当撑板8将套管撑开时,弧形套管4间无明显间隙。For the brace 8 and the bump 9, the bump 9 is located at the vertical center of each arc-shaped casing 4, and the four support points are evenly distributed, as shown in Figures 1-4, so that the brace 8 can be placed horizontally, as Fig. 5 shows the shape of the support plate 8. When the support plate 8 stretches the sleeve pipes, there is no obvious gap between the arc sleeve pipes 4 .

对于中心杆11,如图2、图3所示,最上方设置一个抓手1,再向下为一段螺纹,用于螺母2限定盖板3,下方设置两个限定杆,用于提升中心管10,最下方为螺纹钻头,用于与模板固定。For the center rod 11, as shown in Figure 2 and Figure 3, a gripper 1 is set at the top, and a section of thread is provided downward for the nut 2 to limit the cover plate 3, and two limit rods are set at the bottom for lifting the center tube 10. The bottom part is a threaded drill bit, which is used to fix with the template.

对于盖板3,盖板3轮廓可将套管覆盖,用螺母2将盖板3压紧,既起到防止异物进入套管的目的,又起到将套管固定于模板上的目的。For the cover plate 3, the outline of the cover plate 3 can cover the casing, and the cover plate 3 is pressed tightly with the nut 2, which not only prevents foreign matter from entering the casing, but also fixes the casing on the formwork.

基于上述结构,本发明还提供一种预留洞套管的使用方法,该使用方法的具体实现过程为:Based on the above structure, the present invention also provides a method for using the bushing with a reserved hole, and the specific implementation process of the method is as follows:

查阅图纸,根据梁或墙体位置,弹线确定预留洞口中心位置。Consult the drawing, and determine the center position of the reserved opening according to the position of the beam or wall and the spring line.

确定预留洞口中心位置后,将此放置平稳,中心杆11下方的螺纹钻头放置在预留洞口中心位置上。After determining the central position of the reserved hole, this is placed steadily, and the threaded drill bit below the central rod 11 is placed on the central position of the reserved hole.

转动抓手1,将中心杆11下方的螺纹钻头钻入模板,牢固固定后用撑板8将套管撑开,使套管放置在预留洞口位置处。Turn the gripper 1, drill the threaded drill bit under the central rod 11 into the formwork, and after it is firmly fixed, use the support plate 8 to spread the casing, so that the casing is placed at the reserved hole position.

套管按规定位置放置后,旋转盖板3上方螺母2,将盖板3向下压紧,套管完成固定。After the casing is placed at the specified position, rotate the nut 2 above the cover plate 3 to press the cover plate 3 downward, and the casing is fixed.

待混凝土凝固后,松动螺母2,提起盖板3,将撑板8取出。After the concrete is solidified, loosen the nut 2, lift the cover plate 3, and take out the support plate 8.

旋转抓手1,将中心杆11的螺纹钻头从模板内钻出。Rotate the gripper 1 to drill the threaded drill bit of the central rod 11 out of the template.

提起中心杆11的抓手1 ,将套管从混凝土洞口内整体提出。Lift the gripper 1 of the central rod 11, and the casing is lifted out of the concrete hole as a whole.

通过上面具体实施方式,所述技术领域的技术人员可容易的实现本发明。但是应当理解,本发明并不限于上述的具体实施方式。在公开的实施方式的基础上,所述技术领域的技术人员可任意组合不同的技术特征,从而实现不同的技术方案。Through the above specific implementation manners, those skilled in the technical field can easily realize the present invention. However, it should be understood that the present invention is not limited to the specific embodiments described above. On the basis of the disclosed embodiments, those skilled in the art can arbitrarily combine different technical features, so as to realize different technical solutions.

除说明书所述的技术特征外,均为本专业技术人员的已知技术。Except for the technical features described in the instructions, all are known technologies by those skilled in the art.

Claims (10)

1.一种预留洞套管,其特征在于,其结构包括2N片弧形套管、撑板,撑板呈星型结构并配置有2N个延长段,每个延长段均呈管状并对应支撑一片弧形套管,与该撑板的延长段配合使用的,在每片弧形套管的内壁上均配置有可置入延长段内腔的凸块,安装该撑板后,所有弧形套管拼凑成圆管状,即每片弧形套管为拼凑后圆管的2N分之一,这里的N为≥1的自然数。1. A casing with reserved holes, characterized in that its structure includes 2N arc-shaped casings and braces, the braces are star-shaped and equipped with 2N extensions, each extension is tubular and corresponds to Support a piece of arc-shaped sleeve, and use it in conjunction with the extension section of the support plate. On the inner wall of each piece of arc-shaped sleeve, there is a protrusion that can be inserted into the inner cavity of the extension section. After installing the support plate, all arcs Shaped sleeves are assembled into a circular tube shape, that is, each piece of arc-shaped sleeve is 1/2N of the assembled circular tube, where N is a natural number ≥ 1. 2.根据权利要求1所述的一种预留洞套管,其特征在于,每两片相邻弧形套管之间均通过链状连接件或活页活动连接,当采用链状连接件连接时,该链状连接件的两端分别通过螺栓固定在两片相邻的弧形套管上。2. A bushing with a reserved hole according to claim 1, characterized in that every two adjacent arc-shaped bushings are movably connected by a chain connector or loose-leaf, when a chain connector is used to connect , the two ends of the chain connector are respectively fixed on two adjacent arc-shaped sleeves by bolts. 3.根据权利要求1或2所述的一种预留洞套管,其特征在于,每片弧形套管上用于与相邻弧形套管相连接的两连接面均为倾斜面,该两连接面分别为倾斜面一、倾斜面二,每片弧形套管的两连接面可配合使用,即每片弧形套管的倾斜面一与相邻弧形套管的倾斜面二配合连接。3. A bushing with reserved holes according to claim 1 or 2, characterized in that, the two connecting surfaces used to connect with adjacent arc-shaped bushings on each arc-shaped bushing are inclined surfaces, The two connecting surfaces are inclined surface one and inclined surface two respectively, and the two connecting surfaces of each arc-shaped casing can be used together, that is, the inclined surface one of each arc-shaped casing and the inclined surface two of the adjacent arc-shaped casing Mate connection. 4.根据权利要求1所述的一种预留洞套管,其特征在于,所有弧形套管均连接到放置在拼凑后圆管内的提拉机构上,该提拉机构由中心杆、链状连接件组成,链状连接件的一端固定在上述弧形套管的内壁上、另一端则通过铁环固定在中心杆的外壁上,该链状连接件分成长度顺序递减的N种:第一链条、第二链条……第N链条,且顺序连接在弧形套管与中心杆之间,即连接弧形套管与中心杆的链状连接件分别为第一链条、第二链条……第N链条、第一链条、第二链条……第N链条。4. A bushing with reserved holes according to claim 1, characterized in that all arc-shaped bushings are connected to a lifting mechanism placed in the round tube after patching together, and the lifting mechanism is composed of a central rod, a chain One end of the chain-shaped connector is fixed on the inner wall of the above-mentioned arc-shaped casing, and the other end is fixed on the outer wall of the central rod through an iron ring. The chain-shaped connectors are divided into N types in descending order of length: The first chain, the second chain...the Nth chain, and are sequentially connected between the arc-shaped sleeve and the central rod, that is, the chain-like connectors connecting the arc-shaped sleeve and the central rod are the first chain, the second chain... ...the Nth chain, the first chain, the second chain...the Nth chain. 5.根据权利要求4所述的一种预留洞套管,其特征在于,所述撑板上开设有放置中心杆的凹口。5 . The bushing with a reserved hole according to claim 4 , wherein a notch for placing a central rod is opened on the support plate. 6 . 6.根据权利要求1所述的一种预留洞套管,其特征在于,所有弧形套管均连接到放置在拼凑后圆管内的提拉机构上,该提拉机构由中心杆、中心管、链状连接件组成,中心杆套接在中心管内,在中心杆的下侧焊接配置有凸条,与该凸条配合使用的,中心管的下侧开设有滑道,该中心管的长度与弧形套管长度相同,该中心套管放置在拼凑后的圆管内后,其顶部、底部均与拼凑后的圆管相平齐;所述链状连接件的一端固定在上述弧形套管的内壁上、另一端则通过铁环固定在中心管的外壁上,该链状连接件分成长度顺序递减的N种:第一链条、第二链条……第N链条,且顺序连接在弧形套管与中心管之间,即连接弧形套管与中心管的链状连接件分别为第一链条、第二链条……第N链条、第一链条、第二链条……第N链条。6. A bushing with reserved holes according to claim 1, characterized in that all arc-shaped bushings are connected to a lifting mechanism placed in the round tube after patching together, and the lifting mechanism consists of a central rod, a central Composed of tubes and chain-like connectors, the central rod is sleeved in the central tube, and a raised strip is welded on the lower side of the central rod. For use with the raised strip, a slideway is provided on the lower side of the central tube. The length is the same as that of the arc-shaped sleeve. After the central sleeve is placed in the round tube after assembly, its top and bottom are flush with the round tube after assembly; one end of the chain-like connector is fixed on the above-mentioned arc On the inner wall of the casing, the other end is fixed on the outer wall of the central tube through an iron ring. The chain-like connectors are divided into N types in descending order of length: the first chain, the second chain...the Nth chain, and are connected in sequence Between the arc-shaped sleeve and the center tube, that is, the chain-shaped connectors connecting the arc-shaped sleeve and the center tube are the first chain, the second chain...the Nth chain, the first chain, the second chain...the Nth chain chain. 7.根据权利要求6所述的一种预留洞套管,其特征在于,所述撑板上开设有放置中心杆的凹口。7 . The bushing with a reserved hole according to claim 6 , wherein a notch for placing a central rod is opened on the support plate. 8 . 8.根据权利要求4-7任一所述的一种预留洞套管,其特征在于,所述中心杆的顶部配置有抓手,该抓手与中心杆配合呈“T”字形;该中心杆的底部则配置有螺纹钻头,该中心杆的顶部、底部均伸出拼凑后的圆管。8. A bushing with a reserved hole according to any one of claims 4-7, characterized in that, the top of the central rod is provided with a gripper, and the gripper cooperates with the central rod to form a "T" shape; the The bottom of the center rod is equipped with a threaded drill bit, and the top and bottom of the center rod all extend out of the pieced round pipe. 9.根据权利要求8所述的一种预留洞套管,其特征在于,所述拼凑后的圆管顶部配置有圆形盖板,该盖板套接在中心杆上并通过螺母固定,相对应的,中心杆的上部设置有与螺母配合使用的螺纹,盖板固定后,其外圆周与拼凑后的圆管外圆周相平齐。9. A bushing with a reserved hole according to claim 8, characterized in that, the top of the patched round tube is provided with a circular cover plate, which is sleeved on the central rod and fixed by a nut, Correspondingly, the upper part of the central rod is provided with a screw thread used in conjunction with the nut, and after the cover plate is fixed, its outer circumference is flush with the outer circumference of the pieced circular tube. 10.一种预留洞套管的使用方法,其特征在于,基于上述权利要求所述预留洞套筒,其具体使用过程为:10. A method for using a reserved hole sleeve, characterized in that, based on the reserved hole sleeve described in the above claims, its specific use process is: 查阅图纸,根据梁或墙体位置,弹线确定预留洞口中心位置;Consult the drawings, and determine the center position of the reserved opening according to the position of the beam or wall and the spring line; 首先弹线确定预留洞口中心位置;First, determine the center position of the reserved hole by snapping the line; 确定预留洞口中心位置后,将拼凑后的圆管放置平稳,中心杆下方的螺纹钻头放置在预留洞口中心位置上;After determining the center position of the reserved hole, place the pieced round pipe stably, and place the threaded drill bit under the center rod on the center position of the reserved hole; 转动抓手,将中心杆下方的螺纹钻头钻入模板,牢固固定后用撑板将套管撑开,使弧形套管放置在预留洞口位置处;Turn the gripper, drill the threaded drill bit under the center rod into the formwork, and then use the support plate to spread the casing after it is firmly fixed, so that the arc-shaped casing is placed at the reserved hole position; 弧形套管按规定位置放置后,旋转盖板上方螺母,将盖板向下压紧,弧形套管完成固定;After the arc-shaped sleeve is placed at the specified position, rotate the nut above the cover plate to press the cover plate downward, and the arc-shaped sleeve is fixed; 待混凝土凝固后,松动螺母,提起盖板,将撑板取出;After the concrete is solidified, loosen the nuts, lift the cover plate, and take out the support plate; 旋转抓手,将中心杆的螺纹钻头从模板内钻出;Rotate the gripper to drill the threaded drill bit of the central rod out of the formwork; 提起中心杆的抓手,将套管从混凝土洞口内整体提出。Lift the gripper of the center rod, and lift the casing out of the concrete hole as a whole.
CN201710601990.8A 2017-07-21 2017-07-21 A kind of hole to be provided sleeve pipe and its application method Pending CN107338956A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710601990.8A CN107338956A (en) 2017-07-21 2017-07-21 A kind of hole to be provided sleeve pipe and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710601990.8A CN107338956A (en) 2017-07-21 2017-07-21 A kind of hole to be provided sleeve pipe and its application method

Publications (1)

Publication Number Publication Date
CN107338956A true CN107338956A (en) 2017-11-10

Family

ID=60216410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710601990.8A Pending CN107338956A (en) 2017-07-21 2017-07-21 A kind of hole to be provided sleeve pipe and its application method

Country Status (1)

Country Link
CN (1) CN107338956A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939043A (en) * 2017-11-20 2018-04-20 中铁四局集团第二工程有限公司 Carry the accurate support pinner prepared hole die of positioning function
CN107965144A (en) * 2017-12-07 2018-04-27 中国冶集团有限公司 A kind of multi-functional reserved opening erecting device and mold method
CN114961227A (en) * 2022-06-07 2022-08-30 中建八局第一建设有限公司 A rotatable cantilevered I-beam pre-embedded device and its realization method
CN117166754A (en) * 2023-09-07 2023-12-05 中国建筑第七工程局有限公司 A device for positioning and opening reserved holes in house construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926533A (en) * 2012-11-23 2013-02-13 湖南省沙坪建筑有限公司 Upward-floating and deviating prevention pipeline reserved barrel and construction method thereof
CN103015711A (en) * 2012-12-31 2013-04-03 龚正圣 Combined die for building concrete reserved hole
CN103061504A (en) * 2013-01-30 2013-04-24 陕西建工集团第五建筑工程有限公司 Concrete board pipeline installation reserved hole construction mould and construction method
CN204703509U (en) * 2015-06-04 2015-10-14 中国新兴建设开发总公司 A kind of portable sleeve pipe of self-retaining
CN204781958U (en) * 2015-07-17 2015-11-18 中建八局第二建设有限公司 Hole mould is reserved in installation of concrete horizontal member combination formula
CN207144478U (en) * 2017-07-21 2018-03-27 中建八局第一建设有限公司 A kind of hole to be provided sleeve pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926533A (en) * 2012-11-23 2013-02-13 湖南省沙坪建筑有限公司 Upward-floating and deviating prevention pipeline reserved barrel and construction method thereof
CN103015711A (en) * 2012-12-31 2013-04-03 龚正圣 Combined die for building concrete reserved hole
CN103061504A (en) * 2013-01-30 2013-04-24 陕西建工集团第五建筑工程有限公司 Concrete board pipeline installation reserved hole construction mould and construction method
CN204703509U (en) * 2015-06-04 2015-10-14 中国新兴建设开发总公司 A kind of portable sleeve pipe of self-retaining
CN204781958U (en) * 2015-07-17 2015-11-18 中建八局第二建设有限公司 Hole mould is reserved in installation of concrete horizontal member combination formula
CN207144478U (en) * 2017-07-21 2018-03-27 中建八局第一建设有限公司 A kind of hole to be provided sleeve pipe

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939043A (en) * 2017-11-20 2018-04-20 中铁四局集团第二工程有限公司 Carry the accurate support pinner prepared hole die of positioning function
CN107939043B (en) * 2017-11-20 2023-08-15 中铁四局集团有限公司 Precise supporting pad stone reserved hole mold with built-in positioning function
CN107965144A (en) * 2017-12-07 2018-04-27 中国冶集团有限公司 A kind of multi-functional reserved opening erecting device and mold method
CN107965144B (en) * 2017-12-07 2020-01-24 中国一冶集团有限公司 Multifunctional reserved hole formwork supporting device and method
CN114961227A (en) * 2022-06-07 2022-08-30 中建八局第一建设有限公司 A rotatable cantilevered I-beam pre-embedded device and its realization method
CN114961227B (en) * 2022-06-07 2023-07-11 中建八局第一建设有限公司 Turnover cantilever I-steel pre-embedding device and implementation mode thereof
CN117166754A (en) * 2023-09-07 2023-12-05 中国建筑第七工程局有限公司 A device for positioning and opening reserved holes in house construction

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN107338956A (en) A kind of hole to be provided sleeve pipe and its application method
CN207277841U (en) A kind of detachable service sleeve positioning fixed frame
CN201443203U (en) A mold with reserved holes for cast-in-place reinforced concrete floor slabs
CN111749382A (en) Cast-in-place concrete large-scale mandrel hollow floor anti-floating structure and construction method
CN110306774B (en) Method and device for installing socket type cantilever scaffold
CN108755333A (en) A kind of road and bridge crack repairing device and method for repairing and mending
CN204491608U (en) Building pile foundation pile crown concrete rapid cleaning device
CN204492180U (en) A kind of cast-in-place board-like stair construction joint assembled template device
CN207144478U (en) A kind of hole to be provided sleeve pipe
CN111236639B (en) Structural beam template reinforcing device and method free of split bolts
CN208777720U (en) Detachable straight thread steel bar base of wall hanging mould inclined strut
CN204139596U (en) Reserving hole sleeve pipe and get pipe device
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN213390464U (en) Gutter forming tooling
CN212336470U (en) Anti structure that floats of hollow superstructure of cast in situ concrete jumbo size mandrel
CN107504036B (en) Internal support device for casing and construction method thereof
CN209653365U (en) Tool type wall fitting
CN207878296U (en) A kind of road and bridge crack ruggedized construction
CN216340861U (en) Diagonal bracing structure for aluminum alloy template
CN213898130U (en) Tool capable of being quickly installed and detached for embedded sleeve in building construction engineering
CN205577401U (en) External rectangular cross section concrete column template fastener of pull rod
CN211815972U (en) A extract template component for concrete core wall
CN204475854U (en) Reserved opening hangs die device
CN204826625U (en) Special template for small-diameter circular column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110