- CN107338897A CN107338897A CN201710762965.8A CN201710762965A CN107338897A CN 107338897 A CN107338897 A CN 107338897A CN 201710762965 A CN201710762965 A CN 201710762965A CN 107338897 A CN107338897 A CN 107338897A
- Authority
- CN
- China
- Prior art keywords
- bar part
- button bar
- shaped
- base
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 39
- 238000013016 damping Methods 0.000 title claims abstract description 13
- 238000009434 installation Methods 0.000 title claims abstract description 12
- 238000000034 method Methods 0.000 title claims abstract description 8
- 238000010276 construction Methods 0.000 abstract description 9
- 229910052751 metal Inorganic materials 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 238000005034 decoration Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Vibration Prevention Devices (AREA)
Abstract
A kind of band damping rope suspension arrangement and its installation method, the suspension apparatus includes that Open Side Down and the U-shaped link (1) of the sideband hangers of bottom two, is connected to the downward opening trough-shaped base (2) of link bottom, crosses suspension rod (4), the hoist cable being set on suspension rod in the middle part of link, hoist cable is connected through base with hanging object, and the top positioned at base on hoist cable is set with damper (5);The U-shaped mouth direction of U-shaped link and the notch direction of trough-shaped base are mutually perpendicular to, the bottom land of the both sides hangers of U-shaped link and trough-shaped base is connected by bolt (6), the circular hole (2b) passed through for hoist cable is offered at the bottom land center of groove profile base.Apparatus of the present invention hold that lift heavy amount is big, and safe and reliable, installation is convenient, and efficiency of construction is high.
Description
Technical field
The invention belongs to construction engineering technical field, and in particular to the rope suspension dress under a kind of building primary structure member
Put.
Background technology
In public building, the building decoration of personalized design and modernization has led new architecture structure form, by
Functional requirement is used in building middle corridor decoration and building, needs to hang drop curtain under building primary structure member or in building office frequently
Portion hang drop curtain with meet personalization design and using functional requirement.Under regular situation, can solve drop curtain using rope suspension
The problem of hanging, but be difficult to for the metal drop curtain such as the steel plate more than constant weight and aluminium alloy, existing rope suspension arrangement
The weight of its drop curtain is undertaken, and construction and installation are difficult.
The content of the invention
To solve the problems, such as that existing rope suspension arrangement is difficult to undertake big weight drop curtain and construction and installation difficulty, this hair
Bright offer one kind can be pre-machined in factory, assemble at the construction field (site), easy to operate, quick for installation, construction safety, can undertake greatly
Weight object and holding hangs reliable band damping rope suspension arrangement and its installation method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of band damping rope suspension arrangement, including Open Side Down and the U-shaped link of the sideband hangers of bottom two, is connected to extension
The downward opening trough-shaped base of ring bottom, the hoist cable for crossing suspension rod in the middle part of link, being set on suspension rod, hoist cable pass through bottom
Seat is connected with hanging object, and the top positioned at base on hoist cable is set with damper;The U-shaped mouth direction of U-shaped link and flute profile bottom
The notch direction of seat is mutually perpendicular to, and is connected the bottom land of the both sides hangers of U-shaped link and trough-shaped base by bolt, at groove profile bottom
The bottom land center of seat offers the circular hole passed through for hoist cable;The hoist cable includes being sleeved on hangs head, with hanging first body on suspension rod
Upper button bar part, be connected to the connecting rod of button bar part bottom, the lower button bar part being connected with connecting rod bottom, be connected to lower button bar
The cable wire of part bottom, the upper and lower ends of connecting rod are screw rod, respectively with the top of the inner bolt hole of upper button bar part bottom and lower button bar part
Inner bolt hole be connected;The top of the upper button bar part is thread segment, is fitted with nut and pad, and the damper is set in
Upper fastener is outer and between pad and trough-shaped base.
The both ends of suspension rod of the present invention are screw rod, be located at suspension rod both ends on the outside of U-shaped link be fitted with locking nut and
Pad.The lower button bar part lower end carries inner bolt hole, and cable wire upper end is screwed in the inner bolt hole of lower button bar part lower end.
The installation method of the band damping rope suspension arrangement of the present invention is as follows:
(a) hoist cable is assembled:Nut is screwed on the top of upper button bar part and is screwed, by the upper and lower ends thread segment point of connecting rod
Xuan Ru not be above in the inner bolt hole of button bar part and lower button bar part;
(b) U-shaped link is installed:U-shaped link is straddled on building primary structure member;
(c) hoist cable is installed:Suspension rod is passed across into the boom hole in the middle part of U-shaped link biside plate, is located at U-shaped extension at suspension rod both ends
Pad is placed outside ring side plate, screws in lock nut;
(d) pad is installed:Pad is penetrated at lower button bar part, pad is under the nut;
(e) damper is installed:Damper is penetrated at lower button bar part;
(f) groove profile base is installed:It will penetrate, worn to damper at the lower button bar part of the center hole alignment of groove profile base,
U-shaped link is connected with groove profile base with bolt, tightening nut, is assembled into an integrated sling;
(f) cable wire is installed:Cable wire is screwed in the screwed hole of lower button bar part lower end.
Using the present invention, U-shaped link need to be only hung on the primary structure member of building, bottom hoist cable is that suspended weight adds
Big object, such as metal drop curtain.By the weight using damper and hoist cable shared institute hanging object part, the weight of institute's hanging object part
A part is undertaken by damper, and remainder weight is just undertaken by cable wire, is solved rope suspension arrangement and is difficult to undertake big weight
The problem of drop curtain and construction and installation difficulty.The present invention can manufacture in factory process in advance, at the construction field (site) direct-assembling,
Simple installation is quick, and efficiency of construction is high and safe, safe and reliable.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is Fig. 1 side view;
Fig. 3 is the structural representation of U-shaped link;
Fig. 4 is the top view of trough-shaped base;
Fig. 5 is the structural representation of hoist cable.
Embodiment
The invention will now be described in further detail with reference to the accompanying drawings:
Band damping rope suspension arrangement as shown in Figure 1 and Figure 2, including Open Side Down and the U-shaped extension of the sideband hangers of bottom two
Ring 1, the downward opening trough-shaped base 2 for being connected to link bottom, cross the suspension rod 4 in the middle part of link 1, be set on suspension rod 4
Hoist cable, hoist cable is connected through base 2 with hanging object, and the top positioned at base 2 on hoist cable is set with damper 5.By U-shaped extension
The U-shaped mouth direction of ring and the notch direction of trough-shaped base are arranged in a mutually vertical manner, by bolt 6 by the both sides hangers of U-shaped link with
The bottom land connection of trough-shaped base, the circular hole 2b passed through for hoist cable is offered at the bottom land center of groove profile base.The damper 5 is
Helical form, its spiral internal diameter are more than the diameter of upper button bar part.
As shown in figure 3, offering connecting hole 1b on the U-shaped bottom both sides hangers of link 1, symmetrically opened up in the middle part of link biside plate
Boom hole 1a.As shown in figure 4, the bottom land both ends of groove profile base 2 symmetrically offer fixing hole 2a, the fixing hole is hung with U-shaped link
Connecting hole 1b on ear is corresponding, is fixed together link 1 for 90 degree with 2 opening offset of groove profile base using bolt 6, groove profile
Bottom tub bottom center opens up the circular hole 2b passed through for hoist cable.
As shown in Figure 1, Figure 2, Figure 5, the hoist cable includes being sleeved on hangs first 3, the upper button bar with hanging first body on suspension rod
Part 10, the connecting rod 12 for being connected to button bar part bottom, the lower button bar part 11 being connected with connecting rod bottom, it is connected to lower button bar part
The cable wire 13 of 11 bottoms, the upper and lower ends of connecting rod are screw rod, respectively the inner bolt hole with upper button bar part bottom and lower button bar part top
The inner bolt hole in portion is connected.The top of the upper button bar part is thread segment, is fitted with nut 7 and pad 8, the damper 5
It is set in outside upper fastener and between pad 8 and trough-shaped base 2.The lower lower end of button bar part 11 carries inner bolt hole, cable wire 13
Upper end is screwed in the inner bolt hole of lower button bar part lower end.The both ends of the suspension rod 4 are screw rod, are located at suspension rod both ends outside U-shaped link
Side is fitted with locking nut 9 and pad.The fine setting of hoist cable length is realized by adjusting connection connector 12.
When hanging weight such as metal drop curtain using the present invention, U-shaped link 1 is hung over to the primary structure member 14 of top of building
On, by the hanging of metal drop curtain on cable wire 13.
The present invention can be installed using order below step:
(a) hoist cable is assembled:Nut 7 is screwed on the top of upper button bar part 10 and is screwed, by the upper and lower ends spiral shell of connector 12
Line section screws in the inner bolt hole of button bar part and lower button bar part respectively;
(b) U-shaped link is installed:U-shaped link 1 is straddled on building primary structure member 14;
(c) hoist cable is installed:Suspension rod 4 is passed across into the boom hole 1a in the middle part of the U-shaped biside plate of link 1, is located at U at suspension rod both ends
Pad is placed outside type link side plate, screws in lock nut 9;
(d) pad is installed:Pad 8 is penetrated at lower button bar part, padded under nut 7;
(e) damper is installed:Damper 5 is penetrated at lower button bar part;
(f) groove profile base is installed:It will penetrate, worn to damping at the lower button bar part 11 of the center hole 2b alignments of groove profile base 2
At device, U-shaped link 1 is connected with groove profile base 2 with bolt 6, tightening nut 7, is assembled into an integrated sling;
(f) cable wire is installed:Cable wire 13 is screwed in the screwed hole of lower button bar part lower end.
Claims (4)
1. a kind of band damping rope suspension arrangement, it is characterised in that including Open Side Down and the U-shaped link of the sideband hangers of bottom two
(1) the downward opening trough-shaped base (2) of link bottom, is connected to, suspension rod (4) in the middle part of link (1) is crossed, is set in and hangs
Hoist cable on bar (4), hoist cable are connected through base (2) with hanging object, and the top positioned at base (2) on hoist cable is set with damping
Device (5);The U-shaped mouth direction of U-shaped link and the notch direction of trough-shaped base are mutually perpendicular to, by bolt (6) by the two of U-shaped link
The bottom land of side hangers and trough-shaped base is connected, and the circular hole (2b) passed through for hoist cable is offered at the bottom land center of groove profile base;Institute
State hoist cable and hang head (3), with hanging the upper button bar part (10) of first body, being connected to button bar part bottom on suspension rod including being sleeved on
Connecting rod (12), the lower button bar part (11) being connected with connecting rod bottom, the cable wire (13) for being connected to lower button bar part (11) bottom, even
The upper and lower ends of extension bar are screw rod, coordinate with the inner bolt hole at the top of the inner bolt hole of upper button bar part bottom and lower button bar part connect respectively
Connect;The top of the upper button bar part is thread segment, is fitted with nut (7) and pad (8), and the damper (5) is set in button
Part is outer and between pad (8) and trough-shaped base (2).
A kind of 2. band damping rope suspension arrangement according to claim 1, it is characterised in that the both ends of the suspension rod (4)
For screw rod, it is located at suspension rod both ends on the outside of U-shaped link and is fitted with locking nut (9) and pad.
3. a kind of band damping rope suspension arrangement according to claim 1, it is characterised in that under the lower button bar part (11)
End carries inner bolt hole, and cable wire (13) upper end is screwed in the inner bolt hole of lower button bar part lower end.
4. the installation method of the band damping rope suspension arrangement as described in any one of claim 1-3, it is characterised in that method
It is as follows:
(a) hoist cable is assembled:Nut (7) is screwed on the top of upper button bar part (10) and is screwed, by the upper and lower ends of connecting rod (12)
Thread segment screws in the inner bolt hole of button bar part and lower button bar part respectively;
(b) U-shaped link is installed:U-shaped link (1) is straddled on building primary structure member (14);
(c) hoist cable is installed:Suspension rod (4) is passed across into the boom hole (1a) in the middle part of U-shaped link biside plate, is located at U at suspension rod both ends
Pad is placed outside type link side plate, screws in lock nut (9);
(d) pad is installed:Pad (8) is penetrated at lower button bar part, padded under nut (7);
(e) damper is installed:Damper (6) is penetrated at lower button bar part;
(f) groove profile base is installed:Lower button bar part (11) place of center hole (2b) alignment of groove profile base is penetrated, worn to damper
U-shaped link, is connected, tightening nut (7), is assembled into an integrated sling by place with bolt (6) with groove profile base;
(f) cable wire is installed:Cable wire (13) is screwed in the screwed hole of lower button bar part lower end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710762965.8A CN107338897A (en) | 2017-08-30 | 2017-08-30 | A kind of band damping rope suspension arrangement and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710762965.8A CN107338897A (en) | 2017-08-30 | 2017-08-30 | A kind of band damping rope suspension arrangement and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107338897A true CN107338897A (en) | 2017-11-10 |
Family
ID=60215067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710762965.8A Pending CN107338897A (en) | 2017-08-30 | 2017-08-30 | A kind of band damping rope suspension arrangement and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107338897A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110217394A (en) * | 2019-06-12 | 2019-09-10 | 南昌航空大学 | A kind of soft rope hanging shimmy damping device for multi-rotor unmanned aerial vehicle |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001115594A (en) * | 1999-10-15 | 2001-04-24 | Setsuyo Kogyo Kk | Earthquake resistant vibration-proofing device |
CN201258548Y (en) * | 2008-08-18 | 2009-06-17 | 上海德瑞金属制品有限公司 | Steel frame fixer |
US20110000155A1 (en) * | 2009-07-02 | 2011-01-06 | Frank Wellershoff | Cable End Anchorage With Overload Protection |
CN202157448U (en) * | 2011-06-29 | 2012-03-07 | 中国电子系统工程第四建设有限公司 | Hanging device without destroying roof structure |
CN103266709A (en) * | 2013-05-10 | 2013-08-28 | 浙江亚厦装饰股份有限公司 | Connection structure of suspended ceiling transferring layer and net rack ball |
CN203821643U (en) * | 2014-01-21 | 2014-09-10 | 赵勋海 | Inhaul cable anti-releasing and overload protection device |
CN104179281A (en) * | 2014-08-21 | 2014-12-03 | 云南工程建设总承包公司 | Novel steel cable suspending device and method for mounting same |
CN204174817U (en) * | 2014-11-05 | 2015-02-25 | 邢国表 | A kind of elastic lifting muscle of steelframe of building finishing |
CN105544820A (en) * | 2015-12-25 | 2016-05-04 | 上海江河幕墙系统工程有限公司 | Curve-surface outer curtain wall support steel structure with hanger rods with spring devices and construction method of support steel structure |
CN207314630U (en) * | 2017-08-30 | 2018-05-04 | 云南工程建设总承包股份有限公司 | A kind of band damping rope suspension arrangement |
-
2017
- 2017-08-30 CN CN201710762965.8A patent/CN107338897A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001115594A (en) * | 1999-10-15 | 2001-04-24 | Setsuyo Kogyo Kk | Earthquake resistant vibration-proofing device |
CN201258548Y (en) * | 2008-08-18 | 2009-06-17 | 上海德瑞金属制品有限公司 | Steel frame fixer |
US20110000155A1 (en) * | 2009-07-02 | 2011-01-06 | Frank Wellershoff | Cable End Anchorage With Overload Protection |
CN202157448U (en) * | 2011-06-29 | 2012-03-07 | 中国电子系统工程第四建设有限公司 | Hanging device without destroying roof structure |
CN103266709A (en) * | 2013-05-10 | 2013-08-28 | 浙江亚厦装饰股份有限公司 | Connection structure of suspended ceiling transferring layer and net rack ball |
CN203821643U (en) * | 2014-01-21 | 2014-09-10 | 赵勋海 | Inhaul cable anti-releasing and overload protection device |
CN104179281A (en) * | 2014-08-21 | 2014-12-03 | 云南工程建设总承包公司 | Novel steel cable suspending device and method for mounting same |
CN204174817U (en) * | 2014-11-05 | 2015-02-25 | 邢国表 | A kind of elastic lifting muscle of steelframe of building finishing |
CN105544820A (en) * | 2015-12-25 | 2016-05-04 | 上海江河幕墙系统工程有限公司 | Curve-surface outer curtain wall support steel structure with hanger rods with spring devices and construction method of support steel structure |
CN207314630U (en) * | 2017-08-30 | 2018-05-04 | 云南工程建设总承包股份有限公司 | A kind of band damping rope suspension arrangement |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110217394A (en) * | 2019-06-12 | 2019-09-10 | 南昌航空大学 | A kind of soft rope hanging shimmy damping device for multi-rotor unmanned aerial vehicle |
CN110217394B (en) * | 2019-06-12 | 2023-03-10 | 南昌航空大学 | A shimmy device is hung to soft cable for having more rotor unmanned aerial vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207314630U (en) | A kind of band damping rope suspension arrangement | |
CN204917648U (en) | Turbine rotor lifts by crane instrument | |
CN107419667B (en) | A kind of self-anchored suspension bridge installing Cable-clamp method | |
CN107338897A (en) | A kind of band damping rope suspension arrangement and its installation method | |
CN206834605U (en) | Monolithic insulator hanging apparatus | |
CN205739890U (en) | A kind of buffer of elevator base | |
CN215257622U (en) | Rope length adjusting mechanism convenient to operate | |
CN207200123U (en) | A kind of four line march-past wire lifting devices | |
CN206643862U (en) | A kind of pendent lamp installation auxiliary device of house ornamentation | |
CN205840332U (en) | Hang mould positioner | |
CN205422583U (en) | Lifting hook, hang assembly and hang hoisting accessory | |
CN205348817U (en) | Safety belt pendant | |
CN208401412U (en) | A kind of 10kV stockbridge damper mounting auxiliary | |
CN204355947U (en) | Large-scale without eye plate lifting beam device | |
CN2609893Y (en) | High-pressure vertical tube hanging chain with lock | |
CN209618677U (en) | A kind of multipurpose H-shaped steel hanger | |
CN208561425U (en) | A kind of anti-rotational durable wirerope hook | |
CN2777179Y (en) | Anti-escaped mule-head hanger | |
CN219333007U (en) | Suspension device of safety rope | |
CN207312945U (en) | Assembled lifting lug assembly and lifting fixing structure of crane boom | |
CN205896639U (en) | TV set pendant of variable -spacing adjustment | |
CN206513010U (en) | Movable disk button for support system | |
CN204403274U (en) | A kind of safe self-locking fixture | |
CN105621298B (en) | Sundries is hung | |
CN107425465A (en) | Monolithic insulator hanging apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171110 |