CN107337391A - A kind of prefabricated concrete floor - Google Patents

A kind of prefabricated concrete floor Download PDF

Info

Publication number
CN107337391A
CN107337391A CN201710587592.5A CN201710587592A CN107337391A CN 107337391 A CN107337391 A CN 107337391A CN 201710587592 A CN201710587592 A CN 201710587592A CN 107337391 A CN107337391 A CN 107337391A
Authority
CN
China
Prior art keywords
parts
channel
section steel
water
concrete floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710587592.5A
Other languages
Chinese (zh)
Other versions
CN107337391B (en
Inventor
周新亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Green Concrete Jiangsu Construction Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710587592.5A priority Critical patent/CN107337391B/en
Publication of CN107337391A publication Critical patent/CN107337391A/en
Application granted granted Critical
Publication of CN107337391B publication Critical patent/CN107337391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/002Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/008Ferrous alloys, e.g. steel alloys containing tin
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/10Ferrous alloys, e.g. steel alloys containing cobalt
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/12Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/14Ferrous alloys, e.g. steel alloys containing titanium or zirconium
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

A kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole is offered on a pair of channel-section steel backboards, through connecting hole, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two, concrete is cast with to form precast slab outside longitudinal channel-section steel, horizontal cross sets and a pair of channel-section steels is attached into paired channel-section steel sheet material strengthened in part connector two-by-two, there is preferable intensity in prefabricated concrete floor X direction, so as to improve prefabricated concrete floor comprehensive strength, also reduce sheet material relative weight, the concrete crushing strength tensile strength of the present invention effectively improves.

Description

A kind of prefabricated concrete floor
Technical field
The present invention relates to a kind of prefabricated concrete floor, belongs to floor technical field.
Background technology
Concrete floor typically has Reinforcement, is distributed inside beam, mostly important most of beam is tension steel Muscle, reinforcing bar resist hogging moment at the both ends of beam, and reinforcing bar is located at compressive region at the middle part of beam, bears compression stirrup, is square shape , the reinforcing bar of upper and lower part is fixed up, while resist shearing.Need to be in beam on both sides of the middle by construction when depth of beam is larger With elongated reinforcing bar, connected using tension rib.But the compression capability in the other direction of floor is poor, beams of concrete sets and is not easy Weight is excessive, and also to meet intensity requirement.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of prefabricated concrete floor and its manufacture method,
A kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening set to be formed A pair of channel-section steels, channel-section steel are provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole, connector are offered on a pair of channel-section steel backboards Through connecting hole, a pair of channel-section steels are attached by horizontal cross setting two-by-two, and it is prefabricated to be formed to be cast with concrete outside longitudinal channel-section steel Concrete slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.2-0.3%, Zn 4-6%, Ti 2-3%, V 0.5-0.8%, Nb 0.2-0.5%, Mg 0.2-0.4%, Si 0.20-0.40%;Mn 0.05-0.07%;Co 0.04-0.05%, Sn 0.01-0.02wt%;P≤0.02%;S≤ 0.01%, surplus Fe;The manufacture method of channel-section steel comprises the following steps:Molten iron pre-treatment, converter smelting, LF refining, RH refinings Molten steel is obtained, liquid steel temperature is controlled at 1450 DEG C~1500 DEG C, after being incubated 10-15 minutes, is moved in tundish;Then by Between wrap in molten steel be sent into crystallizer;The wide face water of crystallizer be 3000-4000 liters/min, leptoprosopy water be 450-500 liters/ Minute, crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled in 650-700 amperes, and frequency setting is in 8-10 Hertz, pulling speed of continuous casting is controlled at 3.5-4 ms/min;Continuous casting material is obtained, carrying out roughing-finish rolling to continuous casting material obtains channel-section steel Blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, and roughing is whole It is 920-950 DEG C to roll temperature, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, finish rolling start rolling temperature are 1050- 1070 DEG C, finish rolling finishing temperature is 950-970 DEG C, carries out crop to finish rolling part afterwards, rolled parts is aligned afterwards, is aligned After cut out needed for size and be machined into connecting hole, after multiple longitudinal channel-section steels and connector are fixedly connected, be put into mould In tool,
Concrete is configured afterwards:Concrete forms including following mass parts:Cement 150-180 parts, zeolite powder 10-15 parts, Hai Pao Stone flour 10-15 parts, white lime 5-10 parts, desulfurated plaster 10-20 parts, sand 300-320 parts, stone 400-430 parts, polypropylene fibre 20-25 parts, polyvinyl alcohol 5-10 parts, alum 3-6 parts, spongiosa acid sodium 2-3 parts, water reducer 3-5 parts, water 50-80 parts, by water Mud, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put into grinding 20-30 minutes in flour mill, in 100-120 DEG C of temperature Lower baking 10-15 minutes;Mixture after baking is added in mixer and adds water, stirs 3-5 minutes, adds sand and stone Son, continue to stir 5-8 minutes, sequentially add polypropylene fibre afterwards, polyvinyl alcohol, alum, spongiosa acid sodium, water reducer stirs Mix uniformly, casting concrete is treated in formation, and concreting to be poured is obtained into prefabricated concrete floor to the die for molding.
A kind of described prefabricated concrete floor, connector are connected a pair of channel-section steels by fastener through connecting hole Connect.
A kind of described prefabricated concrete floor, through connecting hole, horizontal cross sets to enter in a pair of channel-section steels connector two-by-two Row connection
A kind of described prefabricated concrete floor, the chemical composition of channel-section steel are by weight percentage:C 0.24%, Zn 5%, Ti 2%, V 0.6%, Nb 0.4%, Mg 0.2-0.4%, Si 0.24%;Mn 0.06%;Co 0.05%, Sn 0.01wt%; P≤0.02%;S≤0.01%, surplus Fe.
A kind of described prefabricated concrete floor, the wide face water of crystallizer be 3800 liters/min, leptoprosopy water be 470 liters/ Minute.
A kind of described prefabricated concrete floor, pulling speed of continuous casting are controlled at 3.5 ms/min.
A kind of described prefabricated concrete floor, concrete form including following mass parts:160 parts of cement, zeolite powder 12 Part, 12 parts of sepiolite powder, 6 parts of white lime, 18 parts of desulfurated plaster, 310 parts of sand, 400 parts of stone, 25 parts of polypropylene fibre, poly- second 8 parts of enol, 6 parts of alum, 2 parts of spongiosa acid sodium, 4 parts of water reducer, 75 parts of water.
A kind of manufacture method of prefabricated concrete floor, prefabricated concrete floor include multiple longitudinal channel-section steels, two-by-two channel-section steel Between backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, a pair Connecting hole is offered on channel-section steel backboard, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two through connecting hole, are indulged Concrete is cast with to outside channel-section steel to form precast slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.2-0.3%, Zn 4-6%, Ti 2-3%, V 0.5-0.8%, Nb 0.2-0.5%, Mg 0.2-0.4%, Si 0.20-0.40%;Mn 0.05-0.07%;Co 0.04-0.05%, Sn 0.01-0.02wt%;P≤0.02%;S≤ 0.01%, surplus Fe;The manufacture method of channel-section steel comprises the following steps:Molten iron pre-treatment, converter smelting, LF refining, RH refinings Molten steel is obtained, liquid steel temperature is controlled at 1450 DEG C~1500 DEG C, after being incubated 10-15 minutes, is moved in tundish;Then by Between wrap in molten steel be sent into crystallizer;The wide face water of crystallizer be 3000-4000 liters/min, leptoprosopy water be 450-500 liters/ Minute, crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled in 650-700 amperes, and frequency setting is in 8-10 Hertz, pulling speed of continuous casting is controlled at 3.5-4 ms/min;Continuous casting material is obtained, carrying out roughing-finish rolling to continuous casting material obtains channel-section steel Blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, and roughing is whole It is 920-950 DEG C to roll temperature, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, finish rolling start rolling temperature are 1050- 1070 DEG C, finish rolling finishing temperature is 950-970 DEG C, carries out crop to finish rolling part afterwards, rolled parts is aligned afterwards, is aligned After cut out needed for size and be machined into connecting hole, after multiple longitudinal channel-section steels and connector are fixedly connected, be put into mould In tool,
Concrete is configured afterwards:Concrete forms including following mass parts:Cement 150-180 parts, zeolite powder 10-15 parts, Hai Pao Stone flour 10-15 parts, white lime 5-10 parts, desulfurated plaster 10-20 parts, sand 300-320 parts, stone 400-430 parts, polypropylene fibre 20-25 parts, polyvinyl alcohol 5-10 parts, alum 3-6 parts, spongiosa acid sodium 2-3 parts, water reducer 3-5 parts, water 50-80 parts, by water Mud, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put into grinding 20-30 minutes in flour mill, in 100-120 DEG C of temperature Lower baking 10-15 minutes;Mixture after baking is added in mixer and adds water, stirs 3-5 minutes, adds sand and stone Son, continue to stir 5-8 minutes, sequentially add polypropylene fibre afterwards, polyvinyl alcohol, alum, spongiosa acid sodium, water reducer stirs Mix uniformly, casting concrete is treated in formation, and concreting to be poured is obtained into prefabricated concrete floor to the die for molding.
A kind of manufacture method of described prefabricated concrete floor, connector is through connecting hole by fastener by a pair of grooves Steel is attached.
Horizontal cross sets and a pair of channel-section steels is attached into paired channel-section steel sheet material strengthened in part connector two-by-two, There is preferable intensity in prefabricated concrete floor X direction, so as to improve prefabricated concrete floor comprehensive strength, also Reduce sheet material relative weight, concrete crushing strength tensile strength of the invention effectively improves;Large-span concrete plate is not It is easily cracked, improve the large-span concrete plate life-span.Steel elemental composition meets channel-section steel intensity and hardness requirement, in casting process The wide face water of crystallizer, leptoprosopy water are controlled, crystallizer water speed and pulling speed of continuous casting keep the certain anti-blocking of curing rate of steel Separate out and promote the alloying of addition element, in the operation of rolling using roughing and finish rolling and control breaking down and finishing temperature and The total coefficient of elongation make it that suppressing crystal grain in steel deformation process becomes thick.
Brief description of the drawings
Fig. 1 is prefabricated concrete floor sectional view,
Fig. 2 is prefabricated concrete floor top view.
Embodiment
A kind of prefabricated concrete floor 1, including multiple longitudinal channel-section steels 2, two-by-two between channel-section steel backwards to and outward opening set Put to form a pair of channel-section steels, channel-section steel is provided with backboard 3 and upper plate symmetrical above and below 4 and lower plate 5, and connection is offered on a pair of channel-section steel backboards Hole 6, through connecting hole, a pair of channel-section steels are attached connector 7 by horizontal cross setting two-by-two, and coagulation is cast with outside longitudinal channel-section steel Soil is to form precast slab, and a pair of channel-section steels are attached by connector through connecting hole by fastener 8, and connecting hole is being carried on the back Offer multiple rows of on plate and cooperatively form parallel multigroup connector with connector, connector is through connecting hole by fastener by one Channel-section steel is attached.
Embodiment 1
A kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening set to be formed A pair of channel-section steels, channel-section steel are provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole, connector are offered on a pair of channel-section steel backboards Through connecting hole, a pair of channel-section steels are attached by horizontal cross setting two-by-two, and it is prefabricated to be formed to be cast with concrete outside longitudinal channel-section steel Concrete slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.2%, Zn 4%, Ti 2.5%, V 0.6%, Nb 0.4%, Mg 0.2%, Si 0.2%;Mn 0.05%; Co 0.045%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel includes following step Suddenly:Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1470 DEG C, are incubated 10-15 After minute, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3500 liters/min Clock, leptoprosopy water are 470 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled at 700 amperes, Frequency setting is controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, continuous casting material is carried out thick Roll-finish rolling obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, essence Start rolling temperature is rolled for 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, crop is carried out to finish rolling part afterwards, afterwards to rolling Product is aligned, and required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and connector are carried out After being fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:160 parts of cement, 12 parts of zeolite powder, sepiolite powder 14 Part, 6 parts of white lime, 18 parts of desulfurated plaster, 300 parts of sand, 410 parts of stone, 20 parts of polypropylene fibre, 8 parts of polyvinyl alcohol, aluminum sulfate 5 parts of potassium, 3 parts of spongiosa acid sodium, 3 parts of water reducer, 70 parts of water, cement, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put Enter grinding 25 minutes in flour mill, toasted 12 minutes at a temperature of 120 DEG C;Mixture after baking is added in mixer and added Enter water, stir 3-5 minutes, add sand and stone, continue to stir 5-8 minutes, sequentially add polypropylene fibre, polyethylene afterwards Alcohol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured described in Die for molding obtains prefabricated concrete floor.
A kind of manufacture method of prefabricated concrete floor, prefabricated concrete floor include multiple longitudinal channel-section steels, two-by-two channel-section steel Between backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, a pair Connecting hole is offered on channel-section steel backboard, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two through connecting hole, are indulged Concrete is cast with to outside channel-section steel to form precast slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.2%, Zn 4%, Ti 2.5%, V 0.6%, Nb 0.4%, Mg 0.2%, Si 0.2%;Mn 0.05%; Co 0.045%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel includes following step Suddenly:Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1470 DEG C, are incubated 10-15 After minute, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3500 liters/min Clock, leptoprosopy water are 470 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled at 700 amperes, Frequency setting is controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, continuous casting material is carried out thick Roll-finish rolling obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, essence Start rolling temperature is rolled for 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, crop is carried out to finish rolling part afterwards, afterwards to rolling Product is aligned, and required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and connector are carried out After being fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:160 parts of cement, 12 parts of zeolite powder, sepiolite powder 14 Part, 6 parts of white lime, 18 parts of desulfurated plaster, 300 parts of sand, 410 parts of stone, 20 parts of polypropylene fibre, 8 parts of polyvinyl alcohol, aluminum sulfate 5 parts of potassium, 3 parts of spongiosa acid sodium, 3 parts of water reducer, 70 parts of water, cement, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put Enter grinding 25 minutes in flour mill, toasted 12 minutes at a temperature of 120 DEG C;Mixture after baking is added in mixer and added Enter water, stir 3-5 minutes, add sand and stone, continue to stir 5-8 minutes, sequentially add polypropylene fibre, polyethylene afterwards Alcohol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured described in Die for molding obtains prefabricated concrete floor.
Embodiment 2
A kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening set to be formed A pair of channel-section steels, channel-section steel are provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole, connector are offered on a pair of channel-section steel backboards Through connecting hole, a pair of channel-section steels are attached by horizontal cross setting two-by-two, and it is prefabricated to be formed to be cast with concrete outside longitudinal channel-section steel Concrete slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.25%, Zn 6%, Ti 2%, V 0.6%, Nb 0.5%, Mg 0.35%, Si 0.35%;Mn 0.07%; Co 0.04%, Sn 0.02wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel includes following step Suddenly:Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1480 DEG C, are incubated 10 points Zhong Hou, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3200 liters/min, Leptoprosopy water is 460 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current control is pacified in 650-700 Training, frequency setting are controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, continuous casting material is carried out Roughing-finish rolling obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, essence Start rolling temperature is rolled for 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, crop is carried out to finish rolling part afterwards, afterwards to rolling Product is aligned, and required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and connector are carried out After being fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:160 parts of cement, 14 parts of zeolite powder, sepiolite powder 15 Part, white lime 5- parts, 10 parts of desulfurated plaster, 300 parts of sand, 420 parts of stone, 22 parts of polypropylene fibre, 8 parts of polyvinyl alcohol, sulfuric acid 3 parts of aluminium potassium, 2.5 parts of spongiosa acid sodium, 3 parts of water reducer, 65 parts of water, by cement, zeolite powder, sepiolite powder, white lime and desulfurization stone Cream is put into grinding 25 minutes in flour mill, is toasted 15 minutes at a temperature of 120 DEG C;Mixture after baking is added to mixer Interior addition water, 3-5 minutes are stirred, add sand and stone, continued to stir 5-8 minutes, sequentially add polypropylene fibre, poly- second afterwards Enol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured to institute State die for molding and obtain prefabricated concrete floor.
A kind of manufacture method of prefabricated concrete floor, prefabricated concrete floor include multiple longitudinal channel-section steels, two-by-two channel-section steel Between backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, a pair Connecting hole is offered on channel-section steel backboard, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two through connecting hole, are indulged Concrete is cast with to outside channel-section steel to form precast slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.25%, Zn 6%, Ti 2%, V 0.6%, Nb 0.5%, Mg 0.35%, Si 0.35%;Mn 0.07%; Co 0.04%, Sn 0.02wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel includes following step Suddenly:Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1480 DEG C, are incubated 10 points Zhong Hou, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3200 liters/min, Leptoprosopy water is 460 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current control is pacified in 650-700 Training, frequency setting are controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, continuous casting material is carried out Roughing-finish rolling obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, essence Start rolling temperature is rolled for 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, crop is carried out to finish rolling part afterwards, afterwards to rolling Product is aligned, and required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and connector are carried out After being fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:160 parts of cement, 14 parts of zeolite powder, sepiolite powder 15 Part, white lime 5- parts, 10 parts of desulfurated plaster, 300 parts of sand, 420 parts of stone, 22 parts of polypropylene fibre, 8 parts of polyvinyl alcohol, sulfuric acid 3 parts of aluminium potassium, 2.5 parts of spongiosa acid sodium, 3 parts of water reducer, 65 parts of water, by cement, zeolite powder, sepiolite powder, white lime and desulfurization stone Cream is put into grinding 25 minutes in flour mill, is toasted 15 minutes at a temperature of 120 DEG C;Mixture after baking is added to mixer Interior addition water, 3-5 minutes are stirred, add sand and stone, continued to stir 5-8 minutes, sequentially add polypropylene fibre, poly- second afterwards Enol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured to institute State die for molding and obtain prefabricated concrete floor.
Embodiment 3
A kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening set to be formed A pair of channel-section steels, channel-section steel are provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole, connector are offered on a pair of channel-section steel backboards Through connecting hole, a pair of channel-section steels are attached by horizontal cross setting two-by-two, and it is prefabricated to be formed to be cast with concrete outside longitudinal channel-section steel Concrete slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.3%, Zn 4%, Ti 2%, V 0.5%, Nb 0.5%, Mg 0.3%, Si 0.25%;Mn 0.07%;Co 0.04%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel comprises the following steps: Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1490 DEG C, are incubated 14 minutes Afterwards, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3900 liters/min, narrow Face water is 460 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled in 650-700 amperes, Frequency setting is controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, continuous casting material is carried out thick Roll-finish rolling obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, essence Start rolling temperature is rolled for 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, crop is carried out to finish rolling part afterwards, afterwards to rolling Product is aligned, and required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and connector are carried out After being fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:180 parts of cement, 14 parts of zeolite powder, sepiolite powder 14 Part, 9 parts of white lime, 20 parts of desulfurated plaster, 320 parts of sand, 430 parts of stone, 25 parts of polypropylene fibre, 9 parts of polyvinyl alcohol, aluminum sulfate 6 parts of potassium, 2.5 parts of spongiosa acid sodium, 4 parts of water reducer, 80 parts of water, by cement, zeolite powder, sepiolite powder, white lime and desulfurated plaster Grinding 22 minutes in flour mill are put into, are toasted 11 minutes at a temperature of 110 DEG C;Mixture after baking is added in mixer Water is added, stirs 3-5 minutes, adds sand and stone, continues to stir 5-8 minutes, sequentially adds polypropylene fibre, polyethylene afterwards Alcohol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured described in Die for molding obtains prefabricated concrete floor.
A kind of manufacture method of prefabricated concrete floor, prefabricated concrete floor include multiple longitudinal channel-section steels, two-by-two channel-section steel Between backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, a pair Connecting hole is offered on channel-section steel backboard, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two through connecting hole, are indulged Concrete is cast with to outside channel-section steel to form precast slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.3%, Zn 4%, Ti 2%, V 0.5%, Nb 0.5%, Mg 0.3%, Si 0.25%;Mn 0.07%;Co 0.04%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel comprises the following steps: Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1490 DEG C, are incubated 14 minutes Afterwards, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3900 liters/min, narrow Face water is 460 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled in 650-700 amperes, Frequency setting is controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, continuous casting material is carried out thick Roll-finish rolling obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, essence Start rolling temperature is rolled for 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, crop is carried out to finish rolling part afterwards, afterwards to rolling Product is aligned, and required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and connector are carried out After being fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:180 parts of cement, 14 parts of zeolite powder, sepiolite powder 14 Part, 9 parts of white lime, 20 parts of desulfurated plaster, 320 parts of sand, 430 parts of stone, 25 parts of polypropylene fibre, 9 parts of polyvinyl alcohol, aluminum sulfate 6 parts of potassium, 2.5 parts of spongiosa acid sodium, 4 parts of water reducer, 80 parts of water, by cement, zeolite powder, sepiolite powder, white lime and desulfurated plaster Grinding 22 minutes in flour mill are put into, are toasted 11 minutes at a temperature of 110 DEG C;Mixture after baking is added in mixer Water is added, stirs 3-5 minutes, adds sand and stone, continues to stir 5-8 minutes, sequentially adds polypropylene fibre, polyethylene afterwards Alcohol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured described in Die for molding obtains prefabricated concrete floor.
Embodiment 4
A kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening set to be formed A pair of channel-section steels, channel-section steel are provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole, connector are offered on a pair of channel-section steel backboards Through connecting hole, a pair of channel-section steels are attached by horizontal cross setting two-by-two, and it is prefabricated to be formed to be cast with concrete outside longitudinal channel-section steel Concrete slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.28%, Zn 5.5%, Ti 2.5%, V 0.8%, Nb 0.4%, Mg 0.3%, Si 0.25%;Mn 0.05%;Co 0.04%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel includes Following steps:Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1460 DEG C, are protected After warm 10-15 minutes, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3300 liters/min, leptoprosopy water is 480 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current controls In 650-700 amperes, frequency setting is controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, to even Strand material carries out roughing-finish rolling and obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing are opened Temperature is rolled for 1020-1040 DEG C, and roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47- 3.14, finish rolling start rolling temperature is 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, carries out crop to finish rolling part afterwards, Rolled parts is aligned afterwards, required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and company After fitting is fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:170 parts of cement, 13 parts of zeolite powder, sepiolite powder 13 Part, 7 parts of white lime, 12 parts of desulfurated plaster, 320 parts of sand, 420 parts of stone, 22 parts of polypropylene fibre, 9 parts of polyvinyl alcohol, aluminum sulfate 3 parts of potassium, 2 parts of spongiosa acid sodium, 4 parts of water reducer, 70 parts of water, cement, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put Enter grinding 27 minutes in flour mill, toasted 15 minutes at a temperature of 120 DEG C;Mixture after baking is added in mixer and added Enter water, stir 3-5 minutes, add sand and stone, continue to stir 5-8 minutes, sequentially add polypropylene fibre, polyethylene afterwards Alcohol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured described in Die for molding obtains prefabricated concrete floor.
A kind of manufacture method of prefabricated concrete floor, prefabricated concrete floor include multiple longitudinal channel-section steels, two-by-two channel-section steel Between backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, a pair Connecting hole is offered on channel-section steel backboard, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two through connecting hole, are indulged Concrete is cast with to outside channel-section steel to form precast slab,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.28%, Zn 5.5%, Ti 2.5%, V 0.8%, Nb 0.4%, Mg 0.3%, Si 0.25%;Mn 0.05%;Co 0.04%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe;The manufacture method of channel-section steel includes Following steps:Molten iron pre-treatment, converter smelting, LF refining, RH are refined to obtain molten steel, and liquid steel temperature is controlled at 1460 DEG C, are protected After warm 10-15 minutes, move in tundish;The molten steel in tundish is then sent into crystallizer;The wide face water of crystallizer is 3300 liters/min, leptoprosopy water is 480 liters/min, and crystallizer water speed is 5-6 meter per seconds, and M-EMS Current controls In 650-700 amperes, frequency setting is controlled at 3.5-4 ms/min in 8-10 hertz, pulling speed of continuous casting;Continuous casting material is obtained, to even Strand material carries out roughing-finish rolling and obtains channel-section steel blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing are opened Temperature is rolled for 1020-1040 DEG C, and roughing finishing temperature is 920-950 DEG C, finishing pass:4-9, finish rolling total coefficient of elongation 1.47- 3.14, finish rolling start rolling temperature is 1050-1070 DEG C, and finish rolling finishing temperature is 950-970 DEG C, carries out crop to finish rolling part afterwards, Rolled parts is aligned afterwards, required size is cut out after aligning and is machined into connecting hole, multiple longitudinal channel-section steels and company After fitting is fixedly connected, it is put into mould,
Concrete is configured afterwards:Concrete forms including following mass parts:170 parts of cement, 13 parts of zeolite powder, sepiolite powder 13 Part, 7 parts of white lime, 12 parts of desulfurated plaster, 320 parts of sand, 420 parts of stone, 22 parts of polypropylene fibre, 9 parts of polyvinyl alcohol, aluminum sulfate 3 parts of potassium, 2 parts of spongiosa acid sodium, 4 parts of water reducer, 70 parts of water, cement, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put Enter grinding 27 minutes in flour mill, toasted 15 minutes at a temperature of 120 DEG C;Mixture after baking is added in mixer and added Enter water, stir 3-5 minutes, add sand and stone, continue to stir 5-8 minutes, sequentially add polypropylene fibre, polyethylene afterwards Alcohol, alum, spongiosa acid sodium, water reducer are stirred, and casting concrete is treated in formation, by concreting to be poured described in Die for molding obtains prefabricated concrete floor.
Concrete material the performance test results of the present invention
Compression strength MPa Anti- rubbish intensity MPa Bending strength MPa Elastic feel quantity
Embodiment 1 75 14.7 17 4.62
Embodiment 2 76 13.9 19 4.57
Embodiment 3 79 14.4 17 4.60
Embodiment 4 79 14.3 18 4.65
Channel-section steel of the present invention Steel material the performance test results

Claims (9)

1. a kind of prefabricated concrete floor, including multiple longitudinal channel-section steels, two-by-two between channel-section steel backwards to and outward opening shape is set Channel-section steel in a pair, channel-section steel are provided with backboard and upper plate symmetrical above and below and lower plate, connecting hole are offered on a pair of channel-section steel backboards, connection Through connecting hole, a pair of channel-section steels are attached part by horizontal cross setting two-by-two, and it is pre- to be formed to be cast with concrete outside longitudinal channel-section steel Concrete slab processed,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.2-0.3%, Zn 4-6%, Ti 2-3%, V 0.5-0.8%, Nb 0.2-0.5%, Mg 0.2-0.4%, Si 0.20-0.40%;Mn 0.05-0.07%;Co 0.04-0.05%, Sn 0.01-0.02wt%;P≤0.02%;S≤ 0.01%, surplus Fe;The manufacture method of channel-section steel comprises the following steps:Molten iron pre-treatment, converter smelting, LF refining, RH refinings Molten steel is obtained, liquid steel temperature is controlled at 1450 DEG C~1500 DEG C, after being incubated 10-15 minutes, is moved in tundish;Then by Between wrap in molten steel be sent into crystallizer;The wide face water of crystallizer be 3000-4000 liters/min, leptoprosopy water be 450-500 liters/ Minute, crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled in 650-700 amperes, and frequency setting is in 8-10 Hertz, pulling speed of continuous casting is controlled at 3.5-4 ms/min;Continuous casting material is obtained, carrying out roughing-finish rolling to continuous casting material obtains channel-section steel Blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, and roughing is whole It is 920-950 DEG C to roll temperature, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, finish rolling start rolling temperature are 1050- 1070 DEG C, finish rolling finishing temperature is 950-970 DEG C, carries out crop to finish rolling part afterwards, rolled parts is aligned afterwards, is aligned After cut out needed for size and be machined into connecting hole, after multiple longitudinal channel-section steels and connector are fixedly connected, be put into mould In tool,
Concrete is configured afterwards:Concrete forms including following mass parts:Cement 150-180 parts, zeolite powder 10-15 parts, Hai Pao Stone flour 10-15 parts, white lime 5-10 parts, desulfurated plaster 10-20 parts, sand 300-320 parts, stone 400-430 parts, polypropylene fibre 20-25 parts, polyvinyl alcohol 5-10 parts, alum 3-6 parts, spongiosa acid sodium 2-3 parts, water reducer 3-5 parts, water 50-80 parts, by water Mud, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put into grinding 20-30 minutes in flour mill, in 100-120 DEG C of temperature Lower baking 10-15 minutes;Mixture after baking is added in mixer and adds water, stirs 3-5 minutes, adds sand and stone Son, continue to stir 5-8 minutes, sequentially add polypropylene fibre afterwards, polyvinyl alcohol, alum, spongiosa acid sodium, water reducer stirs Mix uniformly, casting concrete is treated in formation, and concreting to be poured is obtained into prefabricated concrete floor to the die for molding.
2. a kind of prefabricated concrete floor as claimed in claim 1, connector is through connecting hole by fastener by a pair of grooves Steel is attached.
3. a kind of prefabricated concrete floor as claimed in claim 1, horizontal cross setting will two-by-two through connecting hole for connector A pair of channel-section steels are attached.
4. a kind of prefabricated concrete floor as claimed in claim 1, the chemical composition of channel-section steel are by weight percentage:C 0.24%, Zn 5%, Ti 2%, V 0.6%, Nb 0.4%, Mg 0.2-0.4%, Si 0.24%;Mn 0.06%;Co 0.05%, Sn 0.01wt%;P≤0.02%;S≤0.01%, surplus Fe.
5. a kind of prefabricated concrete floor as claimed in claim 1, the wide face water of crystallizer is 3800 liters/min, leptoprosopy water Measure as 470 liters/min.
6. a kind of prefabricated concrete floor as claimed in claim 1, pulling speed of continuous casting are controlled at 3.5 ms/min.
7. a kind of prefabricated concrete floor as claimed in claim 1, concrete form including following mass parts:160 parts of cement, 12 parts of zeolite powder, 12 parts of sepiolite powder, 6 parts of white lime, 18 parts of desulfurated plaster, 310 parts of sand, 400 parts of stone, polypropylene fibre 25 Part, 8 parts of polyvinyl alcohol, 6 parts of alum, 2 parts of spongiosa acid sodium, 4 parts of water reducer, 75 parts of water.
8. a kind of manufacture method of prefabricated concrete floor, prefabricated concrete floor includes multiple longitudinal channel-section steels, two-by-two channel-section steel it Between backwards to and outward opening set to form a pair of channel-section steels, channel-section steel is provided with backboard and upper plate symmetrical above and below and lower plate, a pair of grooves Connecting hole is offered on steel backing plate, a pair of channel-section steels are attached connector by horizontal cross setting two-by-two through connecting hole, longitudinal direction Concrete is cast with to form precast slab outside channel-section steel,
Prefabricated concrete floor manufacture method comprises the following steps:Channel-section steel, the chemical composition percentage by weight of channel-section steel are manufactured first Than for:C 0.2-0.3%, Zn 4-6%, Ti 2-3%, V 0.5-0.8%, Nb 0.2-0.5%, Mg 0.2-0.4%, Si 0.20-0.40%;Mn 0.05-0.07%;Co 0.04-0.05%, Sn 0.01-0.02wt%;P≤0.02%;S≤ 0.01%, surplus Fe;The manufacture method of channel-section steel comprises the following steps:Molten iron pre-treatment, converter smelting, LF refining, RH refinings Molten steel is obtained, liquid steel temperature is controlled at 1450 DEG C~1500 DEG C, after being incubated 10-15 minutes, is moved in tundish;Then by Between wrap in molten steel be sent into crystallizer;The wide face water of crystallizer be 3000-4000 liters/min, leptoprosopy water be 450-500 liters/ Minute, crystallizer water speed is 5-6 meter per seconds, and M-EMS Current is controlled in 650-700 amperes, and frequency setting is in 8-10 Hertz, pulling speed of continuous casting is controlled at 3.5-4 ms/min;Continuous casting material is obtained, carrying out roughing-finish rolling to continuous casting material obtains channel-section steel Blank:Roughing passage:7-10, roughing total coefficient of elongation 8.87-10.32, roughing start rolling temperature are 1020-1040 DEG C, and roughing is whole It is 920-950 DEG C to roll temperature, finishing pass:4-9, finish rolling total coefficient of elongation 1.47-3.14, finish rolling start rolling temperature are 1050- 1070 DEG C, finish rolling finishing temperature is 950-970 DEG C, carries out crop to finish rolling part afterwards, rolled parts is aligned afterwards, is aligned After cut out needed for size and be machined into connecting hole, after multiple longitudinal channel-section steels and connector are fixedly connected, be put into mould In tool,
Concrete is configured afterwards:Concrete forms including following mass parts:Cement 150-180 parts, zeolite powder 10-15 parts, Hai Pao Stone flour 10-15 parts, white lime 5-10 parts, desulfurated plaster 10-20 parts, sand 300-320 parts, stone 400-430 parts, polypropylene fibre 20-25 parts, polyvinyl alcohol 5-10 parts, alum 3-6 parts, spongiosa acid sodium 2-3 parts, water reducer 3-5 parts, water 50-80 parts, by water Mud, zeolite powder, sepiolite powder, white lime and desulfurated plaster are put into grinding 20-30 minutes in flour mill, in 100-120 DEG C of temperature Lower baking 10-15 minutes;Mixture after baking is added in mixer and adds water, stirs 3-5 minutes, adds sand and stone Son, continue to stir 5-8 minutes, sequentially add polypropylene fibre afterwards, polyvinyl alcohol, alum, spongiosa acid sodium, water reducer stirs Mix uniformly, casting concrete is treated in formation, and concreting to be poured is obtained into prefabricated concrete floor to the die for molding.
9. a kind of prefabricated concrete floor as claimed in claim 1, connector is through connecting hole by fastener by a pair Channel-section steel is attached.
CN201710587592.5A 2017-07-18 2017-07-18 A kind of prefabricated concrete floor Active CN107337391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710587592.5A CN107337391B (en) 2017-07-18 2017-07-18 A kind of prefabricated concrete floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710587592.5A CN107337391B (en) 2017-07-18 2017-07-18 A kind of prefabricated concrete floor

Publications (2)

Publication Number Publication Date
CN107337391A true CN107337391A (en) 2017-11-10
CN107337391B CN107337391B (en) 2019-11-22

Family

ID=60219198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710587592.5A Active CN107337391B (en) 2017-07-18 2017-07-18 A kind of prefabricated concrete floor

Country Status (1)

Country Link
CN (1) CN107337391B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111923192A (en) * 2020-08-25 2020-11-13 王叮叮 Prefabricated concrete composite floor slab, manufacturing mold and manufacturing method
CN112250375A (en) * 2020-07-28 2021-01-22 福州大学 Desert sand concrete and desert sand concrete combined column
US20210221694A1 (en) * 2020-01-17 2021-07-22 Leonard Tim Sperry, III Processes for manufacturing a material

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2775182Y (en) * 2005-03-14 2006-04-26 张礼信 Pole and beam member for light steel structure building
CN201687132U (en) * 2010-06-10 2010-12-29 姚惠良 Light steel combined room upright
CN102912937A (en) * 2012-11-04 2013-02-06 西安建筑科技大学 Embedded type steel high-ductility fiber concrete combination column
CN203531235U (en) * 2013-11-01 2014-04-09 江西建工第二建筑有限责任公司 Anti-corrosion fireproof steel structure hybrid type support beam
CN103938079A (en) * 2014-05-16 2014-07-23 莱芜钢铁集团有限公司 Low-temperature resistant hot rolling H section bar with low compression ratio and super-thick specification and production method thereof
CN204001419U (en) * 2014-05-31 2014-12-10 广西建机钢结构有限公司 A kind of steel work spandrel girder
CN106222557A (en) * 2016-08-25 2016-12-14 山东钢铁股份有限公司 A kind of high efficiency, low cost 610MPa water power steel and production method thereof
CN106518157A (en) * 2016-11-17 2017-03-22 内蒙古绿汇住房产业化技术有限公司 Decorative integrated light load-bearing heat preservation wallboard and preparation method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2775182Y (en) * 2005-03-14 2006-04-26 张礼信 Pole and beam member for light steel structure building
CN201687132U (en) * 2010-06-10 2010-12-29 姚惠良 Light steel combined room upright
CN102912937A (en) * 2012-11-04 2013-02-06 西安建筑科技大学 Embedded type steel high-ductility fiber concrete combination column
CN203531235U (en) * 2013-11-01 2014-04-09 江西建工第二建筑有限责任公司 Anti-corrosion fireproof steel structure hybrid type support beam
CN103938079A (en) * 2014-05-16 2014-07-23 莱芜钢铁集团有限公司 Low-temperature resistant hot rolling H section bar with low compression ratio and super-thick specification and production method thereof
CN204001419U (en) * 2014-05-31 2014-12-10 广西建机钢结构有限公司 A kind of steel work spandrel girder
CN106222557A (en) * 2016-08-25 2016-12-14 山东钢铁股份有限公司 A kind of high efficiency, low cost 610MPa water power steel and production method thereof
CN106518157A (en) * 2016-11-17 2017-03-22 内蒙古绿汇住房产业化技术有限公司 Decorative integrated light load-bearing heat preservation wallboard and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210221694A1 (en) * 2020-01-17 2021-07-22 Leonard Tim Sperry, III Processes for manufacturing a material
CN112250375A (en) * 2020-07-28 2021-01-22 福州大学 Desert sand concrete and desert sand concrete combined column
CN111923192A (en) * 2020-08-25 2020-11-13 王叮叮 Prefabricated concrete composite floor slab, manufacturing mold and manufacturing method

Also Published As

Publication number Publication date
CN107337391B (en) 2019-11-22

Similar Documents

Publication Publication Date Title
CN104451410B (en) Steel for 600MPa-level high-strength steel bars and thermal mechanical rolling method thereof
CN107337391B (en) A kind of prefabricated concrete floor
CN105268884B (en) Method for forging superhigh-temperature soft core of steel ingot
CN110983190A (en) 645 MPa-level high-strength anti-seismic ribbed steel bar and production method thereof
CN102876968B (en) High-strength anti-seismic HRB500E hot-rolled ribbed bar and production process thereof
CN110093474A (en) A kind of production technology mitigating 22CrMoH toothed wheel steel band structure
WO2021115263A1 (en) Hot-rolled h-beam steel based on special-shaped billet rolling and forming, and manufacturing method therefor
CN106756618A (en) 100mm thickness Q420GJCD controlled rolling state high-strength structure steel plates
MX2014002256A (en) Ultra-high strength rebar.
CN106521320A (en) Extra-thick Q460GJCD controlled rolling state high-strength structural steel plate
CN114015848A (en) Needle-shaped ferrite type high-strength steel bar and preparation method thereof
CN109023115A (en) A kind of hot rolling template pulling-on piece steel and its manufacturing method
CN105039782B (en) Fireproof door with protective titanium alloy plate
CN112921241A (en) Production method of Q460 grade building steel with low yield ratio and high toughness under air cooling
DE60113451T2 (en) METHOD FOR PRODUCING HIGHLY NITROUS STEEL WITH EXTREMELY LOW CARBON CONTENT
US20140353464A1 (en) High strength rebar
CN107327071A (en) A kind of large-span concrete plate
CN109881110B (en) Hot-rolled wire rod for welded mesh and manufacturing method thereof
CN110814308A (en) High-strength deformed steel bar continuous casting and production process
CN105155514B (en) Anti-corrosion concrete-filled round tubular pile for road bridge construction
CN111074125B (en) Back ridge for aluminum alloy building template and preparation method thereof
CN106436695A (en) Precast pile column for large-span bridge architecture
CN108687317A (en) The method that bloom continuous casting produces 42CrMoH steel
CN109706390A (en) Big 930MPa grades of anti-hydrogen embrittlement finish rolling deformed bars of specification and its production method
CN106544955B (en) A kind of bridge prefabricated bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191028

Address after: 214000 Xishan Economic Development Zone, Wuxi City, Jiangsu Province 99-8 Furong Zhongsan Road

Applicant after: Wuxi Beida Construction Engineering Co., Ltd.

Address before: 048035 No. 59 West View Road, Jincheng, Shanxi, Zezhou

Applicant before: Zhou Xinya

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210318

Address after: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee after: Li Qiannan

Address before: No. 99-8, Furong Zhongsan Road, Xishan Economic Development Zone, Wuxi City, Jiangsu Province, 214000

Patentee before: Wuxi Beida Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210412

Address after: 213000 Wucheng Industrial Park, Zhenglu Town, Tianning District, Changzhou City, Jiangsu Province

Patentee after: Green concrete (Jiangsu) Construction Technology Co.,Ltd.

Address before: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee before: Li Qiannan

TR01 Transfer of patent right