CN107330644A - A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system - Google Patents
A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system Download PDFInfo
- Publication number
- CN107330644A CN107330644A CN201710757238.2A CN201710757238A CN107330644A CN 107330644 A CN107330644 A CN 107330644A CN 201710757238 A CN201710757238 A CN 201710757238A CN 107330644 A CN107330644 A CN 107330644A
- Authority
- CN
- China
- Prior art keywords
- coal
- outs
- ins
- data
- generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 175
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000007619 statistical method Methods 0.000 title claims abstract description 23
- 238000004364 calculation method Methods 0.000 claims abstract description 50
- 230000005611 electricity Effects 0.000 claims abstract description 33
- 238000004458 analytical method Methods 0.000 claims abstract description 30
- 238000004519 manufacturing process Methods 0.000 claims abstract description 15
- 238000012545 processing Methods 0.000 claims abstract description 12
- 238000013480 data collection Methods 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000004422 calculation algorithm Methods 0.000 description 2
- 238000007405 data analysis Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000002485 combustion reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Disintegrating Or Milling (AREA)
Abstract
The invention discloses a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system, this method includes:Data acquisition is carried out to coal fired thermal power plant by DCS system;Wherein, the data of collection include generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, each coal pulverizer coal-supplying amount ins and outs progress is sentenced and handled by mistake;The data of collection calculate to obtain result of calculation;Wherein, result of calculation includes amounting to coal consumption amount, generator power output and standard coal consumption rate for generating;Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and is marked and shows.This method realizes that automatic data collection analyzes coal fired thermal power plant data, saves human cost.
Description
Technical field
The present invention relates to power plant's technical field, more particularly to a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and
System.
Background technology
At present, power plant operations staff per tour generated energy, Coal-fired capacity, power consumption and gross coal consumption rate need to be acquired, calculated,
Analyze, report.So that decision-making section is to the grasp of same day production status, analysis and to following production line decision-making, combustion is also allowed for
Expect grasp and Distribution Warehouse of the supply department to each run coal bin fuel quantity.
Prior art:At present, traditional mode is all manually to gather, calculate, analyze, fill in message.Artificial collection is needed
Made a copy of by hand to each instrument of production scene, calculating and analyzing will often be carried out by instruments such as common calculators, message
It is also required to beat input computer manually,.
Prior art defect:Collection, calculating, analysis workload are big manually, waste time and energy, mistake easily occur, accuracy rate is not
Height, resulting data often come in and go out than larger with real data, it is impossible to meet the demand that power plant monitors to same day production status,
Even influence the quality of relieving of operations staff.
The content of the invention
It is automatic to realize it is an object of the invention to provide a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system
Collection analysis coal fired thermal power plant data, save human cost.
In order to solve the above technical problems, the present invention provides a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique, the party
Method includes:
Data acquisition is carried out to coal fired thermal power plant by DCS system;Wherein, the data of collection include generator outlet electricity
Ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;
For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, by each coal pulverizer coal-supplying amount bottom
Code sentence and handled by mistake;
The data of collection calculate to obtain result of calculation;Wherein, result of calculation includes amounting to coal consumption amount, generator hair
Electricity and standard coal consumption rate for generating;
Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and is marked and shows
Show.
It is preferred that, it is described by generator outlet electricity ins and outs carry out sentence by mistake processing include:
The calculation formula for calculating generator mean power P, P on duty is:
Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLUnit be
104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;
Generator mean power P on duty is judged whether in interval [0,330], if it is not, determining the generator outlet of collection
Electricity ins and outs is wrong;
It is described each coal pulverizer coal-supplying amount ins and outs is sentenced include by mistake:
For every coal pulverizer, calculating coal pulverizer is on duty averagely to give coal rate F;Wherein, F=(C2-C1)/T, C2For coal pulverizer
Hand over to the next shift ins and outs, C2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T is duty hour, and T unit is h, F's
Unit is t/h;
Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if so, determining the coal pulverizer gathered
Coal-supplying amount ins and outs is wrong.
It is preferred that, generator outlet electricity ins and outs sentence processing by mistake, by each coal-grinding by the data for collection
Machine coal-supplying amount ins and outs sentence after processing by mistake, in addition to:
If it is data acquisition mistake to sentence result by mistake, manual entry data manipulation flow is transferred to.
It is preferred that, it is described that analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and are entered
After line flag and display, in addition to:
Correct result of calculation is deposited in into the webserver, and message is generated by set form.
The present invention also provides a kind of coal fired thermal power plant gross coal consumption rate statistical analysis system, for realizing the above method, including:
Data acquisition device, for carrying out data acquisition to coal fired thermal power plant by DCS system;Wherein, the data of collection
Including generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount
Ins and outs;
Sentence module by mistake, for the data for collection, generator outlet electricity ins and outs sentence processing by mistake, by each mill
Coal machine coal-supplying amount ins and outs sentence and handled by mistake;
Computing module, for by the data of collection calculate obtaining result of calculation;Wherein, result of calculation includes amounting to coal
Consumption, generator power output and standard coal consumption rate for generating;
Analysis module, for entering analysis to result of calculation, will not meet the rational data of actual production in result of calculation
It is marked and shows.
It is preferred that, it is described sentence by mistake module include:
Electricity ins and outs judges unit by accident, and the calculation formula for calculating generator mean power P, P on duty is:Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLList
Position is 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;Judge that generator on duty is averaged
Whether power P is in interval [0,330], if it is not, determining that the generator outlet electricity ins and outs of collection is wrong;
Coal amount ins and outs judges unit by accident, and for for every coal pulverizer, calculating, coal pulverizer is on duty averagely to give coal rate F;Wherein, F
=(C2-C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T for work as
Class's time, T unit is h, and F unit is t/h;Judge whether coal pulverizer is on duty average maximum to coal more than default to coal rate F
Rate, if so, determining that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.
It is preferred that, the erroneous judgement module also includes:
Flow modular converter, if being data acquisition mistake for sentencing result by mistake, is transferred to manual entry data manipulation stream
Journey.
It is preferred that, the coal fired thermal power plant gross coal consumption rate statistical analysis system also includes:
Memory module, for correct result of calculation to be deposited in into the webserver, and generates message by set form.
A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention and system, pass through DCS system pair
Coal fired thermal power plant carries out data acquisition;Wherein, the data of collection include generator outlet electricity ins and outs, station-service power consumption ins and outs,
Generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;For the data of collection, by generator outlet electricity bottom
Code sentence and handled by mistake, and each coal pulverizer coal-supplying amount ins and outs progress is sentenced and handled by mistake;The data of collection are carried out to calculate
Calculate result;Wherein, result of calculation includes amounting to coal consumption amount, generator power output and standard coal consumption rate for generating;Result of calculation is entered
Analysis, will not meet the rational data of actual production and is marked and shows in result of calculation.It can be seen that, conventional data are adopted
Collect, calculate, analysis work replaces artificial means with automation means, and effective analysis is carried out to the result of calculating, realizing certainly
Dynamic collection analysis coal fired thermal power plant data, so as to save manpower, greatly improve operating efficiency, and also progress erroneous judgement operation,
Improve data accuracy.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of flow chart of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention;
Fig. 2 is the outline flowchart of coal fired thermal power plant data collection and analysis;
Fig. 3 is a kind of structural representation of coal fired thermal power plant gross coal consumption rate statistical analysis system provided by the present invention.
Embodiment
The core of the present invention is to provide a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system, automatic to realize
Collection analysis coal fired thermal power plant data, save human cost.
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only
A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is refer to, Fig. 1 is a kind of flow of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention
Figure, this method includes:
S11:Data acquisition is carried out to coal fired thermal power plant by DCS system;
Wherein, the data of collection include generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet wattful power
Rate and each coal pulverizer coal-supplying amount ins and outs;
S12:For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, by each coal pulverizer to coal
Amount ins and outs sentence and handled by mistake;
S13:The data of collection calculate to obtain result of calculation;
Wherein, result of calculation includes amounting to coal consumption amount, generator power output and standard coal consumption rate for generating;
S14:Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and are marked simultaneously
Display.
It can be seen that, in this method, conventional data acquisition, calculating, analysis work are replaced into artificial means with automation means,
And effective analysis is carried out to the result of calculating, realize that automatic data collection analyzes coal fired thermal power plant data, so as to save manpower, significantly
Raising operating efficiency, and also carry out erroneous judgement operation, improve data accuracy.
Based on the above method, further, in step S12, generator outlet electricity ins and outs sentence to the mistake of processing by mistake
Journey is specifically included:
S21:Calculate generator mean power P on duty;
Wherein, P calculation formula is:WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WL
Succeeded ins and outs, W for generatorLUnit be 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;
S22:Generator mean power P on duty is judged whether in interval [0,330], if it is not, determining the generator of collection
Export electricity ins and outs wrong.
Wherein, it should judge whether mean power P is interval interior herein in [0,330] for the interval of 300MW unit P values,
If it is not, determining that the generator outlet electricity ins and outs of collection is wrong.
Further, in step S12, the process for sentence mistake by each coal pulverizer coal-supplying amount ins and outs is specifically included:
S31:For every coal pulverizer, calculating coal pulverizer is on duty averagely to give coal rate F;
Wherein, F=(C2-C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1
Unit be t, T is duty hour, and T unit is h, and F unit is t/h;
S32:Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if so, determining the mill gathered
Coal machine coal-supplying amount ins and outs is wrong.
Wherein, it should judge mean power F whether herein in [0, maximum gives coal rate] for the interval of 300MW unit F values
In interval, if it is not, determining that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.It is maximum to be determined to coal rate by producer's design, it is default
Value.
Further, after step S12, in addition to:If it is data acquisition mistake to sentence result by mistake, manual entry is transferred to
Data manipulation flow.
Wherein, step S11 executor is Power Plant DCS System legacy data harvester.
Detailed, in step S13, the calculation formula for amounting to coal consumption amount is as follows:
CAlways=CA+CB+CC+CD+CE+CF-CL;
Wherein, CAlwaysTo amount to coal consumption amount, unit is t.CATo CFFor each coal pulverizer coal consumption ins and outs, unit is t, CLFor
Succeed coal pulverizer coal consumption ins and outs, unit is t.A to F and L refers to different coal pulverizers.
The calculation formula of generator power output is as follows:
W=k (WN-WL);
Wherein, W is generator power output, and unit is 104kWh。WNHanded over to the next shift ins and outs for generator, unit is 104KWh, WLFor
Generator is succeeded ins and outs, and unit is 104KWh, k are generator kilowatt-hour meter multiplying power.
The calculation formula of standard coal consumption rate for generating is as follows:
Wherein, B ' is the former coa consumption rate that generates electricity, and unit is g/kW.h.
Wherein, B is standard coal consumption rate for generating, and unit is g/kW.h.LHV ' is that the standard coal based on national Specification is low
Position calorific capacity, unit is kJ/kg, and its value is fixed 29307.6kJ/kg, and LHV is as-fired coal low heat value, and unit is kJ/
kg。
Detailed, in step S14, result of calculation is analyzed, the rational data of actual production is not met and carries out
It is highlighted and re-types.
Wherein, standard coal consumption rate for generating B ' changes according to the different of ature of coal during operation, and according to operating experience it can be gathered that
Certain scope, if its value goes beyond the scope, is judged as data acquisition or typing mistake, returns to the manual entry stage, and highlighted aobvious
Show, so that operations staff checks and re-types.
Further, after step S14, in addition to:Correct result of calculation is deposited in into the webserver, and by solid
The formula that fixes generates message.Also, when user needs, icon drafting can be carried out to the data of preservation and shown, so as to user point
Analysis.
The work such as conventional data acquisition, calculating, analysis, message are replaced artificial means by this method with automation means,
And effective analysis is carried out to the result of calculating, various mistake generation messages are wiped out, so as to save manpower, work are greatly improved
Efficiency.Fig. 2 is refer to, Fig. 2 is the outline flowchart of coal fired thermal power plant data collection and analysis.
This method carries out primary to institute's gathered data and sentenced after mistake, if data acquisition is wrong, is transferred to manual entry data, automatically
Data inputting and error detection need to be manually carried out during collection mistake, to ensure the authenticity and accuracy of data.
Fig. 3 is refer to, Fig. 3 is a kind of structure of coal fired thermal power plant gross coal consumption rate statistical analysis system provided by the present invention
Schematic diagram, the system is used to realize the above method, and the system includes:
Data acquisition device 101, for carrying out data acquisition to coal fired thermal power plant by DCS system;Wherein, the number of collection
According to including generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer to coal
Measure ins and outs;
Sentence module 102 by mistake, for the data for collection, generator outlet electricity ins and outs sentence processing by mistake, will be each
Platform coal pulverizer coal-supplying amount ins and outs sentence and handled by mistake;
Computing module 103, for by the data of collection calculate obtaining result of calculation;Wherein, result of calculation includes total
Count coal consumption amount, generator power output and standard coal consumption rate for generating;
Analysis module 104, for entering analysis to result of calculation, will not meet the rational number of actual production in result of calculation
According to being marked and show.
It can be seen that, in the system, conventional data acquisition, calculating, analysis work are replaced into artificial means with automation means,
And effective analysis is carried out to the result of calculating, realize that automatic data collection analyzes coal fired thermal power plant data, so as to save manpower, significantly
Raising operating efficiency, and also carry out erroneous judgement operation, improve data accuracy.
Wherein, data acquisition device is Power Plant DCS System legacy data harvester.
It is further, described to sentence module by mistake and include based on above-mentioned coal fired thermal power plant gross coal consumption rate statistical analysis system:
Electricity ins and outs judges unit by accident, and the calculation formula for calculating generator mean power P, P on duty is:Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLList
Position is 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;Judge that generator on duty is averaged
Whether power P is in interval [0,330], if it is not, determining that the generator outlet electricity ins and outs of collection is wrong;
Coal amount ins and outs judges unit by accident, and for for every coal pulverizer, calculating, coal pulverizer is on duty averagely to give coal rate F;Wherein, F
=(C2-C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T for work as
Class's time, T unit is h, and F unit is t/h;Judge whether coal pulverizer is on duty average maximum to coal more than default to coal rate F
Rate, if so, determining that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.
Further, erroneous judgement module also includes:Flow modular converter, if being that data acquisition is wrong for sentencing result by mistake
By mistake, it is transferred to manual entry data manipulation flow.
Further, coal fired thermal power plant gross coal consumption rate statistical analysis system also includes:Memory module, by will correctly based on
Calculate result and deposit in the webserver, and message is generated by set form.
The system is by Power Plant DCS System legacy data harvester, and measuring point data needed for automatic data collection is simultaneously calculated,
And anti-false judgment, analysis are carried out to the result of calculating.According to institute's analysis result, message, render history curve are generated.To reduce fortune
The workload of administrative staff, also allows for reference, the analysis of user.
The embodiment of each in this specification is described by the way of progressive, what each embodiment was stressed be with it is other
Between the difference of embodiment, each embodiment same or similar part mutually referring to.For being disclosed in embodiment
For system, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is referring to method part
Explanation.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description
And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software, generally describes the composition and step of each example according to function in the above description.These
Function is performed with hardware or software mode actually, depending on the application-specific and design constraint of technical scheme.Specialty
Technical staff can realize described function to each specific application using distinct methods, but this realization should not
Think beyond the scope of this invention.
Directly it can be held with reference to the step of the method or algorithm that the embodiments described herein is described with hardware, processor
Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention and system have been carried out in detail above
It is thin to introduce.Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said
The bright method and its core concept for being only intended to help to understand the present invention.It should be pointed out that for the ordinary skill of the art
For personnel, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these improvement
Also fallen into modification in the protection domain of the claims in the present invention.
Claims (8)
1. a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique, it is characterised in that including:
Data acquisition is carried out to coal fired thermal power plant by DCS system;Wherein, the data of collection include generator outlet electricity bottom
Code, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;
For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, each coal pulverizer coal-supplying amount ins and outs is entered
Row is sentenced to be handled by mistake;
The data of collection calculate to obtain result of calculation;Wherein, result of calculation includes amounting to coal consumption amount, generator power output
And standard coal consumption rate for generating;
Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and is marked and shows.
2. the method as described in claim 1, it is characterised in that described that generator outlet electricity ins and outs sentence processing bag by mistake
Include:
The calculation formula for calculating generator mean power P, P on duty is:
<mrow>
<mi>P</mi>
<mo>=</mo>
<mfrac>
<mrow>
<mi>k</mi>
<mrow>
<mo>(</mo>
<msub>
<mi>W</mi>
<mi>N</mi>
</msub>
<mo>-</mo>
<msub>
<mi>W</mi>
<mi>L</mi>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<mn>10</mn>
<mi>T</mi>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLUnit be
104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;
Generator mean power P on duty is judged whether in interval [0,330], if it is not, determining the generator outlet electricity of collection
Ins and outs is wrong;
It is described each coal pulverizer coal-supplying amount ins and outs is sentenced include by mistake:
For every coal pulverizer, calculating coal pulverizer is on duty averagely to give coal rate F;Wherein, F=(C2-C1)/T, C2Handed over to the next shift for coal pulverizer
Ins and outs, C2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T is duty hour, and T unit is h, F unit
For t/h;
Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if so, determining the coal pulverizer gathered to coal
Measure ins and outs wrong.
3. method as claimed in claim 2, it is characterised in that the data for collection, by generator outlet electricity bottom
Code sentence and handled by mistake, each coal pulverizer coal-supplying amount ins and outs progress is sentenced handle by mistake after, in addition to:
If it is data acquisition mistake to sentence result by mistake, manual entry data manipulation flow is transferred to.
4. method as claimed in claim 3, it is characterised in that described to enter analysis to result of calculation, will not be inconsistent in result of calculation
After the conjunction rational data of actual production are marked and shown, in addition to:
Correct result of calculation is deposited in into the webserver, and message is generated by set form.
5. a kind of coal fired thermal power plant gross coal consumption rate statistical analysis system, it is characterised in that for realizing as in Claims 1-4
Method described in any one, including:
Data acquisition device, for carrying out data acquisition to coal fired thermal power plant by DCS system;Wherein, the data of collection include
Generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;
Sentence module by mistake, for the data for collection, generator outlet electricity ins and outs sentence processing by mistake, by each coal pulverizer
Coal-supplying amount ins and outs sentence and handled by mistake;
Computing module, for by the data of collection calculate obtaining result of calculation;Wherein, result of calculation includes amounting to coal consumption
Amount, generator power output and standard coal consumption rate for generating;
Analysis module, for entering analysis to result of calculation, will not meet the rational data of actual production and carries out in result of calculation
Mark and show.
6. coal fired thermal power plant gross coal consumption rate statistical analysis system as claimed in claim 5, it is characterised in that described to sentence module by mistake
Including:
Electricity ins and outs judges unit by accident, and the calculation formula for calculating generator mean power P, P on duty is:Its
In, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLUnit be 104KWh, k are
Generator kilowatt-hour meter multiplying power, T is duty hour, and P unit is 10-1mW;Judge generator mean power P on duty whether in interval
In [0,330], if it is not, determining that the generator outlet electricity ins and outs of collection is wrong;
Coal amount ins and outs judges unit by accident, and for for every coal pulverizer, calculating, coal pulverizer is on duty averagely to give coal rate F;Wherein, F=(C2-
C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T for it is on duty when
Between, T unit is h, and F unit is t/h;Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if
It is, it is determined that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.
7. coal fired thermal power plant gross coal consumption rate statistical analysis system as claimed in claim 6, it is characterised in that the erroneous judgement module
Also include:
Flow modular converter, if being data acquisition mistake for sentencing result by mistake, is transferred to manual entry data manipulation flow.
8. coal fired thermal power plant gross coal consumption rate statistical analysis system as claimed in claim 7, it is characterised in that the Coal-fired Thermal Power
Factory's gross coal consumption rate statistical analysis system also includes:
Memory module, for correct result of calculation to be deposited in into the webserver, and generates message by set form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710757238.2A CN107330644A (en) | 2017-08-29 | 2017-08-29 | A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710757238.2A CN107330644A (en) | 2017-08-29 | 2017-08-29 | A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107330644A true CN107330644A (en) | 2017-11-07 |
Family
ID=60204030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710757238.2A Pending CN107330644A (en) | 2017-08-29 | 2017-08-29 | A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107330644A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1167900A (en) * | 1997-03-19 | 1997-12-17 | 魏楠 | Method and apparatus for measuring coal consumption of unit generator set in thermal power plant |
CN101725998A (en) * | 2009-12-14 | 2010-06-09 | 贵州电力试验研究院 | System for determining and replacing abnormal data in coal consumption online monitoring system |
CN101893877A (en) * | 2009-05-20 | 2010-11-24 | 中国国电集团公司九江发电厂 | Optimization operational method based on energy consumption analysis for power plant and system thereof |
CN102306335A (en) * | 2011-06-03 | 2012-01-04 | 中国神华能源股份有限公司 | Equipment state detecting method used for thermal power plant |
US20140116045A1 (en) * | 2011-06-27 | 2014-05-01 | Brad William Mullard | Geothermal assisted power generation |
CN106768068A (en) * | 2017-03-20 | 2017-05-31 | 浙江浙能台州第二发电有限责任公司 | Fired power generating unit fire coal calorific value and consumption of standard coal for power generation index on-line monitoring system and method |
-
2017
- 2017-08-29 CN CN201710757238.2A patent/CN107330644A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1167900A (en) * | 1997-03-19 | 1997-12-17 | 魏楠 | Method and apparatus for measuring coal consumption of unit generator set in thermal power plant |
CN101893877A (en) * | 2009-05-20 | 2010-11-24 | 中国国电集团公司九江发电厂 | Optimization operational method based on energy consumption analysis for power plant and system thereof |
CN101725998A (en) * | 2009-12-14 | 2010-06-09 | 贵州电力试验研究院 | System for determining and replacing abnormal data in coal consumption online monitoring system |
CN102306335A (en) * | 2011-06-03 | 2012-01-04 | 中国神华能源股份有限公司 | Equipment state detecting method used for thermal power plant |
US20140116045A1 (en) * | 2011-06-27 | 2014-05-01 | Brad William Mullard | Geothermal assisted power generation |
CN106768068A (en) * | 2017-03-20 | 2017-05-31 | 浙江浙能台州第二发电有限责任公司 | Fired power generating unit fire coal calorific value and consumption of standard coal for power generation index on-line monitoring system and method |
Non-Patent Citations (1)
Title |
---|
李娜等: "燃煤电厂煤耗统计分析方法探讨", 《广西电力》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Duffy et al. | Land-based wind energy cost trends in Germany, Denmark, Ireland, Norway, Sweden and the United States | |
CN106096810B (en) | Method and system for planning based on power distribution network operation data Yu geographical topology information | |
CN106443168A (en) | Remote acquisition meter reading data analysis system | |
CN104361236A (en) | Evaluation method for health condition of electric power equipment | |
CN107766254A (en) | A kind of Evaluation of Software Quality and system based on step analysis | |
Yu et al. | A hybrid multi-criteria decision-making framework for offshore wind turbine selection: A case study in China | |
CN109785187A (en) | A kind of electric set electric supply coal consumption detection data bearing calibration | |
CN111724060A (en) | Integrated analysis monitoring system and analysis method for transformer area line loss | |
Dong et al. | Optimal selection for wind power coupled hydrogen energy storage from a risk perspective, considering the participation of multi-stakeholder | |
Rout et al. | Assessing the financial sustainability of rural grid electrification pathway: A case study of India | |
CN115879632A (en) | Data processing method for carbon emission measurement and calculation data of industrial enterprise | |
Tan et al. | Has the inter-regional transmission expansion promoted the low-carbon transition of China’s power sector? | |
CN110146813A (en) | A kind of distributing Wind turbines electric energy quality test method | |
CN110968703B (en) | Method and system for constructing abnormal metering point knowledge base based on LSTM end-to-end extraction algorithm | |
CN108320081A (en) | A kind of meter reading business datum analysis and processing method and system based on automation | |
CN206470388U (en) | The apparatus for evaluating of metering performance under dynamic load | |
CN203037770U (en) | Multifunctional on-line electricity consumption tester | |
CN102682212B (en) | Reliability measurement method for mechanical and electrical product | |
Govorukha et al. | Economic disruptions in long-term energy scenarios–Implications for designing energy policy | |
CN107330644A (en) | A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system | |
CN108920810A (en) | Electric analog method based on big data framework | |
CN104715289B (en) | Preferably generating progress indicator determines method and device for power plant | |
CN113034271A (en) | Enterprise credit evaluation system based on big data | |
Kirby et al. | Cost-causation-based tariffs for wind ancillary service impacts | |
CN107977724A (en) | A kind of water quality hard measurement Forecasting Methodology of permanganate index |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171107 |