CN107330644A - A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system - Google Patents

A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system Download PDF

Info

Publication number
CN107330644A
CN107330644A CN201710757238.2A CN201710757238A CN107330644A CN 107330644 A CN107330644 A CN 107330644A CN 201710757238 A CN201710757238 A CN 201710757238A CN 107330644 A CN107330644 A CN 107330644A
Authority
CN
China
Prior art keywords
coal
outs
ins
data
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710757238.2A
Other languages
Chinese (zh)
Inventor
张劲
王敬忠
李希宏
杜长庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Pingliang Power Generation Co Ltd
Original Assignee
Huaneng Pingliang Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Pingliang Power Generation Co Ltd filed Critical Huaneng Pingliang Power Generation Co Ltd
Priority to CN201710757238.2A priority Critical patent/CN107330644A/en
Publication of CN107330644A publication Critical patent/CN107330644A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Disintegrating Or Milling (AREA)

Abstract

The invention discloses a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system, this method includes:Data acquisition is carried out to coal fired thermal power plant by DCS system;Wherein, the data of collection include generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, each coal pulverizer coal-supplying amount ins and outs progress is sentenced and handled by mistake;The data of collection calculate to obtain result of calculation;Wherein, result of calculation includes amounting to coal consumption amount, generator power output and standard coal consumption rate for generating;Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and is marked and shows.This method realizes that automatic data collection analyzes coal fired thermal power plant data, saves human cost.

Description

A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system
Technical field
The present invention relates to power plant's technical field, more particularly to a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and System.
Background technology
At present, power plant operations staff per tour generated energy, Coal-fired capacity, power consumption and gross coal consumption rate need to be acquired, calculated, Analyze, report.So that decision-making section is to the grasp of same day production status, analysis and to following production line decision-making, combustion is also allowed for Expect grasp and Distribution Warehouse of the supply department to each run coal bin fuel quantity.
Prior art:At present, traditional mode is all manually to gather, calculate, analyze, fill in message.Artificial collection is needed Made a copy of by hand to each instrument of production scene, calculating and analyzing will often be carried out by instruments such as common calculators, message It is also required to beat input computer manually,.
Prior art defect:Collection, calculating, analysis workload are big manually, waste time and energy, mistake easily occur, accuracy rate is not Height, resulting data often come in and go out than larger with real data, it is impossible to meet the demand that power plant monitors to same day production status, Even influence the quality of relieving of operations staff.
The content of the invention
It is automatic to realize it is an object of the invention to provide a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system Collection analysis coal fired thermal power plant data, save human cost.
In order to solve the above technical problems, the present invention provides a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique, the party Method includes:
Data acquisition is carried out to coal fired thermal power plant by DCS system;Wherein, the data of collection include generator outlet electricity Ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;
For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, by each coal pulverizer coal-supplying amount bottom Code sentence and handled by mistake;
The data of collection calculate to obtain result of calculation;Wherein, result of calculation includes amounting to coal consumption amount, generator hair Electricity and standard coal consumption rate for generating;
Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and is marked and shows Show.
It is preferred that, it is described by generator outlet electricity ins and outs carry out sentence by mistake processing include:
The calculation formula for calculating generator mean power P, P on duty is:
Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLUnit be 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;
Generator mean power P on duty is judged whether in interval [0,330], if it is not, determining the generator outlet of collection Electricity ins and outs is wrong;
It is described each coal pulverizer coal-supplying amount ins and outs is sentenced include by mistake:
For every coal pulverizer, calculating coal pulverizer is on duty averagely to give coal rate F;Wherein, F=(C2-C1)/T, C2For coal pulverizer Hand over to the next shift ins and outs, C2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T is duty hour, and T unit is h, F's Unit is t/h;
Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if so, determining the coal pulverizer gathered Coal-supplying amount ins and outs is wrong.
It is preferred that, generator outlet electricity ins and outs sentence processing by mistake, by each coal-grinding by the data for collection Machine coal-supplying amount ins and outs sentence after processing by mistake, in addition to:
If it is data acquisition mistake to sentence result by mistake, manual entry data manipulation flow is transferred to.
It is preferred that, it is described that analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and are entered After line flag and display, in addition to:
Correct result of calculation is deposited in into the webserver, and message is generated by set form.
The present invention also provides a kind of coal fired thermal power plant gross coal consumption rate statistical analysis system, for realizing the above method, including:
Data acquisition device, for carrying out data acquisition to coal fired thermal power plant by DCS system;Wherein, the data of collection Including generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount Ins and outs;
Sentence module by mistake, for the data for collection, generator outlet electricity ins and outs sentence processing by mistake, by each mill Coal machine coal-supplying amount ins and outs sentence and handled by mistake;
Computing module, for by the data of collection calculate obtaining result of calculation;Wherein, result of calculation includes amounting to coal Consumption, generator power output and standard coal consumption rate for generating;
Analysis module, for entering analysis to result of calculation, will not meet the rational data of actual production in result of calculation It is marked and shows.
It is preferred that, it is described sentence by mistake module include:
Electricity ins and outs judges unit by accident, and the calculation formula for calculating generator mean power P, P on duty is:Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLList Position is 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;Judge that generator on duty is averaged Whether power P is in interval [0,330], if it is not, determining that the generator outlet electricity ins and outs of collection is wrong;
Coal amount ins and outs judges unit by accident, and for for every coal pulverizer, calculating, coal pulverizer is on duty averagely to give coal rate F;Wherein, F =(C2-C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T for work as Class's time, T unit is h, and F unit is t/h;Judge whether coal pulverizer is on duty average maximum to coal more than default to coal rate F Rate, if so, determining that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.
It is preferred that, the erroneous judgement module also includes:
Flow modular converter, if being data acquisition mistake for sentencing result by mistake, is transferred to manual entry data manipulation stream Journey.
It is preferred that, the coal fired thermal power plant gross coal consumption rate statistical analysis system also includes:
Memory module, for correct result of calculation to be deposited in into the webserver, and generates message by set form.
A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention and system, pass through DCS system pair Coal fired thermal power plant carries out data acquisition;Wherein, the data of collection include generator outlet electricity ins and outs, station-service power consumption ins and outs, Generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;For the data of collection, by generator outlet electricity bottom Code sentence and handled by mistake, and each coal pulverizer coal-supplying amount ins and outs progress is sentenced and handled by mistake;The data of collection are carried out to calculate Calculate result;Wherein, result of calculation includes amounting to coal consumption amount, generator power output and standard coal consumption rate for generating;Result of calculation is entered Analysis, will not meet the rational data of actual production and is marked and shows in result of calculation.It can be seen that, conventional data are adopted Collect, calculate, analysis work replaces artificial means with automation means, and effective analysis is carried out to the result of calculating, realizing certainly Dynamic collection analysis coal fired thermal power plant data, so as to save manpower, greatly improve operating efficiency, and also progress erroneous judgement operation, Improve data accuracy.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of flow chart of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention;
Fig. 2 is the outline flowchart of coal fired thermal power plant data collection and analysis;
Fig. 3 is a kind of structural representation of coal fired thermal power plant gross coal consumption rate statistical analysis system provided by the present invention.
Embodiment
The core of the present invention is to provide a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system, automatic to realize Collection analysis coal fired thermal power plant data, save human cost.
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is refer to, Fig. 1 is a kind of flow of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention Figure, this method includes:
S11:Data acquisition is carried out to coal fired thermal power plant by DCS system;
Wherein, the data of collection include generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet wattful power Rate and each coal pulverizer coal-supplying amount ins and outs;
S12:For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, by each coal pulverizer to coal Amount ins and outs sentence and handled by mistake;
S13:The data of collection calculate to obtain result of calculation;
Wherein, result of calculation includes amounting to coal consumption amount, generator power output and standard coal consumption rate for generating;
S14:Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and are marked simultaneously Display.
It can be seen that, in this method, conventional data acquisition, calculating, analysis work are replaced into artificial means with automation means, And effective analysis is carried out to the result of calculating, realize that automatic data collection analyzes coal fired thermal power plant data, so as to save manpower, significantly Raising operating efficiency, and also carry out erroneous judgement operation, improve data accuracy.
Based on the above method, further, in step S12, generator outlet electricity ins and outs sentence to the mistake of processing by mistake Journey is specifically included:
S21:Calculate generator mean power P on duty;
Wherein, P calculation formula is:WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WL Succeeded ins and outs, W for generatorLUnit be 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;
S22:Generator mean power P on duty is judged whether in interval [0,330], if it is not, determining the generator of collection Export electricity ins and outs wrong.
Wherein, it should judge whether mean power P is interval interior herein in [0,330] for the interval of 300MW unit P values, If it is not, determining that the generator outlet electricity ins and outs of collection is wrong.
Further, in step S12, the process for sentence mistake by each coal pulverizer coal-supplying amount ins and outs is specifically included:
S31:For every coal pulverizer, calculating coal pulverizer is on duty averagely to give coal rate F;
Wherein, F=(C2-C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1 Unit be t, T is duty hour, and T unit is h, and F unit is t/h;
S32:Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if so, determining the mill gathered Coal machine coal-supplying amount ins and outs is wrong.
Wherein, it should judge mean power F whether herein in [0, maximum gives coal rate] for the interval of 300MW unit F values In interval, if it is not, determining that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.It is maximum to be determined to coal rate by producer's design, it is default Value.
Further, after step S12, in addition to:If it is data acquisition mistake to sentence result by mistake, manual entry is transferred to Data manipulation flow.
Wherein, step S11 executor is Power Plant DCS System legacy data harvester.
Detailed, in step S13, the calculation formula for amounting to coal consumption amount is as follows:
CAlways=CA+CB+CC+CD+CE+CF-CL
Wherein, CAlwaysTo amount to coal consumption amount, unit is t.CATo CFFor each coal pulverizer coal consumption ins and outs, unit is t, CLFor Succeed coal pulverizer coal consumption ins and outs, unit is t.A to F and L refers to different coal pulverizers.
The calculation formula of generator power output is as follows:
W=k (WN-WL);
Wherein, W is generator power output, and unit is 104kWh。WNHanded over to the next shift ins and outs for generator, unit is 104KWh, WLFor Generator is succeeded ins and outs, and unit is 104KWh, k are generator kilowatt-hour meter multiplying power.
The calculation formula of standard coal consumption rate for generating is as follows:
Wherein, B ' is the former coa consumption rate that generates electricity, and unit is g/kW.h.
Wherein, B is standard coal consumption rate for generating, and unit is g/kW.h.LHV ' is that the standard coal based on national Specification is low Position calorific capacity, unit is kJ/kg, and its value is fixed 29307.6kJ/kg, and LHV is as-fired coal low heat value, and unit is kJ/ kg。
Detailed, in step S14, result of calculation is analyzed, the rational data of actual production is not met and carries out It is highlighted and re-types.
Wherein, standard coal consumption rate for generating B ' changes according to the different of ature of coal during operation, and according to operating experience it can be gathered that Certain scope, if its value goes beyond the scope, is judged as data acquisition or typing mistake, returns to the manual entry stage, and highlighted aobvious Show, so that operations staff checks and re-types.
Further, after step S14, in addition to:Correct result of calculation is deposited in into the webserver, and by solid The formula that fixes generates message.Also, when user needs, icon drafting can be carried out to the data of preservation and shown, so as to user point Analysis.
The work such as conventional data acquisition, calculating, analysis, message are replaced artificial means by this method with automation means, And effective analysis is carried out to the result of calculating, various mistake generation messages are wiped out, so as to save manpower, work are greatly improved Efficiency.Fig. 2 is refer to, Fig. 2 is the outline flowchart of coal fired thermal power plant data collection and analysis.
This method carries out primary to institute's gathered data and sentenced after mistake, if data acquisition is wrong, is transferred to manual entry data, automatically Data inputting and error detection need to be manually carried out during collection mistake, to ensure the authenticity and accuracy of data.
Fig. 3 is refer to, Fig. 3 is a kind of structure of coal fired thermal power plant gross coal consumption rate statistical analysis system provided by the present invention Schematic diagram, the system is used to realize the above method, and the system includes:
Data acquisition device 101, for carrying out data acquisition to coal fired thermal power plant by DCS system;Wherein, the number of collection According to including generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer to coal Measure ins and outs;
Sentence module 102 by mistake, for the data for collection, generator outlet electricity ins and outs sentence processing by mistake, will be each Platform coal pulverizer coal-supplying amount ins and outs sentence and handled by mistake;
Computing module 103, for by the data of collection calculate obtaining result of calculation;Wherein, result of calculation includes total Count coal consumption amount, generator power output and standard coal consumption rate for generating;
Analysis module 104, for entering analysis to result of calculation, will not meet the rational number of actual production in result of calculation According to being marked and show.
It can be seen that, in the system, conventional data acquisition, calculating, analysis work are replaced into artificial means with automation means, And effective analysis is carried out to the result of calculating, realize that automatic data collection analyzes coal fired thermal power plant data, so as to save manpower, significantly Raising operating efficiency, and also carry out erroneous judgement operation, improve data accuracy.
Wherein, data acquisition device is Power Plant DCS System legacy data harvester.
It is further, described to sentence module by mistake and include based on above-mentioned coal fired thermal power plant gross coal consumption rate statistical analysis system:
Electricity ins and outs judges unit by accident, and the calculation formula for calculating generator mean power P, P on duty is:Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLList Position is 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;Judge that generator on duty is averaged Whether power P is in interval [0,330], if it is not, determining that the generator outlet electricity ins and outs of collection is wrong;
Coal amount ins and outs judges unit by accident, and for for every coal pulverizer, calculating, coal pulverizer is on duty averagely to give coal rate F;Wherein, F =(C2-C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T for work as Class's time, T unit is h, and F unit is t/h;Judge whether coal pulverizer is on duty average maximum to coal more than default to coal rate F Rate, if so, determining that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.
Further, erroneous judgement module also includes:Flow modular converter, if being that data acquisition is wrong for sentencing result by mistake By mistake, it is transferred to manual entry data manipulation flow.
Further, coal fired thermal power plant gross coal consumption rate statistical analysis system also includes:Memory module, by will correctly based on Calculate result and deposit in the webserver, and message is generated by set form.
The system is by Power Plant DCS System legacy data harvester, and measuring point data needed for automatic data collection is simultaneously calculated, And anti-false judgment, analysis are carried out to the result of calculating.According to institute's analysis result, message, render history curve are generated.To reduce fortune The workload of administrative staff, also allows for reference, the analysis of user.
The embodiment of each in this specification is described by the way of progressive, what each embodiment was stressed be with it is other Between the difference of embodiment, each embodiment same or similar part mutually referring to.For being disclosed in embodiment For system, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is referring to method part Explanation.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and The interchangeability of software, generally describes the composition and step of each example according to function in the above description.These Function is performed with hardware or software mode actually, depending on the application-specific and design constraint of technical scheme.Specialty Technical staff can realize described function to each specific application using distinct methods, but this realization should not Think beyond the scope of this invention.
Directly it can be held with reference to the step of the method or algorithm that the embodiments described herein is described with hardware, processor Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique provided by the present invention and system have been carried out in detail above It is thin to introduce.Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said The bright method and its core concept for being only intended to help to understand the present invention.It should be pointed out that for the ordinary skill of the art For personnel, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these improvement Also fallen into modification in the protection domain of the claims in the present invention.

Claims (8)

1. a kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique, it is characterised in that including:
Data acquisition is carried out to coal fired thermal power plant by DCS system;Wherein, the data of collection include generator outlet electricity bottom Code, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;
For the data of collection, generator outlet electricity ins and outs sentence processing by mistake, each coal pulverizer coal-supplying amount ins and outs is entered Row is sentenced to be handled by mistake;
The data of collection calculate to obtain result of calculation;Wherein, result of calculation includes amounting to coal consumption amount, generator power output And standard coal consumption rate for generating;
Analysis is entered to result of calculation, the rational data of actual production will not be met in result of calculation and is marked and shows.
2. the method as described in claim 1, it is characterised in that described that generator outlet electricity ins and outs sentence processing bag by mistake Include:
The calculation formula for calculating generator mean power P, P on duty is:
<mrow> <mi>P</mi> <mo>=</mo> <mfrac> <mrow> <mi>k</mi> <mrow> <mo>(</mo> <msub> <mi>W</mi> <mi>N</mi> </msub> <mo>-</mo> <msub> <mi>W</mi> <mi>L</mi> </msub> <mo>)</mo> </mrow> </mrow> <mrow> <mn>10</mn> <mi>T</mi> </mrow> </mfrac> <mo>;</mo> </mrow>
Wherein, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLUnit be 104KWh, k are generator kilowatt-hour meter multiplying power, and T is duty hour, and P unit is 10-1mW;
Generator mean power P on duty is judged whether in interval [0,330], if it is not, determining the generator outlet electricity of collection Ins and outs is wrong;
It is described each coal pulverizer coal-supplying amount ins and outs is sentenced include by mistake:
For every coal pulverizer, calculating coal pulverizer is on duty averagely to give coal rate F;Wherein, F=(C2-C1)/T, C2Handed over to the next shift for coal pulverizer Ins and outs, C2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T is duty hour, and T unit is h, F unit For t/h;
Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if so, determining the coal pulverizer gathered to coal Measure ins and outs wrong.
3. method as claimed in claim 2, it is characterised in that the data for collection, by generator outlet electricity bottom Code sentence and handled by mistake, each coal pulverizer coal-supplying amount ins and outs progress is sentenced handle by mistake after, in addition to:
If it is data acquisition mistake to sentence result by mistake, manual entry data manipulation flow is transferred to.
4. method as claimed in claim 3, it is characterised in that described to enter analysis to result of calculation, will not be inconsistent in result of calculation After the conjunction rational data of actual production are marked and shown, in addition to:
Correct result of calculation is deposited in into the webserver, and message is generated by set form.
5. a kind of coal fired thermal power plant gross coal consumption rate statistical analysis system, it is characterised in that for realizing as in Claims 1-4 Method described in any one, including:
Data acquisition device, for carrying out data acquisition to coal fired thermal power plant by DCS system;Wherein, the data of collection include Generator outlet electricity ins and outs, station-service power consumption ins and outs, generator outlet active power and each coal pulverizer coal-supplying amount ins and outs;
Sentence module by mistake, for the data for collection, generator outlet electricity ins and outs sentence processing by mistake, by each coal pulverizer Coal-supplying amount ins and outs sentence and handled by mistake;
Computing module, for by the data of collection calculate obtaining result of calculation;Wherein, result of calculation includes amounting to coal consumption Amount, generator power output and standard coal consumption rate for generating;
Analysis module, for entering analysis to result of calculation, will not meet the rational data of actual production and carries out in result of calculation Mark and show.
6. coal fired thermal power plant gross coal consumption rate statistical analysis system as claimed in claim 5, it is characterised in that described to sentence module by mistake Including:
Electricity ins and outs judges unit by accident, and the calculation formula for calculating generator mean power P, P on duty is:Its In, WNHanded over to the next shift ins and outs, W for generatorNUnit be 104KWh, WLSucceeded ins and outs, W for generatorLUnit be 104KWh, k are Generator kilowatt-hour meter multiplying power, T is duty hour, and P unit is 10-1mW;Judge generator mean power P on duty whether in interval In [0,330], if it is not, determining that the generator outlet electricity ins and outs of collection is wrong;
Coal amount ins and outs judges unit by accident, and for for every coal pulverizer, calculating, coal pulverizer is on duty averagely to give coal rate F;Wherein, F=(C2- C1)/T, C2Handed over to the next shift ins and outs, C for coal pulverizer2Unit be t, C1Succeeded ins and outs, C for coal pulverizer1Unit be t, T for it is on duty when Between, T unit is h, and F unit is t/h;Judge that coal pulverizer is on duty and averagely give coal rate to whether coal rate F is more than default maximum, if It is, it is determined that the coal pulverizer coal-supplying amount ins and outs of collection is wrong.
7. coal fired thermal power plant gross coal consumption rate statistical analysis system as claimed in claim 6, it is characterised in that the erroneous judgement module Also include:
Flow modular converter, if being data acquisition mistake for sentencing result by mistake, is transferred to manual entry data manipulation flow.
8. coal fired thermal power plant gross coal consumption rate statistical analysis system as claimed in claim 7, it is characterised in that the Coal-fired Thermal Power Factory's gross coal consumption rate statistical analysis system also includes:
Memory module, for correct result of calculation to be deposited in into the webserver, and generates message by set form.
CN201710757238.2A 2017-08-29 2017-08-29 A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system Pending CN107330644A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710757238.2A CN107330644A (en) 2017-08-29 2017-08-29 A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710757238.2A CN107330644A (en) 2017-08-29 2017-08-29 A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system

Publications (1)

Publication Number Publication Date
CN107330644A true CN107330644A (en) 2017-11-07

Family

ID=60204030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710757238.2A Pending CN107330644A (en) 2017-08-29 2017-08-29 A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system

Country Status (1)

Country Link
CN (1) CN107330644A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1167900A (en) * 1997-03-19 1997-12-17 魏楠 Method and apparatus for measuring coal consumption of unit generator set in thermal power plant
CN101725998A (en) * 2009-12-14 2010-06-09 贵州电力试验研究院 System for determining and replacing abnormal data in coal consumption online monitoring system
CN101893877A (en) * 2009-05-20 2010-11-24 中国国电集团公司九江发电厂 Optimization operational method based on energy consumption analysis for power plant and system thereof
CN102306335A (en) * 2011-06-03 2012-01-04 中国神华能源股份有限公司 Equipment state detecting method used for thermal power plant
US20140116045A1 (en) * 2011-06-27 2014-05-01 Brad William Mullard Geothermal assisted power generation
CN106768068A (en) * 2017-03-20 2017-05-31 浙江浙能台州第二发电有限责任公司 Fired power generating unit fire coal calorific value and consumption of standard coal for power generation index on-line monitoring system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1167900A (en) * 1997-03-19 1997-12-17 魏楠 Method and apparatus for measuring coal consumption of unit generator set in thermal power plant
CN101893877A (en) * 2009-05-20 2010-11-24 中国国电集团公司九江发电厂 Optimization operational method based on energy consumption analysis for power plant and system thereof
CN101725998A (en) * 2009-12-14 2010-06-09 贵州电力试验研究院 System for determining and replacing abnormal data in coal consumption online monitoring system
CN102306335A (en) * 2011-06-03 2012-01-04 中国神华能源股份有限公司 Equipment state detecting method used for thermal power plant
US20140116045A1 (en) * 2011-06-27 2014-05-01 Brad William Mullard Geothermal assisted power generation
CN106768068A (en) * 2017-03-20 2017-05-31 浙江浙能台州第二发电有限责任公司 Fired power generating unit fire coal calorific value and consumption of standard coal for power generation index on-line monitoring system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李娜等: "燃煤电厂煤耗统计分析方法探讨", 《广西电力》 *

Similar Documents

Publication Publication Date Title
Duffy et al. Land-based wind energy cost trends in Germany, Denmark, Ireland, Norway, Sweden and the United States
CN106096810B (en) Method and system for planning based on power distribution network operation data Yu geographical topology information
CN106443168A (en) Remote acquisition meter reading data analysis system
CN104361236A (en) Evaluation method for health condition of electric power equipment
CN107766254A (en) A kind of Evaluation of Software Quality and system based on step analysis
Yu et al. A hybrid multi-criteria decision-making framework for offshore wind turbine selection: A case study in China
CN109785187A (en) A kind of electric set electric supply coal consumption detection data bearing calibration
CN111724060A (en) Integrated analysis monitoring system and analysis method for transformer area line loss
Dong et al. Optimal selection for wind power coupled hydrogen energy storage from a risk perspective, considering the participation of multi-stakeholder
Rout et al. Assessing the financial sustainability of rural grid electrification pathway: A case study of India
CN115879632A (en) Data processing method for carbon emission measurement and calculation data of industrial enterprise
Tan et al. Has the inter-regional transmission expansion promoted the low-carbon transition of China’s power sector?
CN110146813A (en) A kind of distributing Wind turbines electric energy quality test method
CN110968703B (en) Method and system for constructing abnormal metering point knowledge base based on LSTM end-to-end extraction algorithm
CN108320081A (en) A kind of meter reading business datum analysis and processing method and system based on automation
CN206470388U (en) The apparatus for evaluating of metering performance under dynamic load
CN203037770U (en) Multifunctional on-line electricity consumption tester
CN102682212B (en) Reliability measurement method for mechanical and electrical product
Govorukha et al. Economic disruptions in long-term energy scenarios–Implications for designing energy policy
CN107330644A (en) A kind of coal fired thermal power plant gross coal consumption rate statistical analysis technique and system
CN108920810A (en) Electric analog method based on big data framework
CN104715289B (en) Preferably generating progress indicator determines method and device for power plant
CN113034271A (en) Enterprise credit evaluation system based on big data
Kirby et al. Cost-causation-based tariffs for wind ancillary service impacts
CN107977724A (en) A kind of water quality hard measurement Forecasting Methodology of permanganate index

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107