CN107330608A - A kind of production scheduling method based on Techniques of Neural Network - Google Patents
A kind of production scheduling method based on Techniques of Neural Network Download PDFInfo
- Publication number
- CN107330608A CN107330608A CN201710502188.3A CN201710502188A CN107330608A CN 107330608 A CN107330608 A CN 107330608A CN 201710502188 A CN201710502188 A CN 201710502188A CN 107330608 A CN107330608 A CN 107330608A
- Authority
- CN
- China
- Prior art keywords
- neural network
- neuron node
- techniques
- scheduling method
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 46
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 44
- 238000013528 artificial neural network Methods 0.000 title claims abstract description 27
- 210000002569 neuron Anatomy 0.000 claims abstract description 41
- 238000004422 calculation algorithm Methods 0.000 claims abstract description 10
- 238000004891 communication Methods 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000005036 nerve Anatomy 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The invention discloses a kind of production scheduling method based on Techniques of Neural Network, methods described comprises the following steps:Extracted by critical data and resource is abstracted into neuron node by mathematical modeling in a computer;Judge whether each neuron node is in idle condition;When judged result is that neuron node is idle, the maximum scheduling plan of lower probability that imposes a condition is calculated using neural network algorithm.Present invention can apply to manufacturing business, production efficiency and utilization rate of equipment and installations can be improved, potential production production capacity is fully excavated.
Description
Technical field
The present invention relates to the field of manufacturing, more particularly to a kind of production scheduling method based on Techniques of Neural Network.
Background technology
Manufacturing in industry enterprise, often with multiple resources, multiple product tasks, each product task often has again
Multiple process tasks, higher efficiency and Geng Gao production capacities are reached, it is necessary to rationally scientifically arrange the life of each product in order that must produce
Production task.Therefore, for manufacturing industry enterprise, efficient production scheduling is most important.Current most enterprises are all adopted
With the manual scheduling mode based on paper list, but with order volume increase and product category increase, traditional manual method
Deficiency is dealt with, especially when running into the customization order of multiple types small lot, and manual scheduling easily causes production scene chaotic,
It can not more ensure that product hands over the phase.To solve manual scheduling problem, present Some Enterprises, which have begun to use, carries automatic arrangement program
The information system of function, such as ERP, MES, but this type of information system can only be true according to being provided in live automation equipment or factory
Determine creation data(Such as standard machining period, number of workers)Automatic arrangement program could be carried out, the production in factory is not accounted for
There is dynamic changing process, and the probability change that different production schedulings caused can process production capacity in activity, in the case, should
Production production capacity is frequently can lead to after category information online implementing and declines the problems such as can not implementing with production planning and sequencing.It can see in summary
Go out, manufacture industry enterprise be badly in need of it is a kind of can really improve production production capacity, dynamic can be adjusted according to factory's uncertain data
Whole automatic production scheduling system.
The content of the invention
In view of this, it is an object of the invention to provide a kind of production scheduling method based on Techniques of Neural Network, carry
High enterprises production efficiency and utilization rate of equipment and installations, fully excavate potential production production capacity.Its specific method is as follows:
A kind of production scheduling method based on Techniques of Neural Network, comprises the following steps:
Step one, extracted by critical data and resource is abstracted into neuron node by mathematical modeling in a computer;
Step 2, judges whether each neuron node is in idle condition;
Step 3, when judged result is that neuron node is idle, calculated using neural network algorithm impose a condition it is lower general
The maximum scheduling plan of rate.
Further, in step one, resource can be people, equipment etc., and the existing forms of resource are not limited.
Further, in step one, neuron node can be a model, a program or one section in computer
Code etc., the existing forms of neuron node in a computer are not limited.
Further, in step one, set up between neuron node and real resources by communication equipment and communication network
Correspondence, the behavior that resource truly occurs will be recorded in the data space of neuron node one by one.
Further, in step one, neuron node can calculate various rows by continuous education resource historical data
For the probability of generation.
Further, in step 2, when neuron node does not have task or the number of tasks to be less than setting value, then neuron section
Point is in idle condition.
Further, in step 2, if judged result, which is neuron node, is not located in idle condition, without rear
Continuous scheduling processing.
Further, in step 3, neural network algorithm first calculates a number of scheduling, neuron node pair
Each scheduling feedback probability, the joint that the probability calculation that neural network algorithm feeds back according to neuron node goes out each scheduling is general
Rate, is picked out in the maximum scheduling of lower probability that imposes a condition.
Further, in step 3, including but not limited to production capacity maximization, quality maximization, efficiency are imposed a condition most
Bigization etc..
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, of the invention
Schematic description and description is used to explain the present invention, does not constitute inappropriate limitation of the present invention.
Fig. 1 is a kind of step flow chart of the production scheduling method based on Techniques of Neural Network of the present invention.
Fig. 2 is a kind of neuron node figure using the present invention.
Embodiment
Illustrate embodiments of the present invention below by particular specific embodiment, the present invention is furture elucidated, Ying Li
These embodiments are solved to be only illustrative of the invention and is not intended to limit the scope of the invention, after the present invention has been read, ability
The technical staff in domain is to the modification of the various equivalent form of values of the present invention in appended claims limited range of the present invention.
Fig. 1 is a kind of step flow chart of the production scheduling method based on Techniques of Neural Network of the present invention.Such as Fig. 1 institutes
Show that a kind of production scheduling method based on Techniques of Neural Network of the present invention comprises the following steps:
Step 101, extracted by critical data and resource is abstracted into neuron node by mathematical modeling in a computer.Here institute
The resource stated is the people for task of realizing, neuron node is a class object in computer program.Resource described here is led to
Cross smart machine and the network equipment to communicate with the neuron node foundation in computer, resource occurs real behavior and passes through intelligence
Energy equipment and wireless network record are in the data space of neuron node.Neuron node can pass through continuous education resource history
Data, calculate the probability of various actions generation.
Step 102, judge whether each neuron node is in idle condition.If current time resource does not have task or appointed
Number be engaged in less than setting value, then the corresponding neuron node of resource is in idle condition.In present pre-ferred embodiments, number of tasks
Arranges value can be set according to the experience of user.
Step 103, when judged result is that neuron node is idle, calculated and imposed a condition using neural network algorithm
The maximum scheduling plan of lower probability.
The present invention will be further illustrated by a specific embodiment below:
Fig. 2 is a kind of neuron node figure using the present invention.As shown in Fig. 2 employee in enterprise is abstracted into nerve by the present invention
First node, and each neuron node is connected according to the tissue frame of enterprise.
Assuming that having product task A, B, each product task currently only includes 1 process task, and phase between product task
It is mutually independent, for example have:A{a1};B{b1};Assuming that having two resource workshop group leaders 1 and workshop group leader 2;Each resource can only be processed
One process.
Assuming that current inter-vehicular group leader 1 and workshop group leader 2 are all in idle condition, neural network algorithm is directed to workshop group leader
1 and the permutation and combination of workshop group leader 2 go out two kinds of scheduling plan P1 { a1, b1 } and P2 { b1, a1 }, it is assumed that impose a condition to be processed into
Work(, it is 60% that the node of workshop group leader 1 provides the processing probability of success for scheduling P1, and the node of workshop group leader 2 is provided for scheduling P1 to be added
The work probability of success is 80%, and it is 70%, the node pair of workshop group leader 2 that the node of workshop group leader 1 provides the processing probability of success for scheduling P2
It is 70% to provide the processing probability of success in scheduling P2.The joint that neural network algorithm calculates scheduling P1 and P2 processes successfully general
Rate, and judge that P1 probability is more than P2, select scheduling P1 to be used as final scheduling for this.
Claims (9)
1. a kind of production scheduling method based on Techniques of Neural Network, it is characterised in that methods described comprises the following steps:
Step one, extracted by critical data and resource is abstracted into neuron node by mathematical modeling in a computer;
Step 2, judges whether each neuron node is in idle condition;
Step 3, when judged result is that neuron node is idle, calculated using neural network algorithm impose a condition it is lower general
The maximum scheduling plan of rate.
2. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step one
In, resource can be people, equipment etc., and the existing forms of resource are not limited.
3. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step one
In, neuron node can be a model, a program or one section of code etc. in computer, and neuron node is not limited and is existed
Existing forms in computer.
4. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step one
In, correspondence, the row that resource truly occurs are set up by communication equipment and communication network between neuron node and real resources
For that will record one by one in the data space of neuron node.
5. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step one
In, neuron node by continuous education resource historical data, can calculate the probability of various actions generation.
6. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step 2
In, when neuron node does not have task or number of tasks less than setting value, then neuron node is in idle condition.
7. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step 2
In, if judged result, which is neuron node, is not located in idle condition, handled without follow-up scheduling.
8. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step 3
In, neural network algorithm first calculates a number of scheduling, and neuron node is to each scheduling feedback probability, neuron net
The probability calculation that network algorithm feeds back according to neuron node goes out the joint probability of each scheduling, picks out and is imposing a condition lower probability most
Big scheduling.
9. the production scheduling method according to claim 1 based on Techniques of Neural Network, it is characterised in that in step 3
In, the including but not limited to production capacity that imposes a condition is maximized, quality is maximized, efficiency is maximized etc..
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710502188.3A CN107330608B (en) | 2017-06-27 | 2017-06-27 | Production scheduling method based on neuron network technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710502188.3A CN107330608B (en) | 2017-06-27 | 2017-06-27 | Production scheduling method based on neuron network technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107330608A true CN107330608A (en) | 2017-11-07 |
CN107330608B CN107330608B (en) | 2021-04-23 |
Family
ID=60197998
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710502188.3A Active CN107330608B (en) | 2017-06-27 | 2017-06-27 | Production scheduling method based on neuron network technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107330608B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111506552A (en) * | 2019-01-30 | 2020-08-07 | 宁波创元信息科技有限公司 | Dynamic database design method and system of tree structure |
CN111932217A (en) * | 2020-10-10 | 2020-11-13 | 宁波创元信息科技有限公司 | Neural-MOS neuron network intelligent production operating system and operation method thereof |
CN113297314A (en) * | 2021-07-28 | 2021-08-24 | 深圳市永达电子信息股份有限公司 | Data visualization method and device and storage medium |
CN114139879A (en) * | 2021-11-08 | 2022-03-04 | 杭州科强信息技术有限公司 | Intelligent scheduling method under pipeline mode |
CN114240200A (en) * | 2021-12-21 | 2022-03-25 | 贵州卓讯软件股份有限公司 | Cross-enterprise production management system and method |
CN114240195A (en) * | 2021-12-21 | 2022-03-25 | 贵州卓讯软件股份有限公司 | Cross-enterprise production scheduling system and method |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1643460A (en) * | 2002-03-15 | 2005-07-20 | 株式会社日立制作所 | Automobile manufacturing line input order planning apparatus |
CN101604418A (en) * | 2009-06-29 | 2009-12-16 | 浙江工业大学 | Chemical enterprise intelligent production plan control system based on quanta particle swarm optimization |
CN102509178A (en) * | 2011-11-25 | 2012-06-20 | 江苏省电力公司淮安供电公司 | Distribution network device status evaluating system |
CN102831011A (en) * | 2012-08-10 | 2012-12-19 | 上海交通大学 | Task scheduling method and device based on multi-core system |
CN103646299A (en) * | 2013-12-19 | 2014-03-19 | 浙江省公众信息产业有限公司 | Neural network based crop prediction method and device |
CN103826219A (en) * | 2014-03-11 | 2014-05-28 | 山东大学 | Secrecy system power allocation method capable of satisfying requirements on time delay QoS (Quality of Service) |
CN103854072A (en) * | 2014-03-17 | 2014-06-11 | 湖南工学院 | Processing method and system for path selection |
CN104200336A (en) * | 2014-09-18 | 2014-12-10 | 北京清晖翔科技有限公司 | Enterprise materials balancing method based on comprehensive energy consumption judgment |
US20150035831A1 (en) * | 2013-08-02 | 2015-02-05 | Disney Enterprises, Inc. | Methods and systems of joint path importance sampling |
CN104484701A (en) * | 2014-11-28 | 2015-04-01 | 哈尔滨工业大学深圳研究生院 | Neural network evaluation method for environment issues |
CN104636834A (en) * | 2015-03-20 | 2015-05-20 | 华北电力大学 | Improved optimization method for joint probability programming model system |
CN105069236A (en) * | 2015-08-13 | 2015-11-18 | 山东大学 | Generalized load joint probability modeling method considering node spatial correlation of wind power plant |
US20160093301A1 (en) * | 2014-09-30 | 2016-03-31 | Apple Inc. | Parsimonious handling of word inflection via categorical stem + suffix n-gram language models |
CN105787583A (en) * | 2016-01-06 | 2016-07-20 | 北京首钢自动化信息技术有限公司 | Metallurgical gas integrated dynamic balance scheduling system and method |
CN106125714A (en) * | 2016-06-20 | 2016-11-16 | 南京工业大学 | Failure rate prediction method combining BP neural network and two-parameter Weibull distribution |
CN106709628A (en) * | 2016-11-24 | 2017-05-24 | 广州赛意信息科技股份有限公司 | Production scheduling method and production scheduling system |
-
2017
- 2017-06-27 CN CN201710502188.3A patent/CN107330608B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1643460A (en) * | 2002-03-15 | 2005-07-20 | 株式会社日立制作所 | Automobile manufacturing line input order planning apparatus |
CN101604418A (en) * | 2009-06-29 | 2009-12-16 | 浙江工业大学 | Chemical enterprise intelligent production plan control system based on quanta particle swarm optimization |
CN102509178A (en) * | 2011-11-25 | 2012-06-20 | 江苏省电力公司淮安供电公司 | Distribution network device status evaluating system |
CN102831011A (en) * | 2012-08-10 | 2012-12-19 | 上海交通大学 | Task scheduling method and device based on multi-core system |
US20150035831A1 (en) * | 2013-08-02 | 2015-02-05 | Disney Enterprises, Inc. | Methods and systems of joint path importance sampling |
CN103646299A (en) * | 2013-12-19 | 2014-03-19 | 浙江省公众信息产业有限公司 | Neural network based crop prediction method and device |
CN103826219A (en) * | 2014-03-11 | 2014-05-28 | 山东大学 | Secrecy system power allocation method capable of satisfying requirements on time delay QoS (Quality of Service) |
CN103854072A (en) * | 2014-03-17 | 2014-06-11 | 湖南工学院 | Processing method and system for path selection |
CN104200336A (en) * | 2014-09-18 | 2014-12-10 | 北京清晖翔科技有限公司 | Enterprise materials balancing method based on comprehensive energy consumption judgment |
US20160093301A1 (en) * | 2014-09-30 | 2016-03-31 | Apple Inc. | Parsimonious handling of word inflection via categorical stem + suffix n-gram language models |
CN104484701A (en) * | 2014-11-28 | 2015-04-01 | 哈尔滨工业大学深圳研究生院 | Neural network evaluation method for environment issues |
CN104636834A (en) * | 2015-03-20 | 2015-05-20 | 华北电力大学 | Improved optimization method for joint probability programming model system |
CN105069236A (en) * | 2015-08-13 | 2015-11-18 | 山东大学 | Generalized load joint probability modeling method considering node spatial correlation of wind power plant |
CN105787583A (en) * | 2016-01-06 | 2016-07-20 | 北京首钢自动化信息技术有限公司 | Metallurgical gas integrated dynamic balance scheduling system and method |
CN106125714A (en) * | 2016-06-20 | 2016-11-16 | 南京工业大学 | Failure rate prediction method combining BP neural network and two-parameter Weibull distribution |
CN106709628A (en) * | 2016-11-24 | 2017-05-24 | 广州赛意信息科技股份有限公司 | Production scheduling method and production scheduling system |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111506552A (en) * | 2019-01-30 | 2020-08-07 | 宁波创元信息科技有限公司 | Dynamic database design method and system of tree structure |
CN111506552B (en) * | 2019-01-30 | 2023-10-31 | 宁波创元信息科技有限公司 | Dynamic database design method and system of tree structure |
CN111932217A (en) * | 2020-10-10 | 2020-11-13 | 宁波创元信息科技有限公司 | Neural-MOS neuron network intelligent production operating system and operation method thereof |
CN111932217B (en) * | 2020-10-10 | 2022-01-14 | 宁波创元信息科技有限公司 | Neural-MOS neuron network intelligent production operating system and operation method thereof |
CN113297314A (en) * | 2021-07-28 | 2021-08-24 | 深圳市永达电子信息股份有限公司 | Data visualization method and device and storage medium |
CN114139879A (en) * | 2021-11-08 | 2022-03-04 | 杭州科强信息技术有限公司 | Intelligent scheduling method under pipeline mode |
CN114240200A (en) * | 2021-12-21 | 2022-03-25 | 贵州卓讯软件股份有限公司 | Cross-enterprise production management system and method |
CN114240195A (en) * | 2021-12-21 | 2022-03-25 | 贵州卓讯软件股份有限公司 | Cross-enterprise production scheduling system and method |
Also Published As
Publication number | Publication date |
---|---|
CN107330608B (en) | 2021-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107330608A (en) | A kind of production scheduling method based on Techniques of Neural Network | |
Sinha et al. | Reviewing cyber-physical system as a part of smart factory in industry 4.0 | |
Zhang et al. | Game theory based real‐time shop floor scheduling strategy and method for cloud manufacturing | |
Leng et al. | Cloud-edge orchestration-based bi-level autonomous process control for mass individualization of rapid printed circuit boards prototyping services | |
KR101825881B1 (en) | Method of managing a manufacturing process and system using the same | |
Navickas et al. | Cyber–physical systems expression in industry 4.0 context | |
Nie et al. | A multi-agent and cloud-edge orchestration framework of digital twin for distributed production control | |
CN108198093A (en) | A kind of wisdom building system based on CPS | |
CN115098278B (en) | Digital twin workshop multi-scene interaction method based on microservice | |
Ghaleb et al. | Reinforcement learning-based real-time scheduling under random machine breakdowns and other disturbances: A case study | |
Ajorlou et al. | Optimization of a multiproduct conwip-based manufacturing system using artificial bee colony approach | |
CN111369130A (en) | Distributed self-adaptive production line reconstruction method based on semantic data and knowledge reasoning | |
WO2020062047A1 (en) | Scheduling rule updating method, device, system, storage medium and terminal | |
Andreev et al. | Problems concerning operations system of the enterprise in the context of Industry 4.0 | |
Lavopa et al. | Advanced digital technologies and industrial resilience during the COVID-19 pandemic: A firm-level perspective | |
Dumitrache et al. | Intelligent cyber-enterprise in the production context | |
Jinqi et al. | The supply chain network on cloud manufacturing environment based on coin model with q-learning algorithm | |
Li et al. | Dynamic Data Scheduling of a Flexible Industrial Job Shop Based on Digital Twin Technology | |
CN113610484A (en) | Intelligent manufacturing production execution system L-MES and manufacturing method thereof | |
CN106530110A (en) | Big-data-based oceanographic engineering management system and method | |
Sreenivasulu et al. | Applicability of Industrial Internet of Things in Lean Manufacturing: A Brief Study | |
Hrustek et al. | ERP systems in the context of smart factories | |
CN110647085A (en) | Parameter adjusting method and device | |
Olyai et al. | Process mining-based business process management architecture: A case study in smart factories | |
CN117389231B (en) | MES/PCS integrated system of digital workshop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |