CN107330602A - A kind of engineering project workout system and method based on internet - Google Patents
A kind of engineering project workout system and method based on internet Download PDFInfo
- Publication number
- CN107330602A CN107330602A CN201710486490.4A CN201710486490A CN107330602A CN 107330602 A CN107330602 A CN 107330602A CN 201710486490 A CN201710486490 A CN 201710486490A CN 107330602 A CN107330602 A CN 107330602A
- Authority
- CN
- China
- Prior art keywords
- plan
- engineering project
- module
- internet
- client
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/101—Collaborative creation, e.g. joint development of products or services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of engineering project workout system based on internet and method, the engineering project workout system based on internet includes client and Cloud Server, the system passes through the client-side editing engineering project, plan edited result is preserved beyond the clouds in the way of structural data, can be with multi-client while online editing engineering project, the efficiency of project plan establishment is substantially increased, Consumer's Experience is improved.
Description
Technical field
The present invention relates to a kind of engineering project workout system based on internet and method.
Background technology
The establishment of engineering project be engineering project in an essential link of implementation process, can by engineering project
With the project process that followed up in project management process, it is ensured that the smooth implementation of project.
At present, at PC ends, the establishment of engineering project is generally by professional is completed by planning software, such as:
Microsoft Project, zebra progress software etc..
Above-mentioned planning software in use, the problem of there is the following aspects:
(1) it is unable to multiple person cooperational Editorial Calendar., can only be in platform because most of planning software is all LAN-ignorant program
The enterprising edlin of formula computer, so as to cause to be unable to multiple person cooperational Editorial Calendar.
(2) can not be synchronous beyond the clouds.Because the plan that LAN-ignorant program is worked out preserves plan by way of file, plan
Share can only being transmitted by file, causing can not be synchronous beyond the clouds.
(3) mobile terminal is not supported to edit.The project documentation of LAN-ignorant program establishment, it is impossible to open and edit in mobile terminal.
(4) planned time adjustment is inconvenient.During the new plan of editor, slightly being changed using the plan of conventional project just can be with
New plan is formed, needs to carry out each height plan the adjustment of time, cumbersome and inconvenience during modification.
The content of the invention
It is contemplated that at least solving one of above-mentioned technical problem to a certain extent or providing at a kind of useful business
Industry is selected.Therefore, it is an object of the present invention to propose a kind of engineering project workout system based on internet, it is described to be based on
The engineering project workout system of internet includes client and Cloud Server, and the system passes through the client-side editing engineering meter
Draw, plan edited result preserved in the way of structural data beyond the clouds, can with multi-client simultaneously online editing engineering project,
The efficiency of project plan establishment is substantially increased, Consumer's Experience is improved.It is another object of the present invention to propose a kind of base
Engineering project preparation method in internet.
According to the engineering project workout system based on internet of the present invention, the engineering project establishment based on internet
System includes the client that can communicate to connect and Cloud Server, the client include file identification module, plan editor module,
Synchronization module, calculating time claimed module and date translation module, wherein, the file identification module be used to importing it is prepared in advance just
Begin identification file, and the initial identification file is converted into transient target planning data, and the initial identification file is mpp lattice
Formula file, and the mpp files are by Project Software Creates;The plan editor module is used for the transient target plan
The plan title of data, Start Date, deadline, preposition plan, plan are described into edlin;The synchronization module is used for will
The transient target planning data is transmitted to the Cloud Server, and the one unified objective plan number of generation in the Cloud Server
According to;The calculating time claimed module is used to, when changing the Start Date of engineering project or deadline, recalculate the engineering
The duration of plan;The date translation module is used in the date integrated regulation of engineering project, recalculates the engineering meter
The Start Date and deadline drawn.
According to the engineering project workout system based on internet of the present invention, the engineering project establishment based on internet
System includes client and Cloud Server, and the system plans edited result to tie by the client-side editing engineering project
The mode of structure data is preserved beyond the clouds, can be with multi-client while online editing engineering project, substantially increases the project plan
The efficiency of establishment, improves Consumer's Experience.
In addition, according to the above-mentioned engineering project workout system based on internet of the present invention, can also have following additional
Technical characteristic:
Editor's initial identification file includes the newly-built initial identification file, deletes the initial identification text
Part, the insertion initial identification file and the initial identification file that sorts.
The client includes mobile phone, tablet personal computer, desktop computer or notebook computer.
The client include it is multiple, it is many to generate that multiple clients can enter edlin to same initial identification file
Individual transient target plan.
The synchronization module is used to transmit the multiple transient target planning data to the Cloud Server, the cloud clothes
Device be engaged in for carrying out one unified objective plan data of generation after contrast processing to the multiple transient target planning data.
The Cloud Server is additionally operable to the unified goal planning data synchronous transfer to the multiple client.
The objective plan include many height plans, each of which son plan include plan title, plan coding, beginning-
Deadline, duration, preposition plan, plan description and target advance.
The client includes applying software for editing, and the application software for editing includes Android App, IOS App, net
Page application software.
The Cloud Server is additionally operable to the unified goal planning data generating a Gantt chart picture, and by the gunter
Figure picture transfer is to the multiple client.
Present invention also offers a kind of engineering project preparation method based on internet, methods described is applied to one based on mutual
The engineering project workout system of networking, the system includes:The client and Cloud Server that can be communicated to connect, the client bag
File identification module, plan editor module, synchronization module, calculating time claimed module and date translation module are included, methods described includes
Following steps:S1, import initial identification file prepared in advance in the file identification module, and by initial identification text
Part is converted into a transient target planning data, and the initial identification file is mpp formatted files, and the mpp files by
Project Software Creates;S2, the plan editor module to the plan title of the transient target planning data, Start Date,
Deadline, preposition plan, plan are described into edlin;S3, the synchronization module transmit the transient target planning data
To the Cloud Server, and the one unified objective plan data of generation in the Cloud Server;S4, the calculating time claimed module exist
When the Start Date of engineering project or deadline change, the duration of the engineering project is recalculated;S5, date translation
Module recalculates the Start Date and deadline of the engineering project in the date integrated regulation of engineering project.
According to the engineering project preparation method based on internet of the present invention, the engineering project establishment based on internet
Method is applied to an engineering project workout system based on internet, and the engineering project workout system based on internet includes
Client and Cloud Server, the system is by the client-side editing engineering project, and plan edited result is with structural data
Mode preserve beyond the clouds, can with multi-client simultaneously online editing engineering project, substantially increase the project plan establishment effect
Rate, improves Consumer's Experience.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description
Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become from description of the accompanying drawings below to embodiment is combined
Substantially and be readily appreciated that, wherein:
Fig. 1 is the structured flowchart of the engineering project workout system based on internet of one embodiment of the present of invention;
Fig. 2 is the structured flowchart of the client of one embodiment of the present of invention;
Fig. 3 is the flow chart of the engineering project preparation method based on internet of one embodiment of the present of invention.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and be not considered as limiting the invention.
With reference to Fig. 1-Fig. 2, the invention provides a kind of engineering project workout system based on internet, the engineering project
Workout system can work out engineering project by internet.The engineering project workout system based on internet includes client 10
With Cloud Server 20, client 10 can be communicated to connect with Cloud Server 20, and such as client 10 is with Cloud Server 20 by wireless
Network is attached.In specific implementation, the client 10 can be mobile phone, tablet personal computer, desktop computer, notebook computer
Deng.
The client 10 includes file identification module 11, plan editor module 12, synchronization module 13, calculating time claimed module
14th, date translation module 15 etc..
The file identification module 11 is used to import initial identification file prepared in advance, and by the initial identification file
Transient target planning data is converted into, the initial identification file is mpp formatted files, and the mpp files are soft by Project
Part is generated for example, Project files prepared in advance are identified by file identification module 11 and in import system.
The plan editor module 12 is used for the plan title of the transient target planning data, Start Date, cut-off
Date, preposition plan, plan are described into edlin.
The synchronization module 13 is used to transmit the transient target planning data to the Cloud Server 20, and described
A unified objective plan data are generated in Cloud Server 20.
The calculating time claimed module 14 is used to, when changing the Start Date of engineering project or deadline, recalculate institute
State the duration of engineering project.For example, when Start Date/deadline shifts to an earlier date, calculating time claimed module 14 recalculates plan time,
So as to which the Start Date/deadline being intended in the duration also correspondingly shifts to an earlier date;When Start Date/deadline postpones, the duration
Computing module 14 recalculates plan time, so that the Start Date being intended in the duration/deadline also correspondingly postpones.
The date translation module 15 is used in the date integrated regulation of engineering project, recalculates the engineering project
Start Date and deadline.When i.e. the date of engineering project integrally postpones in advance or integrally, date translation module 15
Calculating engineering project according to the NEW BEGINNING date needs the number of days of translation (overall to shift to an earlier date or overall postponement), then by whole work
Journey plan overall Start Date does translation calculation with the deadline.The engineering project based on internet of the embodiment of the present invention is compiled
System processed, its Start Date of engineering project again when to the duration integrated regulation of engineering project by date translation module 15
With the deadline, date translation module 15, which calculates engineering project, needs the number of days translated by the Start Date of whole engineering project
Estimate corresponding translation with the cut-off duration, it is to avoid when needing each height plan progress to engineering project in the prior art
Between adjustment caused by cumbersome and inconvenience, shorten the establishment time of engineering project, simplify flow, improve engineering
The efficiency of Plan rescheduling, improves Consumer's Experience.
In specific implementation, the plan editor module 12, which edits the initial identification file, includes the newly-built initial knowledge
In other file, the deletion initial identification file, the insertion initial identification file and the initial identification file that sorts
It is one or several kinds of.
In specific implementation, the client 10 include it is multiple, multiple clients 10 can to same initial identification text
Part enters edlin to generate multiple transient target planning datas;The synchronization module 13 is used for the multiple transient target plan
Data transfer is to the Cloud Server 20, and the Cloud Server 20 is used to contrast the multiple transient target planning data
A unified objective plan data are generated after processing;The Cloud Server 20 is additionally operable to synchronously pass the unified goal planning data
Transport to the multiple client 10.In one embodiment of the invention, the client 10 includes a mobile phone, a tablet personal computer
And a notebook computer, i.e., three users are respectively by a mobile phone, a tablet personal computer, a notebook computer to same initial identification
File generates three transient target planning datas after the completion of entering edlin, editor, because each user is according to schedule to initial knowledge
The transient target planning data of its editor's generation is incomplete same when other file enters edlin, passes through the synchronization module of client 10
13 can transmit above three transient target planning data to server 20, and three transient target planning datas of server 20 pair are entered
A unified objective plan data are generated after row contrast processing, and server 20 passes the unified objective plan data syn-chronization
Three clients 10 are transported to, so that ensure that editor's data do not conflict, and clean up editing result uniform validity.
In specific implementation, the objective plan is the tree of a multilayer, and the objective plan includes many height
Plan, each of which son plan includes plan title, plan coding, beginning-deadline, duration, preposition plan, plan description
And target advance etc..For example, in the date integrated regulation of engineering project, can be by all sons by date translation module 15
Start Date of plan and deadline be overall forward or to be moved rearwards by a date section.
In specific implementation, the client 10 includes applying software for editing, and the application software for editing includes Android
App, IOS App, web application software.I.e. user can be on multiple terminal by applying software for editing come editorial project meter
Draw, specifically, user can use Android App come editorial project on the mobile terminal using Android operation system
Plan, either user can use IOS App come editorial project plan on the mobile terminal using IOS or
Web application software can be used to carry out editorial project plan on desktop computer or notebook computer for user.I.e. user can be a variety of
Protected in terminal using corresponding application software for editing come editorial project plan, and plan edited result in the way of structural data
There is Cloud Server 20.In the time of cell-phone, user can be preferably using the time of fragment come editorial project plan, whenever and wherever possible
Understand project progress, substantially increase the efficiency of project plan establishment, improve Consumer's Experience.
In specific implementation, the Cloud Server 20 is additionally operable to the unified goal planning data generating a Gantt chart figure
Piece, and by the Gantt chart picture transfer of generation to the multiple client 10.Because picture can pass through all kinds of communication canals
Road is propagated, such as wechat, QQ, mail.The engineering project workout system based on internet of the embodiment of the present invention, is taken by cloud
Unified goal planning data is generated Gantt chart picture by device 20 of being engaged in, and by the Gantt chart picture transfer of generation to multiple client
10, the user of client 10 can be allowed to be directly viewable, user is facilitated, Consumer's Experience is improved.
A kind of engineering project preparation method based on internet is additionally provided in one embodiment of the present of invention, it is described to be based on
The engineering project preparation method of internet is applied in the above-mentioned engineering project workout system based on internet, described based on interconnection
The engineering project workout system of net includes client 10 and the Cloud Server 20 that can be communicated to connect, and the client 10 includes file
Identification module 11, plan editor module 12, synchronization module 13, calculating time claimed module 14 and date translation module 15, with reference to Fig. 3,
The engineering project preparation method based on internet specifically includes following steps:
S1, import initial identification file prepared in advance in the file identification module 11, and by the initial identification
File is converted into a transient target planning data, and the initial identification file is mpp formatted files, and the mpp files by
Project Software Creates;
S2,12 pairs of the plan editor module transient target planning data plan title, Start Date, deadline
Phase, preposition plan, plan are described into edlin;
S3, the synchronization module 13 transmit the transient target planning data to the Cloud Server 20, and described
A unified objective plan data are generated in Cloud Server 20;
S4, the calculating time claimed module 14 recalculate institute when changing the Start Date of engineering project or deadline
State the duration of engineering project;
S5, the date translation module 15 recalculate the engineering project in the date integrated regulation of engineering project
Start Date and deadline.
According to the engineering project preparation method based on internet of the present invention, the engineering project establishment based on internet
Method is applied to an engineering project workout system based on internet, and the engineering project workout system based on internet includes
Client 10 and Cloud Server 20, by the editorial project plan of client 10, plan edited result is with structural data
Mode is preserved beyond the clouds, can with multi-client simultaneously online editing engineering project, substantially increase the project plan establishment efficiency,
Improve Consumer's Experience.
In one embodiment of the invention, the project management system can be a Project Management System,
Project management system according to embodiments of the present invention is solved during project management caused by factor data segmentation
The problem of project process tracking difficulty and difficult cost analysis, building engineering construction enterprise is helped to improve the efficiency of management, realization essence
ZOOM analysis.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means to combine specific features, structure, material or the spy that the embodiment or example are described
Point is contained at least one embodiment of the present invention or example.In this manual, to the schematic representation of above-mentioned term not
Necessarily refer to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be any
One or more embodiments or example in combine in an appropriate manner.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example
Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art is not departing from the principle and objective of the present invention
In the case of above-described embodiment can be changed within the scope of the invention, change, replace and modification.
Claims (10)
1. a kind of engineering project workout system based on internet, it is characterised in that including:The client and cloud that can be communicated to connect
Server, it is flat that the client includes file identification module, plan editor module, synchronization module, calculating time claimed module and date
Shifting formwork block, wherein,
The file identification module is used to import initial identification file prepared in advance, and the initial identification file is converted into
Transient target planning data, the initial identification file is mpp formatted files, and the mpp files are given birth to by Project softwares
Into;
The plan editor module is used for the plan title of the transient target planning data, Start Date, the deadline, preceding
The plan of putting, plan are described into edlin;
The synchronization module is used to transmit the transient target planning data to the Cloud Server, and in the Cloud Server
One unified objective plan data of middle generation;
The calculating time claimed module is used to, when changing the Start Date of engineering project or deadline, recalculate the engineering
The duration of plan;
The date translation module is used in the date integrated regulation of engineering project, recalculates the beginning of the engineering project
Date and deadline.
2. the engineering project workout system according to claim 1 based on internet, it is characterised in that described in the editor
Initial identification file includes the newly-built initial identification file, deletes the initial identification file, inserts the initial identification text
Part and the initial identification file that sorts.
3. the engineering project workout system according to claim 1 based on internet, it is characterised in that the client bag
Include mobile phone, tablet personal computer, desktop computer or notebook computer.
4. the engineering project workout system according to claim 3 based on internet, it is characterised in that the client bag
Include multiple, multiple clients can enter edlin to generate multiple transient target planning datas to same initial identification file.
5. the engineering project workout system according to claim 4 based on internet, it is characterised in that the synchronization module
For the multiple transient target planning data to be transmitted to the Cloud Server, the Cloud Server is used to face the multiple
When objective plan data carry out generating a unified objective plan data after contrast processing.
6. the engineering project workout system according to claim 5 based on internet, it is characterised in that the Cloud Server
It is additionally operable to the unified goal planning data synchronous transfer to the multiple client.
7. the engineering project workout system according to claim 1 based on internet, it is characterised in that the objective plan
Including many height plans, each of which son plan includes plan title, plan coding, beginning-deadline, duration, preposition meter
Draw, plan is described and target advance.
8. the engineering project workout system according to claim 3 based on internet, it is characterised in that the client bag
Include and apply software for editing, the application software for editing includes Andro id App, I OS App, web application software.
9. the engineering project workout system according to claim 5 based on internet, it is characterised in that the Cloud Server
It is additionally operable to the unified goal planning data generating a Gantt chart picture, and by the Gantt chart picture transfer to the multiple
Client.
10. a kind of engineering project preparation method based on internet, methods described is applied to an engineering project based on internet
Workout system, it is characterised in that the system includes:The client and Cloud Server that can be communicated to connect, the client include
File identification module, plan editor module, synchronization module, calculating time claimed module and date translation module, methods described include with
Lower step:
S1, import initial identification file prepared in advance in the file identification module, and the initial identification file is turned
Change a transient target planning data into, the initial identification file is mpp formatted files, and the mpp files are soft by Project
Part is generated;
S2, the plan editor module are to the plan title of the transient target planning data, Start Date, the deadline, preceding
The plan of putting, plan are described into edlin;
S3, the synchronization module transmit the transient target planning data to the Cloud Server, and in the Cloud Server
One unified objective plan data of middle generation;
S4, the calculating time claimed module recalculate the engineering when changing the Start Date of engineering project or deadline
The duration of plan;
S5, the date translation module recalculate the beginning of the engineering project in the date integrated regulation of engineering project
Date and deadline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486490.4A CN107330602A (en) | 2017-06-23 | 2017-06-23 | A kind of engineering project workout system and method based on internet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486490.4A CN107330602A (en) | 2017-06-23 | 2017-06-23 | A kind of engineering project workout system and method based on internet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107330602A true CN107330602A (en) | 2017-11-07 |
Family
ID=60194451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710486490.4A Pending CN107330602A (en) | 2017-06-23 | 2017-06-23 | A kind of engineering project workout system and method based on internet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107330602A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108320107A (en) * | 2018-02-09 | 2018-07-24 | 北京天元创新科技有限公司 | A kind of web-based task scheduling establishment and execute system and method |
CN108389026A (en) * | 2017-12-28 | 2018-08-10 | 广州建软科技股份有限公司 | A kind of power failure planning management system and method |
CN109886562A (en) * | 2019-01-29 | 2019-06-14 | 长沙迪迈数码科技股份有限公司 | Surface mining production technical reserve pending transactions automatically create and processing method and system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101556663A (en) * | 2009-01-22 | 2009-10-14 | 上海冠信电子系统有限公司 | Project design process management system |
CN101699487A (en) * | 2009-11-19 | 2010-04-28 | 上海交通大学 | Networking cooperative information system participated by suppliers and method thereof |
US20170139702A1 (en) * | 2015-11-15 | 2017-05-18 | Youware Company | Method of cloud engineering services of industrial process automation systems |
-
2017
- 2017-06-23 CN CN201710486490.4A patent/CN107330602A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101556663A (en) * | 2009-01-22 | 2009-10-14 | 上海冠信电子系统有限公司 | Project design process management system |
CN101699487A (en) * | 2009-11-19 | 2010-04-28 | 上海交通大学 | Networking cooperative information system participated by suppliers and method thereof |
US20170139702A1 (en) * | 2015-11-15 | 2017-05-18 | Youware Company | Method of cloud engineering services of industrial process automation systems |
Non-Patent Citations (2)
Title |
---|
苏绍娟等: "船舶并行协同设计计划管理客户化研究", 《造船技术》 * |
迟振华: "船舶并行协同设计管理技术研究", 《船舶并行协同设计管理技术研究》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108389026A (en) * | 2017-12-28 | 2018-08-10 | 广州建软科技股份有限公司 | A kind of power failure planning management system and method |
CN108320107A (en) * | 2018-02-09 | 2018-07-24 | 北京天元创新科技有限公司 | A kind of web-based task scheduling establishment and execute system and method |
CN109886562A (en) * | 2019-01-29 | 2019-06-14 | 长沙迪迈数码科技股份有限公司 | Surface mining production technical reserve pending transactions automatically create and processing method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI628604B (en) | Apparatus, computer-implemented method and system for managing a collaborative working environment | |
US20140075342A1 (en) | Collaborative on-line design landscape design tool | |
CN107330602A (en) | A kind of engineering project workout system and method based on internet | |
US11361152B2 (en) | System and method for automated content labeling | |
CN104504160B (en) | The online batch wiring method of Excel document based on SSH frames | |
CN109035060A (en) | A kind of structured processes management system and management method | |
US9754624B2 (en) | Video creation platform | |
Dulock et al. | Digital collections are a sprint, not a marathon: Adapting Scrum project management techniques to library digital initiatives | |
CN102323927A (en) | Method for combining documents | |
CN107423952A (en) | A kind of expansible DevOps continues delivery system and its method | |
CN104881776B (en) | Easy to the office system of multi-user Cooperation | |
CN107402775A (en) | Generation method, the device and system of webpage | |
CN104737196A (en) | Systems and methods for multiple photo feed stories | |
US11704482B2 (en) | System and method for automated content annotation workflow | |
CN106446063A (en) | Webpage updating system | |
CN107436785B (en) | Revit software information interaction system and interaction method based on information system | |
CN106411703A (en) | Information synchronization method and apparatus | |
US20240161062A1 (en) | Moment-based gifts and designs generated using a digital product collaboration platform | |
EP1533733A1 (en) | Active agenda | |
KR101814981B1 (en) | Web-based Interactive Image Production System | |
Li et al. | Office Automation Sub-Summary of the Work and the Project Management System | |
US20150286620A1 (en) | Interactive project management | |
TW200425696A (en) | Method and system of using shared file for data collaboration | |
US20180197206A1 (en) | Real-time Mobile Multi-Media Content Management System for marketing, Communication and Engagement | |
CN103186514B (en) | For realizing the method and apparatus of file structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171107 |
|
RJ01 | Rejection of invention patent application after publication |