CN107327374A - A kind of wind power generating set workshop simulative debugging platform - Google Patents

A kind of wind power generating set workshop simulative debugging platform Download PDF

Info

Publication number
CN107327374A
CN107327374A CN201611148876.6A CN201611148876A CN107327374A CN 107327374 A CN107327374 A CN 107327374A CN 201611148876 A CN201611148876 A CN 201611148876A CN 107327374 A CN107327374 A CN 107327374A
Authority
CN
China
Prior art keywords
flange
connecting shaft
gear
box
coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611148876.6A
Other languages
Chinese (zh)
Inventor
沈中渝
沈险峰
景云平
施丛新
李林龙
曹鹏飞
徐建慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN ENERGY INVESTMENT HAIZHUANG NEW ENERGY EQUIPMENT Co Ltd
Original Assignee
YUNNAN ENERGY INVESTMENT HAIZHUANG NEW ENERGY EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN ENERGY INVESTMENT HAIZHUANG NEW ENERGY EQUIPMENT Co Ltd filed Critical YUNNAN ENERGY INVESTMENT HAIZHUANG NEW ENERGY EQUIPMENT Co Ltd
Priority to CN201611148876.6A priority Critical patent/CN107327374A/en
Publication of CN107327374A publication Critical patent/CN107327374A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The invention discloses a kind of wind power generating set workshop simulative debugging platform, including dragging platform, drive motor, reduction gear box, Hooks coupling universal coupling, spindle end connecting shaft flange, support frame and wind-force electrical machinery unit, the right side of the dragging platform is provided with debugger unit tool for placing working tools;The output end of the change gear box is connected with gear-box connecting shaft flange, and the right-hand member of gear-box connecting shaft flange is connected with counter flange, is provided between counter flange and gear-box connecting shaft flange in keyway, keyway and is provided with flat key.The present invention installs 200KW motor and reduction gear box on experiment porch, and unit wind wheel locking plate is connected through universal drive shaft and ring flange;Drive driving-chain to rotate when motor start-up, mechanical energy is converted to modeling wind field wind energy, mechanical energy is converted to the process of electric energy;This process purpose is to detect the power transfer system of whole unit and the integrity of electricity generation system.

Description

A kind of wind power generating set workshop simulative debugging platform
Technical field
The present invention relates to wind power generating set workshop modeling wind field debugging technique field, specifically a kind of wind power generating set Workshop simulative debugging platform.
Background technology
Wind power generating set is transported from workshop and will debugged to after wind field rigging out, then grid-connected.But we are not It can ensure that all components of machine of the unit sent after the completion of assembling from workshop are all intact, cannot guarantee that all Electrical system can normally be run.Assembling in the high towers of 70m-100m, if one of gadget it is abnormal and When needing to change, operation maintenance personnel will climb tower seventy or eighty meter high, and this process is very waste of manpower and time.Such as The big part such as fruit generator, frequency converter, driving-chain goes wrong and needs to change, the problem of that is just more than manpower and time, greatly The payment for initiation of type crane is used and long-distance transport will be a no small expenditure.In addition, owner because generating dutation loss and by This is more difficult to estimation to the reputation loss caused by company.Therefore, it is contemplated that allowing wind power generating set to complete to set in workshop After standby assembling, the preceding operation debugging test for carrying out modeling wind field, the integrity of assembly ware to ensure are produced, and detects all Electrical apparatus interstar connection finishes and correctly, finally causes each blower fan that dispatches from the factory can be realized within the most short time to generate electricity by way of merging two or more grid systems.
The content of the invention
It is an object of the invention to provide a kind of wind power generating set workshop simulative debugging platform, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the present invention provides following technical scheme:
A kind of wind power generating set workshop simulative debugging platform, including dragging platform, drive motor, reduction gear box, Hooks coupling universal coupling, spindle end connecting shaft flange, support frame and wind-force electrical machinery unit, the right side of the dragging platform are provided with debugger machine Wind-force electrical machinery unit is installed on group tool for placing working tools, debugger unit tool for placing working tools, debugger unit tool for placing working tools passes through multiple M36*400 hex bolts and M36 hex nuts are fixedly mounted on the ground, and the bottom of wind-force electrical machinery main body is flat provided with forerunner's experiment Platform positioning gear, forerunner's test platform positioning gear is arranged on debugger unit tool for placing working tools, and dragging platform can support dragging electricity Machine and reduction gear box, dragging motor are located in the upper end of dragging platform, and the bottom of dragging motor is provided with motor mounting rack, dragging Motor is arranged on motor mounting rack by multiple M24*120 hex bolts, M24 hex nuts and 24 plain washers (15);It is described The bottom of reduction gear box be provided with gear-box fixed mount, reduction gear box by M30*120 hex bolts, M30 hex nuts with And 30 plain washer be arranged on gear-box fixed mount on, between reduction gear box and dragging motor be provided with plum blossom yielding coupling, plum The two ends of flower yielding coupling are solid by multiple M10*20 hex bolts, M10 hex nuts 20 and reduction gear box, dragging motor Fixed connection, the outside of plum blossom yielding coupling is provided with protective cover, and the bottom of protective cover is provided with support column, and the support column of protective cover is pacified On dragging platform;Several threaded mounting holes, spindle end connecting shaft are laid with the wind-force electrical machinery set main shaft end face Flange is fixedly connected by multiple M42*25 hex bolts, M42 hex nuts and 42 plain washers with main shaft end face, and spindle end connects Four holes for hoist are laid with shaft flange;The middle part of the Hooks coupling universal coupling is provided with breathing zone, Hooks coupling universal coupling and spindle end The keyway that one end of connecting shaft flange connection is provided with keyway, spindle end connecting shaft flange on correspondence Hooks coupling universal coupling also is provided with a phase With keyway, between spindle end connecting shaft flange and Hooks coupling universal coupling by multiple M20*100 hex bolts, M20 hex nuts with And 20 plain washer be attached;The output end of the change gear box is connected with gear-box connecting shaft flange, gear-box connecting shaft flange Right-hand member be connected with counter flange, keyway is provided between counter flange and gear-box connecting shaft flange, flat key, and mistake are provided with keyway Cross between flange and gear-box connecting shaft flange and to be attached by multiple M12*30 hex bolts and M24*120 hex bolts, Excessive flange is connected by bolt with Hooks coupling universal coupling.
Further:The universal joint protective cover is combined by two half-turns and is formed by connecting, and two half-turns pass through multiple M12*40 bolt assemblies are attached.
Further:The universal drive shaft of the Hooks coupling universal coupling is extension type, and ring flange can be dismantled individually placed.
Further:The outside of the Hooks coupling universal coupling is provided with universal joint protective cover.
Compared with prior art, civil power is introduced workshop by the present invention, needed for obtaining set grid-connection by transformer boost The power supply of 690V voltages and whole control system;The power switch to each equipment in switch board is detected after unit energization, Ensure that each facility switching can be operating normally, can normally closed and breaking circuit;Unit is set by a set of workshop debugging software It is standby to be tested, it is ensured that each equipment can normal start-stop;Each device signal feedback and voltage, pressure, temperature, liquid are detected simultaneously Whether the sensors such as position, vibrations are normal, it is ensured that equipment can normal work;In addition, installing 200KW motor on experiment porch And reduction gear box, connect unit wind wheel locking plate through universal drive shaft and ring flange;Driving-chain is driven to rotate when motor start-up, Mechanical energy is converted to modeling wind field wind energy, mechanical energy is converted to the process of electric energy, this process purpose is to detect whole unit Power transfer system and electricity generation system integrity.
Brief description of the drawings
Fig. 1 is a kind of structural representation of wind power generating set workshop simulative debugging platform.
Fig. 2 is a kind of partial top view of wind power generating set workshop simulative debugging platform.
Fig. 3 is a kind of scheme of installation of spindle end adpting flange in wind power generating set workshop simulative debugging platform.
Fig. 4 is a kind of connection diagram of wind power generating set workshop simulative debugging platform shaft coupling.
Fig. 5 is the site layout project figure in a kind of wind power generating set workshop simulative debugging platform.
Fig. 6 is the electrical system architecture figure in a kind of wind power generating set workshop simulative debugging platform.
In figure:1- dragging platform, 2- drive motors, 3- reduction gear boxes, 4- plum blossoms yielding coupling, 5- protective covers, 6- forerunner's test platform positioning gear, 7- gear-box connecting shafts flange, 8- flat keys, 9- Hooks coupling universal couplings, 10- spindle end connecting shafts flange, 11- universal joints protective cover, 12- counter flanges, 13-M24*120 hex bolts, 14-M24 hex nuts, 15-24 plain washers, 16-M30*120 hex bolts, 17-M30 hex nuts, 18-30 plain washers, 19-M10*20 hex bolts, 20-M10 hexagonal spiral shells Mother, 21-M12*30 hex bolts, 22-M20*100 hex bolts, 23-M20 hex nuts, 24-20 plain washers, 25-M42*25 Hex bolts, 26-M42 hex nuts, 27-42 plain washers, 28-M36*400 hex bolts, 29-M36 hex nuts, 30- liftings Hole, 31- main shafts end face, 32- support frames, 33- keyways, 34- breathing zones, 35-M12*40 bolt assemblies.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Refer to Fig. 1-6, a kind of wind power generating set workshop simulative debugging platform, including dragging platform 1, drive motor 2nd, reduction gear box 3, Hooks coupling universal coupling 9, spindle end connecting shaft flange 10, support frame 32 and wind-force electrical machinery unit, the dragging are put down The right side of platform 1 is provided with debugger unit tool for placing working tools, debugger unit tool for placing working tools and is provided with wind-force electrical machinery unit, debugger Unit tool for placing working tools is fixedly mounted on the ground by multiple M36*400 hex bolts 28 and M36 hex nuts 29, wind-force electrical machinery The bottom of main body is arranged on debugger unit tool for placing working tools provided with forerunner's test platform positioning gear 6, forerunner's test platform positioning gear 6 On, forerunner's test platform positioning gear 6 can be positioned to unit, it is ensured that the distance of unit and reduction gear box 3, drag platform 1 can support dragging motor 2 and reduction gear box 3, so that provide convenient for the wind wheel for installing universal drive shaft connection unit, dragging electricity Machine 2 is located in the upper end of dragging platform 1, and the bottom of dragging motor 2 is provided with motor mounting rack, and dragging motor 2 passes through multiple M24* 120 hex bolts 13, the plain washer of M24 hex nuts 14 and 24 are arranged on motor mounting rack, and motor mounting rack is tilted to the right;Make During, civil power is powered through frequency converter for drive motor, and dragging motor 2 can provide the energy needed for unit is rotated, mould The wind for intending wind field realizes the transmission system test of unit;The bottom of the reduction gear box 3 is provided with gear-box fixed mount, reducing gear Roller box 3 is arranged on gear-box fixed mount by M30*120 hex bolts 16, the plain washer 18 of M30 hex nuts 17 and 30, is subtracted Plum blossom yielding coupling 4 is provided between fast gear-box 3 and dragging motor 2, the two ends of plum blossom yielding coupling 4 pass through multiple M10* 20 hex bolts 19, M10 hex nuts 20 are fixedly connected with reduction gear box 3, dragging motor 2, outside plum blossom yielding coupling 4 Side is provided with protective cover 5, and the bottom of protective cover 5 is provided with support column, and the support column of protective cover 5 is arranged on dragging platform 1;Use When, dragging motor 2, which is rotated, reduces rotating speed through gear-box, and change gear box 3 can export bigger torque, to realize drive wind Machine wind wheel is rotated;Several threaded mounting holes, spindle end connecting shaft method are laid with the wind-force electrical machinery set main shaft end face 31 Orchid 10 is fixedly connected by multiple M42*25 hex bolts 25, the plain washer 27 of M42 hex nuts 26 and 42 with main shaft end face 31, Four holes for hoist 30 are laid with spindle end connecting shaft flange 10, in use, passing through hole for hoist 30 just by using 1t*4m suspender belts Spindle end connecting shaft flange 10 can be sling, be then arranged on for spindle end connecting shaft flange 10 on main shaft end face 31 and facility is provided; The middle part of the Hooks coupling universal coupling 9 is provided with breathing zone 34, and one end that Hooks coupling universal coupling 9 is connected with spindle end connecting shaft flange 10 is provided with Keyway on keyway 33, spindle end connecting shaft flange 10 on correspondence Hooks coupling universal coupling 9 also is provided with an identical keyway 33, spindle end Pass through multiple M20*100 hex bolts 22, the plain cushion of M20 hex nuts 23 and 20 between connecting shaft flange 10 and Hooks coupling universal coupling 9 Circle 24 is attached;The outside of Hooks coupling universal coupling 9 is provided with universal joint protective cover 11, and universal joint protective cover 11 is by two half-turns Combination is formed by connecting, and two half-turns are attached by multiple M12*40 bolt assemblies 35, after the completion of lifting debugging, with support Frame 32 props up Hooks coupling universal coupling 9;The output end of the change gear box 3 is connected with gear-box connecting shaft flange 7, gear-box connecting shaft The right-hand member of flange 7 is connected with counter flange 12, is provided with keyway, keyway and sets between counter flange 12 and gear-box connecting shaft flange 7 Have between flat key 8, and counter flange 12 and gear-box connecting shaft flange 7 by multiple M12*30 hex bolts 21 and M24*120 Hex bolts 13 is attached, and excessive flange 12 is connected by bolt with Hooks coupling universal coupling 9;In use, first by drive motor 2 And reduction gear box 3 is fixedly mounted on dragging platform 1, is connected using plum blossom yielding coupling 4, when drive motor 2 is rotated When drive gear-box 3 rotate, transmit energy to gear-box 3, high torque (HT) exported after gearbox speed reduction, use gear-box connecting shaft Method, 7 are fixedly connected on the one end of Hooks coupling universal coupling 9 on gear-box, when gearbox output is rotated, and drive universal drive shaft 9 to rotate; The universal drive shaft other end is connected with ring flange, and unit is changed for convenience, and ring flange and universal drive shaft are connected as assembled in situ connection, ten thousand It is extension type to axle, ring flange is detachably individually placed, ring flange uses eight M42 bolt and the wind wheel locking plate of unit Connection, and then the process for enabling whole preceding drive system modeling wind field wheel rotation to drive set drive chain to rotate;Using Before, civil power is introduced into workshop, electricity is divided into two-way through one-level power distribution cabinet, makees drive motor power supply to dragging frequency converter all the way With, all the way to transformer it is boosted after do the grid-connected power supply of frequency converter and machine set system is powered use;To meet the power supply of different type of machines, Second level power distribution cabinet is set.Circuit is divided into by three tunnels through the electric cabinet of graduation two according to live electricity consumption, the first via is underlying frequency converter 690V powers, and the second tunnel is that cabin column foot cabinet is powered, and the 3rd tunnel powers above to put frequency converter 690V;Column foot switch board and cabin it Between connected using 4G35 power line, powered as machine set control cabinet power supply;When forerunner's debugging tool is installed, first use Suspender belt connects shaft flange through spindle end from inside to outside, then slings main shaft end flanges with half gantry crane, and be moved to be debugged Set main shaft end face, then spindle end is connected into shaft flange and the docking of set main shaft end face, and tightened bolt using electric wrench , in docking, if bolt hole is unjustified, can discharge after unit brake, high speed brake disc is rotated manually to bolt hole pair Together, eight bolts need to be uniformly installed on set main shaft end face;Thereafter shaft coupling spindle end is slowly hung with driving, suspender belt again Rise, crawl driving coordinates the keyway of key and spindle end shaft coupling flange, then with monkey wrench screwing tool bolt;By slip ring line Disk ties up fixation on spindle end adpting flange with band;Piece 4G70 of onsite application cable connection column foot switch board and two Level power distribution cabinet, as the power line of column foot switch board, uses a 4G70 cable connection column foot switch board and engine room control cabinet It is used as engine room control cabinet power line;Using a 4G70 cable connection frequency converter net side, inverter supply power line is used as;Debugging When using optical fiber connection cabin and column foot, as cabin and the communication signal line of column foot, use a set of workshop debugging software Carry out all device performance detections on unit;After unit device detection is completely normal, generator operation test will be carried out, now Forerunner's debugging tool need to be connected with unit wind wheel, start dragging frequency converter and be slowly increased dragging motor rotating speed, by reducing gear Roller box, Hooks coupling universal coupling, the transmission of set drive chain, drive generator unit stator to rotate;Controlled by workshop debugging software so that Generator unit stator realized with power network it is grid-connected, and then test generator and frequency converter it is whether normal.
The better embodiment to this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party , can also be on the premise of this patent objective not be departed from formula, the knowledge that one skilled in the relevant art possesses Various changes can be made.

Claims (4)

1. a kind of wind power generating set workshop simulative debugging platform, including dragging platform (1), drive motor (2), reduction gearing Case (3), Hooks coupling universal coupling (9), spindle end connecting shaft flange (10), support frame (32) and wind-force electrical machinery unit, it is characterised in that institute The right side for stating dragging platform (1) is provided with debugger unit tool for placing working tools, is provided with wind-force electrical machinery on debugger unit tool for placing working tools Unit, debugger unit tool for placing working tools is fixedly mounted on by multiple M36*400 hex bolts (28) and M36 hex nuts (29) On ground, the bottom of wind-force electrical machinery main body is provided with forerunner's test platform positioning gear (6), and forerunner's test platform positioning gear (6) is installed On debugger unit tool for placing working tools, dragging platform (1) can support dragging motor (2) and reduction gear box (3), dragging motor (2) it is located in the upper end of dragging platform (1), the bottom of dragging motor (2) is provided with motor mounting rack, and dragging motor (2) is by more Individual M24*120 hex bolts (13), M24 hex nuts (14) and 24 plain washers (15) are arranged on motor mounting rack;It is described to subtract The bottom of fast gear-box (3) is provided with gear-box fixed mount, and reduction gear box (3) passes through M30*120 hex bolts (16), M30 six Angle nut (17) and 30 plain washers (18) are arranged on gear-box fixed mount, between reduction gear box (3) and dragging motor (2) Provided with plum blossom yielding coupling (4), the two ends of plum blossom yielding coupling (4) pass through multiple M10*20 hex bolts (19), M10 six Angle nut 20 is fixedly connected with reduction gear box (3), dragging motor (2), and the outside of plum blossom yielding coupling (4) is provided with protective cover (5), the bottom of protective cover (5) is provided with support column, and the support column of protective cover (5) is arranged on dragging platform (1);The wind electricity Several threaded mounting holes are laid with machine set main shaft end face (31), spindle end connecting shaft flange (10) passes through multiple M42*25 Hex bolts (25), M42 hex nuts (26) and 42 plain washers (27) are fixedly connected with main shaft end face (31), spindle end connecting shaft Four holes for hoist (30) are laid with flange (10);The middle part of the Hooks coupling universal coupling (9) is provided with breathing zone (34), universal One end that axle device (9) is connected with spindle end connecting shaft flange (10) is provided with correspondence ten thousand on keyway (33), spindle end connecting shaft flange (10) An identical keyway (33), spindle end connecting shaft flange (10) and Hooks coupling universal coupling (9) also are provided with to the keyway on shaft coupling (9) Between be attached by multiple M20*100 hex bolts (22), M20 hex nuts (23) and 20 plain washers (24);It is described The output end of change gear box (3) is connected with gear-box connecting shaft flange (7), and the right-hand member of gear-box connecting shaft flange (7) was connected with Flange (12) is crossed, is provided between counter flange (12) and gear-box connecting shaft flange (7) in keyway, keyway and is provided with flat key (8), and mistake Cross between flange (12) and gear-box connecting shaft flange (7) by multiple M12*30 hex bolts (21) and M24*120 hexagonal spiral shells Bolt (13) is attached, and excessive flange (12) is connected by bolt with Hooks coupling universal coupling (9).
2. a kind of wind power generating set workshop simulative debugging platform according to claim 1, it is characterised in that described universal Joint protective cover (11) is combined by two half-turns and is formed by connecting, and two half-turns are connected by multiple M12*40 bolt assemblies (35) Connect.
3. a kind of wind power generating set workshop simulative debugging platform according to claim 1, it is characterised in that described universal The universal drive shaft of shaft coupling (9) is extension type, and ring flange can be dismantled individually placed.
4. a kind of wind power generating set workshop simulative debugging platform according to claim 1, it is characterised in that described universal The outside of shaft coupling (9) is provided with universal joint protective cover (11).
CN201611148876.6A 2016-12-13 2016-12-13 A kind of wind power generating set workshop simulative debugging platform Pending CN107327374A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611148876.6A CN107327374A (en) 2016-12-13 2016-12-13 A kind of wind power generating set workshop simulative debugging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611148876.6A CN107327374A (en) 2016-12-13 2016-12-13 A kind of wind power generating set workshop simulative debugging platform

Publications (1)

Publication Number Publication Date
CN107327374A true CN107327374A (en) 2017-11-07

Family

ID=60192902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611148876.6A Pending CN107327374A (en) 2016-12-13 2016-12-13 A kind of wind power generating set workshop simulative debugging platform

Country Status (1)

Country Link
CN (1) CN107327374A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345018A (en) * 2019-08-09 2019-10-18 国电联合动力技术(连云港)有限公司 The comprehensive test device and its test method of double-feedback aerogenerator group
CN113073289A (en) * 2021-03-27 2021-07-06 天津先知邦科技股份有限公司 Heat diffusion furnace and process for continuous zinc impregnation processing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050172729A1 (en) * 2004-02-10 2005-08-11 Gonzalez Jose Ignacio L. Test bench for wind turbines
CN101464213A (en) * 2008-12-11 2009-06-24 三一电气有限责任公司 Fan yawing test mechanism and fan set testing bench
CN101888146A (en) * 2010-06-30 2010-11-17 三一电气有限责任公司 Power supply device for test bed of wind driven generator and test system of wind driven generator
CN201680966U (en) * 2010-05-14 2010-12-22 华锐风电科技(集团)股份有限公司 Test bench commonly used by high-power wind generating set
CN201680969U (en) * 2010-05-14 2010-12-22 华锐风电科技(集团)股份有限公司 Load loading device of complete machine test stand of high-power wind turbine generator set
CN203037769U (en) * 2012-12-26 2013-07-03 北京荣华恒信开关技术有限公司 Wind power and photovoltaic grid-connected testing platform
CN106194604A (en) * 2016-09-30 2016-12-07 哈尔滨理工大学 A kind of wind power generating set simulation test weighted platform
CN206555075U (en) * 2016-12-13 2017-10-13 云南能投海装新能源设备有限公司 A kind of wind power generating set workshop simulative debugging platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050172729A1 (en) * 2004-02-10 2005-08-11 Gonzalez Jose Ignacio L. Test bench for wind turbines
CN101464213A (en) * 2008-12-11 2009-06-24 三一电气有限责任公司 Fan yawing test mechanism and fan set testing bench
CN201680966U (en) * 2010-05-14 2010-12-22 华锐风电科技(集团)股份有限公司 Test bench commonly used by high-power wind generating set
CN201680969U (en) * 2010-05-14 2010-12-22 华锐风电科技(集团)股份有限公司 Load loading device of complete machine test stand of high-power wind turbine generator set
CN101888146A (en) * 2010-06-30 2010-11-17 三一电气有限责任公司 Power supply device for test bed of wind driven generator and test system of wind driven generator
CN203037769U (en) * 2012-12-26 2013-07-03 北京荣华恒信开关技术有限公司 Wind power and photovoltaic grid-connected testing platform
CN106194604A (en) * 2016-09-30 2016-12-07 哈尔滨理工大学 A kind of wind power generating set simulation test weighted platform
CN206555075U (en) * 2016-12-13 2017-10-13 云南能投海装新能源设备有限公司 A kind of wind power generating set workshop simulative debugging platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345018A (en) * 2019-08-09 2019-10-18 国电联合动力技术(连云港)有限公司 The comprehensive test device and its test method of double-feedback aerogenerator group
CN110345018B (en) * 2019-08-09 2021-01-01 国电联合动力技术(连云港)有限公司 Comprehensive test method of double-fed wind generating set
CN113073289A (en) * 2021-03-27 2021-07-06 天津先知邦科技股份有限公司 Heat diffusion furnace and process for continuous zinc impregnation processing

Similar Documents

Publication Publication Date Title
CN105977864B (en) A kind of multifunction power high-altitude operation worktable used for transmission line
CN107327374A (en) A kind of wind power generating set workshop simulative debugging platform
CN104963928A (en) System for reducing wind driven generator bolt scheduled maintenance frequency
CN206555075U (en) A kind of wind power generating set workshop simulative debugging platform
CN111590310A (en) Robot assembly platform and method for wind driven generator yaw system
CN104121018B (en) Alternating current traction coal-winning machine
CN106654943A (en) Auxiliary working platform of substation transformer
CN107370006B (en) Platform is dismantled in special use of million volt sleeve pipe terminal
CN115370171A (en) Construction method for in-situ suspension protection of power pipeline
CN205928675U (en) A robot for installing high altitude transmission line
CN112223175B (en) Auxiliary assembly equipment is assembled with crane span structure to water and electricity installation
CN206874692U (en) A kind of metering pump transmission device suitable for chemical fiber machinery
US20130340256A1 (en) Bearing replacement method and tools for rotating machine
CN104074191A (en) Screw-in device for mounting and overhauling power transmission and transformation device
CN204186386U (en) Alternating current traction coal-winning machine
CN203905412U (en) Electromagnetic climbing device
CN104037661A (en) All-dimensional multifunctional installation and maintenance auxiliary device for power transmission and transformation
CN206352650U (en) A kind of cycloidal planetary gear speed reducer frame of easy access
CN205715068U (en) A kind of hydraulic haulage pilot system with energy feedback
CN220431996U (en) Boiler installation equipment
CN218330435U (en) Hydraulic nut repairing and checking device
CN216670567U (en) Full-automatic spanner measurement and control system for track bolt
CN204171962U (en) Pneumatic operated valve attaching/detaching apparatus
WO2024060016A1 (en) Motor direct drive drawworks
CN208900684U (en) A kind of upper air installing speed reducer device with fixed function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination