CN107323461A - Train can the facility of split railway carriage inside and outside - Google Patents

Train can the facility of split railway carriage inside and outside Download PDF

Info

Publication number
CN107323461A
CN107323461A CN201710531641.3A CN201710531641A CN107323461A CN 107323461 A CN107323461 A CN 107323461A CN 201710531641 A CN201710531641 A CN 201710531641A CN 107323461 A CN107323461 A CN 107323461A
Authority
CN
China
Prior art keywords
railway carriage
split
main body
seat
split railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710531641.3A
Other languages
Chinese (zh)
Inventor
熊生银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710531641.3A priority Critical patent/CN107323461A/en
Publication of CN107323461A publication Critical patent/CN107323461A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D17/00Construction details of vehicle bodies

Abstract

Train can the facility of split railway carriage inside and outside, the particularly seat in railway carriage it is higher than common seat, the stress of seat and handle rod is complete empty all on roof, below seat, is easy to quickly put, takes thing;The hook of draw hook hydraulic jack is hooked after traction main force post, and traction telescopic mast stretches out the hook for clamping draw hook hydraulic jack immediately, prevents split railway carriage from play;The same door of subway and main body railway carriage are communicated, it is ensured that the people and goods got on or off the bus quickly pass in and out main railway carriage, it is necessary to ensure all doors that split railway carriage all shuts main railway carriage and split railway carriage in 1 minute before separation;Headstock tail respectively has one section to be used for anticollision, and the tailstock has a hovel, for stacking express delivery goods;Split railway carriage is 1.4 meters wide for only more than 10 meters long above and below guest, if people is more, and young body is strong to stand the handle on handle cross bar;Split railway carriage has multiple tracks to lead to the door of main railway carriage, what the door of main body railway carriage and split railway carriage was in alignment with, full-automatic switch.

Description

Train can the facility of split railway carriage inside and outside
Technical field
Train can the facility of split railway carriage inside and outside, the particularly seat in railway carriage it is higher than common seat, seat and drawing The stress of hand lever is complete empty all on roof, below seat, can put many personal luggages and goods;Especially also set in afterbody The semi-circular sheet steel for having the semi-circular sheet steel and main railway carriage that are designed with anticollision before and after special freight hold, outside is contacted, and hydraulic pressure subtracts Shake;Subway equally multi-door and main body railway carriage is communicated, it is ensured that the people and goods got on or off the bus quickly pass in and out main railway carriage, it is necessary to ensured point All doors that body railway carriage all shuts main railway carriage and split railway carriage in 1 minute before separation.
Background technology
Category of trains is finally a lot, and subway is not included, and has slow train, express, express train, also motor-car;Express, express train, motor-car, stop Be all major station, small station is not stopped with regard to many cars;The people of Poor Mountainous Area are in, entrance is exactly railway station, but too remote Slow train does not stop, and the railway on entrance is in addition to bringing noise, and what benefit does not have yet.
For train:Parking will first slow down, then stop 3 minutes, start, accelerate to run, thus delay Many strokes, even if the train of 120 kilometers of speed per hour (motor-car just not to mention), slows down, stop 3 minutes, start, accelerate Code has just delayed 4-5 minutes, and 8-10 kilometers are run less;Stop if meeting station, be just that high ferro also can not run gesture.
In summary, it is a kind of to meet station is not parking can just be left with the first of car point railway carriage, and the second point that people and thing will be loaded with Railway carriage is with walking with car《Public transport train》(application number:201710492561.1) just arise at the historic moment;Here what is said is《It is public Friendshipization train》Train can the facility of split railway carriage inside and outside, it is ensured that safety is preceding topic, could talk convenient and quick.
The content of the invention
Train can the facility of split railway carriage inside and outside, it is characterised in that:All it is before and after split railway carriage and main body railway carriage (16) one The semicircular design of sample, more abundant steel plate is used for anticollision;Telescopic hydraulic oil cylinder (18) bounces back, draw hook hydraulic jack (17) Hook just and split railway carriage is separated, hanger rail see (《Public transport train》Application number:201710492561.1) just carry split car Case " upward slope ", and main body railway carriage (16) are kept completely separate;Driving wheel (3), driven pulley (6) are drawn under the control at digital control center Start brake mode to enter the station ...;The traction electric machine (4) for being located at split railway carriage top drives traction driving wheel through driving chain (5) (3), driven pulley (6) carries split railway carriage and leaves station, and the place merged with main body railway carriage (16), main body railway carriage are come through hanger rail (16) the telescopic hydraulic oil cylinder (18) on is stretched out, and the hook of draw hook hydraulic jack (17) is hooked after traction main force's post (1);Traction is stretched Contracting post (2) stretches out the hook for clamping draw hook hydraulic jack (17) immediately under the control at digital control center, makes split railway carriage not Can play;Draw hook hydraulic jack (17) reset, just drive split railway carriage put into it is that main body railway carriage (16) leaves to split railway carriage, On the room more longer than split railway carriage.
Split railway carriage front set with the discontiguous one side of main body railway carriage together with the door (7) got on or off the bus;Whole split railway carriage by Power is most of on top, and davit (8) is hung oneself down from top, and handle cross bar (9) is contacted all davits (8);One of seat (14) Davit (8) following is just connected to, other end is fixed on the wall of door (7) this side got on or off the bus, and also sets multiple on this face wall body The windowpane (10) that can not be opened;Seat to about 0.55 meter of floor high (11), than common seat to floor high more slightly higher, purpose It is that floor (15) under seat is entirely empty, can quickly puts many things;Because headstock has one section to be used for anticollision, the tailstock There is one section to be used for anticollision, the tailstock will also stay a hovel, for putting express delivery article;Split railway carriage is for only 10 above and below guest Many meters long, 1.4 meters wide, safe but not very comfortable seat only has more than 30, if people is more, and what young body was strengthened have to be handle Handle on cross bar (9) stands, without being afraid of there was only a few minutes;Split railway carriage has multiple tracks to lead to the door (13) of main railway carriage, main body car What the door of case and split railway carriage was in alignment with, full-automatic switch;Being aligned on the wall (12) of main body railway carriage and split railway carriage also has The windowpane that can not be opened.
Brief description of the drawings
In appended figure, in nonrestrictive citing form, illustrate one embodiment of the present of invention, then, detailed Description in, more clearly show the present invention other characteristic and advantage.In appended figure,
Accompanying drawing 1 is that train can the facility schematic diagram of split railway carriage inside and outside.
1 in figure:Draw main force's post;2:Draw telescopic mast;3:Draw driving wheel;4:Traction electric machine;5:Driving chain;6:From Driving wheel;7:The door got on or off the bus;8:Davit;9:Handle cross bar;10:The windowpane that can not be opened;11:Seat is high to floor;12:Wall Body;13:Lead to the door of main railway carriage;14:Seat;15:Floor;16:Main body railway carriage;17:Draw hook hydraulic jack;18:Flexible liquid Compressing cylinder.
Embodiment
Train can the facility of split railway carriage inside and outside, it is characterised in that:Main body railway carriage (16) center section is for one point width Two have dug out the room of the split railway carriage of a ship shape, more longer than split railway carriage;Main body railway carriage is exactly that half has railway carriage, high With degree is other railway carriages as, and the split railway carriage room of ship shape is exactly average, as flat car, but outside and has more upwards public more than 10 The side divided, for keeping a grip on split railway carriage;All it is semicircular design before and after main body railway carriage (16), more abundant steel plate is used for anticollision Hit;Main body railway carriage (16) front is provided with draw hook hydraulic jack (8) and movable hook hydraulic jack (9), railway carriage provided with numeral control Center processed, for controlling draw hook hydraulic jack (17), telescopic hydraulic oil cylinder (18);Digital control center controls traction electric machine (4) starting, speed, digital control center also control split railway carriage draw driving wheel (3), the brake gear of driven pulley (6) and Split railway carriage bus stop hydraulic shock-absorption oil cylinder, table, which is crossed, not to be carried.
Train can the facility of split railway carriage inside and outside, it is characterised in that:All it is before and after split railway carriage and main body railway carriage (16) one The semicircular design of sample, more abundant steel plate is used for anticollision;Telescopic hydraulic oil cylinder (18) bounces back, draw hook hydraulic jack (17) Hook just and split railway carriage is separated, hanger rail see (《Public transport train》Application number:201710492561.1) just carry split car Case " upward slope ", and main body railway carriage (16) are kept completely separate;Driving wheel (3), driven pulley (6) are drawn under the control at digital control center Start brake mode to enter the station ...;The traction electric machine (4) for being located at split railway carriage top drives traction driving wheel through driving chain (5) (3), driven pulley (6) carries split railway carriage and leaves station, and the place merged with main body railway carriage (16), main body railway carriage are come through hanger rail (16) the telescopic hydraulic oil cylinder (18) on is stretched out, and the hook of draw hook hydraulic jack (17) is hooked after traction main force's post (1);Traction is stretched Contracting post (2) stretches out the hook for clamping draw hook hydraulic jack (17) immediately under the control at digital control center, makes split railway carriage not Can play;Draw hook hydraulic jack (17) reset, just drive split railway carriage put into it is that main body railway carriage (16) leaves to split railway carriage, On the room more longer than split railway carriage.
Split railway carriage front set with the discontiguous one side of main body railway carriage together with the door (7) got on or off the bus;Whole split railway carriage by Power is most of on top, and davit (8) is hung oneself down from top, and handle cross bar (9) is contacted all davits (8);One of seat (14) Davit (8) following is just connected to, other end is fixed on the wall of door (7) this side got on or off the bus, and also sets multiple on this face wall body The windowpane (10) that can not be opened;Seat to about 0.55 meter of floor high (11), than common seat to floor high more slightly higher, purpose It is that floor (15) under seat is entirely empty, can quickly puts many things;Because headstock has one section to be used for anticollision, the tailstock There is one section to be used for anticollision, the tailstock will also stay a hovel, for putting express delivery article;Split railway carriage is for only 10 above and below guest Many meters long, 1.4 meters wide, safe but not very comfortable seat only has more than 30, if people is more, and what young body was strengthened have to be handle Handle on cross bar (9) stands, without being afraid of there was only a few minutes;Split railway carriage has multiple tracks to lead to the door (13) of main railway carriage, main body car What the door of case and split railway carriage was in alignment with, full-automatic switch;Being aligned on the wall (12) of main body railway carriage and split railway carriage also has The windowpane that can not be opened.
When being got on the bus in inception point, stand the passenger that will get off to second and goods be put into split railway carriage because station and When the distance between small station only has 10-20 how public, a few minutes arrive;After arriving at a station, the door (7) the got on or off the bus alignment of split railway carriage The door at station, two sects are opened simultaneously, guest, goods can at leisure under;Under it is complete after, station staff can just load one The goods to be walked of class, when waiting a few minutes before next regular bus, notifies guest to enter split railway carriage, the old,weak,sick and disabled takes a seat, young body Strong person, which occupies stably, to be helped, and after split railway carriage and main body railway carriage coincide, leads to the door (13) of main railway carriage and the door of main body railway carriage while opening Rise, the guest of split railway carriage, goods are rapidly crossed and arrive main body railway carriage, guest that the main body railway carriage next stop to be got off, goods are also fast Cross to split railway carriage fastly, the door for shutting main body railway carriage also will be while shut the door (13) for leading to main railway carriage on split car, Through having spent a few minutes, after a few minutes, split railway carriage enters the station again;Main body railway carriage, the split railway carriage whole nation are unified, Mei Gezhan There is a split railway carriage to keep on file, can be arranged in pairs or groups with any train, certain motor-car will set station, motor-car main body railway carriage and dynamic in addition Car split railway carriage is arranged in pairs or groups.

Claims (2)

1. train can the facility of split railway carriage inside and outside, it is characterised in that:All it is half as main body railway carriage 16 before and after split railway carriage Circular design, more abundant steel plate is used for anticollision;Telescopic hydraulic oil cylinder 18 bounces back, the hook of draw hook hydraulic jack 17 just and Split railway carriage is separated, and hanger rail just carries split railway carriage " upward slope ", and main body railway carriage 16 is kept completely separate;Draw driving wheel 3, driven Wheel 6 has started brake mode under the control at digital control center and entered the station ...;The traction electric machine 4 on split railway carriage top is located at through passing Dynamic chain 5 drives traction driving wheel 3, driven pulley 6 to carry split railway carriage and leave station, comes and is merged with main body railway carriage 16 through hanger rail Place, the telescopic hydraulic oil cylinder 18 on main body railway carriage 16 stretches out, and the hook of draw hook hydraulic jack 17 hooks traction main force post 1 Afterwards;Draw telescopic mast 2 and stretch out the hook for clamping draw hook hydraulic jack 17 immediately under the control at digital control center, make split car Case is unable to play;Draw hook hydraulic jack 17 resets, just drive split railway carriage put into it is that main body railway carriage 16 leaves to split railway carriage, On the room more longer than split railway carriage.
2. train according to claim 1 can the facility of split railway carriage inside and outside, it is characterised in that:Split railway carriage front and master The discontiguous one side of body railway carriage sets the door 7 got on or off the bus together;Whole split railway carriage stress is most of on top, and davit 8 is from top Hang down, handle cross bar 9 is contacted all davits 8;One of seat 14 is just connected to the following of davit 8, above and below other end is fixed on On the wall of this side of door 7 of car, multiple windowpanes 10 that can not be opened also are set on this face wall body;Seat is to floor high 11 about 0.55 Rice, it is high more slightly higher to floor than common seat, it is therefore an objective to which that the floor 15 under seat is entirely empty, it can quickly put a lot Thing;Also there is one section to be used for anticollision because headstock has one section to be used for anticollision, the tailstock, the tailstock will also stay a hovel, for putting Express delivery article;Split railway carriage is more than 10 meters long for only having above and below guest, and 1.4 meters wide, safe but not very comfortable seat only has 30 Multiple, if people is more, young body is strong to stand the handle on handle cross bar 9;Split railway carriage has multiple tracks to lead to main car What the door of the door 13 of case, main body railway carriage and split railway carriage was in alignment with, full-automatic switch;The wall of main body railway carriage and split railway carriage Being aligned on 12 also has the windowpane that can not be opened.
CN201710531641.3A 2017-07-03 2017-07-03 Train can the facility of split railway carriage inside and outside Pending CN107323461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710531641.3A CN107323461A (en) 2017-07-03 2017-07-03 Train can the facility of split railway carriage inside and outside

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710531641.3A CN107323461A (en) 2017-07-03 2017-07-03 Train can the facility of split railway carriage inside and outside

Publications (1)

Publication Number Publication Date
CN107323461A true CN107323461A (en) 2017-11-07

Family

ID=60198845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710531641.3A Pending CN107323461A (en) 2017-07-03 2017-07-03 Train can the facility of split railway carriage inside and outside

Country Status (1)

Country Link
CN (1) CN107323461A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1366811A (en) * 1963-05-06 1964-07-17 Automatisme & Technique Continuous train
DE3136858A1 (en) * 1981-09-14 1983-03-31 Klaus Dipl.-Ing. 1000 Berlin Homann Track-bound vehicle with transferrable transport component for transportation without intermediate stops in a local traffic system which has a number of stopping points
DE4436194A1 (en) * 1994-10-11 1996-04-18 Rasmus Dr Krevet Passenger carriage for magnetic levitation rail vehicle
CN101152870A (en) * 2006-09-30 2008-04-02 上海外国语大学附属大境中学 Method by which passenger can be on-off without stopping train
CN201405876Y (en) * 2009-06-08 2010-02-17 蔡长茂 Device for embarking and debarking passengers quickly without need of stopping train
CN102442322A (en) * 2011-03-05 2012-05-09 杜文娟 Rapid passenger train structure combining a single-rail short-distance train with a nonstop train
CN104908753A (en) * 2014-05-30 2015-09-16 赵毅 Large-transport-capacity nonstop rail traffic system
CN105416316A (en) * 2015-10-14 2016-03-23 郑州大学 Passenger shuttle bus for fixed-wheel external electric-driven non-stop cyclic running railway train

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1366811A (en) * 1963-05-06 1964-07-17 Automatisme & Technique Continuous train
DE3136858A1 (en) * 1981-09-14 1983-03-31 Klaus Dipl.-Ing. 1000 Berlin Homann Track-bound vehicle with transferrable transport component for transportation without intermediate stops in a local traffic system which has a number of stopping points
DE4436194A1 (en) * 1994-10-11 1996-04-18 Rasmus Dr Krevet Passenger carriage for magnetic levitation rail vehicle
CN101152870A (en) * 2006-09-30 2008-04-02 上海外国语大学附属大境中学 Method by which passenger can be on-off without stopping train
CN201405876Y (en) * 2009-06-08 2010-02-17 蔡长茂 Device for embarking and debarking passengers quickly without need of stopping train
CN102442322A (en) * 2011-03-05 2012-05-09 杜文娟 Rapid passenger train structure combining a single-rail short-distance train with a nonstop train
CN104908753A (en) * 2014-05-30 2015-09-16 赵毅 Large-transport-capacity nonstop rail traffic system
CN105416316A (en) * 2015-10-14 2016-03-23 郑州大学 Passenger shuttle bus for fixed-wheel external electric-driven non-stop cyclic running railway train

Similar Documents

Publication Publication Date Title
CN105035115A (en) Rail train without the need to stop at station
CN205059593U (en) System for train does not stop and realizes that passenger gets on or off bus
CN107323461A (en) Train can the facility of split railway carriage inside and outside
CN104150314A (en) Elevator emergency rescue device
CN105257040B (en) A kind of and supporting multi-storied garage of building
KR102423656B1 (en) Aerial cableway transport installation and method
CN204310627U (en) A kind of building lift
CN109292589A (en) Novel elevator
CN106043335A (en) Escape device for straddle-type monorail vehicle
CN205867547U (en) Can draw in bumper car ride in
CN203780526U (en) Zero-speed boarding device for caliper type rope clip overhead passenger cable car
CN201474353U (en) Floor type garage lifting elevator
CN203267884U (en) Tarpaulin rack facilitating lorry tarpaulin covering
CN207645579U (en) A kind of aluminium alloy or steel hoistway force three face enabling home lifts of driving
CN103144992B (en) Cut-to-length two-layer drum splicing car
CN201971598U (en) Mother-sun forklift truck
CN207469857U (en) Vehicle conveying equipment
CN107264537A (en) Public transport train
CN207497853U (en) Weight hoisting tooling equipped with stabilising arrangement
CN207686377U (en) A kind of three-dimensional parking-garage lifting machine
CN205241006U (en) Elevator of children's safety handle is equipped with
CN107954295A (en) A kind of aluminium alloy or steel hoistway forces three face enabling home lifts of driving
CN205602980U (en) Home elevator system
CN206158285U (en) No front column chain formula stereo garage
CN206255744U (en) Novel elevator carrying cabin

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171107