CN107316444A - Chemicals production device actual time safety method for early warning - Google Patents

Chemicals production device actual time safety method for early warning Download PDF

Info

Publication number
CN107316444A
CN107316444A CN201610409693.9A CN201610409693A CN107316444A CN 107316444 A CN107316444 A CN 107316444A CN 201610409693 A CN201610409693 A CN 201610409693A CN 107316444 A CN107316444 A CN 107316444A
Authority
CN
China
Prior art keywords
time
information
early warning
warning
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610409693.9A
Other languages
Chinese (zh)
Other versions
CN107316444B (en
Inventor
张晓华
蔡宝华
厉建祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Safety Engineering Research Institute Co Ltd
Original Assignee
China Petroleum and Chemical Corp
Sinopec Qingdao Safety Engineering Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Qingdao Safety Engineering Institute filed Critical China Petroleum and Chemical Corp
Priority to CN201610409693.9A priority Critical patent/CN107316444B/en
Publication of CN107316444A publication Critical patent/CN107316444A/en
Application granted granted Critical
Publication of CN107316444B publication Critical patent/CN107316444B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B31/00Predictive alarm systems characterised by extrapolation or other computation using updated historic data

Abstract

The present invention relates to a kind of chemicals production device actual time safety method for early warning, the problem of subsystems fail messages such as existing chemicals process units technological parameter, equipment, interlocking, pressure relief device, torch, fire-fighting are scattered, major accident danger million can not in time be recognized, found and be handled mainly is solved.The present invention is by using a kind of chemicals production device actual time safety method for early warning, pass through data mining technology, concentrate mapping techniques, Early-warning Model, early warning classification rule, warning information treatment principle etc., cell arrangement systematic failure information is monitored in real time, grading forewarning system, and responsible person concerned is sent in time, realize that failure is found in time, problem is handled in time, cut-out in time feeds or stopped in emergency before major accident danger million, and event handler procedure is recorded, statistical analysis simultaneously preferably solves above mentioned problem as knowledge base for the technical scheme that similar incidents next time provide reference, available in chemicals production device actual time safety early warning.

Description

Chemicals production device actual time safety method for early warning
Technical field
The present invention relates to a kind of chemicals production device actual time safety method for early warning.
Background technology
The particularly serious industrial accident such as chemical leakage, fire explosion, such accident occur successively for recent domestic Common ground be many levels (each aspect in the technological parameter of material, equipment, pressure relief device, interlocking, fire-fighting system Referred to as independent protection layer) still handled while failure and undiscovered, or after finding by site operation personnel, competent technology people Member fails timely intervention processing, causes the state of affairs to expand, causes serious consequence.Profound cause analysis is found:Domestic and international production pipe Reason division of labor based on specialization clearly, such as process management, equipment control professional division clearly, and equipment control be divided into static equipment, move set Multiple specialties such as standby, instrument, fire-fighting, administrative staff are mutually independent with management information system, and device information can not concentrate displaying, Apparatus system failure can not be found in time, particularly can not be cut off charging in time before major accident danger million or be stopped in emergency, Cause major accident.
As thermometer shows temperature rise in storage tank, torch can not be lighted, spray system does not reach spray in Bhopal accident Drenching multiple independent protection layer failures such as height causes damage sequence extremely serious.So the quantity of protective layer failure occurs with accident Possibility and consequence seriousness it is directly related, in time find protective layer fail and carry out grading forewarning system, handle, in necessary situation It is lower to be stopped in emergency, cut off charging etc., it will to avoid the generation of major accident.
Domestic and international technology in this regard is mainly leading indicators dynamic prediction production operation risk level method, and (U.S. is special Profit 20130063264A1) and production board performance real-time ameliorative way (China Patent No. 102749889A).Leading indicators Method is by statistical analysis process safety near miss incidents, identification change or ascendant trend dynamic, to manage process safety risk. It is to set up board " performance benchmark " to produce the real-time ameliorative way of board performance, and data and " performance base are detected by information system It is accurate " contrasted, the problem of discovery state change and it is sent to team work and is handled.But both technologies can not be realized The early warning of safe condition real-time graded, processing to the complicated chemical product device entirety of many variety classes equipment compositions.
The content of the invention
The technical problems to be solved by the invention are that existing chemicals process units technological parameter, equipment, interlocking, pressure are released Put that the subsystems such as device, torch, fire-fighting fail message is scattered, major accident danger million can not by timely identification, find and locate The problem of reason, there is provided a kind of new chemicals production device actual time safety method for early warning.This method has security preferably excellent Point.
To solve the above problems, the technical solution adopted by the present invention is as follows:A kind of chemicals production device actual time safety is pre- Alarm method, for petrochemical production device real-time early warning, excavate dispersed information, concentrate exhibiting device systematic failure situation, Ensure in time to start before major accident occurs and stop in emergency;With each function and protecting layer failure mode of recognition unit device and consequence Based on assessment, by data mining technology, mapping techniques, Early-warning Model, early warning is concentrated to be classified rule, warning information processing original Then, cell arrangement protective layer system disabler information is subjected to monitoring, grading forewarning system in real time, related responsibility is delivered in time People, reaches that the timely discovery of failure, problem are handled in time, cut-out in time feeds or stopped in emergency before major accident danger million, and event Processing procedure is recorded, statistical analysis and provide reference as knowledge base for similar incidents next time, and final realize avoids weight The target of especially big process safety accident, specifically includes following steps:
(1) production unit for being related to material is selected first, and the equipment and technique of protective layer identification of function production unit are gone forward side by side Row is sorted out, for actual production unit, identification and sorts out protective layer it is understood that mentality of designing, by design drawing and actual device Combine analysis;
(2) identification can reflect two or more association technic indexs of material compromising feature and carry out consequence and comment Estimate, the consequence that technic index fails simultaneously is estimated according to sequence of matrices, early warning level is determined according to latent consequences seriousness Not;
(3) the disabler pattern of this unit key equipment, pipeline and annex is recognized;
(4) in order to reduce low-risk early warning interference, carry out this unit main equipment and be superimposed consequence assessment with technological parameter failure, Recognize key safety superposition equipment and technology parameter;
(5) pressure relief device, interlock instrument, surge tank and flare system, leakage monitoring equipment are recognized successively, disappeared The disabler pattern of anti-system;
(6) identification above real time information source;
(7) the software information method of exploitation, searches for each protective layer fail message by data mining information technology, presses in real time According to quantify Early-warning Model calculated, and carry out guard of computer layer failure it is integrated and mapping show;
(8) during plant running, software information method maps the protective layer status information that displaying is excavated, software in real time Backstage carries out warning level quantum chemical method according to early warning quantitative model, and result of calculation is matched with early warning classification processing criterion, Information system sends warning level, fail message and treatment principle according to matching result to related personnel, and software information method is same When displaying history similar incidents alarm and processing record;
(9) after processing terminates under problem line, information approach person liable carries out issue handling process login, closes this time pre- Alert, event handler procedure is stored in information system as knowledge base, carries out event category, business reasons statistical analysis, and be Next event handling provides reference.
In above-mentioned technical proposal, it is preferable that described information method is capable of the function of each independent protection layer of automatic mining device Fail message, carries out concentrated image displaying, and is calculated by quantifying assessment of risks method, and then accurate grading forewarning system, and When send warning information and treatment principle automatically by internet, realize independent protect multiple to the device unit comprising hazardous material (fluids) The automatic early-warning of sheath disabler degree, early warning event information is that business reasons statistical analysis and early warning processing are provided and known again Know.
The present invention is a kind of chemicals production device real-time early warning system of Kernel-based methods safeguard protection shelf theory, by pre- The function and protecting layer and critical failure factor consequence of first recognition unit device are assessed, and set up cell arrangement protective layer grading forewarning system collection Middle mapping interface;Equipment state, Process operating parameters, safety guard state, work in real-time acquisition device running The data such as skill lock file, collect same logic by the different sub-systems information progress mapping for being subordinate to same device unit and set It is standby, by a kind of protective layer early warning failure quantitative model, classification report is carried out with reference to all process state informations of the logical device Alert processing, warning message is prompted the user with integrated and visualized mode, and warning message passes to correlation according to grading forewarning system rule Person liable.The record of alarm history data is carried out simultaneously, provides a user the inquiry and support of history event data information.To know Based on other each function and protecting layer failure mode of production unit device and consequence are assessed, by data mining technology, mapping is concentrated Technology, Early-warning Model, early warning classification rule, warning information treatment principle etc., cell arrangement systematic failure information are carried out real When monitoring, grading forewarning system, and be sent to responsible person concerned in time, realize that failure is found in time, problem is handled in time, major accident Cut-out charging in time or stopped in emergency before danger million, and event handler procedure is recorded, statistical analysis and under being as knowledge base One time similar incidents provide reference, it is to avoid the target that particularly serious process safety accident occurs, and achieve preferable technique effect.
Brief description of the drawings
The basic theories model of Fig. 1 present invention, i.e. unit independent protection layer schematic diagram.
Schematic diagram is mapped in Fig. 2 protective layer state sets.
Fig. 3 Information System Frames.
Fig. 4 early warning quantitative model schematic diagrames.
In Fig. 4, anRepresent that technic index exceedes safety limit, bnRepresent equipment failure pattern, cnRepresent safe releasing device Failure mode, dnRepresent interlock system failure mode, enRepresent the alarm of detection warning system or failure mode, fnRepresent that fire-fighting should Anxious thrashing pattern.
Below by embodiment, the invention will be further elaborated, but is not limited only to the present embodiment.
Embodiment
【Embodiment 1】
This method is applied to hydrocracking unit.It is a kind of technique in petrochemical industry to be hydrocracked, i.e. petroleum refining During under higher pressure and temperature, hydrogen makes mink cell focus occur hydrogenation, cracking and isomerization reaction through catalyst action, It is converted into the process of light oil (gasoline, kerosene, diesel oil or catalytic cracking, the raw material of cracking alkene processed).
The present invention passes through data mining based on each function and protecting layer failure mode of recognition unit device and consequence are assessed Technology, concentration mapping techniques, Early-warning Model, early warning classification rule, warning information treatment principle etc., series of strata are protected by cell arrangement Disabler information of uniting carries out monitoring, grading forewarning system in real time, and responsible person concerned is delivered in time, reaches that failure finds, asked in time Cut-out in time is fed or stopped in emergency before the timely processing of topic, major accident danger million, and event handler procedure is recorded, statistical Analyse and provide reference as knowledge base for similar incidents next time, it is final to realize the target for avoiding particularly serious process safety accident.
This method is used for petrochemical production device real-time early warning, with excavation dispersed information, concentrates exhibiting device system Property failure conditions, ensure major accident occur before in time start stop in emergency the characteristics of.
The technical solution adopted by the present invention is as follows:
Step as shown in Figure 1:
1) material that is related to selected first (can both be made including poisonous harmful chemicals or comprising the release such as high steam, nitrogen Into blast, impact public work material) production unit, the equipment of protective layer identification of function production unit as shown in Figure 1 And technique, and sorted out.Fig. 1, which gives relatively independent protective layer, to be included:Material self-characteristic (passes through technological parameter such as temperature Degree, pressure, concentration etc. are characterized), the closed container (such as tower, reactor, compressor, pump) of material and pipeline, DCS, pressure releases Put device, interlocking, monitoring alarm, surge tank and torch, fire-fighting and other emergency systems.For actual production unit, know Not with classification protective layer it is understood that mentality of designing, combines analysis by design drawing and actual device;
2) identification can reflect two or more association technic indexs of material compromising feature and carry out consequence and comment Estimate, the consequence that technic index fails simultaneously can be estimated according to sequence of matrices, early warning is determined according to latent consequences seriousness Rank, is shown in Table 1.Acutely abnormal exothermic chemical is there occurs inside material as may reflect when the temperature and pressure of chemicals is all high Reaction, then then have potential explosion danger, consequence is to be in extreme danger when temperature and pressure exceedes safety limit;
3) the disabler pattern of this unit key equipment, pipeline and annex is recognized.Table 2 illustrates fractionating column (DA603 Tower) disabler pattern, listed failure mode refer to equipment be directed to place unit disabler, such as equipment detection or bypass Although when equipment do not damage, the function of design can not be undertaken in device unit, therefore can be regarded as in device unit failure;
Technical step Sequence number
Based on the identification of protection shelf theory with the dangerous unit of potential leakage, fire explosion, including associate device and safety device 1
Recognize this unit key process parameter, and interrelated influence key parameter, the crucial superposition process parameter of identification 2
Recognize the failure mode of this unit main equipment, pipeline and annex 3
Carry out this unit main equipment and consequence assessment, identification key safety superposition equipment and technology parameter are superimposed with technological parameter failure 4
Recognize this unit DCS instrument and flogic system failure mode 5
Recognize this cell pressure release device failure mode 6
Recognize this unit interlock system failure mode 7
Recognize this unit surge tank, flare system failure mode 8
Recognize this cell leakage detecting system failure mode 9
Recognize this unit fire-fighting system failure mode 10
Recognize above real time information source 11
Set up computer data and excavate passage 12
Set up computer data it is integrated and mapping displaying 13
Based on the sheaf theoretic early warning quantitative model of protection 14
Early warning classification is carried out according to early warning classification rule 15
Warning information is transmitted to responsible person concerned 16
Person liable enters issue handling under line 17
After being disposed under problem line, computer information system login is carried out, this early warning is closed. 18
Event information entry event storehouse, carries out statistical analysis and for inquiry, similar prompting. 19
Table 1
Table 2
Technic index Technic index Associate consequence Reason Risk factor
DA603 tower temperatures degree (height) DA603 pressure towers (height) Blast It is in extreme danger
DA603 towers liquid level (height) Without synergistic effect
DA603 towers concentration (height) Reaction is violent, blast Highly dangerous
4) in order to reduce low-risk early warning interference, carry out this unit main equipment and be superimposed consequence assessment with technological parameter failure, Recognize key safety superposition equipment and technology parameter;
5) pressure relief device, interlock instrument, surge tank and flare system, leakage monitoring equipment are recognized successively, disappeared The disabler pattern of anti-system etc., is shown in Table 3;
Table 3
6) identification above real time information source, such as technological parameter derives from DCS system, and equipment failure information source is believed in EM Cease system module, Corrosion monitoring information module etc.;
7) the software information method of exploitation, searches for each protective layer fail message by data mining information technology, presses in real time Calculated according to Early-warning Model is quantified, and carry out guard of computer layer and failed integrated and map displaying, integration exhibition such as Fig. 2 shows. Software module is shown in Fig. 3.Software for Design key is set from the status information systems of the various kinds of equipment such as main equipment, safety attachment, key Failure mode data is excavated in real time in standby real time execution monitoring system, DCS, leakage monitoring system (not entering into for for example every 10 minutes Computerized information need to be logged in from the system), software pre-enters the superposition dangerous information and early warning computation model of setting;
8) during plant running, software information method maps the protective layer status information that displaying is excavated, software in real time Backstage carries out warning level quantum chemical method according to the early warning quantitative model shown in Fig. 4, and result of calculation and the early warning of table 4 classification processing are accurate Then matched, information system sends warning level, fail message and treatment principle according to matching result to related personnel.Software Information approach shows alarm and the processing record of history similar incidents simultaneously;
Table 4
9) after processing terminates under problem line, information approach person liable carries out issue handling process login, closes this early warning. Event handler procedure is stored in information system as knowledge base, carries out the statistical analyses such as event category, business reasons, and can be Next event handling provides reference.
In the present invention, information approach is capable of the disabler information of each independent protection layer of automatic mining device, is concentrated Image display, and calculated by quantifying assessment of risks method, and then accurate grading forewarning system, it is timely automated to be sent out by internet Send warning information and treatment principle.It can realize to the multiple independent protection layer disabler journeys of the device unit comprising hazardous material (fluids) The automatic early-warning of degree, early warning event information is that business reasons statistical analysis and early warning processing provide knowledge again.
Effective application of the invention can avoid the severe and great casualty of relevant industries from occurring.

Claims (2)

1. a kind of chemicals production device actual time safety method for early warning, for petrochemical production device real-time early warning, excavates and divides Information is dissipated, exhibiting device systematic failure situation is concentrated, ensures in time to start before major accident occurs and stop in emergency;To recognize Based on each function and protecting of cell arrangement layer failure mode and consequence are assessed, by data mining technology, concentrate mapping techniques, it is pre- Alert model, early warning classification rule, warning information treatment principle, cell arrangement protective layer system disabler information are carried out real-time Monitoring, grading forewarning system, are delivered to responsible person concerned in time, reach that failure is found in time, problem is handled in time, major accident danger million It is preceding it is timely cut-out charging or stop in emergency, and event handler procedure is recorded, statistical analysis and as knowledge base be next time Similar incidents provide reference, final to realize the target for avoiding particularly serious process safety accident, specifically include following steps:
(1) production unit for being related to material, the equipment and technique of protective layer identification of function production unit are selected first, and are returned Class, for actual production unit, identification and classification protective layer are it is understood that mentality of designing, design drawing and actual device are combined Get up to analyze;
(2) identification can reflect two or more association technic indexs of material compromising feature and carry out consequence assessment, The consequence that technic index fails simultaneously is estimated according to sequence of matrices, warning level is determined according to latent consequences seriousness;
(3) the disabler pattern of this unit key equipment, pipeline and annex is recognized;
(4) in order to reduce low-risk early warning interference, carry out this unit main equipment and be superimposed consequence assessment, identification with technological parameter failure Key safety is superimposed equipment and technology parameter;
(5) pressure relief device, interlock instrument, surge tank and flare system, leakage monitoring equipment, fire-fighting system are recognized successively The disabler pattern of system;
(6) identification above real time information source;
(7) the software information method of exploitation, searches for each protective layer fail message, according to amount in real time by data mining information technology Change Early-warning Model calculated, and carry out guard of computer layer failure it is integrated and mapping show;
(8) during plant running, software information method maps the protective layer status information that displaying is excavated, software backstage in real time Warning level quantum chemical method is carried out according to early warning quantitative model, result of calculation is matched with early warning classification processing criterion, information System sends warning level, fail message and treatment principle according to matching result to related personnel, and software information method is opened up simultaneously Show alarm and the processing record of history similar incidents;
(9) after processing terminates under problem line, information approach person liable carries out issue handling process login, closes this early warning, thing Part processing procedure is stored in information system as knowledge base, carries out event category, business reasons statistical analysis, and be next thing Part processing provides reference.
2. chemicals production device actual time safety method for early warning according to claim 1, it is characterised in that described information method It is capable of the disabler information of each independent protection layer of automatic mining device, carries out concentrated image displaying, and comment by quantifying danger The method of estimating is calculated, and then accurate grading forewarning system, timely automated to send warning information and treatment principle by internet, is realized To the automatic early-warning of the multiple independent protection layer disabler degree of the device unit comprising hazardous material (fluids), early warning event information is again Business reasons statistical analysis and early warning processing provide knowledge.
CN201610409693.9A 2016-06-12 2016-06-12 Chemicals production device actual time safety method for early warning Active CN107316444B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610409693.9A CN107316444B (en) 2016-06-12 2016-06-12 Chemicals production device actual time safety method for early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610409693.9A CN107316444B (en) 2016-06-12 2016-06-12 Chemicals production device actual time safety method for early warning

Publications (2)

Publication Number Publication Date
CN107316444A true CN107316444A (en) 2017-11-03
CN107316444B CN107316444B (en) 2019-10-01

Family

ID=60185088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610409693.9A Active CN107316444B (en) 2016-06-12 2016-06-12 Chemicals production device actual time safety method for early warning

Country Status (1)

Country Link
CN (1) CN107316444B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108319232A (en) * 2017-12-22 2018-07-24 甘肃银光聚银化工有限公司 A kind of process abnormality alarm of consecutive production and processing system
CN110045695A (en) * 2019-03-26 2019-07-23 石化盈科信息技术有限责任公司 A kind of technological parameter on-line early warning method based on variance analysis
CN110134079A (en) * 2019-03-26 2019-08-16 石化盈科信息技术有限责任公司 A kind of technological parameter method for early warning and system based on slope analysis
CN111695752A (en) * 2019-03-15 2020-09-22 中国石油化工股份有限公司 Process safety data mining and accident early warning method based on structured accident database
CN113538866A (en) * 2021-06-22 2021-10-22 北京首钢自动化信息技术有限公司 Intelligent industrial operation room voice alarm method, device and storage medium
CN113554248A (en) * 2020-04-23 2021-10-26 中国石油化工股份有限公司 Risk dynamic early warning assessment method and device for hazardous chemical substance transport vehicle
CN113723724A (en) * 2020-05-25 2021-11-30 中国石油化工股份有限公司 Method and system for evaluating safety and preventive performance indexes of production device process
CN113821991A (en) * 2020-06-18 2021-12-21 中国石油化工股份有限公司 Tank area emergency disposal full-factor simulation system and modeling method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349903A (en) * 2008-08-06 2009-01-21 兖矿国泰化工有限公司 Safety production early-warning system of coal chemical engineering enterprise
US20090224875A1 (en) * 2008-03-06 2009-09-10 Vira Manufacturing, Inc. System for preventing theft of articles from an enclosure
CN102945584A (en) * 2012-11-09 2013-02-27 百年金海安防科技有限公司 Intelligent fire fighting monitoring system for dangerous chemical production field
CN203759508U (en) * 2014-01-22 2014-08-06 滨州学院 Safety management early-warning control system for dangerous chemicals
CN104809599A (en) * 2015-05-22 2015-07-29 中国石油化工股份有限公司 Evaluation method and system for guaranteeing effectiveness of protective measures of interplant pipeline of petrochemical enterprise
CN105116821A (en) * 2015-08-14 2015-12-02 中国石油化工股份有限公司 A petrochemical apparatus commissioning safety monitoring platform and a usage method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090224875A1 (en) * 2008-03-06 2009-09-10 Vira Manufacturing, Inc. System for preventing theft of articles from an enclosure
CN101349903A (en) * 2008-08-06 2009-01-21 兖矿国泰化工有限公司 Safety production early-warning system of coal chemical engineering enterprise
CN102945584A (en) * 2012-11-09 2013-02-27 百年金海安防科技有限公司 Intelligent fire fighting monitoring system for dangerous chemical production field
CN203759508U (en) * 2014-01-22 2014-08-06 滨州学院 Safety management early-warning control system for dangerous chemicals
CN104809599A (en) * 2015-05-22 2015-07-29 中国石油化工股份有限公司 Evaluation method and system for guaranteeing effectiveness of protective measures of interplant pipeline of petrochemical enterprise
CN105116821A (en) * 2015-08-14 2015-12-02 中国石油化工股份有限公司 A petrochemical apparatus commissioning safety monitoring platform and a usage method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108319232A (en) * 2017-12-22 2018-07-24 甘肃银光聚银化工有限公司 A kind of process abnormality alarm of consecutive production and processing system
CN111695752A (en) * 2019-03-15 2020-09-22 中国石油化工股份有限公司 Process safety data mining and accident early warning method based on structured accident database
CN111695752B (en) * 2019-03-15 2024-02-27 中国石油化工股份有限公司 Process safety data mining and accident early warning method based on structured accident database
CN110045695A (en) * 2019-03-26 2019-07-23 石化盈科信息技术有限责任公司 A kind of technological parameter on-line early warning method based on variance analysis
CN110134079A (en) * 2019-03-26 2019-08-16 石化盈科信息技术有限责任公司 A kind of technological parameter method for early warning and system based on slope analysis
CN113554248A (en) * 2020-04-23 2021-10-26 中国石油化工股份有限公司 Risk dynamic early warning assessment method and device for hazardous chemical substance transport vehicle
CN113723724A (en) * 2020-05-25 2021-11-30 中国石油化工股份有限公司 Method and system for evaluating safety and preventive performance indexes of production device process
CN113821991A (en) * 2020-06-18 2021-12-21 中国石油化工股份有限公司 Tank area emergency disposal full-factor simulation system and modeling method thereof
CN113538866A (en) * 2021-06-22 2021-10-22 北京首钢自动化信息技术有限公司 Intelligent industrial operation room voice alarm method, device and storage medium

Also Published As

Publication number Publication date
CN107316444B (en) 2019-10-01

Similar Documents

Publication Publication Date Title
CN107316444B (en) Chemicals production device actual time safety method for early warning
Fabiano et al. From a survey on accidents in the downstream oil industry to the development of a detailed near-miss reporting system
Ciarapica et al. An approach based on association rules and social network analysis for managing environmental risk: A case study from a process industry
Paltrinieri et al. Coupling of advanced techniques for dynamic risk management
Skelton Process safety analysis: An introduction
Kang et al. Analysis of the safety barrier function: Accidents caused by the failure of safety barriers and quantitative evaluation of their performance
CN102436721B (en) Intelligent early-warning emergency system for wind power safety and method thereof
US8589214B1 (en) Health meter for evaluating the status of process safety of at least one facility as an executive dashboard on a client device connected to a network
Li et al. A CAST-based causal analysis of the catastrophic underground pipeline gas explosion in Taiwan
Bellamy et al. Analysis of underlying causes of investigated loss of containment incidents in Dutch Seveso plants using the Storybuilder method
Chen et al. Integration of process safety engineering and fire protection engineering for better safety performance
Fam et al. Data learning and expert judgment in a Bayesian belief network for aiding human reliability assessment in offshore decommissioning risk assessment
Taçgın et al. Development of an intelligent knowledge base for identification of accident causes based on Fu et al.’s model
Campbell Human factors: The impact on industry and the environment
Afefy Hazard analysis and risk assessments for industrial processes using FMEA and bow-tie methodologies
Mohajeri et al. Using association rules to investigate causality patterns of safety-related incidents in the construction industry
RU2709155C1 (en) Safety assessment system for hazardous production facility
Stauffer et al. Get a life (cycle)! Connecting alarm management and safety instrumented systems
Gunasekera et al. Process industry accidents in Sri Lanka: Analysis and basic lessons learnt
Santos-Reyes et al. Applying MORT to the analysis of the “Tláhuac” incident
Sendy et al. A Comparative analysis of hazard analysis methods for sustainable energy development
Briwa et al. Alarm Management for human performance. Are we getting better?
Ramli et al. Preliminary Study on the Prioritization of Asset Integrity Elements for Catastrophic Industrial Accident’s Warning Signs Using Analytic Hierarchy Process (AHP)
Firmansyah et al. Improvement of Overhaul Maintenance Management System Based on Failure Method Operation Failure Analysis Using The FMEA Method
Moura et al. Learning from accidents: Investigating the genesis of human errors in multi-attribute settings to improve the organisation of design

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221130

Address after: Yanan City, Shandong province Qingdao City three road 266071 No. 218

Patentee after: CHINA PETROLEUM & CHEMICAL Corp.

Patentee after: Sinopec Safety Engineering Research Institute Co.,Ltd.

Address before: Yanan City, Shandong province Qingdao City three road 266071 No. 218

Patentee before: CHINA PETROLEUM & CHEMICAL Corp.

Patentee before: SINOPEC Research Institute OF SAFETY ENGINEERING

TR01 Transfer of patent right