CN107316164A - Repetition outage analysis method based on fuzzy matching - Google Patents

Repetition outage analysis method based on fuzzy matching Download PDF

Info

Publication number
CN107316164A
CN107316164A CN201710630179.2A CN201710630179A CN107316164A CN 107316164 A CN107316164 A CN 107316164A CN 201710630179 A CN201710630179 A CN 201710630179A CN 107316164 A CN107316164 A CN 107316164A
Authority
CN
China
Prior art keywords
power failure
plan
record
executed
maintenance module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710630179.2A
Other languages
Chinese (zh)
Inventor
桑雷
童年
张聂鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Power Supply Company State Grid Jiangsu Electric Power Co
Original Assignee
Zhenjiang Power Supply Company State Grid Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Power Supply Company State Grid Jiangsu Electric Power Co filed Critical Zhenjiang Power Supply Company State Grid Jiangsu Electric Power Co
Priority to CN201710630179.2A priority Critical patent/CN107316164A/en
Publication of CN107316164A publication Critical patent/CN107316164A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of repetition outage analysis method based on fuzzy matching, including power failure schedule maintenance module, executed power failure schedule maintenance module, power failure balance module, power failure schedule module is balanced;The power failure schedule maintenance module carries out power failure and plans to import, edit, delete, inquiring about, exporting;The executed power failure schedule maintenance module carries out executed power failure plan importing, inquiry, deleted, and the power failure balance module progress repeats outage analysis, the maintenance of power failure projected state, have a power failure plan merging;The power failure schedule module that balanced has been balanced power failure plan inquiry, export.The repetition outage analysis method based on fuzzy matching of the present invention, quick, high-efficiency and continuous on-line analysis repeats power cut record;So that the artificial degree for participating in analysis process is greatly reduced, available man-power resource is liberated;Same have a power failure is analyzed in very short time and is related to the repetition power cut record of a plurality of dead line in the works, to improve analysis efficiency.

Description

Repetition outage analysis method based on fuzzy matching
Technical field
The present invention relates to a kind of repetition outage analysis method based on fuzzy matching, belong to electrical equipment technical field.
Background technology
It is after the power failure plan of constituent parts next period is collected, to be extracted by from traffic department that tradition, which repeats outage analysis method, Recent executed have a power failure and be intended to be the supports of repetition outage analysis data, the then root one by one in next period power failure list of schedules According to line name keyword, manually screening reaches that analysis repeats the purpose of power cut record from executed power failure plan form, if Find repetition power cut record, take a nearest record, then it is artificial it is counter fill out into next period power failure list of schedules, the meter until next period has a power failure List investigation is drawn to finish.
There is problems with existing analysis method:
Analysis process is cumbersome, and heavy dependence analyzes the working attitude of personnel, easily error;Personnel's analysis efficiency is too low, accounts for Employee's plenty of time is used, the wasting of resources is caused, it is impossible to analysis process real-time continuous demand is met.
The content of the invention
It is artificial to be greatly reduced it is an object of the invention to provide a kind of repetition outage analysis method based on fuzzy matching The degree of analysis process is participated in, available man-power resource is liberated;This method is quick, high-efficiency and continuous on-line analysis repeats the note that has a power failure Record;It is related to the repetition power cut record of a plurality of dead line in the works to analyze same have a power failure in very short time, improves analysis effect Rate;Realize that repeating the automation of power failure control flow, power failure plan declares standardization.
The purpose of the present invention is achieved by the following technical programs:
A kind of repetition outage analysis method based on fuzzy matching, including power failure schedule maintenance module, executed power failure meter Draw maintenance module, power failure balance module, balance power failure schedule module;
1. described in power failure schedule maintenance module carry out have a power failure plan import, editor, delete, inquiry, export;
Importing comprises the following steps:
1) to fill next period power failure plan under Excel template line, the Excel file safeguarded then is imported into the meter that has a power failure Draw in maintenance module;
2) system analysis upload Excel file content and carry out data validation;
3) data validation is completely after, and the content parsed in Excel file is carried out structuring by system Store database;
Editor comprises the following steps:
1) the power failure plan record for needing to edit is found by the search condition specified in power failure schedule maintenance module;
2) in lookup result list, choosing needs the record into edlin, completes editting function;
Deletion comprises the following steps:
1) the power failure plan record for needing to delete is found by the search condition specified in power failure schedule maintenance module;
2) in lookup result list, the record for needing to be deleted is chosen, completes to delete function.
Inquiry comprises the following steps:
In power failure schedule maintenance module, system provides date start-stop scope, line name, the retrieval of applying unit according to plan Corresponding power failure plan is searched in condition, progress;
Export comprises the following steps:
In power failure schedule maintenance module by the search condition specified, the derived power failure plan record of needs is found, is completed Export;
2. described in executed power failure schedule maintenance module carry out executed have a power failure plan import, inquiry, delete,
Importing comprises the following steps:
1) from scheduling OMS export this month executed power failure planning data;
2) executed is had a power failure and plans Excel file importing executed power failure schedule maintenance module;
3) parse the Excel file content uploaded and carry out data validation;
4) content parsed in Excel is carried out structured storage to number by data validation completely after According to storehouse;
Inquiry comprises the following steps:
In executed power failure schedule maintenance module, by actual power failure start-stop scope, applying unit, power failure range retrieval bar Corresponding executed power failure plan is searched in part, progress;
Deletion comprises the following steps:
1) in executed power failure schedule maintenance module by the search condition specified, finding needs the executed deleted to have a power failure Plan record,
2) in lookup result list, the record for needing to be deleted is chosen, completes to delete function;
3. described in power failure balance module carry out repeat outage analysis, power failure projected state safeguard, have a power failure plan merge;
The outage analysis that repeats comprises the following steps:
1) one is chosen in next period power failure list of schedules needs to analyze the record for repeating to have a power failure;
2) line name having a power failure in the works currently chosen is extracted, if there is branch in line name, unifies to replace For the branch under Chinese character coding input method;
3) split to replacing the line name after branch by branch, line name quantity is after fractionation【Branch number+ 1】Bar;
4) line name after all fractionations is circulated, using in database【LIKE】Grammer, specific rules are【LIKE ' % line names % '】Fuzzy matching is searched before and after carrying out【Executed has a power failure actual power off time in the works】【Next period has a power failure Date of enterprise in the works】Record in the range of nearest two months, circulation is until the equal fuzzy search of all line names one time;
5) by whole fuzzy matching to executed power failure plan record return in repetition power cut record list show;
6) have a power failure in the works in the executed matched, to repeating what is had a power failure【Line name】Carry out red coloration and protrude aobvious Show;
The power failure projected state, which is safeguarded, to be comprised the following steps:
1) record for needing to change power failure projected state is chosen in next period power failure list of schedules;
2) selection is to the change result of this power failure projected state, and the date performs or postponed flat to next month according to plan for selection approval Weigh or declare and be unplanned;
The power failure plan merging comprises the following steps:
1) a plurality of power failure plan record for needing to merge is chosen in next period power failure list of schedules;
2) pooling function is completed;
4. described in balanced power failure schedule module balanced power failure plan inquiry, export;
Inquiry comprises the following steps:
Power failure schedule module is being balanced, system provides date start-stop scope, line name, the inspection of applying unit according to plan Rope condition, progress, which is searched, has accordingly balanced power failure plan;
Export comprises the following steps:
1) power failure schedule module is being balanced by the search condition specified, find the derived power failure plan record of needs;
2) export function is completed.
The purpose of the present invention can also further be realized by following technical measures:
The foregoing repetition outage analysis method based on fuzzy matching, wherein power failure schedule maintenance module carry out power failure plan and led Enter step 2) system analysis upload Excel file content and carry out data validation, including:
When date of enterprise, line name, power failure range, power failure amount, power failure duration, action, power failure are started over Between, responsibility teams and groups, unit in charge of construction, project manager, unit in charge of construction work director, applying unit's attribute whether filled in correspondence number According to not filling in the record of data, system is recorded and alarmed.
The foregoing repetition outage analysis method based on fuzzy matching, wherein power failure schedule maintenance module carry out power failure plan and led Enter step 2) system analysis upload Excel file content and carry out data validation, including:
Whether the special data such as date, time, numerical value form is normally filled in, the record do not filled in by agreement form, system Record and alarm.
The foregoing repetition outage analysis method based on fuzzy matching, wherein power failure schedule maintenance module carry out power failure plan and led Enter step 2) system analysis upload Excel file content and carry out data validation, including:
The data that applying unit's attribute is filled in, if in the range of system agreement, if the not data in the range of agreement, System is recorded and alarmed.
The foregoing repetition outage analysis method based on fuzzy matching, the executed power failure schedule maintenance module has been held Row, which has a power failure, plans steps for importing 3) parse the Excel file content uploaded and carry out data validation, including:
Whether power failure range, action have filled in corresponding data, and the record of data is not filled in, and system is recorded and alarmed.
The foregoing repetition outage analysis method based on fuzzy matching, the executed power failure schedule maintenance module has been held Row, which has a power failure, plans steps for importing 3) parse the Excel file content uploaded and carry out data validation, including:
Whether the special data such as date, time, numerical value form is normally filled in, the record do not filled in by agreement form, system Record and alarm.
The foregoing repetition outage analysis method based on fuzzy matching, the executed power failure schedule maintenance module has been held Row, which has a power failure, plans steps for importing 3) parse the Excel file content uploaded and carry out data validation, including:
The data that applying unit's attribute is filled in, if in the range of system agreement, if the not data in the range of agreement, System is recorded and alarmed.
Compared with prior art, the beneficial effects of the invention are as follows:The repetition outage analysis based on fuzzy matching of the present invention Method, quick, high-efficiency and continuous on-line analysis repeats power cut record;So that the artificial degree for participating in analysis process is greatly reduced, Liberate available man-power resource;Same have a power failure is analyzed in very short time and is related to the repetition power failure note of a plurality of dead line in the works Record, to improve analysis efficiency, the present invention realizes that repeating the automation of power failure control flow, power failure plan declares standardization.
Brief description of the drawings
Fig. 1 is the repetition outage analysis method flow diagram based on fuzzy matching of the present invention.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Plan as shown in figure 1, the repetition outage analysis method of fuzzy matching is had a power failure by power failure schedule maintenance module, executed Maintenance module, power failure balance module, balanced power failure schedule module composition.
1. power failure schedule maintenance module:
This module mainly provides the functions such as power failure plan importing, editor, deletion, inquiry, export.
Import:
Next period power failure plan is filled under constituent parts power failure planning personnel, the Excel template line specified using system, Then the Excel file safeguarded is selected to import in system blackout schedule maintenance module;
The Excel file content of system analysis upload simultaneously carries out data validation:
When date of enterprise, line name, power failure range, power failure amount, power failure duration, action, power failure are started over Between, responsibility teams and groups, unit in charge of construction, project manager, unit in charge of construction work director, the attribute such as applying unit whether filled in correspondence Data, the record of data is not filled in, and system is recorded and alarmed;
Whether the special data such as date, time, numerical value form is normally filled in, the record do not filled in by agreement form, system Record and alarm;
The data that applying unit's attribute is filled in, if in the range of system agreement, if the not data in the range of agreement, System is recorded and alarmed.
Data validation is completely after, and system arrives the content parsed in Excel progress structured storage Database.
Editor:
In power failure schedule maintenance module by the search condition specified, the power failure plan record for needing to edit is found;
In lookup result list, choosing needs the record into edlin, clicks on【Modification】Button;
After the editing interface of opening, amendment corresponding contents, click on【Submit】Button, completes editting function.
Delete:
In power failure schedule maintenance module by the search condition specified, the power failure plan record for needing to delete is found;
In lookup result list, the record for needing to be deleted is chosen, is clicked on【Delete】Button, completes to delete function.
Inquiry:
In power failure schedule maintenance module, system provides date start-stop scope, line name (fuzzy), applying unit according to plan Etc. search condition, corresponding power failure plan function is searched in progress.
Export:
In power failure schedule maintenance module by the search condition specified, the derived power failure plan record of needs is found;
Click on【Export】Button, completes export function.
2. executed power failure schedule maintenance module
This module mainly provides the functions such as executed power failure plan importing, inquiry, deletion.
Import:
Outage analysis personnel are repeated, before monthly No. 15, from scheduling OMS export this month executed power failure quota According to;
Derived executed power failure plan Excel file is selected to lead in the system executed power failure schedule maintenance module Enter;
The Excel file content of system analysis upload simultaneously carries out data validation:
Whether power failure range, action have filled in corresponding data, and the record of data is not filled in, and system is recorded and alarmed;
Whether the special data such as date, time, numerical value form is normally filled in, the record do not filled in by agreement form, system Record and alarm;
The data that applying unit's attribute is filled in, if in the range of system agreement, if the not data in the range of agreement, System is recorded and alarmed.
Data validation is completely after, and system arrives the content parsed in Excel progress structured storage Database.
Inquiry:
In executed power failure schedule maintenance module, system, which is provided, presses actual power failure start-stop scope, applying unit, power failure range Corresponding executed power failure plan function is searched in search conditions such as (fuzzy), progress.
Delete:
In executed power failure schedule maintenance module by the search condition specified, the executed power failure meter for needing to delete is found Mark record;
In lookup result list, the record for needing to be deleted is chosen, is clicked on【Delete】Button, completes to delete function.
3. power failure balance module
This module mainly provides the functions such as repetition outage analysis, power failure projected state are safeguarded, power failure plan merges.
Repeat outage analysis:
One is chosen in next period power failure list of schedules needs to analyze the record for repeating to have a power failure;
The line name having a power failure in the works currently chosen is extracted, if there is branch in line name, is uniformly replaced with Branch under Chinese character coding input method;
Split to replacing the line name after branch by branch, line name quantity is after fractionation【Branch number+1】 Bar;
The line name after all fractionations is circulated, using in database【LIKE】Grammer, specific rules are【LIKE ' % Line name % '】Fuzzy matching is searched before and after carrying out【Executed has a power failure actual power off time in the works】【Next period, which has a power failure, plans Middle date of enterprise】Record in the range of nearest two months, circulation is until the equal fuzzy search of all line names one time;
By whole fuzzy matching to executed power failure plan record return in repetition power cut record list show;
Have a power failure in the works in the executed matched, to repeating what is had a power failure【Line name】Red coloration is carried out to highlight.
Power failure projected state is safeguarded:
A record for needing to change power failure projected state is chosen in next period power failure list of schedules;
The change result to this power failure projected state is selected, the date performs, postpones to next month balance, declares according to plan for approval It is unplanned etc..
The plan that has a power failure merges:
The a plurality of power failure plan record for needing to merge is chosen in next period power failure list of schedules;
Click on【Merge】Button, fills in the corresponding contents after merging opening interface, clicks on【Preserve】Button, completes to merge Function.
4. balance power failure schedule module
This module, which is mainly provided, has balanced the functions such as power failure plan inquiry, export.
Inquiry:
Power failure schedule module is being balanced, system provides date start-stop scope, line name (fuzzy), request slip according to plan The search conditions such as position, progress, which is searched, has accordingly balanced power failure plan function.
Export:
Power failure schedule module is being balanced by the search condition specified, the derived power failure plan record of needs is found;
Click on【Export】Button, completes export function.
Constituent parts power failure plan approving person examines to our unit's next period power failure plan, is needed in approval process to spy Different regular data carries out handling as follows:
1) the doubtful repetition power failure plan of line name identical is merged;
2) plan of the power failure amount more than 400 families in the works that have a power failure needs to upload explanation;
3) plan of the power failure duration more than 8 hours in the works that have a power failure needs to fill in reason;
After abnormal data is all disposed, it can just examine and pass through.
Power failure balance personnel, the executed of export this month has a power failure in scheduling OMS before the balance meeting that monthly has a power failure Planning data, and import in the system;
In power failure balance module, choose after a next period power failure plan, the fractionation that system can be unified in alternative routing title Symbol;
Split after symbol unification, carry out fractionation circuit, the line set after being split;
All line names fuzzy matching power failure range in executed power failure planning data is circulated, searches whether exist Power cut record is performed, if in the presence of showing that belonging to repetition has a power failure, all matching results of circulation end merging, which are returned, repeats power cut record List is shown;
Power failure balance personnel make power failure projected state change strategy according to network analysis result.
In addition to the implementation, the present invention can also have other embodiment, all use equivalent substitution or equivalent transformation shape Into technical scheme, all fall within the protection domain of application claims.

Claims (7)

1. a kind of repetition outage analysis method based on fuzzy matching, it is characterised in that including power failure schedule maintenance module, held Row power failure schedule maintenance module, power failure balance module, power failure schedule module is balanced;
First, the power failure schedule maintenance module have a power failure plan import, editor, delete, inquiry, export;
Importing comprises the following steps:
1) to fill next period power failure plan under Excel template line, the Excel file safeguarded then is imported into power failure plan and tieed up Protect in module;
2) system analysis upload Excel file content and carry out data validation;
3) data validation is completely after, and the content parsed in Excel file is carried out structured storage by system To database;
Editor comprises the following steps:
1) the power failure plan record for needing to edit is found by the search condition specified in power failure schedule maintenance module;
2) in lookup result list, choosing needs the record into edlin, completes editting function;
Deletion comprises the following steps:
1) the power failure plan record for needing to delete is found by the search condition specified in power failure schedule maintenance module;
2) in lookup result list, the record for needing to be deleted is chosen, completes to delete function.
Inquiry comprises the following steps:
In power failure schedule maintenance module, system provides date start-stop scope, line name, the retrieval bar of applying unit according to plan Corresponding power failure plan is searched in part, progress;
Export comprises the following steps:
In power failure schedule maintenance module by the search condition specified, the derived power failure plan record of needs is found, export is completed;
2nd, the executed power failure schedule maintenance module carries out the executed plan that has a power failure and imports, inquiry, deletes, import include with Lower step:
1) from scheduling OMS export this month executed power failure planning data;
2) executed is had a power failure and plans Excel file importing executed power failure schedule maintenance module;
3) parse the Excel file content uploaded and carry out data validation;
4) content parsed in Excel is carried out structured storage to database by data validation completely after;
Inquiry comprises the following steps:
In executed power failure schedule maintenance module, by actual power failure start-stop scope, applying unit, power failure range search condition, Corresponding executed power failure plan is searched in progress;
Deletion comprises the following steps:
1) the executed power failure plan for needing to delete is found by the search condition specified in executed power failure schedule maintenance module Record,
2) in lookup result list, the record for needing to be deleted is chosen, completes to delete function;
3rd, the power failure balance module carries out repeating outage analysis, the maintenance of power failure projected state, has a power failure and plan to merge;
The outage analysis that repeats comprises the following steps:
1) one is chosen in next period power failure list of schedules needs to analyze the record for repeating to have a power failure;
2) line name having a power failure in the works currently chosen is extracted, if there is branch in line name, in uniformly replacing with Branch under literary input method;
3) split to replacing the line name after branch by branch, line name quantity is after fractionation【Branch number+1】 Bar;
4) line name after all fractionations is circulated, using in database【LIKE】Grammer, specific rules are【LIKE ' % lines Road title % '】Fuzzy matching is searched before and after carrying out【Executed has a power failure actual power off time in the works】【Next period has a power failure in the works Date of enterprise】Record in the range of nearest two months, circulation is until the equal fuzzy search of all line names one time;
5) by whole fuzzy matching to executed power failure plan record return in repetition power cut record list show;
6) have a power failure in the works in the executed matched, to repeating what is had a power failure【Line name】Red coloration is carried out to highlight;
The power failure projected state, which is safeguarded, to be comprised the following steps:
1) record for needing to change power failure projected state is chosen in next period power failure list of schedules;
2) selection is to the change result of this power failure projected state, selection approval according to plan the date perform or postpone to next month balance or Declare unplanned;
The power failure plan merging comprises the following steps:
1) a plurality of power failure plan record for needing to merge is chosen in next period power failure list of schedules;
2) pooling function is completed;
4th, the power failure schedule module that balanced has been balanced power failure plan inquiry, export;
Inquiry comprises the following steps:
Power failure schedule module is being balanced, system provides date start-stop scope, line name, the retrieval bar of applying unit according to plan Part, progress, which is searched, has accordingly balanced power failure plan;
Export comprises the following steps:
1) power failure schedule module is being balanced by the search condition specified, find the derived power failure plan record of needs;
2) export function is completed.
2. the repetition outage analysis method as claimed in claim 1 based on fuzzy matching, it is characterised in that the power failure plan Maintenance module carries out the plan steps for importing 2 that has a power failure) the Excel file content that uploads of system analysis and carry out data validation and test Card, including:
Date of enterprise, line name, power failure range, power failure amount, power failure duration, action, power failure start over time, duty Appoint whether teams and groups, unit in charge of construction, project manager, unit in charge of construction work director, applying unit's attribute have filled in corresponding data, not The record of data is filled in, system is recorded and alarmed.
3. the repetition outage analysis method as claimed in claim 1 based on fuzzy matching, it is characterised in that the power failure plan Maintenance module carries out the plan steps for importing 2 that has a power failure) the Excel file content that uploads of system analysis and carry out data validation and test Card, including:
Whether the special data such as date, time, numerical value form is normally filled in, the record do not filled in by agreement form, system record And alarm.
4. the repetition outage analysis method as claimed in claim 1 based on fuzzy matching, it is characterised in that the power failure plan Maintenance module carries out the plan steps for importing 2 that has a power failure) the Excel file content that uploads of system analysis and carry out data validation and test Card, including:
The data that applying unit's attribute is filled in, if in the range of system agreement, if the not data in the range of agreement, system Record and alarm.
5. the repetition outage analysis method as claimed in claim 1 based on fuzzy matching, it is characterised in that the executed stops Electric schedule maintenance module carries out executed power failure plan steps for importing 3) parse the Excel file content uploaded and carry out data conjunction Method checking, including:
Whether power failure range, action have filled in corresponding data, and the record of data is not filled in, and system is recorded and alarmed.
6. the repetition outage analysis method as claimed in claim 1 based on fuzzy matching, it is characterised in that the executed stops Electric schedule maintenance module carries out executed power failure plan steps for importing 3) parse the Excel file content uploaded and carry out data conjunction Method checking, including:
Whether the special data such as date, time, numerical value form is normally filled in, the record do not filled in by agreement form, system record And alarm.
7. the repetition outage analysis method as claimed in claim 1 based on fuzzy matching, it is characterised in that the executed stops Electric schedule maintenance module carries out executed power failure plan steps for importing 3) parse the Excel file content uploaded and carry out data conjunction Method checking, including:
The data that applying unit's attribute is filled in, if in the range of system agreement, if the not data in the range of agreement, system Record and alarm.
CN201710630179.2A 2017-07-28 2017-07-28 Repetition outage analysis method based on fuzzy matching Pending CN107316164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710630179.2A CN107316164A (en) 2017-07-28 2017-07-28 Repetition outage analysis method based on fuzzy matching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710630179.2A CN107316164A (en) 2017-07-28 2017-07-28 Repetition outage analysis method based on fuzzy matching

Publications (1)

Publication Number Publication Date
CN107316164A true CN107316164A (en) 2017-11-03

Family

ID=60175404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710630179.2A Pending CN107316164A (en) 2017-07-28 2017-07-28 Repetition outage analysis method based on fuzzy matching

Country Status (1)

Country Link
CN (1) CN107316164A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110874689A (en) * 2019-09-24 2020-03-10 国网天津静海供电有限公司 Cloud platform-based power failure plan management and control method
CN112364210A (en) * 2020-10-13 2021-02-12 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power failure plan duplicate checking method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130116843A1 (en) * 2011-11-07 2013-05-09 Lsis Co., Ltd. Outage schedule management apparatus and method in ems
CN103208050A (en) * 2013-04-28 2013-07-17 国家电网公司 Decision platform for implementing comprehensive power-cut maintenance plan
CN104156790A (en) * 2014-08-22 2014-11-19 国家电网公司 Method for optimizing and balancing power-cut schemes
WO2015178810A1 (en) * 2014-05-21 2015-11-26 Telefonaktiebolaget L M Ericsson (Publ) Managing effects of a scheduled outage of mains power

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130116843A1 (en) * 2011-11-07 2013-05-09 Lsis Co., Ltd. Outage schedule management apparatus and method in ems
CN103208050A (en) * 2013-04-28 2013-07-17 国家电网公司 Decision platform for implementing comprehensive power-cut maintenance plan
WO2015178810A1 (en) * 2014-05-21 2015-11-26 Telefonaktiebolaget L M Ericsson (Publ) Managing effects of a scheduled outage of mains power
CN104156790A (en) * 2014-08-22 2014-11-19 国家电网公司 Method for optimizing and balancing power-cut schemes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钱宇: "配网停电计划优化决策系统设计与实现", 《电脑知识与技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110874689A (en) * 2019-09-24 2020-03-10 国网天津静海供电有限公司 Cloud platform-based power failure plan management and control method
CN112364210A (en) * 2020-10-13 2021-02-12 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power failure plan duplicate checking method
CN112364210B (en) * 2020-10-13 2024-03-01 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power outage plan duplicate checking method

Similar Documents

Publication Publication Date Title
CN111815132B (en) Network security management information publishing method and system for power monitoring system
CN107402976B (en) Power grid multi-source data fusion method and system based on multi-element heterogeneous model
CN111767247A (en) File specification and synchronous forming control platform for real-time supervision of engineering data
CN106327087A (en) Test task assignment method
CN104899143B (en) The software peer review system implementation device of data mining is provided
CN102567859A (en) Data integrated management system of intelligentized power supply system
CN103955754A (en) Mold workshop scheduling method based on real-time production data collection
CN110597791B (en) Knowledge database construction and management method for operation and maintenance of electric power metering equipment
CN112446649A (en) Method and device for examining material purchasing plan
CN103455896B (en) With no paper assembling Quality Control method based on Internet of Things
CN105046604A (en) Patent information management system
CN106447156A (en) Attendance management method and system
CN202600765U (en) Data comprehensive management system for intelligent power supply system
CN109615088A (en) A kind of processing operation/maintenance work orders based on power information acquisition label
CN113190501A (en) Method for forming and filing electronic file for quality testing of water conservancy and hydropower engineering
WO2018160085A1 (en) Method for managing the lifecycle of a complex utility plant and system for the implementation thereof
CN107316164A (en) Repetition outage analysis method based on fuzzy matching
CN106296038A (en) Test assignment triggering method
CN113570345B (en) Automatic power failure range identification system based on construction project circuit diagram
Kropp et al. An approach to data driven process discovery in the cost estimation process of a construction company
CN107544895A (en) Hadoop big datas platform testing system and method
Fauzan et al. Information system for asset management
CN115204832A (en) Full-flow electrical construction process monitoring method and system
CN105184523B (en) Grid operation mode data digging method and system based on CART decision tree
CN116822926A (en) Delay statistics and analysis method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171103