CN107313728A - A kind of drilling string stabilizer for slowing down jarring - Google Patents

A kind of drilling string stabilizer for slowing down jarring Download PDF

Info

Publication number
CN107313728A
CN107313728A CN201710529274.3A CN201710529274A CN107313728A CN 107313728 A CN107313728 A CN 107313728A CN 201710529274 A CN201710529274 A CN 201710529274A CN 107313728 A CN107313728 A CN 107313728A
Authority
CN
China
Prior art keywords
compression spring
drill string
centralizer
hole
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710529274.3A
Other languages
Chinese (zh)
Other versions
CN107313728B (en
Inventor
任俊
陈永强
李争光
郑菲菲
杨志
张恒武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIYUAN HUAXIN PETROLEUM MACHINERY CO Ltd
Original Assignee
JIYUAN HUAXIN PETROLEUM MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIYUAN HUAXIN PETROLEUM MACHINERY CO Ltd filed Critical JIYUAN HUAXIN PETROLEUM MACHINERY CO Ltd
Priority to CN201710529274.3A priority Critical patent/CN107313728B/en
Publication of CN107313728A publication Critical patent/CN107313728A/en
Application granted granted Critical
Publication of CN107313728B publication Critical patent/CN107313728B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1042Elastomer protector or centering means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to the drilling string stabilizer for slowing down jarring, it can effectively solve the problems, such as drilling string stabilizer the occurrence of the drill string that drilling process is neutralized during making a trip enters slim-hole and borehole wall projection, its solve technical scheme be, upper body top is the interior cylinder for setting step, bottom is multiple edge body, it is set with the first compression spring successively thereon, centralizer body, second compression spring, the pin thread screw thread that upper body bottom is provided with is together with the box screw thread spinning of lower body upper end, centralizer body inwall is multiple edge body, match with the multiple edge body of upper body bottom, prominent conveyor screw is evenly equipped with outer wall, the first compression spring is respectively provided with the step surface of centralizer body upper and lower side two, second compression spring, centralizer body can be made to be maintained at the middle part of upper body bottom multiple edge body, structure novel and unique of the present invention, advantages of simple, using effect is good, improve the security of instrument, extend service life, it is the innovation on drilling string stabilizer.

Description

A kind of drilling string stabilizer for slowing down jarring
Technical field
The present invention relates to petroleum drilling engineering field, particularly a kind of drilling string stabilizer for slowing down jarring.
Background technology
, can be by setting in drill string to ensure institute's bored borehole according to engineering design requirements formation well during wellbore construction Meter requires the appropriate drilling string stabilizer of access, but existing drilling string stabilizer does not possess anti-sticking and unfreezing function, drilling string stabilizer Can with drill string tripping in bored borehole, when bore meet slim-hole when, can be in card column drill string and during prominent in well sillar The drilling string stabilizer of access, due to being strong in the case of not knowing on ground sweep away into waiting ground instrument reaction and operating personnel's hair Now, drill string has been stuck, the occurrence of particularly tripping in is more prone to occur above-mentioned when underground situation is complicated, therefore, Design brand-new drilling string stabilizer imperative.
The content of the invention
For above-mentioned situation, to solve the defect of prior art, the purpose of the present invention, which is just to provide, a kind of slows down jarring Drilling string stabilizer, can effectively solve drilling string stabilizer and enter slim-hole and well in the drill string that drilling process is neutralized during making a trip The occurrence of wall projection problem.
The technical scheme that the present invention is solved is, including upper body, spring, centralizer body and lower body, and upper body top sets step to be interior Cylinder, bottom is multiple edge body, is set with the first compression spring, centralizer body, the second compression spring, upper body lower end successively thereon The pin thread screw thread that portion is provided with is together with the box screw thread spinning of lower body upper end, and centralizer body inwall is multiple edge body, with upper body bottom Multiple edge body match, prominent conveyor screw is evenly equipped with outer wall, the first pressure is respectively provided with the step surface of centralizer body upper and lower side two Contracting spring, the second compression spring, can make centralizer body be maintained at the middle part of upper body bottom multiple edge body.
Structure novel and unique of the present invention, advantages of simple, using effect is good, improves the security of instrument, extends and use In the life-span, can effectively take rapidly to put to put drill string progress jarring and operate releases its drill string accident, meets live actual demand, Drilling safety environment and production work efficiency are effectively improved, is the innovation on drilling string stabilizer.
Brief description of the drawings
Fig. 1 is structural profile schematic diagram of the invention.
Fig. 2 is structural representation of the invention.
Embodiment
The embodiment of the present invention is described in further detail below in conjunction with accompanying drawing.
Provided by Fig. 1-2, the present invention includes upper body, spring, centralizer body and lower body, upper body top is the interior cylinder for setting step Body, bottom is multiple edge body, is set with the first compression spring 2a, centralizer body 3, the second compression spring 2b, upper body lower end successively thereon The pin thread screw thread that portion is provided with is together with the upper end box screw thread spinning of lower body 6, and the inwall of centralizer body 3 is under multiple edge body, with upper body The multiple edge body in portion matches, and prominent conveyor screw 5 is evenly equipped with outer wall, and is respectively provided with the step surface of 3 upper and lower side of centralizer body two One compression spring 2a, the second compression spring 2b, can make centralizer body 3 be maintained at the middle part of upper body bottom multiple edge body, work as drill stem stabilization Descending with drill string after device is connected on drill string, when meeting slim-hole, centralizer body 3 is obstructed, and compresses the first compression spring 2a, subtracts The slow hard collision with slim-hole, when centralizer body 3 is stuck at slim-hole, puts on body and is compressed with the up upper pressure first of drill string on drill string Spring 2a and on hit centralizer body 3 and unfreezing, be hampered when drill string is above carried in top well section slim-hole, the compression of centralizer body 3 second is pressed Contracting spring 2b slows down the hard collision with slim-hole, when centralizer body 3 is stuck at slim-hole, and drill string transfers upper body and pushes the with drill string Two compression spring 2b and under hit centralizer body 3 and unfreezing, drill string is normally in drilling, because centralizer body 3 is the bottom that is sleeved on upper body, The impact endurance test shock to the borehole wall from drill string can be reduced.
In order to ensure using effect, it is described it is upper have through hole in vivo, upper end is provided with the box thread for being easy to be connected with drill string Button.
Described lower body 6 is the threaded hollow circular cylinder in two ends, and cylindrical upper end is in step-like, upper end box screw thread It is connected with upper body bottom pin thread screw thread, the first compression of the centralizer body 3 and suit of suit outside box step limitation upper body Spring 2a, the second compression spring 2b are dropped out, it is ensured that they are set with the limits prescribed.
Described upper body bottom, the inwall of centralizer body 3 are 6-8 rib bodies.
Described conveyor screw 5 is 3-5.
The described surface of conveyor screw 5 is provided with the hole of insert carbide button 4, and carbide button 4 is cylinder, is fitted in by tight fit In hole on conveyor screw 5, it is therefore an objective to for the wearability of increase conveyor screw 5.
The service condition of the present invention is that the damping assembled is slowed down into jarring drilling string stabilizer is even linked into by design requirement Descending with drill string when boring instantly on drill string, when meeting slim-hole, centralizer body 3, which is obstructed, then compresses upper spring 2a, slow down with it is small The hard collision of well, when centralizer body 3 is stuck at slim-hole, put on drill string body with spring 2a in the up pressure of drill string and on hit and help Roman 3 and unfreezing.When pull out of hole when, on top, well section slim-hole is hampered when above carrying drill string, centralizer body 3 compression lower spring 2b slow down with The hard collision of slim-hole, when centralizer body 3 is stuck at slim-hole, drill string transfer upper body with pressing spring 2b under drill string and under hit righting Body 3 and unfreezing.When normal drilling, because centralizer body 3 is the bottom that is sleeved on upper body, it can reduce to rush the borehole wall to drill string Hit vibrations.Application of the jarring drilling string stabilizer on drill string is slowed down by damping, conventional damping is preferably resolved and slows down jarring The problem of, the security of instrument is improved, service life is extended.
Drilling string stabilizer damping slows down jarring ability in structure novel and unique of the present invention, advantages of simple, enhancing drilling process, Security is enhanced, and can timely and effectively reduce bit freezing probability, the problem of live operability is improved, reduces drilling well well The generation of lower engineering accident, easy to use, effect is good, is the innovation on drilling well stabilizer, with good economy and society's effect Benefit.

Claims (6)

1. a kind of drilling string stabilizer for slowing down jarring, including upper body, spring, centralizer body and lower body, it is characterised in that upper body (1) Top is the interior cylinder for setting step, and bottom is multiple edge body, be set with successively thereon the first compression spring (2a), centralizer body (3), Second compression spring (2b), the pin thread screw thread that upper body (1) bottom is provided with is with lower body (6) upper end box screw thread spinning one Rise, centralizer body (3) inwall is multiple edge body, matches with the multiple edge body of upper body (1) bottom, prominent conveyor screw is evenly equipped with outer wall (5) the first compression spring (2a), the second compression spring (2b), are respectively provided with the step surface of centralizer body (3) upper and lower side two, can make to help Roman (3) is maintained at the middle part of upper body (1) bottom multiple edge body, after drilling string stabilizer is connected on drill string, is removed with drill string one OK, when meeting slim-hole, centralizer body (3) is obstructed, and compresses the first compression spring (2a), slows down the hard collision with slim-hole, work as righting Body (3) is stuck at slim-hole, put on drill string body (1) with drill string it is up it is upper pressure the first compression spring (2a) and on hit centralizer body (3) unfreezing, when drill string is above carried, on top, well section slim-hole is hampered, and centralizer body (3), which compresses the second compression spring (2b), to be slowed down With the hard collision of slim-hole, when centralizer body (3) is stuck at slim-hole, drill string decentralization upper body (1) pushes the second compression with drill string Spring (2b) and under hit centralizer body (3) and unfreezing, drill string is normally in drilling, because centralizer body (3) is sleeved under upper body (1) Portion, can reduce the impact endurance test shock to the borehole wall from drill string.
2. the drilling string stabilizer according to claim 1 for slowing down jarring, it is characterised in that have logical in described upper body (1) Hole, upper end is provided with the box thread button for being easy to be connected with drill string.
3. the drilling string stabilizer according to claim 1 for slowing down jarring, it is characterised in that described lower body (6) is two ends Threaded hollow circular cylinder, cylindrical upper end is in step-like, upper end box screw thread and upper body (1) bottom pin thread screw thread phase The first compression spring (2a) of the centralizer body (3) of suit and suit, the second compression outside connection, box step limitation upper body (1) Spring (2b) is dropped out, it is ensured that they are set with the limits prescribed.
4. the drilling string stabilizer according to claim 1 for slowing down jarring, it is characterised in that described upper body (1) bottom, help Roman (3) inwall is 6-8 rib bodies.
5. the drilling string stabilizer according to claim 1 for slowing down jarring, it is characterised in that described conveyor screw (5) is 3-5 It is individual.
6. the drilling string stabilizer according to claim 1 for slowing down jarring, it is characterised in that described conveyor screw (5) surface Hole provided with insert carbide button (4), carbide button (4) is cylinder, is fitted in by tight fit in the hole on conveyor screw (5), mesh Be for increase conveyor screw (5) wearability.
CN201710529274.3A 2017-07-01 2017-07-01 Drill string stabilizer for slowing down shock Active CN107313728B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710529274.3A CN107313728B (en) 2017-07-01 2017-07-01 Drill string stabilizer for slowing down shock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710529274.3A CN107313728B (en) 2017-07-01 2017-07-01 Drill string stabilizer for slowing down shock

Publications (2)

Publication Number Publication Date
CN107313728A true CN107313728A (en) 2017-11-03
CN107313728B CN107313728B (en) 2023-03-03

Family

ID=60181399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710529274.3A Active CN107313728B (en) 2017-07-01 2017-07-01 Drill string stabilizer for slowing down shock

Country Status (1)

Country Link
CN (1) CN107313728B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE960261C (en) * 1952-08-08 1957-03-21 Nuesse & Graefer K G Maschf Drill bit guide for rotary drilling in mining with expandable guide parts that are elastically attached to the borehole wall
CA872671A (en) * 1971-06-08 L. Downen Jim Apparatus for the simultaneous application to an oil well fish of the direct strain of a drill string and an independent jarring blow
US4169505A (en) * 1978-10-10 1979-10-02 Neal William C Kick-over apparatus
SU973790A1 (en) * 1980-11-27 1982-11-15 за витель -- - -у : V , Hydraulic apparatus
US5377751A (en) * 1992-01-29 1995-01-03 Rickert Precision Industries Apparatus and method for centralizing downhole pipe and blast joints
CN201180486Y (en) * 2007-12-25 2009-01-14 中国石化集团胜利石油管理局钻井工艺研究院 Stabilizer used for slim-hole well drilling
CN202544754U (en) * 2012-05-07 2012-11-21 盐城华亚石油机械制造有限公司 Screw drilling tool
CN105781444A (en) * 2016-04-29 2016-07-20 中国石油大学(北京) Torque reducing and resistance reducing stabilizer
US20160251898A1 (en) * 2012-11-29 2016-09-01 Per Angman Mixed form tubular centralizers and method of use

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA872671A (en) * 1971-06-08 L. Downen Jim Apparatus for the simultaneous application to an oil well fish of the direct strain of a drill string and an independent jarring blow
DE960261C (en) * 1952-08-08 1957-03-21 Nuesse & Graefer K G Maschf Drill bit guide for rotary drilling in mining with expandable guide parts that are elastically attached to the borehole wall
US4169505A (en) * 1978-10-10 1979-10-02 Neal William C Kick-over apparatus
SU973790A1 (en) * 1980-11-27 1982-11-15 за витель -- - -у : V , Hydraulic apparatus
US5377751A (en) * 1992-01-29 1995-01-03 Rickert Precision Industries Apparatus and method for centralizing downhole pipe and blast joints
CN201180486Y (en) * 2007-12-25 2009-01-14 中国石化集团胜利石油管理局钻井工艺研究院 Stabilizer used for slim-hole well drilling
CN202544754U (en) * 2012-05-07 2012-11-21 盐城华亚石油机械制造有限公司 Screw drilling tool
US20160251898A1 (en) * 2012-11-29 2016-09-01 Per Angman Mixed form tubular centralizers and method of use
CN105781444A (en) * 2016-04-29 2016-07-20 中国石油大学(北京) Torque reducing and resistance reducing stabilizer

Also Published As

Publication number Publication date
CN107313728B (en) 2023-03-03

Similar Documents

Publication Publication Date Title
CN102654024B (en) Hydraulic chambering device for drilling
CN102418488A (en) Wire line coring drill
CN104314482A (en) Closed type helical hole-protecting drill and using method thereof for drilling of soft coal bed
CN106703695A (en) High WOB anti-deviation well straightening drill assembly
CN106194087A (en) A kind of heavy caliber jumping chisel journey core drill and core-drilling method
CN204552740U (en) Wireless drilling inclinometers device underground fishing releasing device
CN207033364U (en) A kind of drilling string stabilizer for slowing down jarring
CN103291236A (en) Clamp-block percussion power transmission mechanism for wire-line coring and percussive rotary drilling
CN107313728A (en) A kind of drilling string stabilizer for slowing down jarring
CN206928927U (en) Deep hole inner pipe is automatically notified cord coring drill in place
CN206554816U (en) A kind of colliery quick release and the drilling rod being connected
CN202596585U (en) Energy-storage protection tool for mechanical drilling tool
CN205532453U (en) Novel oil pipe blanking plug in pit
CN104100204B (en) Combined PDC bit
CN207960501U (en) Can fast drilling multistage drill bit
CN203296709U (en) Hydraulic-releasing telescopic pipe
CN202745781U (en) Downhole throttle salvaging tool for natural gas extraction
CN2793299Y (en) Drawn driller
CN104499959A (en) Novel vertical drilling tension anti-deviation drill collar
CN209293702U (en) Interchangeable straight wing stabilizer
CN200940451Y (en) Sleeve hydraulic variable diameter centralizer
CN201068760Y (en) Oilfield down-hole salvager
CN204371261U (en) A kind of locking mechanism of major diameter restriction choke
CN208950520U (en) A kind of pony packer fishing tool
CN2906039Y (en) Underground broken pipes dragging tools

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant