A kind of heavy caliber jumping chisel journey core drill and core-drilling method Download PDF

Info

Publication number
CN106194087A
CN106194087A CN201610578377.4A CN201610578377A CN106194087A CN 106194087 A CN106194087 A CN 106194087A CN 201610578377 A CN201610578377 A CN 201610578377A CN 106194087 A CN106194087 A CN 106194087A
Authority
CN
China
Prior art keywords
inner tube
core
drilling
tube assembly
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610578377.4A
Other languages
Chinese (zh)
Inventor
王稳石
朱永宜
张恒春
闫家
曹龙龙
许洁
肖志强
余俊勋
王跃伟
朱芝同
齐力强
杜垚森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JULI GEO-ENGINEERING TECHNICAL DEVELOPMENT Co (LANGFANG)
Institute of Exploration Technology Chinese Academy of Geological Sciences
Original Assignee
JULI GEO-ENGINEERING TECHNICAL DEVELOPMENT Co (LANGFANG)
Institute of Exploration Technology Chinese Academy of Geological Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JULI GEO-ENGINEERING TECHNICAL DEVELOPMENT Co (LANGFANG), Institute of Exploration Technology Chinese Academy of Geological Sciences filed Critical JULI GEO-ENGINEERING TECHNICAL DEVELOPMENT Co (LANGFANG)
Priority to CN201610578377.4A priority Critical patent/CN106194087A/en
Publication of CN106194087A publication Critical patent/CN106194087A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B25/00Apparatus for obtaining or removing undisturbed cores, e.g. core barrels, core extractors
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring

Abstract

A kind of heavy caliber jumping chisel journey core drill and core-drilling method, described drilling tool is made up of single action mechanism, outer pipe assembly and inner tube assembly;Outer pipe assembly is provided with one group of outer tube assembly being from top to bottom sequentially connected in series, each of which group outer tube assembly all includes outer tube and reamer, outer tube is threadeded with reamer, being positioned at outer tube assembly middle external tube topmost to assemble with single action mechanism, the reamer being positioned in the outer tube assembly of bottom assembles with drill bit;Inner tube assembly is provided with one group of inner tube assembly being from top to bottom sequentially connected in series, and each group of inner tube assembly all includes standard inner tube and inner tube box cupling, and the standard inner tube being positioned in the inner tube assembly of the top is assembled with single action mechanism.The present invention gives drilling method.The problems such as the present invention solves that the drilling equipment amount of parts that " path core, the reaming of big footpath " finishing drilling pattern exists is many, complex operation step, long in time limit, engineering cost is high and drilling accident risk is big, reach to improve the purpose of Science Drilling economy and safety.

Description

A kind of heavy caliber jumping chisel journey core drill and core-drilling method
Technical field
The present invention relates to a kind of core drill and core-drilling method, a kind of heavy caliber being applicable to Science Drilling Jumping chisel journey core drill and core-drilling method, belong to drilling technology field.
Background technology
Science Drilling is to obtain the Use of Geophysical Data Scientific Engineering as main purpose in formation core and well, and it requires to obtain Representative, continuous print, the formation in situ of high taking rate, native-state core.Exist owing to conventional core drill is applicable to boreHereinafter holing, the core diameter of acquisition existsHereinafter, rock core saturation is not more than 10m, therefore greatly Bore well section, Science Drilling is had to, and " path is cored (generally in employing), the reaming of big footpath " Finishing drilling pattern.
Above-mentioned " path core, the reaming of big footpath " finishing drilling pattern, must be equipped with path in work progress and cores and big footpath is expanded Tubing, drilling tool and mud system are overlapped in hole two, and not only drilling equipment amount of parts is many, complex operation step, and faces reaming Security risk, adds engineering cost.It addition, the conventional core drill rock core saturation less than 10m determines its round trip and cores Drilling depth is less than 10m, thus considerably increases engineering and puts brill number of times, reduces efficiency of construction, extend the duration;Put simultaneously Bore increasing and having increased the weight of the injury to the borehole wall of number of times, increase drilling accident risk.As can be seen here, in large-diameter well section, The finishing drilling pattern of the conventional core drill that uses at present and " path core, the reaming of big footpath " is the caving-in bash of Science Drilling, tool There are relatively low economy and safety.
Summary of the invention
The present invention provides a kind of heavy caliber jumping chisel journey core drill and core-drilling method, it is intended to " path is cored, greatly in solution Footpath reaming " finishing drilling pattern exist drilling equipment amount of parts is many, complex operation step, long in time limit, engineering cost is high and hole The problems such as interior accident risk is big, reach to improve the purpose of Science Drilling economy and safety.
Above-mentioned purpose of the present invention is achieved through the following technical solutions:
A kind of heavy caliber jumping chisel journey core drill, is made up of single action mechanism, outer pipe assembly and inner tube assembly;Its special feature Being, described outer pipe assembly is provided with one group of outer tube assembly being from top to bottom sequentially connected in series, and each of which group outer tube assembly is equal Including outer tube and reamer, described outer tube is threadeded with reamer, is positioned at outer tube assembly middle external tube topmost and single acting engine Structure assembles, and the reamer being positioned in the outer tube assembly of bottom assembles with drill bit;Said inner tube assembly is provided with one group and from top to bottom depends on The secondary inner tube assembly being connected in series, each of which group inner tube assembly all includes standard inner tube and inner tube box cupling, is positioned at topmost Standard inner tube in pipe assembly is assembled with single action mechanism, and the inner tube box cupling lower end being positioned in the inner tube assembly of bottom connects regulation Pipe, sets gradually clip spring seat and lower circlip seat in described regulation inner tube lower end, installs jump ring in described upper clip spring seat, described Lower circlip seat is installed lower circlip.
Above-mentioned heavy caliber jumping chisel journey core drill, described outer tube connects with standard inner tube and inner tube with the length sum of reamer The length sum of hoop is equal, and its positive negative error is not more than 5mm.
Above-mentioned heavy caliber jumping chisel journey core drill, the diameter of described outer tube is preferredDescribed standard inner tube and Regulation diameter of inner pipe is preferredDescribed outside diameter is preferred
Above-mentioned heavy caliber jumping chisel journey core drill, the diameter of described outer tube is preferredDescribed standard inner tube and Regulation diameter of inner pipe is preferredDescribed outside diameter is preferred
Above-mentioned heavy caliber jumping chisel journey core drill, the diameter of described outer tube is preferredDescribed standard inner tube and Regulation diameter of inner pipe is preferredDescribed outside diameter is preferred
Above-mentioned heavy caliber jumping chisel journey core drill, the diameter of described outer tube is preferredDescribed standard inner tube and Regulation diameter of inner pipe is preferredDescribed outside diameter is preferred
A kind of heavy caliber jumping chisel journey core-drilling method, uses above-mentioned core drill to complete Science Drilling and cores process, should Method comprises the following steps:
A, ground assemble: assemble outer pipe assembly, single action mechanism and inner tube assembly, outside pipe assembly assembling respectively on earth's surface Time, outer tube assembly is divided into some joints, installs outer tube in the upper end often saving outer tube assembly and carries silk, and one saves under outer tube assembly wherein End installs drill bit, and when inner tube assembly assembles, inner tube assembly saves inner tube with wherein one after being divided into some joints, single action mechanism to assemble Assembly assembles, and installs joint in the upper end of single action mechanism and carry silk, and the upper end of remaining inner tube assembly is respectively mounted inner tube and carries silk;
B, well head assemble: carry silk by outer tube and joint outer tube assembly each in outer pipe assembly is lifted into well head successively, and by rule Fixed order is fixed at well head after being completed, and carries silk by inner tube, top connection carries silk and inner tube assembly and single action mechanism are hung Install to well head, and fit together by technological requirement, get at the bottom of hole down;
C, core-drilling: time bottom core drill access hole, turn on pump, at the bottom of huge discharge flushing hole, slowly transfer drilling tool to hole The end, little the pressure of the drill is normal core-drilling after creeping into certain distance;
D, make up a joint: when kelly bar side enters to have beaten, need to add when making up a joint, be first shut off slush pump, slowly on extract the heart Drilling tool cuts off rock core, and rock core is added by the step of technological requirement after cutting off and makes up a joint;
E, continuing core-drilling: complete to add and make up a joint after operation, open slush pump, slow reaming on earth, continues column drill Enter;
F, cut the heart and pull out of hole: when full packages or time drilling depth does not needs to pull out of hole, first close slush pump, slowly on carry drilling tool and cut off rock The heart, the most normally pulls out of hole;
G, well head get rid of drilling tool: inner tube assembly unloading at inner tube box cupling screw thread opened, inner tube assembly is divided into some joints, use Inner tube carries silk and is lifted into ground respectively;
H, ground go out the heart: utilize hydraulic jack and extension bar to assist out the heart, by the expanding-contracting action of hydraulic cylinder piston rod Rock core in standard inner tube or regulation inner tube is released.
Above-mentioned heavy caliber jumping chisel journey core-drilling method, when described core drill rock core saturation is more than 30m, needs repeatedly Add when making up a joint, repeat step d and step e, complete repeatedly to make up a joint and core-drilling operation.
Above-mentioned heavy caliber jumping chisel journey core-drilling method, in step c, when getting into away from 3-5m at the bottom of hole under core drill Time, turn on pump, at the bottom of huge discharge flushing hole 10-20 minute, slowly transfer drilling tool at the bottom of hole, little the pressure of the drill normally takes after creeping into 0.5m-1m The heart creeps into.
Heavy caliber jumping chisel journey core drill of the present invention, is from top to bottom sequentially connected in series one group outside in pipe assembly Outer tube assembly, and in inner tube assembly, from top to bottom it is sequentially connected in series one group of inner tube assembly, total with inner tube by outer pipe assembly The cooperation become, the rock core considerably increasing core drill accommodates length, improves footage per round trip, decrease the number of times that makes a trip, with Time, in each group of outer tube assembly, outer tube and reamer are applied in combination, make core drill adapt to more heavy caliber well, expand The range of application of core drill;Heavy caliber jumping chisel journey core-drilling method of the present invention, is carrying out outer pipe assembly and interior During the ground-mounted of pipe assembly, outer tube assembly and inner tube assembly are divided into some joints, during well head assembling operation, can directly exist The core drill of four or more multi packs it is assembled on the basis of three multi pack drilling tools.In a word, heavy caliber of the present invention Jumping chisel journey core drill and core-drilling method solve the drilling equipment zero that " path core, the reaming of big footpath " finishing drilling pattern exists The problems such as number of components is many, complex operation step, long in time limit, engineering cost is high and drilling accident risk is big, reach improvement science Probing economy and the purpose of safety.
Accompanying drawing explanation
Fig. 1 is the cross-sectional view of heavy caliber jumping chisel journey core drill of the present invention;
Tu2Shi single action mechanism cross-sectional view;
Fig. 3 is outer pipe assembly cross-sectional view;
Fig. 4 is inner tube assembly cross-sectional view;
Fig. 5 is schematic enlarged-scale view at I in Fig. 4;
Fig. 6 is outer pipe assembly ground assembling mode schematic diagram;
Fig. 7 is inner tube assembly ground assembling mode schematic diagram;
Fig. 8 is that ground goes out heart process schematic.
In figure, each list of reference numerals is:
1, single action mechanism, 1-1, top connection, 1-2, bearing, 1-3, bearing bore, 1-4, mandrel, 1-5, steel ball, 1-6, locking Nut, 1-7, inner pipe joint;2, outer pipe assembly, 2-1, outer tube, 2-2, reamer, 2-3, drill bit;3, inner tube assembly, 3-1, standard Inner tube, 3-2, inner tube box cupling, 3-3, regulation inner tube, 3-4, upper clip spring seat, 3-5, upper jump ring, 3-6, lower circlip seat, 3-7, lower card Spring;4, outer tube carries silk, 5, top connection carry silk, 6, inner tube carry silk, 7, rock core, 8, extension bar, 9, hydraulic jack.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Referring to Fig. 1, Fig. 2, heavy caliber jumping chisel journey core drill of the present invention is by single action mechanism 1, outer pipe assembly 2 and inner tube Assembly 3 forms.Described single action mechanism includes top connection 1-1, bearing 1-2, bearing bore 1-3, mandrel 1-4, steel ball 1-5, locking screw Female 1-6, inner pipe joint 1-7, described top connection 1-1 lower end is connected with bearing bore 1-3 threaded upper ends, described bearing bore 1-3 lower end Threadeding with outer pipe assembly, described mandrel 1-4 is cavity structure, and mandrel 1-4 upper end is assemblied in bearing bore 1-by bearing 1-2 In 3, threaded with inner pipe joint 1-7 in mandrel 1-4 lower end, and is locked by locking nut 1-6, said inner tube joint 1- 7 assemble with inner tube assembly 3, and this core drill forms outer pipe assembly relative to mandrel and the list of connection member thereof by bearing 1-2 Dynamic property, described steel ball 1-5 is placed in mandrel cavity, forms one-way valve structures, to prevent flushing core 7.
Referring to Fig. 1, Fig. 3, in heavy caliber jumping chisel journey core drill of the present invention, described outer pipe assembly 2 is provided with one group The outer tube assembly being from top to bottom sequentially connected in series, each of which group outer tube assembly all includes outer tube 2-1 and reamer 2-2, institute State outer tube 2-1 to threaded with reamer 2-2, be positioned at outer tube assembly middle external tube topmost and top connection 1-1 in single action mechanism 1 Assembling, the reamer being positioned in the outer tube assembly of bottom assembles with drill bit 2-3.
Referring to Fig. 1, Fig. 4, Fig. 5, in heavy caliber jumping chisel journey core drill of the present invention, said inner tube assembly 3 is provided with The inner tube assembly that one group is from top to bottom sequentially connected in series, each of which group inner tube assembly all includes standard inner tube 3-1 and inner tube Box cupling 3-2, the standard inner tube being positioned in the inner tube assembly of the top and inner pipe joint 1-7 assembling in single action mechanism 1, be positioned at bottom Inner tube box cupling lower end in inner tube assembly connects regulation inner tube 3-3, sets gradually clip spring seat in described regulation inner tube 3-3 lower end 3-4 and lower circlip seat 3-6, installs jump ring 3-5 in described upper clip spring seat 3-4, install lower circlip 3-in described lower circlip seat 3-6 7。
Referring to Fig. 1 to Fig. 5, heavy caliber jumping chisel journey core drill of the present invention, in its drill bit 2-3, outer tube 2-1, standard Pipe 3-1 and regulation inner tube 3-3 can have multiple product line, each series to recommend specification as shown in table 1, each of which size Numerical value allows upper lower deviation 5mm because of the size that processing and design factor standard provide.
Table 1 jumping chisel journey drilling tool series specification size
Referring to Fig. 1 to Fig. 8, the core-drilling method utilizing heavy caliber jumping chisel journey core drill of the present invention to complete includes Following steps:
A, ground assemble: assemble outer pipe assembly 2, single action mechanism 1 and inner tube assembly 3 respectively on earth's surface, pipe assembly 2 fills outside Timing, outer tube assembly is divided into some joints, installs outer tube in the upper end often saving outer tube assembly and puies forward silk 4, and a joint outer tube group wherein Drill bit 2-3 is installed in part lower end, and when inner tube assembly 3 assembles, inner tube assembly is divided into some joints, single action mechanism 1 to assemble afterwards and it In a joint inner tube assembly assembling, and install joint in the upper end of single action mechanism 1 and carry silk 5, the upper end of remaining inner tube assembly is all pacified Dress inner tube carries silk 6;
B, well head assemble: carry the outer pipe assembly 2 of silk 4 by outer tube and respectively save outer tube assembly and be lifted into well head successively, and press Fig. 3 Shown order is fixed at well head after being completed, and carries silk 6 by inner tube, top connection puies forward 5 inner tube assemblies 3 of silk and single acting engine Structure 1 is lifted into well head, and assembling structure fits together with outer pipe assembly 2 as shown in Figure 1, gets at the bottom of hole down;
C, core-drilling: when getting into away from 3-5m at the bottom of hole under core drill, turn on pump, 10-20 at the bottom of huge discharge flushing hole divides Clock, slowly transfers drilling tool at the bottom of hole, and little the pressure of the drill is normal core-drilling after creeping into 0.5m-1m;
D, make up a joint: when kelly bar side enters to have beaten, need to add when making up a joint, be first shut off slush pump, slowly on extract the heart Drilling tool cuts off rock core 7, and rock core 7 is added by the step of technological requirement after cutting off and makes up a joint;
E, continuing core-drilling: complete to add and make up a joint after operation, open slush pump, slow reaming on earth, continues column drill Enter;
F, cut the heart and pull out of hole: when described core drill rock core saturation is more than 30m, need repeatedly to add when making up a joint, repeat step Rapid d and step e, complete repeatedly to make up a joint and core-drilling operation, when full packages or time drilling depth does not needs to pull out of hole, first closes mud Pump, slowly on carry drilling tool core breaking 7, the most normally pull out of hole;
G, well head get rid of drilling tool: inner tube assembly 3 unloading at inner tube box cupling 3-2 screw thread opened, inner tube assembly 3 is divided into some Joint, carries silk 6 by inner tube and is lifted into ground respectively;
H, ground go out the heart: utilize hydraulic jack 9 and extension bar 8 to assist out the heart, and flexible by hydraulic cylinder piston rod moves Make to release the rock core in standard inner tube 3-1 or regulation inner tube 3-3.

Claims (9)

1. a heavy caliber jumping chisel journey core drill, is made up of single action mechanism (1), outer pipe assembly (2) and inner tube assembly (3);Its Feature is, described outer pipe assembly (2) is provided with one group of outer tube assembly being from top to bottom sequentially connected in series, each of which group outer tube group Part all includes outer tube (2-1) and reamer (2-2), and described outer tube (2-1) is threadeded with reamer (2-2), is positioned at topmost Outer tube assembly middle external tube and single action mechanism (1) assemble, the reamer being positioned in the outer tube assembly of bottom fills with drill bit (2-3) Join;Said inner tube assembly (3) is provided with one group of inner tube assembly being from top to bottom sequentially connected in series, and each of which group inner tube assembly is equal Including standard inner tube (3-1) and inner tube box cupling (3-2), it is positioned at the standard inner tube in the inner tube assembly of the top and single action mechanism (1) Assembling, the inner tube box cupling lower end being positioned in the inner tube assembly of bottom connects regulation inner tube (3-3), described regulation inner tube (3-3) Lower end sets gradually clip spring seat (3-4) and lower circlip seat (3-6), installs jump ring (3-5) in described upper clip spring seat (3-4), Described lower circlip seat (3-6) is installed lower circlip (3-7).
Heavy caliber jumping chisel journey core drill the most according to claim 1, is characterized in that, described outer tube (2-1) and reamer (2-2) length sum is equal with the length sum of standard inner tube (3-1) and inner tube box cupling (3-2), and its positive negative error is not more than 5mm。
Heavy caliber jumping chisel journey core drill the most according to claim 1 and 2, is characterized in that, the diameter of described outer tubeDescribed standard inner tube and regulation diameter of inner pipeDescribed outside diameter
Heavy caliber jumping chisel journey core drill the most according to claim 1 and 2, is characterized in that, above-mentioned heavy caliber jumping chisel journey takes Heart drilling tool, the diameter of described outer tubeDescribed standard inner tube and regulation diameter of inner pipeInstitute State outside diameter
Heavy caliber jumping chisel journey core drill the most according to claim 1 and 2, is characterized in that, the diameter of described outer tubeDescribed standard inner tube and regulation diameter of inner pipeDescribed outside diameter
Heavy caliber jumping chisel journey core drill the most according to claim 1 and 2, is characterized in that, the diameter of described outer tubeDescribed standard inner tube and regulation diameter of inner pipeDescribed outside diameter
7. a heavy caliber jumping chisel journey core-drilling method, uses the heavy caliber jumping chisel as according to any one of claim 1 to 6 Journey core drill completes Science Drilling and cores process, and the method comprises the following steps:
A, ground assemble: assemble outer pipe assembly (2), single action mechanism (1) and inner tube assembly (3), pipe assembly outside respectively on earth's surface (2) during assembling, outer tube assembly is divided into some joints, installs outer tube in the upper end often saving outer tube assembly and carries silk (4), and a joint wherein Drill bit (2-3) is installed in outer tube assembly lower end, and when inner tube assembly (3) assembles, inner tube assembly is divided into some joints, single action mechanism (1) With wherein one joint inner tube assembly assembling after assembling, and install joint in the upper end of single action mechanism (1) and carry silk (5), in remaining The upper end of pipe assembly is respectively mounted inner tube and carries silk (6);
B, well head assemble: carry silk (4) by outer tube and each joint outer tube assembly of outer pipe assembly (2) is lifted into well head successively, and press The order of regulation is fixed at well head after being completed, carry silk (6) by inner tube, top connection carry silk (5) inner tube assembly (3) and Single action mechanism (1) is lifted into well head, and fits together by technological requirement, gets at the bottom of hole down;
C, core-drilling: time bottom core drill access hole, turn on pump, at the bottom of huge discharge flushing hole, slowly transfer drilling tool at the bottom of hole, little The pressure of the drill is normal core-drilling after creeping into certain distance;
D, make up a joint: when kelly bar side enters to have beaten, need to add when making up a joint, be first shut off slush pump, slowly on carry core drill Cutting off rock core (7), rock core (7) is added by the step of technological requirement after cutting off and makes up a joint;
E, continuing core-drilling: complete to add and make up a joint after operation, open slush pump, slow reaming on earth, continues core-drilling;
F, cut the heart and pull out of hole: when full packages or time drilling depth does not needs to pull out of hole, first close slush pump, slowly on carry drilling tool core breaking (7), The most normally pull out of hole;
G, well head get rid of drilling tool: open, inner tube assembly (3) unloading at inner tube box cupling (3-2) screw thread inner tube assembly (3) if being divided into Dry joint, carries silk (6) by inner tube and is lifted into ground respectively;
H, ground go out the heart: utilize hydraulic jack (9) and extension bar (8) to assist out the heart, and flexible by hydraulic cylinder piston rod moves Make to release the rock core in standard inner tube (3-1) or regulation inner tube (3-3).
Heavy caliber jumping chisel journey core-drilling method the most according to claim 7, is characterized in that, when described core drill rock core Saturation, more than 30m, needs repeatedly to add when making up a joint, and repeats step d and step e, completes repeatedly to make up a joint and core-drilling is made Industry.
Heavy caliber jumping chisel journey core-drilling method the most according to claim 7, is characterized in that, in step c, work as column drill When getting into away from 3-5m at the bottom of hole under tool, turn on pump, at the bottom of huge discharge flushing hole 10-20 minute, slowly transfer drilling tool at the bottom of hole, little the pressure of the drill Normal core-drilling after creeping into 0.5m-1m.
CN201610578377.4A 2016-07-21 2016-07-21 A kind of heavy caliber jumping chisel journey core drill and core-drilling method Pending CN106194087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610578377.4A CN106194087A (en) 2016-07-21 2016-07-21 A kind of heavy caliber jumping chisel journey core drill and core-drilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610578377.4A CN106194087A (en) 2016-07-21 2016-07-21 A kind of heavy caliber jumping chisel journey core drill and core-drilling method

Publications (1)

Publication Number Publication Date
CN106194087A true CN106194087A (en) 2016-12-07

Family

ID=57492227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610578377.4A Pending CN106194087A (en) 2016-07-21 2016-07-21 A kind of heavy caliber jumping chisel journey core drill and core-drilling method

Country Status (1)

Country Link
CN (1) CN106194087A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677701A (en) * 2017-01-23 2017-05-17 珠海市英格尔特种钻探设备有限公司 Engineering geological drilling construction method based on thin-walled drilling tool
CN106869840A (en) * 2017-02-21 2017-06-20 中国地质科学院勘探技术研究所 It is a kind of to prevent interior assembly with dynamic core drill single acting device
CN108386148A (en) * 2018-01-31 2018-08-10 长江岩土工程总公司(武汉) Using the drilling coring method of mud clothing package core in sand
CN112112588A (en) * 2020-09-08 2020-12-22 中国地质科学院勘探技术研究所 Press-in type rope coring drilling tool and coring process method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030106717A1 (en) * 2001-12-06 2003-06-12 Douglas Kinsella Coring system and method
CN101235710A (en) * 2008-02-28 2008-08-06 中国科学院武汉岩土力学研究所 Impact type double tube double-motion coring device and its method
CN102797427A (en) * 2012-08-27 2012-11-28 中国地质科学院勘探技术研究所 Rock core ejection method
CN204476329U (en) * 2015-02-02 2015-07-15 陕西铁道工程勘察有限公司 A kind of basement rock triple pipe core bit
CN105672923A (en) * 2015-12-16 2016-06-15 中国地质科学院勘探技术研究所 Single-action assembly capable of preventing inner tube assembly from falling off

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030106717A1 (en) * 2001-12-06 2003-06-12 Douglas Kinsella Coring system and method
CN101235710A (en) * 2008-02-28 2008-08-06 中国科学院武汉岩土力学研究所 Impact type double tube double-motion coring device and its method
CN102797427A (en) * 2012-08-27 2012-11-28 中国地质科学院勘探技术研究所 Rock core ejection method
CN204476329U (en) * 2015-02-02 2015-07-15 陕西铁道工程勘察有限公司 A kind of basement rock triple pipe core bit
CN105672923A (en) * 2015-12-16 2016-06-15 中国地质科学院勘探技术研究所 Single-action assembly capable of preventing inner tube assembly from falling off

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677701A (en) * 2017-01-23 2017-05-17 珠海市英格尔特种钻探设备有限公司 Engineering geological drilling construction method based on thin-walled drilling tool
CN106677701B (en) * 2017-01-23 2018-08-17 珠海市英格尔特种钻探设备有限公司 A kind of Engineering Geologic Drilling Practice method based on cord coring drill
CN106869840A (en) * 2017-02-21 2017-06-20 中国地质科学院勘探技术研究所 It is a kind of to prevent interior assembly with dynamic core drill single acting device
CN108386148A (en) * 2018-01-31 2018-08-10 长江岩土工程总公司(武汉) Using the drilling coring method of mud clothing package core in sand
CN108386148B (en) * 2018-01-31 2020-01-17 长江岩土工程总公司(武汉) Drilling coring method for wrapping rock core in sandy soil by using mud coating
CN112112588A (en) * 2020-09-08 2020-12-22 中国地质科学院勘探技术研究所 Press-in type rope coring drilling tool and coring process method thereof

Similar Documents

Publication Publication Date Title
CN106194087A (en) A kind of heavy caliber jumping chisel journey core drill and core-drilling method
CN101268247A (en) A percussion hammer for enlarging drilled holes
CN107208463A (en) The form of thread of balance, using balance the form of thread tubing and correlation technique
CN104712279B (en) Coiled tubing hydraulic double-way jar
CN105545241A (en) Slip-type internal fisher for coiled tube
US3489211A (en) Method and apparatus for parting subsurface well casing from floating drilling vessels
CN102678059A (en) Energy storage protection tool of mechanical drilling tool
CN102635322A (en) Tool for expandable casing in open hole section
CN101382043A (en) Combined drill for drilling with casing
CN204552670U (en) A kind of coiled tubing hydraulic bidirectional bumper jar
CN109138856A (en) Coiled tubing connector
CN211974879U (en) Hydraulic reaming tool for lateral drilling of old well
CN202596633U (en) Tool for expandable casing in open hole section
CN207960501U (en) Can fast drilling multistage drill bit
CN104329046A (en) Rotary hydraulic packer
CN206860100U (en) Three sections spiral two-way with brill expansion reaming tool
CN202266221U (en) Salvageable bottom plug combination
US2869827A (en) Retrievable stabilizer for well bores
CN107630661A (en) Can fast drilling multistage drill bit
CN204163680U (en) A kind of rotating hydraulic packer
CN209212173U (en) Coiled tubing connector
CN203559850U (en) Jam releasing device for oilfield downhole drilling
CN208845111U (en) A kind of chance card buries the drill bit that can give up
CN202544751U (en) Expanding drill bit
CN109681121A (en) A kind of downhole drill bidirectional eccentric pipe nipple expanding drilling tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination