CN107313723A - Slidingtype super large caliber subsea manifold - Google Patents

Slidingtype super large caliber subsea manifold Download PDF

Info

Publication number
CN107313723A
CN107313723A CN201710598964.4A CN201710598964A CN107313723A CN 107313723 A CN107313723 A CN 107313723A CN 201710598964 A CN201710598964 A CN 201710598964A CN 107313723 A CN107313723 A CN 107313723A
Authority
CN
China
Prior art keywords
module
roll
pipe
several
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710598964.4A
Other languages
Chinese (zh)
Inventor
琚选择
姜瑛
李刚
付剑波
方伟
杨成鹏
顾永维
王凤云
石磊
孙雪梅
张蓬菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201710598964.4A priority Critical patent/CN107313723A/en
Publication of CN107313723A publication Critical patent/CN107313723A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0007Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/001Survey of boreholes or wells for underwater installation

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Geophysics (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of slidingtype super large caliber subsea manifold, including:Interim barrel of sending and receiving the ball provides pile foundation structure, the pipe-line system on pile foundation structure and the roll-off module of support for manifold conduits and under water, wherein, several piling sleeves are respectively arranged with four angles of pile foundation structure, pile foundation structure tail end is provided with the supporting construction of interim barrel of sending and receiving the ball under water;Roll-off module is provided with several slip spacer pins;Several slip spacer pins are inserted into the slot of pile foundation structure, so that fixed roll-off module, after manifold is installed in place, several spacer pins will be opened;Several gliding movement targeting structures are installed on roll-off module and pile foundation structure.The present invention, which is not only solved, uses the problem of submarine pipeline material cost is higher, greatly reduces cost of building projects;Moreover, it can receive and send under water spherical pig, pigging operation and pipe detection operation during being easy to construct and operating greatly save finishing operations and maintenance cost.

Description

Slidingtype super large caliber subsea manifold
Technical field
The present invention relates to subsea manifold, more particularly to a kind of slidingtype for connecing, unloading single point mooring system for Crude Oil at Sea Super large caliber subsea manifold.Belong to Offshore Engineering field.
Background technology
Connect with traditional harbour crude oil, compared with unloading system, Crude Oil at Sea, which connects, unload single point mooring system is moved harbour by bank To marine, solve that most harbor approach in the world are narrow, shallower, scale is smaller, it is impossible to mammoth tanker and ultra-large type The contradiction that oil tanker development matches;Crude Oil at Sea connects, it is smaller to unload the influence of single point mooring system climate, and its cost of investment is about The a quarter of traditional harbour.Exemplified by connecing oil, the workflow that crude oil connect, unloaded single point mooring system is:Oil tanker mooring and drift Float on the floating drum on sea, crude oil is delivered to single-point floating drum by flotation hose from oil tanker, then is delivered to water by underwater hose Lower manifold, finally, crude oil are delivered to land treatment facility by submarine pipeline by manifold.Emptying flow is then opposite.
At present, single point mooring's subsea manifold is mainly connected by expansion bends with submarine pipeline, to solve submarine pipeline Expansion issues.But, because existing major diameter expansion bends pipeline is longer and heavier, pass through expansion bends and submarine pipeline phase The cost of this mode not only submarine pipeline material even is higher and also higher to the hardware requirement of mounting shipping;Therefore, cause Installation difficulty is larger, and installation cost is higher;Meanwhile, it is not easy to carry out pigging operation and Technique of Subsea Pipeline Inspection operation during operation, Difficulty is brought for follow-up system maintenance.
The content of the invention
It is a primary object of the present invention to overcome the disadvantages mentioned above that prior art is present, and provide a kind of slidingtype super large pipe Footpath subsea manifold, it absorbs the expansion of submarine pipeline by roll-off module, not only solve with submarine pipeline material cost compared with High the problem of, greatly reduce cost of building projects, Attention problems difficulty and set-up time;Moreover, it can be received under water With transmission spherical pig, pigging operation and pipe detection operation during being easy to construct and operating greatly save finishing operations and dimension Protect cost.
The purpose of the present invention is realized by following technical scheme:
A kind of slidingtype super large caliber subsea manifold, it is characterised in that:Including:For manifold conduits and interim sending and receiving under water Ball cylinder provides pile foundation structure, the pipe-line system on pile foundation structure and the roll-off module of support, wherein, in pile foundation It is respectively arranged with four angles of plinth structure and provides the several piling sleeves being oriented to for driven pile, pile foundation structure tail end is provided with The supporting construction of interim barrel of sending and receiving the ball under water;Roll-off module is located between pile foundation structure and pipe-line system;Set on roll-off module There are the several slip spacer pins moved along submarine pipeline expansion direction;Several spacer pins that slide are inserted into inserting for pile foundation structure In groove, so that fixed roll-off module, prevents roll-off module from sliding during manifold is transported and is lifted, after manifold is installed in place, number Individual spacer pin will be opened;Promising roll-off module is installed on roll-off module and pile foundation structure the several slide-and-guides being oriented to are provided Structure.
The pile foundation structure is rectangular configuration;Supporting construction is trapezium structure.
The top of the piling sleeve is bell shape.
The pipe-line system includes:A piece main pipeline and two branch pipes, the diameter of main pipeline are consistent with submarine pipeline;Supervisor Isolating valve is respectively arranged with road and branch pipe;It is coated with pipe-line system on pipe clamp, pipe clamp and deep floor is set;In pipe-line system It is separately installed with several pipeline supports, several antifatigue pipeline supports.
The head end of the main pipeline is provided with welding neck flange, and pipe-line system is connected by one end of welding neck flange and goose neck pipe Connect, the other end of goose neck pipe is connected with submarine pipeline again;Two branch pipes are distributed on main pipeline both sides, two branch pipes and set respectively There is SSIV.
The branch pipe afterbody is lifted up certain angle by elbow, and branch pipe afterbody is axially and vertical direction angle is 30 ° ~45 °, two branch pipes are connected by the branch pipe end flanges positioned at afterbody with underwater hose respectively.
The roll-off module is the single layer structure module that shaped steel is welded to form, and roll-off module passes through several gliding movement targeting structures Respectively together with pile foundation structure constraint;Two long sides of roll-off module are enclosed in several gliding movement targeting structures, are only allowed Sliding mould slides axially along main pipeline.
Several slip spacer pins are arranged on the outside on two long sides of roll-off module.
The gliding movement targeting structure is rectangle, deep floor is symmetrically arranged with the outside of gliding movement targeting structure, slip is led Certain interval is left between the inner side of structure and the shaped steel internally slided;And inner side is fixed with several backing plates, make sliding mould Block smoothly slides along gliding movement targeting structure.
Beneficial effects of the present invention:The present invention is due to using above-mentioned technical proposal, and simple in construction, easy to operate, it passes through Roll-off module absorbs the expansion of submarine pipeline, not only solve with submarine pipeline material cost it is higher the problem of, substantially reduce Cost of building projects, Attention problems difficulty and set-up time;Moreover, it can receive and send under water spherical pig, it is easy to Pigging operation and pipe detection operation during construction and operation, greatly save finishing operations and maintenance cost.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present invention.
Fig. 2 is that inventive pipeline arranges schematic diagram.
Fig. 3 is pile foundation structure schematic diagram of the present invention.
Fig. 4-1 is roll-off module guider dimensional structure diagram of the present invention.
Fig. 4-2 is roll-off module guider main structure diagram of the present invention.
Fig. 5-1 is that inventive pipeline supports dimensional structure diagram.
Fig. 5-2 is that inventive pipeline supports main structure diagram.
Major Symbol explanation in figure:
1- under water interim barrel of sending and receiving the ball, the SSIVs of 2- first, 3- first piling sleeve, the pipeline supports of 4- first, 5- First pipe end flanges, the antifatigue pipeline supports of 6- first, the support of 7- second pipes, the SSIVs of 8- second, 9- supervisor Road, the piling of 10- second sleeve, 11- supervisors end flange, the pipeline supports of 12- the 3rd, second pipe end flanges of 13-, 14- the Two antifatigue pipeline supports, the gliding movement targeting structures of 15- first, 16- roll-off modules, the piling of 17- the 3rd sleeve, 18- the 3rd are under water Isolating valve, 19- first slide spacer pin, 20- pile foundation structures, the gliding movement targeting structures of 21- second, 22- second slide spacer pin, The piling of 23- the 4th sleeve, 24- the 3rd slide spacer pin, the gliding movement targeting structures of 25- the 3rd, 26- the 4th and slide spacer pin, 27- the The supporting construction of the interim barrel of sending and receiving the ball of four gliding movement targeting structures, 28-, the backing plates of 29- first, the backing plates of 30- second, 31- the 3rd are padded Plate, the backing plates of 32- the 4th, half-watt, 36- pipes, 37- deep floors under half-watt, 34- floors, 35- pipe clamps on 33- pipe clamps.
Embodiment
As shown in Fig. 1-Fig. 5-2, the present invention includes:Interim barrel of sending and receiving the ball 1 provides support for manifold conduits and under water Pile foundation structure 20, the pipe-line system on pile foundation structure 20 and roll-off module 16, wherein, in pile foundation structure 20 Four angles on use welding manner be respectively arranged with it is several piling sleeves (the present embodiment be first piling sleeve 3, second drive piles Sleeve 10, the 3rd piling sleeve 17, the 4th piling sleeve 23) provide guiding for driven pile;
Above-mentioned pile foundation structure 20 is rectangular configuration, is made up of shaped steel welding, its tail end is provided with interim sending and receiving ball under water The supporting construction 28 of cylinder, for supporting interim barrel of sending and receiving the ball 1, supporting construction 28 is trapezium structure, and this structure type can strengthen Bearing capacity, it is to avoid main pipeline 9 produces excessive moment of flexure, so that the sealing of damage containment valve or influence flange face.
Above-mentioned first piling sleeve 3, the second piling sleeve 10, the 3rd piling sleeve 17, the top of the 4th piling sleeve 23 For bell shape, it is therefore an objective to which there is provided guiding during pitching pile.
Above-mentioned pipe-line system includes:A piece main pipeline 9 and two branch pipes, the diameter of main pipeline 9 are consistent with submarine pipeline, main Pipeline 9 and branch pipe are connected by threeway;Be respectively arranged with main pipeline 9 and branch pipe isolating valve (the present embodiment be first under water every From valve 2, the second SSIV 8, the 3rd SSIV 18), its pipe-line system is used as connection underwater hose and submerged pipeline Bridge, realize connecing, unloading operation for crude oil;First SSIV 2 is arranged on the tail end of pipe-line system, and it can connect water Interim barrel of sending and receiving the ball 1, is not only convenient for the pre- Task of Debugging in engineering construction stage down, meanwhile, it is easy to the pigging operation during operation With pipe detection operation, finishing operations maintenance cost is greatlyd save.
The head end of above-mentioned main pipeline 9 is provided with welding neck flange 11, and pipe-line system passes through welding neck flange 11 and the one of goose neck pipe End connection, the other end of goose neck pipe is connected with submarine pipeline again;Two branch pipes are distributed in the both sides of main pipeline 9, its size, shape With component all same, but two branch pipe arranged directions are opposite, it is therefore an objective to enable two underwater hoses being attached thereto formed " in State's lantern " configuration.Second SSIV 8 and the 3rd SSIV 18, its purpose are respectively arranged with two branch pipes It is when changing flexible pipe, valve to be closed, so as to prevent crude oil leakage.
Above-mentioned branch pipe afterbody is lifted up certain angle by elbow, and branch pipe afterbody is axially and vertical direction angle is 30 ° ~45 °, angle angle must is fulfilled for underwater hose configuration design requirement, simultaneously, it is ensured that will not be produced between flexible pipe and subsea manifold Raw interference, so different waters, different water depth, this angle angle may be variant.Two branch pipes pass through positioned at the first of afterbody Branch pipe end flanges 5, second pipe end flanges 13 are connected with underwater hose.
According to project demands, the isolating valve of pipe-line system is ball valve under water, and it can select top-loading ball valve or side-mounted Ball valve.
Above-mentioned roll-off module 16 is located between pile foundation structure 20 and pipe-line system, and roll-off module 16 is slided provided with several (the slip spacer pin of the present embodiment is the first slip spacer pin 19 to spacer pin, and second slides spacer pin 22, and the 3rd slides spacer pin 24, the 4th slides spacer pin 26), it can be moved along submarine pipeline expansion direction, on roll-off module 16 and pile foundation structure 20 Be provided with it is several be roll-off module 16 provide be oriented to gliding movement targeting structure (the present embodiment gliding movement targeting structure be first slide lead To structure 15, the second gliding movement targeting structure 21, the 3rd gliding movement targeting structure 25, the 4th gliding movement targeting structure 27), slide spacer pin Effect be manifold transport and lift during fix roll-off module 16.
Above-mentioned roll-off module 16 is the single layer structure module that shaped steel is welded to form, and it passes through several gliding movement targeting structures (this Several gliding movement targeting structures of embodiment are the first gliding movement targeting structure 15, the second gliding movement targeting structure 21, the 3rd slide-and-guide Structure 25, the 4th gliding movement targeting structure 27), together with it is constrained with pile foundation structure 20 respectively.Two of roll-off module 16 are long The shaped steel on side is enclosed in four the first gliding movement targeting structures 15, the second gliding movement targeting structure 21, the 3rd gliding movement targeting structure 25, In four gliding movement targeting structures 27, only roll-off module 16 is allowed to be slid axially along main pipeline 9.
Above-mentioned several slip spacer pins are arranged on the outside of the shaped steel on 16 two long sides of roll-off module, several slip spacer pins In the slot that can be inserted into pile foundation structure 20, so that fixed roll-off module 16, prevents from sliding mould during manifold is transported and is lifted Block 16 is slided, and after manifold is installed in place, several spacer pins will be opened.
Above-mentioned gliding movement targeting structure is rectangle, and deep floor 37 is symmetrically arranged with the outside of gliding movement targeting structure, is slided The inner side of guide frame and certain interval is left between the shaped steel of its internal slide, and inner side be fixed with it is several certain thickness The backing plates 29 of Te Folong (PTFE) first, the second backing plate 30, the 3rd backing plate 31, the 4th backing plate 32, it is therefore an objective to reduce coefficient of friction, Roll-off module 16 is set smoothly to be slid along gliding movement targeting structure.
Half-watt 33 on the pipe clamp that half-watt 35 is constituted under half-watt 33 and pipe clamp on pipe clamp, pipe clamp is coated with above-mentioned pipe-line system And be bolted under pipe clamp between half-watt 35, deep floor 34 is set on pipe clamp.Pipe clamp lower half watt is connected by pipe 36 35 and roll-off module 16, and pipe 36 is connected with half-watt under pipe clamp 35 and following structural steel shape using welding manner respectively.
Be connected by screw bolts in above-mentioned pipe-line system mode be separately installed with the first pipeline support 4, second pipe support 7, 3rd pipeline support 12, antifatigue pipeline support 6, antifatigue pipeline support 14, to be used as guide support.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, it is all It is any simple modification, equivalent variations and the modification made according to the technical spirit of the present invention to above example, still falls within In the range of technical solution of the present invention.

Claims (9)

1. a kind of slidingtype super large caliber subsea manifold, it is characterised in that:Including:For manifold conduits and under water interim sending and receiving ball Cylinder provides pile foundation structure, the pipe-line system on pile foundation structure and the roll-off module of support, wherein, in pile foundation It is respectively arranged with four angles of structure and provides the several piling sleeves being oriented to for driven pile, pile foundation structure tail end is provided with water The supporting construction of interim barrel of sending and receiving the ball down;Roll-off module is located between pile foundation structure and pipe-line system;Roll-off module is provided with The several slip spacer pins moved along submarine pipeline expansion direction;It is several to slide the slot that spacer pin is inserted into pile foundation structure It is interior, so that fixed roll-off module, prevents roll-off module from sliding during manifold is transported and is lifted, it is several after manifold is installed in place Spacer pin will be opened;Promising roll-off module is installed on roll-off module and pile foundation structure the several slide-and-guide knots being oriented to are provided Structure.
2. slidingtype super large caliber subsea manifold according to claim 1, it is characterised in that:The pile foundation structure is square Shape structure;Supporting construction is trapezium structure.
3. slidingtype super large caliber subsea manifold according to claim 1, it is characterised in that:The top of the piling sleeve For bell shape.
4. slidingtype super large caliber subsea manifold according to claim 1, it is characterised in that:The pipe-line system includes: A piece main pipeline and two branch pipes, the diameter of main pipeline are consistent with submarine pipeline;Isolation is respectively arranged with main pipeline and branch pipe Valve;It is coated with pipe-line system on pipe clamp, pipe clamp and deep floor is set;Be separately installed with pipe-line system several pipeline supports, Several antifatigue pipeline supports.
5. slidingtype super large caliber subsea manifold according to claim 4, it is characterised in that:The head end peace of the main pipeline Equipped with welding neck flange, pipe-line system is connected by welding neck flange with one end of goose neck pipe, the other end of goose neck pipe again with Submarine Pipeline Road is connected;Two branch pipes are distributed on main pipeline both sides, two branch pipes and are respectively arranged with SSIV.
6. the slidingtype super large caliber subsea manifold according to claim 4 or 5, it is characterised in that:The branch pipe afterbody leads to Cross elbow and be lifted up certain angle, branch pipe afterbody is axially and vertical direction angle is 30 °~45 °, and two branch pipes pass through respectively Branch pipe end flanges positioned at afterbody are connected with underwater hose.
7. slidingtype super large caliber subsea manifold according to claim 1, it is characterised in that:The roll-off module is shaped steel The single layer structure module being welded to form, roll-off module constrains in one with pile foundation structure respectively by several gliding movement targeting structures Rise;Two long sides of roll-off module are enclosed in several gliding movement targeting structures, only allow sliding mould to be slid axially along main pipeline.
8. slidingtype super large caliber subsea manifold according to claim 1, it is characterised in that:Several slip spacer pins It is arranged on the outside on two long sides of roll-off module.
9. slidingtype super large caliber subsea manifold according to claim 1, it is characterised in that:The gliding movement targeting structure is Rectangle, be symmetrically arranged with deep floor on the outside of gliding movement targeting structure, the inner side of gliding movement targeting structure and internally slides Certain interval is left between shaped steel;And inner side is fixed with several backing plates, roll-off module is set smoothly to be slid along gliding movement targeting structure.
CN201710598964.4A 2017-07-21 2017-07-21 Slidingtype super large caliber subsea manifold Pending CN107313723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710598964.4A CN107313723A (en) 2017-07-21 2017-07-21 Slidingtype super large caliber subsea manifold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710598964.4A CN107313723A (en) 2017-07-21 2017-07-21 Slidingtype super large caliber subsea manifold

Publications (1)

Publication Number Publication Date
CN107313723A true CN107313723A (en) 2017-11-03

Family

ID=60178130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710598964.4A Pending CN107313723A (en) 2017-07-21 2017-07-21 Slidingtype super large caliber subsea manifold

Country Status (1)

Country Link
CN (1) CN107313723A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723076A (en) * 2018-12-24 2019-05-07 大连理工大学 A kind of free style seabed mud mat shallow foundation
CN111649178A (en) * 2020-03-02 2020-09-11 海洋石油工程股份有限公司 Topside mounted subsea pipeline termination
CN111852400A (en) * 2020-06-10 2020-10-30 海洋石油工程股份有限公司 Combined PLET for connecting flexible vertical pipe
CN113202448A (en) * 2021-04-20 2021-08-03 天津大学 Two-way slidingtype of submarine manifold system prevents sinking board foundation structure
CN113970012A (en) * 2021-11-01 2022-01-25 中海石油(中国)有限公司 Fixing pin fixing method for underwater production manifold in steel cylinder under seabed mud surface

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202100243U (en) * 2011-05-17 2012-01-04 中国海洋石油总公司 Underwater manifold production pipeline
CN102704888A (en) * 2012-06-01 2012-10-03 中国海洋石油总公司 Novel underwater manifold sledge
US8387704B2 (en) * 2008-09-19 2013-03-05 Petroleo Brasileiro S.A.-Petrobras System and method for simultaneous sea drilling operations
CN103046906A (en) * 2011-10-11 2013-04-17 天津市海王星海上工程技术有限公司 Novel subsea manifold basic structure
CN203570282U (en) * 2013-07-26 2014-04-30 中海石油深海开发有限公司 Deepwater underwater on-line piping system
CN104060971A (en) * 2014-06-19 2014-09-24 中国海洋石油总公司 Assembly type underwater manifold structure
CN204213471U (en) * 2014-10-27 2015-03-18 中国海洋石油总公司 Embed the underwater facility structure of sliding type docking
CN106401539A (en) * 2016-10-24 2017-02-15 中海石油(中国)有限公司 Underwater manifold device with automatic pipe clearing ball launching function

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8387704B2 (en) * 2008-09-19 2013-03-05 Petroleo Brasileiro S.A.-Petrobras System and method for simultaneous sea drilling operations
CN202100243U (en) * 2011-05-17 2012-01-04 中国海洋石油总公司 Underwater manifold production pipeline
CN103046906A (en) * 2011-10-11 2013-04-17 天津市海王星海上工程技术有限公司 Novel subsea manifold basic structure
CN102704888A (en) * 2012-06-01 2012-10-03 中国海洋石油总公司 Novel underwater manifold sledge
CN203570282U (en) * 2013-07-26 2014-04-30 中海石油深海开发有限公司 Deepwater underwater on-line piping system
CN104060971A (en) * 2014-06-19 2014-09-24 中国海洋石油总公司 Assembly type underwater manifold structure
CN204213471U (en) * 2014-10-27 2015-03-18 中国海洋石油总公司 Embed the underwater facility structure of sliding type docking
CN106401539A (en) * 2016-10-24 2017-02-15 中海石油(中国)有限公司 Underwater manifold device with automatic pipe clearing ball launching function

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723076A (en) * 2018-12-24 2019-05-07 大连理工大学 A kind of free style seabed mud mat shallow foundation
CN109723076B (en) * 2018-12-24 2020-04-24 大连理工大学 Free type seabed anti-sinking plate shallow foundation
WO2020133666A1 (en) * 2018-12-24 2020-07-02 大连理工大学 Free-form seabed anti-sinking plate shallow foundation
AU2019417183B2 (en) * 2018-12-24 2022-01-20 Dalian University Of Technology Free-sliding seabed mudmat foundation
US11396732B2 (en) 2018-12-24 2022-07-26 Dalian University Of Technology Free-sliding seabed mudmat foundation
CN111649178A (en) * 2020-03-02 2020-09-11 海洋石油工程股份有限公司 Topside mounted subsea pipeline termination
CN111852400A (en) * 2020-06-10 2020-10-30 海洋石油工程股份有限公司 Combined PLET for connecting flexible vertical pipe
CN113202448A (en) * 2021-04-20 2021-08-03 天津大学 Two-way slidingtype of submarine manifold system prevents sinking board foundation structure
CN113970012A (en) * 2021-11-01 2022-01-25 中海石油(中国)有限公司 Fixing pin fixing method for underwater production manifold in steel cylinder under seabed mud surface

Similar Documents

Publication Publication Date Title
CN107313723A (en) Slidingtype super large caliber subsea manifold
CN104245550A (en) A system and method for fluids transfer between ship and shore
US20090264033A1 (en) Deep water hydrocarbon transfer system
US11448341B2 (en) Pipelaying
US5702205A (en) Steel catenary riser system for marine platform
CN105333226A (en) Laying device of deepwater J-shaped pipe laying ship
US10344893B2 (en) Joining device of a continuous conduit for changes in slope of seabeds, continuous conduit comprising a device and method for joining a continuous conduit
CN210770654U (en) Submarine pipeline with honeycomb hole structure
CN113531210B (en) Method for underwater immersed tube construction
CN101265995B (en) Underwater pump tube and its construction method and concrete conveying method
CN212745373U (en) Offshore oil conveying pipeline
CN202031490U (en) Spacer block device for deep sea tower type vertical pipe
Perinet et al. J-lay and steep S-lay: complementary tools for ultradeep water
CN207879272U (en) Hybrid pipeline system
CN204197237U (en) A kind of landing stage formula gas station trestle connecting device
CN216969927U (en) CO2 transport ship single-point mooring injection system
CN218492600U (en) Ultra-deep dredging immersed tube
Wilkins From S-lay to J-lay
KR20130068464A (en) Fixing apparatus of half-track pad moving submarine pipe line
Marshall et al. Mardi Gras transportation system overview
Ali Lightweight, Compact, Fast & Flexible Subsea Tie-Ins with HCCS-L
Damsleth et al. Large Diameter, Deep Water PLEM Concepts
KR20070105295A (en) Method for laying pipe line on bottom of the sea
CN113063034A (en) Method for balancing bladder in PE/PP pipe section and laying in water
CN116951179A (en) Underwater continuous laying method for pipelines with and without counterweight

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: Offshore Oil Engineering Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: Offshore Oil Engineering Co., Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171103