CN107313529A - A kind of assembled architecture wall - Google Patents
A kind of assembled architecture wall Download PDFInfo
- Publication number
- CN107313529A CN107313529A CN201710719795.5A CN201710719795A CN107313529A CN 107313529 A CN107313529 A CN 107313529A CN 201710719795 A CN201710719795 A CN 201710719795A CN 107313529 A CN107313529 A CN 107313529A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- wall body
- wall
- longitudinal bracing
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/562—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/293—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Building Environments (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a kind of assembled architecture wall, including main wall body, crossbeam, foundation and shear wall, crossbeam is installed on the top of main wall body, and shear wall is installed on the bottom of main wall body;Concrete layer is filled with shear wall and the foundation is formed;The lateral surface of the main wall body is provided with bamboo-carbon layer;The shear wall includes multiple cross-brace pipes, multiple longitudinal bracing pipes and connection component, and multiple cross-brace pipes are intervally arranged along the short transverse of shear wall;Multiple longitudinal bracing pipes are intervally arranged along the width of shear wall;Multiple longitudinal bracing pipes are connected between two adjacent cross-brace pipes;Each longitudinal bracing pipe is affixed by the connection component with cross-brace pipe.Flue dust inside the assembled architecture wall of the present invention, its energy adsorption space, while having stable shear wall structure.
Description
Technical field
The present invention relates to building trade technical field, more particularly to a kind of assembled architecture wall.
Background technology
At present, the existing wall of China in use exist some defects, for example, present wall use when
The function of lacking certain absorption flue dust is waited, and the wall having also is not very fire resisting, so when occurring fire, is held very much
Easily there is Hong the phenomenon collapsed, while the Steel bar rack knot in traditional shear wall existing defects in use, its shear wall
Structure is not enough consolidated, the danger that there is deformation in use.
The content of the invention
In order to overcome the deficiencies in the prior art, it is an object of the invention to provide a kind of assembled architecture wall, it can inhale
The flue dust of attached interior volume, while having stable shear wall structure.
The purpose of the present invention is realized using following technical scheme:
A kind of assembled architecture wall, including main wall body, crossbeam, foundation and shear wall, crossbeam are installed on the top of main wall body,
Shear wall is installed on the bottom of main wall body;Concrete layer is filled with shear wall and the foundation is formed;Outside the main wall body
Side is provided with bamboo-carbon layer;The shear wall includes multiple cross-brace pipes, multiple longitudinal bracing pipes and connection component, multiple horizontal strokes
It is intervally arranged to support tube along the short transverse of shear wall;Multiple longitudinal bracing pipes are intervally arranged along the width of shear wall;
Multiple longitudinal bracing pipes are connected between two adjacent cross-brace pipes;Each longitudinal bracing pipe leads to cross-brace pipe
Cross the connection component affixed.
It is preferred that, the connection component includes fixed cover, connecting rod, top fixed plate and side fixed plate, the fixed cover
It is set on cross-brace pipe, one end of connecting rod is fixed on cross-brace pipe, the other end of connecting rod is fixed in longitudinal branch
On stay tube;Top fixed plate is fixed in the top of fixed cover and fixed with the end of longitudinal bracing pipe;Side fixed plate is fixed in fixation
The sidepiece of set is simultaneously affixed with cross-brace pipe.
It is preferred that, the outer surface of longitudinal bracing pipe is provided with Zinc material layer.
It is preferred that, it is convexly equipped with spelter outside the longitudinal bracing pipe.
It is preferred that, longitudinal bracing pipe is internally formed hollow bulb;Longitudinal bracing pipe is provided with upper osculum and lower osculum, institute
State osculum and lower osculum is connected with the hollow bulb.
It is preferred that, main wall body includes main wall body steel bar framework and main wall body concrete layer, the layer filling of main wall body concrete
In in main wall body steel bar framework.
It is preferred that, crossbeam includes crossbeam steel bar framework and crossbeam concrete layer, and crossbeam concrete layer is filled in beam steel
In muscle framework;Crossbeam steel bar framework includes multiple crossbeams and erects reinforcing bar and multiple crossbeam cross reinforcements;Multiple crossbeams erect reinforcing bar and multiple
Crossbeam cross reinforcement is intersecting and affixed.
It is preferred that, foundation steel bar framework is installed with the shear wall;The foundation is filled in foundation steel bar framework.
It is preferred that, the outer surface of the main wall body is provided with dirt bed, and the bamboo-carbon layer is located at the outside of dirt bed;Dirt bed
Internal decking sheet is provided between bamboo-carbon layer.
It is preferred that, side of the main wall body away from bamboo-carbon layer is formed as decorative cover, and the decorative cover is provided with outer decorative layer.
Compared with prior art, the beneficial effects of the present invention are:1st, it is provided with bamboo-carbon layer, bamboo charcoal in the outer surface of main wall body
Layer can be at any time adsorption space inside flue dust, certain catharsis can be thus played to interior volume, is improved
Interior volume environmental amenity degree.
2nd, shear wall is formed by multiple longitudinal bracing pipes and multiple cross-brace pipes by the way that connection component is affixed, and shear wall
Interior fill concrete layer forms foundation, can greatly promote the stability of shear wall and foundation, prevent shape during use
Become.The refractoriness of wall can be also lifted simultaneously, the performance of main wall body is improved.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is sectional view of the invention;
Fig. 3 is the partial structural diagram of the shear wall of the present invention;
Fig. 4 is the structural representation of the longitudinal bracing pipe of the present invention.
In figure:10th, crossbeam;11st, crossbeam erects reinforcing bar;12nd, crossbeam cross reinforcement;13rd, crossbeam concrete layer;20th, main wall body;
21st, bamboo-carbon layer;22nd, main wall body steel bar framework;23rd, dirt bed;24th, internal decking sheet;25th, outer decorative layer;30th, shear wall;31st, mix
Solidifying soil layer;32nd, foundation steel bar framework cross reinforcement;33rd, foundation steel bar framework erects reinforcing bar;301st, cross-brace pipe;302nd, longitudinal direction branch
Stay tube;3021st, hollow bulb;3022nd, upper osculum;3023rd, lower osculum;3024th, spelter;303rd, connecting rod;304th, top is fixed
Plate;305th, side fixed plate;306th, fixed cover;40th, right column;50th, left column.
Embodiment
Below, with reference to accompanying drawing and embodiment, the present invention is described further:
A kind of assembled architecture wall as Figure 1-4, including main wall body 20, crossbeam 10, foundation and shear wall 30, specifically
Crossbeam 10 is arranged on the top of main wall body 20, and shear wall 30 is arranged on the bottom of main wall body 20.It is filled with simultaneously in shear wall 30
Concrete layer 31, the concrete layer 31 can form the foundation of above-mentioned main wall body 20.Bamboo-carbon layer is provided with the lateral surface of main wall body 20
21, the flue dust inside adsorption space that the bamboo-carbon layer 21 can be at any time can thus play certain purification to interior volume
Effect, improves interior volume environmental amenity degree.
In addition, shear wall 30 includes multiple cross-brace pipes 301, multiple longitudinal bracing pipes 302 and connection component, make many
Short transverse of the individual cross-brace pipe 301 along shear wall 30 is intervally arranged, width of multiple longitudinal bracing pipes 302 along shear wall 30
Direction is intervally arranged.Multiple longitudinal bracing pipes 302 are connected between two adjacent cross-brace pipes 301;Each longitudinal bracing
Pipe 302 is affixed by connection component with cross-brace pipe 301.I other words, the shear wall 30 of the assembled wall is by multiple longitudinal directions
Support tube 302 and multiple cross-brace pipes 301 are formed by the way that connection component is affixed, and 31 shape of fill concrete layer in shear wall 30
Into foundation, the stability of shear wall 30 and foundation can be greatly promoted, prevents from deforming upon during use.It can also be lifted simultaneously
The refractoriness of wall, improves the performance of main wall body 20.
It is preferred that, in the present embodiment, connection component includes fixed cover 306, connecting rod 303, top fixed plate 304 and side
Fixed cover 306, in the assembling of shear wall 30, can be set on cross-brace pipe 301, while connecting rod 303 by fixed plate 305
One end be fixed on cross-brace pipe 301, the other end of connecting rod 303 is fixed on longitudinal bracing pipe 302.In addition, above-mentioned
Top fixed plate 304 is fixed in the top of fixed cover 306 and fixed with the end of longitudinal bracing pipe 302, and side fixed plate 305 is fixed in
The sidepiece of fixed cover 306 is simultaneously affixed with cross-brace pipe 301.In this way, cross-brace pipe 301 and longitudinal bracing pipe 302 are in linking
Place and the formation triangular support configurations of connecting rod 303, because triangle has stability, can cause shear wall using three-legged structure
30 more consolidate in use.In addition, being fixed by top fixing plate, fixed cover 306 and sidepiece fixed plate, make
It supports stress point to increase, and is unlikely to deform.Certainly, above-mentioned connecting rod 303, top fixed plate 304 and side fixed plate 305 and transverse direction
Support tube 301 and longitudinal bracing pipe 302 can be fixedly connected using bolt, be easy to assembling.
It is preferred that, the outer surface of longitudinal bracing pipe 302 is provided with Zinc material layer, above-mentioned longitudinal bracing pipe 302 and cross-brace
Pipe 301 selects steel pipe, and one layer of Zinc material layer has been plated on the surface of longitudinal bracing pipe 302, because the chemical property of zinc is more active than iron,
Even if Zinc material layer is damaged, galvanic cell can be also formed in breakage, occurs galvanic cell chemical reaction, protects iron not to be corroded, make
The service life of longitudinal bracing pipe 302 is longer.
Moreover, spelter 3024 is convexly equipped with outside longitudinal bracing pipe 302, in moist dark environment, spelter
3024 form galvanic cell with iron, protect iron not to be corroded, and equally can also reduce the corrosion of longitudinal bracing pipe 302, and raising uses the longevity
Life.
It is preferred that, hollow bulb 3021 is internally formed in longitudinal bracing pipe 302, while provided with upper on longitudinal bracing pipe 302
Osculum 3022 and lower osculum 3023, make osculum 3022 and lower osculum 3023 be connected with hollow bulb 3021.In this way,
Wall assembling finish after, have water by longitudinal bracing pipe 302 and cross-brace pipe 301 interface penetrate into when, hollow bulb 3021
Water water can be discharged by upper osculum 3022 or lower osculum 3023, reduce longitudinal bracing pipe 302 and cross-brace
The corrosion of pipe 301.
It is preferred that, above-mentioned main wall body 20 includes main wall body steel bar framework 22 and main wall body concrete layer, the main wall body
Concrete layer is filled in main wall body steel bar framework 22, in addition, steel bar welding can be internally provided with main wall body steel bar framework 22
Joint, can so reinforce the structure and its fire resistance of main wall body 20.
Likewise, crossbeam 10 may include crossbeam steel bar framework and crossbeam concrete layer 13, the crossbeam concrete layer 13 is filled out
Fill in the steel bar framework of crossbeam 10.And crossbeam steel bar framework includes multiple crossbeams and erects reinforcing bar 11 and multiple crossbeam cross reinforcements 12, makes
Multiple crossbeams erect reinforcing bar 11 and multiple crossbeam cross reinforcements 12 are intersecting and affixed, equally also can the structure of reinforcing crossmember 10 and its fire resisting
Performance.
It is preferred that, foundation steel bar framework is fixedly provided with shear wall 30, above-mentioned foundation is filled in foundation steel bar framework, together
Sample can also strengthen the supporting construction and fire resistance of the wall.
It is preferred that, the outer surface of main wall body 20 is provided with dirt bed 23, and bamboo-carbon layer 21 is located at the outside of dirt bed 23;Dirt bed
Internal decking sheet 24 is provided between 23 and bamboo-carbon layer 21, the intensity of wall can be strengthened.
It is preferred that, be formed as decorative cover in side of the main wall body 20 away from bamboo-carbon layer 21, the decorative cover is provided with external decoration
Layer 25, makes metope attractive in appearance.
Certainly, in order to further strengthen the structure of wall, also left column 50 and the right side can be provided with the both sides of main wall body 20
Column 40, left column 50 and right column 40 are all connected between crossbeam 10 and foundation, the structure of main wall body 20 is more stablized, no
Easily cave in.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various
It is corresponding to change and deformation, and all these change and deformation should all belong to the protection domain of the claims in the present invention
Within.
Claims (10)
1. a kind of assembled architecture wall, it is characterised in that including main wall body, crossbeam, foundation and shear wall, crossbeam is installed on
The top of main wall body, shear wall is installed on the bottom of main wall body;Concrete layer is filled with shear wall and the foundation is formed;Institute
The lateral surface for stating main wall body is provided with bamboo-carbon layer;The shear wall includes multiple cross-brace pipes, multiple longitudinal bracing pipes and company
Connected components, multiple cross-brace pipes are intervally arranged along the short transverse of shear wall;Width of multiple longitudinal bracing pipes along shear wall
Direction is intervally arranged;Multiple longitudinal bracing pipes are connected between two adjacent cross-brace pipes;Each longitudinal bracing pipe
It is affixed by the connection component with cross-brace pipe.
2. assembled architecture wall as claimed in claim 1, it is characterised in that the connection component includes fixed cover, connection
Bar, top fixed plate and side fixed plate, the fixed cover are set on cross-brace pipe, and one end of connecting rod is fixed in horizontal branch
On stay tube, the other end of connecting rod is fixed on longitudinal bracing pipe;Top fixed plate be fixed in fixed cover top and with longitudinal branch
The end of stay tube is fixed;Side fixed plate is fixed in the sidepiece of fixed cover and affixed with cross-brace pipe.
3. assembled architecture wall as claimed in claim 1, it is characterised in that the outer surface of longitudinal bracing pipe is provided with Zinc material
Layer.
4. the assembled architecture wall as described in claim 1 or 3, it is characterised in that be convexly equipped with outside the longitudinal bracing pipe
Spelter.
5. assembled architecture wall as claimed in claim 4, it is characterised in that longitudinal bracing pipe is internally formed hollow bulb;It is vertical
Upper osculum and lower osculum are provided with to support tube, the upper osculum and lower osculum are connected with the hollow bulb.
6. assembled architecture wall as claimed in claim 1, it is characterised in that main wall body include main wall body steel bar framework and
Main wall body concrete layer, main wall body concrete layer is filled in main wall body steel bar framework.
7. assembled architecture wall as claimed in claim 1, it is characterised in that crossbeam includes crossbeam steel bar framework and crossbeam
Concrete layer, crossbeam concrete layer is filled in crossbeam steel bar framework;Crossbeam steel bar framework includes multiple crossbeams and erects reinforcing bar and many
Individual crossbeam cross reinforcement;Multiple crossbeams erect reinforcing bar and multiple crossbeam cross reinforcements are intersecting and affixed.
8. assembled architecture wall as claimed in claim 1, it is characterised in that foundation reinforcing steel bar frame is installed with the shear wall
Frame;The foundation is filled in foundation steel bar framework.
9. assembled architecture wall as claimed in claim 1, it is characterised in that the outer surface of the main wall body is provided with soil
Layer, the bamboo-carbon layer is located at the outside of dirt bed;Internal decking sheet is provided between dirt bed and bamboo-carbon layer.
10. assembled architecture wall as claimed in claim 9, it is characterised in that side of the main wall body away from bamboo-carbon layer is formed
For decorative cover, the decorative cover is provided with outer decorative layer.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710719795.5A CN107313529B (en) | 2017-08-21 | 2017-08-21 | Assembled building wall |
PCT/CN2018/086232 WO2019037472A1 (en) | 2017-08-21 | 2018-05-10 | Prefabricated building wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710719795.5A CN107313529B (en) | 2017-08-21 | 2017-08-21 | Assembled building wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107313529A true CN107313529A (en) | 2017-11-03 |
CN107313529B CN107313529B (en) | 2023-09-26 |
Family
ID=60177128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710719795.5A Active CN107313529B (en) | 2017-08-21 | 2017-08-21 | Assembled building wall |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107313529B (en) |
WO (1) | WO2019037472A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019037472A1 (en) * | 2017-08-21 | 2019-02-28 | 深圳市亚泰国际建设股份有限公司 | Prefabricated building wall |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112942631B (en) * | 2021-02-04 | 2022-11-18 | 中建七局第一建筑有限公司 | Steel tube bundle combined shear wall |
CN114892842B (en) * | 2022-05-27 | 2024-09-27 | 江门奥斯钢结构工程有限公司 | High-strength assembled steel structure building wall |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101570109A (en) * | 2009-04-07 | 2009-11-04 | 沈福昌 | Environment-friendly decorative board |
CN202273374U (en) * | 2011-10-11 | 2012-06-13 | 应孝华 | Parapet wall |
KR20130139627A (en) * | 2012-06-13 | 2013-12-23 | 주식회사 포스코 | Steel plate shear wall structure using block assembly |
CN103485441A (en) * | 2013-09-10 | 2014-01-01 | 华南理工大学 | Combined shearing wall |
CN205840052U (en) * | 2016-06-14 | 2016-12-28 | 中国建筑标准设计研究院有限公司 | Reinforced concrete wall and attachment structure thereof is filled out in a kind of assembled steel framework |
CN205976086U (en) * | 2016-08-11 | 2017-02-22 | 云南建工钢结构股份有限公司 | Compound slat wall body of assembled |
CN207194217U (en) * | 2017-08-21 | 2018-04-06 | 深圳市亚泰国际建设股份有限公司 | A kind of assembled architecture wall |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07247610A (en) * | 1994-03-14 | 1995-09-26 | Ohbayashi Corp | Beam for building using pc wall |
CN202627375U (en) * | 2012-05-23 | 2012-12-26 | 马高 | Novel plate |
CN202925716U (en) * | 2012-12-06 | 2013-05-08 | 河北联合大学 | Integrally assembled type concrete filled steel tube frame shear wall |
CN203307959U (en) * | 2013-05-10 | 2013-11-27 | 上海欧雅装饰材料有限公司 | Low-noise base film wall |
CN204960138U (en) * | 2015-06-09 | 2016-01-13 | 南京长江都市建筑设计股份有限公司 | Inside thin steel skeleton texture of concrete shear force wall |
CN105201103B (en) * | 2015-10-09 | 2018-07-31 | 北京工业大学 | A kind of assembled band frame ribbing steel plate shear force wall |
CN205669282U (en) * | 2016-06-06 | 2016-11-02 | 河北建筑工程学院 | A kind of assembly concrete frame wall filled with masonry system |
CN206337722U (en) * | 2016-12-29 | 2017-07-18 | 山西中技金谷新型建材有限公司 | A kind of prefabricated assembled light steel concrete wallboard |
CN106836492A (en) * | 2017-03-31 | 2017-06-13 | 重庆大学 | A kind of group frame-embedded faced wall Lateral Resistant System |
CN206815597U (en) * | 2017-06-14 | 2017-12-29 | 五经科技有限公司 | It is a kind of can absorbing smoke dust fire resisting steel bar wall |
CN207003718U (en) * | 2017-06-14 | 2018-02-13 | 五经科技有限公司 | A kind of shear wall structure |
CN107313529B (en) * | 2017-08-21 | 2023-09-26 | 深圳市郑中设计股份有限公司 | Assembled building wall |
-
2017
- 2017-08-21 CN CN201710719795.5A patent/CN107313529B/en active Active
-
2018
- 2018-05-10 WO PCT/CN2018/086232 patent/WO2019037472A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101570109A (en) * | 2009-04-07 | 2009-11-04 | 沈福昌 | Environment-friendly decorative board |
CN202273374U (en) * | 2011-10-11 | 2012-06-13 | 应孝华 | Parapet wall |
KR20130139627A (en) * | 2012-06-13 | 2013-12-23 | 주식회사 포스코 | Steel plate shear wall structure using block assembly |
CN103485441A (en) * | 2013-09-10 | 2014-01-01 | 华南理工大学 | Combined shearing wall |
CN205840052U (en) * | 2016-06-14 | 2016-12-28 | 中国建筑标准设计研究院有限公司 | Reinforced concrete wall and attachment structure thereof is filled out in a kind of assembled steel framework |
CN205976086U (en) * | 2016-08-11 | 2017-02-22 | 云南建工钢结构股份有限公司 | Compound slat wall body of assembled |
CN207194217U (en) * | 2017-08-21 | 2018-04-06 | 深圳市亚泰国际建设股份有限公司 | A kind of assembled architecture wall |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019037472A1 (en) * | 2017-08-21 | 2019-02-28 | 深圳市亚泰国际建设股份有限公司 | Prefabricated building wall |
Also Published As
Publication number | Publication date |
---|---|
WO2019037472A1 (en) | 2019-02-28 |
CN107313529B (en) | 2023-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662736U (en) | Gas concrete out-hung panel slippage node | |
CN202248390U (en) | Enclosed end column embedded steel plate concrete composite shear wall | |
CN107313529A (en) | A kind of assembled architecture wall | |
CN101701485A (en) | Hollow steel pipe-reinforced concrete superimposed member | |
CN204199537U (en) | A kind of assembled steel and concrete combination beam | |
CN102409808A (en) | Steel tube concrete superposed column with mild steel casing outer packed concrete at bottom and preparation method thereof | |
CN206680888U (en) | A kind of ruggedized construction of arch bridge spandrel arch circle | |
CN202731104U (en) | Novel reinforcing mesh sheet support structure | |
CN107034793A (en) | A kind of ruggedized construction of arch bridge spandrel arch circle | |
CN207194217U (en) | A kind of assembled architecture wall | |
CN201169907Y (en) | Inclined strut type suspension supporting rack | |
CN204418422U (en) | A kind of combined concrete shear wall | |
CN101974958A (en) | Steel pipe concrete column of I-shaped FRP section | |
CN101705728B (en) | Wavelike steel webplate shear wall structure | |
CN208310001U (en) | A kind of built-in lattice stem concrete-filled steel square tubular column | |
CN203924362U (en) | External strengthening ring type steel beam column node structure | |
CN101525918A (en) | Method for making winged steel tube-concrete composite beam | |
CN102535748A (en) | Rectangular concrete-filled steel tube column added with I-shaped rib plate and preparing method of rectangular concrete-filled steel tube column | |
CN201901981U (en) | Separated type L-shaped steel pipe concrete core column | |
CN205399463U (en) | Reinforcement type foundation ring basis | |
CN202000686U (en) | Composite steel structure for concrete reinforcement | |
CN201835439U (en) | Concrete column with steel pipe | |
CN203514902U (en) | Cylindrical water tank structure | |
CN206815597U (en) | It is a kind of can absorbing smoke dust fire resisting steel bar wall | |
CN201649602U (en) | Overhanging type scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 4b01, 4b02, excellence Times Square, intersection of Yitian road and Fuhua Road, Central District, Futian District, Shenzhen City, Guangdong Province Applicant after: Shenzhen Zhengzhong Design Co.,Ltd. Address before: 518000 4b01, 4b02, excellence Times Square, intersection of Yitian road and Fuhua Road, Central District, Futian District, Shenzhen City, Guangdong Province Applicant before: SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |