CN107297600B - The production method of high-strength bolt hole group's truss - Google Patents

The production method of high-strength bolt hole group's truss Download PDF

Info

Publication number
CN107297600B
CN107297600B CN201710525453.XA CN201710525453A CN107297600B CN 107297600 B CN107297600 B CN 107297600B CN 201710525453 A CN201710525453 A CN 201710525453A CN 107297600 B CN107297600 B CN 107297600B
Authority
CN
China
Prior art keywords
connecting plate
strings
sole
bar
fine silk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710525453.XA
Other languages
Chinese (zh)
Other versions
CN107297600A (en
Inventor
陈苍
黄河浪
杨高阳
姚焕成
张明
李建宏
朱强
陈晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201710525453.XA priority Critical patent/CN107297600B/en
Publication of CN107297600A publication Critical patent/CN107297600A/en
Application granted granted Critical
Publication of CN107297600B publication Critical patent/CN107297600B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Farming Of Fish And Shellfish (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of the step of production method of high-strength bolt hole group's truss includes providing top boom and lower boom, top boom and lower boom are located on platform for lining with being oppositely arranged, top boom and lower boom include multiple fine silk strings used for the outer strings bars, and cutting gap will be reserved between the connector of adjacent two fine silk strings used for the outer strings bar;Tooling connecting plate is provided, tooling connecting plate is located on the connector of adjacent two fine silk strings used for the outer strings bar, and tooling connecting plate is fixed on the connector of adjacent two fine silk strings used for the outer strings bar by spot welding;Top boom and lower boom are disassembled from platform for lining, and cut off tooling connecting plate along cutting gap using cutter device;Screwhole position on corresponding tooling connecting plate makes screw hole on fine silk strings used for the outer strings bar;The tooling connecting plate on fine silk strings used for the outer strings bar is removed after the completion of drilling.The screw hole precision of fine silk strings used for the outer strings bar can be effectively ensured in the production method of high-strength bolt hole group's truss of the invention, keep fine silk strings used for the outer strings bar consistent with the screw hole of product connecting plate, improve the punching rate of high-strength bolt.The invention further relates to a kind of high-strength bolt hole group truss.

Description

The production method of high-strength bolt hole group's truss
Technical field
The present invention relates to steelframe structure technical field, in particular to a kind of production method of high-strength bolt hole group truss.
Background technique
Increasingly developed with steel construction, high-strength bolt is convenient and efficient with its, anti-seismic performance is good, installation is fast, short time limit Advantage makes it using more and more common.The use of high-strength bolt reduces welding workload, and it is brittle weak to overcome welding point Point, is effectively guaranteed project progress and quality.But the control of the High-strength bolt hole machining accuracy of enormous amount is always steel knot One problem of structure construction industry.In previous construction, reaming can only be used by encountering when bolt hole group is misfitted between product connecting plate Device carries out reaming, both influences construction speed, such as excessive reaming amount, also easily becomes potential hidden danger of quality.
At present the production method of High-strength bolt hole group steel member be first make single component, using artificial crossed method into Hole group's processing on the single component of row, single component are welded after making, and finally carry out the preassembling of all components, this side Method high-strength bolt hole precision is difficult to ensure that all the preassembling stage is arrived in accumulation to hole group's fabrication error, encounters between product connecting plate Bolt hole can only carry out reaming when misfitting using reamer, and preassembling rework rate is high, and production efficiency is low.
Summary of the invention
The object of the present invention is to provide a kind of production methods of high-strength bolt hole group truss, and son can be effectively ensured The screw hole precision of chord member keeps the screw hole of fine silk strings used for the outer strings bar consistent with the screw hole of product connecting plate, and then improves the punching rate of high-strength bolt, Reduction is done over again.
It is that it is realized by adopting the following technical scheme that the present invention, which solves its technical problem,.
A kind of the step of production method of high-strength bolt hole group's truss, the production method includes:
Top boom and lower boom are provided, top boom and lower boom are located on platform for lining with being oppositely arranged, top boom Include multiple fine silk strings used for the outer strings bars with lower boom, cutting gap will be reserved between the connector of adjacent two fine silk strings used for the outer strings bar;
Tooling connecting plate is provided, tooling connecting plate is located on the connector of adjacent two fine silk strings used for the outer strings bar, and passes through spot welding for work Load fishplate bar is fixed on the connector of adjacent two fine silk strings used for the outer strings bar;
Top boom and lower boom are disassembled from platform for lining, and cut off work along cutting gap using cutter device Load fishplate bar;
Screwhole position on corresponding tooling connecting plate makes screw hole on fine silk strings used for the outer strings bar;And
The tooling connecting plate on fine silk strings used for the outer strings bar is removed after the completion of drilling.
In the preferred embodiment, the step of positioning tool connecting plate includes:
Multiple rows of sample dotting punch is made in the joint surface of adjacent two fine silk strings used for the outer strings bar, every row makes multiple sample dotting punches;
It is a plurality of to zygonema in the joint surface picture of each fine silk strings used for the outer strings bar, rush every various kinds being correspondingly connected in every row to zygonema Eye, and it is overlapped the extended line to zygonema on adjacent two fine silk strings used for the outer strings bar;
Tooling connecting plate is located on the connector of adjacent two fine silk strings used for the outer strings bar according to sample dotting punch and to the position of zygonema.
In the preferred embodiment, above-mentioned fine silk strings used for the outer strings bar includes the first side plate, the second side plate and fixed plate, by first Side plate is oppositely arranged with the second side plate, and fixed plate is set between the first side plate and the second side plate, and by the two sides of fixed plate It is connected to the first side plate and the second side plate, makes sample dotting punch respectively in the first side plate, the second side plate and fixed plate and to zygonema, Three pieces of tooling connecting plates are connected on the first side plate, the second side plate and fixed plate of adjacent two fine silk strings used for the outer strings bar.
In the preferred embodiment, include: in the step of assembled high-strength bolt hole group's truss on platform for lining
More beam columns are provided, each beam column is located on platform for lining spaced reciprocally, and are set between adjacent two beam column Set the top boom and the lower boom;
More web members are provided, two web members are set between adjacent two beam column, and two web members are positioned arranged in a crossed mannerly On platform for lining;
Multiple ox soles are provided, one ox sole is set in the intersection of beam column and top boom and beam column and lower boom, And ox sole is located on platform for lining.
In the preferred embodiment, include: the step of making screw hole on ox sole and web member
Cutting gap will be reserved between ox sole and the connector of web member;
Tooling connecting plate is located on the connector of ox sole and web member, and tooling connecting plate is fixed on by ox by spot welding On the connector of sole and web member;
Ox sole and web member are disassembled from platform for lining, and cut off tooling along cutting gap using cutter device Connecting plate;
Screwhole position on corresponding tooling connecting plate makes screw hole on ox sole and web member;And
The tooling connecting plate on ox sole and web member is removed after the completion of drilling.
In the preferred embodiment, the step of positioning tool connecting plate includes:
Multiple rows of sample dotting punch is made in the joint surface of ox sole and web member, every row makes multiple sample dotting punches;
It is a plurality of to zygonema in the joint surface of ox sole and web member picture, make every various kinds being correspondingly connected in every row to zygonema Dotting punch, and it is overlapped the extended line to zygonema on ox sole and web member;
Tooling connecting plate is located on the connector of ox sole and web member according to sample dotting punch and to the position of zygonema.
In the preferred embodiment, the step of welded high-strength bolt hole group truss includes:
Each beam column is located on platform for lining spaced reciprocally, a top boom and one is set between adjacent two beam column The both ends of top boom are connected on two beam columns by root lower boom, and the both ends of lower boom are connected on two beam columns;
Product connecting plate is provided, product connecting plate is arranged on two adjacent fine silk strings used for the outer strings bars, and is connected by bolt and product Each fine silk strings used for the outer strings bar of fishplate bar and manufactured screw hole mating connection top boom and lower boom;
One ox sole is set in the intersection of beam column and top boom and beam column and lower boom, ox sole is located in spelling On assembling platform, and connect ox sole and beam column;
Two web members are set between adjacent two beam column, and two web members are located on platform for lining across;
Product connecting plate is arranged on ox sole and web member, and passes through bolt and product connecting plate and manufactured screw hole Mating connection ox sole and web member.
The step of production method of high-strength bolt hole group's truss of the invention includes providing top boom and lower boom, will be upper Chord member and lower boom are located on platform for lining with being oppositely arranged, and top boom and lower boom include multiple fine silk strings used for the outer strings bars, by adjacent two Cutting gap is reserved between the connector of fine silk strings used for the outer strings bar;Tooling connecting plate is provided, tooling connecting plate is located in adjacent two fine silk strings used for the outer strings bar On connector, and tooling connecting plate is fixed on the connector of adjacent two fine silk strings used for the outer strings bar by spot welding;By top boom and lower boom from spelling It is disassembled on assembling platform, and cuts off tooling connecting plate along cutting gap using cutter device;On corresponding tooling connecting plate Screwhole position makes screw hole on fine silk strings used for the outer strings bar;The tooling connecting plate on fine silk strings used for the outer strings bar is removed after the completion of drilling.Of the invention is high-strength After the production method of degree bolt hole group truss is fixed on platform for lining with fine silk strings used for the outer strings bar spot welding using tooling connecting plate, then carry out Cutting, fine silk strings used for the outer strings bar return to workshop using radial drill with screw hole is drilled, finally remove tooling connecting plate, fine silk strings used for the outer strings bar can be effectively ensured Screw hole precision keeps the screw hole of fine silk strings used for the outer strings bar consistent with the screw hole of product connecting plate, and then improves the punching rate of high-strength bolt, and reduction is returned Work.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention, And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects, features and advantages of the invention can It is clearer and more comprehensible, it is special below to lift preferred embodiment, and cooperate attached drawing, it is described in detail.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of high-strength bolt hole truss of the invention.
Fig. 2 is that sample dotting punch and the schematic diagram to zygonema are made on fine silk strings used for the outer strings bar.
Fig. 3 is the schematic diagram being located in tooling connecting plate on fine silk strings used for the outer strings bar.
Specific embodiment
It is of the invention to reach the technical means and efficacy that predetermined goal of the invention is taken further to illustrate, below in conjunction with Attached drawing and preferred embodiment, to the specific embodiment party of the production method of high-strength bolt hole group truss proposed according to the present invention Formula, structure, feature and its effect, detailed description are as follows:
For the present invention aforementioned and other technology contents, feature and effect refer to the preferable reality of schema in following cooperation Applying in the detailed description of example can clearly appear from.By the explanation of specific embodiment, when predetermined mesh can be reached to the present invention The technical means and efficacy taken be able to more deeply and it is specific understand, however institute's accompanying drawings are only to provide with reference to and say It is bright to be used, it is not intended to limit the present invention.
Fig. 1 is the structural schematic diagram of high-strength bolt hole group's truss of the invention.As shown in Figure 1, in the present embodiment, it is high Strength bolts hole group's truss 10 includes more beam columns 12, more top booms 13, more lower booms 14, multiple ox soles 15, more Web member 16 and multiple product connecting plates 17.
Each beam column 12 is spaced apart from each other setting, and each beam column 12 is parallel to each other.In the present embodiment, high-strength bolt hole group purlin Frame 10 is not limited thereto for example including three beam columns 12.
Top boom 13 is set between adjacent two beam column 12, and a top boom 13 is arranged between adjacent two beam column 12.On Perpendicular to the length direction of beam column 12, the both ends of top boom 13 are connected on two beam columns 12 length direction of chord member 13;Top boom 13 are realized and are connect by the way of welding with beam column 12, but are not limited thereto.Top boom 13 includes multiple fine silk strings used for the outer strings bars 132, i.e., Top boom 13 is spliced to form by multiple fine silk strings used for the outer strings bars 132, it is preferable that each top boom 13 is spliced to form by two sub- chord members 132.Son Chord member 132 includes the first side plate 133, the second side plate 134 and fixed plate 135, and the first side plate 133 is set relatively with the second side plate 134 It sets, fixed plate 135 is set between the first side plate 133 and the second side plate 134, and the two sides of fixed plate 135 are connected to the first side plate 133 and second side plate 134, i.e. top boom 13 it is H-shaped.The joint of adjacent two fine silk strings used for the outer strings bar 132 is equipped with multiple rows of screw hole, and every row has Multiple screw holes are specifically equipped with multiple rows of spiral shell in the first side plate 133 of two fine silk strings used for the outer strings bars 132, the second side plate 134 and fixed plate 135 Hole.In the present embodiment, product connecting plate 17 is used to each fine silk strings used for the outer strings bar 132 connection forming top boom 13, such as product connecting plate 17 are equipped with multiple rows of screw hole corresponding with fine silk strings used for the outer strings bar 132, the first side plate 133,134 and of the second side plate of adjacent two fine silk strings used for the outer strings bar 132 One product connecting plate 17 is respectively set in fixed plate 135, passes through bolt and screw hole between product connecting plate 17 and two fine silk strings used for the outer strings bars 132 It is cooperatively connected.
Lower boom 14 is oppositely arranged with top boom 13, and lower boom 14 is set between adjacent two beam column 12, and adjacent two beam A piece lower boom 14 is set between column 12.The length direction of lower boom 14 perpendicular to beam column 12 length direction, lower boom 14 Both ends are connected on two beam columns 12;Lower boom 14 is realized by the way of welding with beam column 12 and is connect, but is not limited thereto.Under Chord member 14 includes multiple fine silk strings used for the outer strings bars 142, i.e. lower boom 14 is spliced to form by multiple fine silk strings used for the outer strings bars 142, it is preferable that each lower boom 14 It is spliced to form by two sub- chord members 142.Fine silk strings used for the outer strings bar 142 include the first side plate 143, the second side plate 144 and fixed plate 145, first Side plate 143 is oppositely arranged with the second side plate 144, and fixed plate 145 is set between the first side plate 143 and the second side plate 144, fixed The two sides of plate 145 are connected to the first side plate 143 and the second side plate 144, i.e. lower boom 14 is H-shaped.Adjacent two fine silk strings used for the outer strings bar 142 connects Multiple rows of screw hole is equipped at head, every row has multiple screw holes, specifically, the first side plate 143, the second side plate 144 of two fine silk strings used for the outer strings bars 142 With multiple rows of screw hole is equipped in fixed plate 145.In the present embodiment, product connecting plate 17 is used to each fine silk strings used for the outer strings bar 142 connecting shape At lower boom 14, product connecting plate 17 be equipped with multiple rows of screw hole corresponding with fine silk strings used for the outer strings bar 142, the first of adjacent two fine silk strings used for the outer strings bar 142 One product connecting plate 17, product connecting plate 17 and two fine silk strings used for the outer strings bars are respectively set in side plate 143, the second side plate 144 and fixed plate 145 It is cooperatively connected between 142 by bolt and screw hole.
The junction of beam column 12 and top boom 13 and beam column 12 and lower boom 14, each ox sole is arranged in each ox sole 15 15 are connected on beam column 12;The side of ox sole 15 is connected on beam column 12 by the way of welding, but is not limited thereto.? In the present embodiment, the connector of ox sole 15 is equipped with multiple rows of screw hole, and every row has multiple screw holes.
Two web members 16 are set between adjacent two beam column 12, two web members 16 are arranged in a crossed manner, and every 16 both ends of web member Connector of the connector respectively with two ox soles 15 is oppositely arranged.In the present embodiment, the connector at 16 both ends of web member is equipped with multiple rows of Screw hole, every row have multiple screw holes;Product connecting plate 17 is for connecting on ox sole 15 and web member 16, such as product connecting plate 17 Equipped with multiple rows of screw hole corresponding with ox sole 15 and web member 16, a product connecting plate is provided on ox sole 15 and web member 16 17, it is cooperatively connected between product connecting plate 17 and ox sole 15 and web member 16 by bolt and screw hole.
It is noted that high-strength bolt hole group's truss 10 of the invention can pass through dismounting product connecting plate 17 and bolt Realize the product connecting plate 17 and bolt, disassembly lower boom 14 in assembly, such as the adjacent two fine silk strings used for the outer strings bar 132 of disassembly top boom 13 Adjacent two fine silk strings used for the outer strings bar 142 on product connecting plate 17 and bolt and disassembly ox sole 15 and web member 16 on product connecting plate 17 and the i.e. decomposable high-strength bolt hole group truss 10 of bolt;Similarly, using product connecting plate 17 and being bolted top boom 13 Adjacent two fine silk strings used for the outer strings bar 132, the adjacent two fine silk strings used for the outer strings bar 142 of lower boom 14, ox sole 15 and web member 16 can be assembled into high intensity Bolt hole group truss 10.
Fig. 1 is please referred to, in the present embodiment, the step of production method of high-strength bolt hole group truss of the invention wraps It includes:
More beam columns 12 are provided, each beam column 12 is located on platform for lining spaced reciprocally, and in adjacent two beam column 12 Between a top boom 13 and a lower boom 14 are set;
More web members 16 are provided, two web members 16 are set between adjacent two beam column 12, and two intersections of web member 16 are set It is located on platform for lining with setting;
Multiple ox soles 15 are provided, the setting one in the intersection of beam column 12 and top boom 13 and beam column 12 and lower boom 14 A ox sole 15, and ox sole 15 is located on platform for lining.
Fig. 2 is that sample dotting punch and the schematic diagram to zygonema are made on fine silk strings used for the outer strings bar.Fig. 3 is that tooling connecting plate is located in fine silk strings used for the outer strings Schematic diagram on bar.As shown in Figures 2 and 3, include: the step of making screw hole on top boom 13 and lower boom 14
Cutting gap 101 will be reserved between the connector of adjacent two fine silk strings used for the outer strings bar 132,142;
Multiple rows of sample dotting punch 102 is made in the joint surface of adjacent two fine silk strings used for the outer strings bar 132,142, every row makes multiple sample dotting punches 102;
It is a plurality of to zygonema 103 in the joint surface picture of each fine silk strings used for the outer strings bar 132,142, make every to be correspondingly connected with zygonema 103 Various kinds dotting punch 102 in every row, and it is overlapped the extended line to zygonema 103 on adjacent two fine silk strings used for the outer strings bar 132,142;Specifically, Fine silk strings used for the outer strings bar 132,142 includes first the 133,143, second side plate of side plate 134,144 and fixed plate 135,145, by the first side plate 133, it 143 is oppositely arranged with the second side plate 134,144, fixed plate 135,145 is set to the first side plate 133,143 and second side Between plate 134,144, and the two sides of fixed plate 135,145 are connected to the first side plate 133,143 and the second side plate 134,144, Sample dotting punch 102 is made respectively on first the 133,143, second side plate of side plate 134,144 and fixed plate 135,145 and to zygonema 103, and it is overlapped the extended line to zygonema 103 on adjacent two fine silk strings used for the outer strings bar 132,142;
According to sample dotting punch 102 and to the position of zygonema 103 by tooling connecting plate 10a be located in adjacent two fine silk strings used for the outer strings bar 132, On 142 connector;Specifically, by three pieces of tooling connecting plate 10a be separately positioned on adjacent two fine silk strings used for the outer strings bar 132 the first side plate 133, 143, on the second side plate 134,144 and fixed plate 135,145, and reveal sample dotting punch 102 from the screw hole of tooling connecting plate 10a Out;
Three pieces of tooling connecting plate 10a are fixed on the connector of adjacent two fine silk strings used for the outer strings bar 132,142 by spot welding;
Top boom 13 and lower boom 14 are disassembled from platform for lining, and using cutter device along cutting gap 101 cutting tooling connecting plate 10a;
Screwhole position on corresponding tooling connecting plate 10a makes screw hole on fine silk strings used for the outer strings bar 132,142;And
The tooling connecting plate 10a on fine silk strings used for the outer strings bar 132,142 is removed after the completion of drilling, later to sub- chord member 132,142 It is smooth that first the 133,143, second side plate of side plate 134,144 and fixed plate 135,145 are polishing to surface.
Referring to figure 2. and Fig. 3, include: the step of making screw hole on ox sole 15 and web member 16
Cutting gap 101 will be reserved between ox sole 15 and the connector of web member 16;
Multiple rows of sample dotting punch 102 is made in the joint surface of ox sole 15 and web member 16, every row makes multiple sample dotting punches 102;
It is a plurality of to zygonema 103 in the joint surface of ox sole 15 and web member 16 picture, make every to be correspondingly connected with often zygonema 103 Various kinds dotting punch 102 in row, and it is overlapped the extended line to zygonema 103 on ox sole 15 and web member 16;
Tooling connecting plate 10a is located in ox sole 15 and web member 16 according to sample dotting punch 102 and to the position of zygonema 103 On connector;Specifically, when tooling connecting plate 10a being located on ox sole 15 and web member 16, guarantee that sample dotting punch 102 connects from tooling Expose in the screw hole of fishplate bar 10a;
Tooling connecting plate 10a is fixed on the connector of ox sole 15 and web member 16 by spot welding;
Ox sole 15 and web member 16 are disassembled from platform for lining, and using cutter device along cutting gap 101 Cut off tooling connecting plate 10a;
Screwhole position on corresponding tooling connecting plate 10a makes screw hole on ox sole 15 and the web member 16;And
The tooling connecting plate 10a on ox sole 15 and web member 16 is removed after the completion of drilling, later to ox sole 15 and abdomen It is smooth that bar 16 is polishing to surface.
As shown in Figure 1, the step of welded high-strength bolt hole group's truss, includes:
Each beam column 12 is located on platform for lining spaced reciprocally, a top boom is set between adjacent two beam column 12 13 and a lower boom 14, the both ends of top boom 13 are connected on two beam columns 12, the both ends of lower boom 14 are connected respectively It connects on two beam columns 12;Specifically, beam column 12 and top boom 13 and beam column 12 and lower boom 14 are realized using welding manner and are connected It connects, but is not limited thereto;
Product connecting plate 17 is provided, product connecting plate 17 is arranged on two adjacent fine silk strings used for the outer strings bars 132, and by bolt and Each fine silk strings used for the outer strings bar 132,142 of product connecting plate 17 and manufactured screw hole mating connection top boom 13 and lower boom 14;
One ox sole 15 is set in the intersection of beam column 12 and top boom 13 and beam column 12 and the lower boom 14, by ox Sole 15 is located on platform for lining, and connects ox sole 15 and beam column 12;Specifically, ox sole 15 and beam column 12 are using welding Mode realizes connection, but is not limited thereto;
Two web members 16 are set between adjacent two beam column 12, and two web members 16 are located in platform for lining across On;
Product connecting plate 17 is arranged on ox sole 15 and web member 16, and passes through bolt and product connecting plate 17 and system At screw hole mating connection ox sole 15 and web member 16.
The step of production method of high-strength bolt hole group's truss of the invention includes providing top boom 13 and lower boom 14, Top boom 13 and lower boom 14 are located on platform for lining with being oppositely arranged, top boom 13 and lower boom 14 include multiple fine silk strings used for the outer strings Bar 132,142 will reserve cutting gap 101 between the connector of adjacent two fine silk strings used for the outer strings bar 132,142;Tooling connecting plate 10a is provided, it will Tooling connecting plate 10a is located on the connector of adjacent two fine silk strings used for the outer strings bar 132,142, and is fixed tooling connecting plate 10a by spot welding On the connector of adjacent two fine silk strings used for the outer strings bar 132,142;Top boom 13 and lower boom 14 are disassembled from platform for lining, and utilized Cutter device cuts off tooling connecting plate 10a along cutting gap 101;Screwhole position on corresponding tooling connecting plate 10a is in fine silk strings used for the outer strings Screw hole is made on bar 132,142;The tooling connecting plate 10a on fine silk strings used for the outer strings bar 132,142 is removed after the completion of drilling.Height of the invention Strength bolts hole group truss production method using tooling connecting plate 10a on platform for lining with 132,142 solid weldings of fine silk strings used for the outer strings bar It after fixed, is then cut, fine silk strings used for the outer strings bar 132,142 returns to workshop using radial drill with screw hole is drilled, and finally removes tooling connection The screw hole precision of fine silk strings used for the outer strings bar 132,142 can be effectively ensured in plate 10a, make the screw hole of fine silk strings used for the outer strings bar 132,142 and product connecting plate 17 Screw hole is consistent, and then improves the punching rate of high-strength bolt, and reduction is done over again.
It is described the prefered embodiments of the present invention in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Detail in mode can carry out technical solution of the present invention a variety of simple within the scope of the technical concept of the present invention Modification, these simple variants all belong to the scope of protection of the present invention.It is as described in the above specific embodiments each specific Technical characteristic can be combined in the case of no contradiction by still what suitable mode.In order to avoid unnecessary heavy Multiple, the invention will not be further described in various possible combinations.

Claims (7)

1. a kind of production method of high-strength bolt hole group's truss, which is characterized in that the step of production method includes:
Top boom and lower boom are provided, the top boom and the lower boom are located on platform for lining with being oppositely arranged, this winds up Bar and the lower boom include multiple fine silk strings used for the outer strings bars, and cutting gap will be reserved between the connector of adjacent two fine silk strings used for the outer strings bar;
Tooling connecting plate is provided, which is located on the connector of adjacent two fine silk strings used for the outer strings bar, and passes through spot welding for the work Load fishplate bar is fixed on the connector of adjacent two fine silk strings used for the outer strings bar;
The top boom and the lower boom are disassembled from platform for lining, and cut off using cutter device along the cutting gap The tooling connecting plate;
Screwhole position on the corresponding tooling connecting plate makes screw hole on fine silk strings used for the outer strings bar;And
The tooling connecting plate on fine silk strings used for the outer strings bar is removed after the completion of drilling.
2. the production method of high-strength bolt hole group truss as described in claim 1, which is characterized in that position tooling connection The step of plate includes:
Multiple rows of sample dotting punch is made in the joint surface of adjacent two fine silk strings used for the outer strings bar, every row makes multiple sample dotting punches;
Each fine silk strings used for the outer strings bar joint surface draw it is a plurality of every various kinds dotting punch being correspondingly connected in every row to zygonema is made to zygonema, And it is overlapped the extended line to zygonema on adjacent two fine silk strings used for the outer strings bar;
The tooling connecting plate is located on the connector of adjacent two fine silk strings used for the outer strings bar according to sample dotting punch and to the position of zygonema.
3. the production method of high-strength bolt hole as claimed in claim 2 group's truss, which is characterized in that the fine silk strings used for the outer strings bar includes the First side plate and second side plate are oppositely arranged by side plate, the second side plate and fixed plate, by the fixed plate be set to this Between side plate and second side plate, and the two sides of the fixed plate are connected to first side plate and second side plate, this Sample dotting punch is made in side plate, the second side plate and fixed plate respectively and to zygonema, the tooling connecting plate is connected to by three pieces In first side plate of adjacent two fine silk strings used for the outer strings bar, the second side plate and fixed plate.
4. the production method of high-strength bolt hole group truss as described in claim 1, which is characterized in that spelled on platform for lining Dress high-strength bolt hole group truss the step of include:
More beam columns are provided, the respectively beam column is located on platform for lining spaced reciprocally, and are set between adjacent two beam columns Set the top boom and the lower boom;
More web members are provided, two web members are set between adjacent two beam columns, and two web members are located in arranged in a crossed mannerly On platform for lining;
Multiple ox soles are provided, one ox is set in the intersection of the beam column and the top boom and the beam column and the lower boom Sole, and the ox sole is located on platform for lining.
5. the production method of high-strength bolt hole group truss as claimed in claim 4, which is characterized in that in the ox sole and be somebody's turn to do The step of production screw hole, includes: on web member
Cutting gap will be reserved between the ox sole and the connector of the web member;
The tooling connecting plate is located on the connector of the ox sole and the web member, and is fixed the tooling connecting plate by spot welding On the connector of the ox sole and the web member;
The ox sole and the web member are disassembled from platform for lining, and should along cutting gap cutting using cutter device Tooling connecting plate;
Screwhole position on the corresponding tooling connecting plate makes screw hole on the ox sole and the web member;And
The tooling connecting plate on the ox sole and the web member is removed after the completion of drilling.
6. the production method of high-strength bolt hole group truss as claimed in claim 5, which is characterized in that position tooling connection The step of plate includes:
Multiple rows of sample dotting punch is made in the joint surface of the ox sole and the web member, every row makes multiple sample dotting punches;
It is a plurality of to zygonema in the joint surface of the ox sole and web member picture, make every various kinds being correspondingly connected in every row to zygonema Dotting punch, and it is overlapped the extended line to zygonema on the ox sole and the web member;
The tooling connecting plate is located on the connector of the ox sole and the web member according to sample dotting punch and to the position of zygonema.
7. the production method of high-strength bolt hole group truss as claimed in claim 5, which is characterized in that welded high-strength bolt Hole group truss the step of include:
The respectively beam column is located on platform for lining spaced reciprocally, be arranged between adjacent two beam columns top boom and The both ends of the top boom are connected on two beam columns, the both ends of the lower boom are connected to by piece lower boom On two beam columns;
Product connecting plate is provided, which is arranged on two adjacent fine silk strings used for the outer strings bars, and is connected by bolt with product Plate and manufactured screw hole are cooperatively connected each fine silk strings used for the outer strings bar of the top boom and the lower boom;
One ox sole is set in the intersection of the beam column and the top boom and the beam column and the lower boom, by the ox sole It is located on platform for lining, and connects the ox sole and the beam column;
Two web members are set between adjacent two beam columns, and the web member is located on platform for lining across by two;
By product connecting plate setting on the ox sole and the web member, and pass through bolt and product connecting plate and manufactured spiral shell Hole is cooperatively connected the ox sole and the web member.
CN201710525453.XA 2017-06-30 2017-06-30 The production method of high-strength bolt hole group's truss Active CN107297600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710525453.XA CN107297600B (en) 2017-06-30 2017-06-30 The production method of high-strength bolt hole group's truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710525453.XA CN107297600B (en) 2017-06-30 2017-06-30 The production method of high-strength bolt hole group's truss

Publications (2)

Publication Number Publication Date
CN107297600A CN107297600A (en) 2017-10-27
CN107297600B true CN107297600B (en) 2019-08-09

Family

ID=60135211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710525453.XA Active CN107297600B (en) 2017-06-30 2017-06-30 The production method of high-strength bolt hole group's truss

Country Status (1)

Country Link
CN (1) CN107297600B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241974B (en) * 2019-04-29 2023-11-17 深圳市建筑设计研究总院有限公司 Full-bolt-connection truss type steel reinforced concrete beam and construction method
CN110039264A (en) * 2019-04-29 2019-07-23 上海宝冶集团有限公司 The method for improving large-scale reburner furnace body wallboard preassembling punching rate
CN111236266A (en) * 2020-03-24 2020-06-05 中铁第四勘察设计院集团有限公司 Supporting member, foundation pit supporting system and construction method of subway station
CN113857827B (en) * 2021-11-12 2024-02-13 鑫源富金属制品(漳州)有限公司 Truss making auxiliary device
CN114559218B (en) * 2022-03-07 2023-01-24 中铁宝桥集团有限公司 Spatial hole group relation inspection device and manufacturing and using method thereof
CN114876073B (en) * 2022-05-09 2024-01-30 中国铁建港航局集团有限公司 Bolt group embedding method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6691488B2 (en) * 1998-01-23 2004-02-17 John Branson Method and apparatus for structural conversion of poultry houses
US8327592B2 (en) * 2005-08-05 2012-12-11 Lafferty Iii George A Structural reinforcing system components
CN102277825B (en) * 2011-05-23 2014-02-26 江苏沪宁钢机股份有限公司 Steel truss bridge and method for fabricating same
CN102966244B (en) * 2012-12-07 2015-07-22 马钢(集团)控股有限公司 Process for connection among steel structure workshop roof truss, brackets and columns
CN203174879U (en) * 2013-04-17 2013-09-04 河南天丰节能板材科技股份有限公司 Quick-install truss and quick-install house using same
CN103233584B (en) * 2013-05-07 2015-04-01 中国化学工程第三建设有限公司 Method and special forming die for one-step forming of steel roof truss
CN103290785B (en) * 2013-06-30 2015-07-01 中铁一局集团有限公司 Closure method for height variable continuous steel truss girder

Also Published As

Publication number Publication date
CN107297600A (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN107297600B (en) The production method of high-strength bolt hole group's truss
EP3314076B1 (en) Tower consisting of segments and method for producing a segment of a tower
CN104652284A (en) Reverse splicing construction method for steel box girder
CN106475741A (en) A kind of self-elevating drilling platform cantilever beam pushing-pulling-rack building technology
CN106180359A (en) A kind of adjustable steel plate rushes louvered die
CN101695804B (en) Precise processing technology for split dismantling type steel structural parts
CN112031164A (en) Method for ensuring perforation rate of high-strength bolt of steel structure
CN101497151B (en) Assembly welding technique of translational frame of heating stove
CN104863266A (en) Prefabricated high-ductility beam-column joint for box column and I-beam
CN101875163B (en) Assembling and welding jig frame used for bracket of bridge fabrication machine and method for fabricating bracket by using same
CN102069208A (en) Drilling method of steel-structure connecting plate
KR20180089111A (en) Continuous manufacturing system of trap
CN205394012U (en) Building steel punching device with automatically, cut board function
DE102013215830A1 (en) Steel profile, support profile and method for producing a steel profile
CN208543105U (en) Rectangle hollow steel pipe is cut by laser tooling
CN111434449A (en) Fence manufacturing method and device
CN202447483U (en) Stamping die
CN112922304A (en) Auxiliary board of climbing frame
CN204876088U (en) High ductility beam column node of prefabricated assembled of box post - I -beam
CN207420574U (en) A kind of shield is missed the stop steelframe
CN220112746U (en) Quick positioner of no sign indicating number I type member first hole method
CN105643301A (en) Board girder flange face machining equipment
WO2019086136A1 (en) Method for producing a sub-section of a multi-part tower section
CN205200838U (en) Assemble positioner
CN211144520U (en) Positioning device for tunnel steel arch frame connecting plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701

Patentee before: China Construction Steel Structure Corp.,Ltd.