CN107292533B - 一种四状态空间的一供一备配电网供电可靠性评估方法 - Google Patents

一种四状态空间的一供一备配电网供电可靠性评估方法 Download PDF

Info

Publication number
CN107292533B
CN107292533B CN201710566318.XA CN201710566318A CN107292533B CN 107292533 B CN107292533 B CN 107292533B CN 201710566318 A CN201710566318 A CN 201710566318A CN 107292533 B CN107292533 B CN 107292533B
Authority
CN
China
Prior art keywords
rate
load bus
maintenance rate
maintenance
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710566318.XA
Other languages
English (en)
Other versions
CN107292533A (zh
Inventor
吴杰康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201710566318.XA priority Critical patent/CN107292533B/zh
Publication of CN107292533A publication Critical patent/CN107292533A/zh
Application granted granted Critical
Publication of CN107292533B publication Critical patent/CN107292533B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明实施例公开了一种四状态空间的一供一备配电网供电可靠性评估方法,用于解决目前电力系统传统可靠性评估方法很少同时考虑元件、备用原件或系统故障率、维修率、转换率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足的技术问题。本发明实施例方法包括:对工作系统的电源系统为双母线接线、备用系统的电源系统为单母线接线的四状态空间的一供一备配电网考虑配电线路和负荷母线故障率、维修率以及备用模型转化率等的影响,构建基于四状态空间的一供一备配电网供电可靠性评估模型,计算涵盖工作系统和备用系统所有电源、线路和负荷母线故障率和维修率影响的一供一备配电网供电可靠性。

Description

一种四状态空间的一供一备配电网供电可靠性评估方法
技术领域
本发明涉及电力系统及其自动化技术领域,尤其涉及一种四状态空间的一供一备配电网供电可靠性评估方法。
背景技术
可靠性评估一直是电力系统主要和重要的工作内容,是电力系统规划设计工作的常规任务。在现代配电网中,供电能力日益增强、复杂性不断增多、需求性逐渐增大,对供电可靠性要求也日益增高。同时,随着配电网容量规模日渐扩大、结构特性日益复杂,不同用户对可靠性需求水平也不相同,因此不同用户的供电网络总会有很大的差异性。不同结构的配电网有不同的元件配置,而且数量不尽相同,因使用年限的不同其故障率、维修率也不尽相同,元件数量影响配电网供电可靠性。由于不同结构特性的配电网运行方式不同,在不同负荷水平、地理环境、气象条件与运行方式下其运行率也有非常大的差异,对供电可靠性有着不同的影响。
1933年Lyman和Dean等人开创电力系统可靠性评估的先例,采用概率方法构建电力系统可靠性模型并提出可靠性评估方法,旨在解决电网元件维修的工作问题。1947年,Calabrese首次提出了供电功率不足概率的概念,在电力系统可靠性中考虑了发电容量的影响。1950年以后,电力系统可靠性的蒙特卡罗方法开始得到应用,其基本原理是采用抽样方法,通过模拟计算获得足够大的样本值,进而采用统计方法计算电力系统可靠性概率指标。1964年,Desieno和stine采用马尔科夫数学方法构建述电力系统可靠性模型,形成了电力系统可靠性评估的马尔科夫方法,使得电力系统可靠性评估从随机变量模型的评估阶段发展到了随机过程模型的评估阶段。1970年以后,我国电力系统可靠性评估开始得到高度重视和关注,取得了丰富的研究成果并在生产系统中获得广泛应用,这些成果中大部分是以经典的蒙特卡罗方法和马尔科夫方法为基础。
传统的配电网供电可靠性评估主要从规划设计角度出发,在假设元件可靠性评估模型和参数固定不变的情况下采用长期统计平均值的方法评估元件可靠性,采用系统的理论计算配电网供电可靠性指标。基于元件故障率的电力系统供电可靠性评估针对的是平稳状态,但是不同供电网络的元件在不同负荷水平、地理环境、气象条件与运行方式下总会处于不同运行状态和方式,元件的这种运行状态和运行方式也总会影响整个电力系统供电可靠性,如果再考虑元件故障率和维修率,供电可靠性评估变得更为复杂。
电力系统传统可靠性评估方法很少同时考虑元件或系统故障率、维修率、转换率以及电网运行方式变化的影响,更少考虑备用元件或系统故障率、维修率、运行率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足。
发明内容
本发明实施例提供了一种四状态空间的一供一备配电网供电可靠性评估方法,解决了目前电力系统传统可靠性评估方法很少同时考虑元件或系统故障率、维修率、转换率以及电网运行方式变化的影响,更少考虑备用元件或系统故障率、维修率、运行率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足的技术问题。
本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法,包括:
工作系统、备用系统、备用母线;
工作系统包括有电源系统A、电源母线A、配电线路A、负荷母线A,电源系统包括第一电源系统A1和第二电源系统A2,第一电源系统A1与电源母线A、配电线路A、负荷母线A构成第一工作子系统,第二电源系统A2与电源母线A、配电线路A、负荷母线A构成第二工作子系统,第一工作子系统和第二工作子系统构成工作系统;
备用系统包括有电源系统B、电源母线B、配电线路B、负荷母线B,工作系统还包括有工作断路器,备用系统还包括有备用断路器;
工作系统通过工作断路器经备用母线与备用断路器连接;
方法步骤包括:根据工作系统和备用系统的故障数据,分别获取第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率;
根据工作系统和备用系统的维修数据,分别获取第一电源系统A1的维修率、第二电源系统A2的维修率、配电线路A的维修率、负荷母线A的维修率及电源系统B的维修率、配电线路B的维修率、负荷母线B的维修率;
根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第一工作子系统的负荷母线A可靠性的二状态空间模型,第一工作子系统的负荷母线A可靠性的二状态空间模型为:
Figure GDA0002605253080000031
式中,a11、a12、a21和a22均为A矩阵元素,A矩阵元素根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率计算得到;
根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作子系统的故障率及维修率;
根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第二工作子系统的负荷母线A可靠性的二状态空间模型,第二工作子系统的负荷母线A可靠性的二状态空间模型与第一工作子系统的负荷母线A可靠性的二状态空间模型构建方式一致;
根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算第二工作子系统的故障率及维修率;
根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率构建负荷母线B可靠性的二状态空间模型,负荷母线B可靠性的二状态空间模型为:
Figure GDA0002605253080000032
式中,b11、b12、b21和b22均为B矩阵元素,B矩阵元素根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率计算得到;
根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及维修率;
根据第一工作子系统的故障率及维修率、第二工作子系统的故障率及维修率、备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型,一供一备配电网可靠性评估的四状态空间模型为:
Figure GDA0002605253080000041
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A,λA1、λA2和λB-A分别为第一工作子系统的故障率、第一工作子系统的故障率和备用系统的故障率,μA1、μA2和μB-A分别为第一工作子系统的维修率、第一工作子系统的维修率和备用系统的维修率;
根据一供一备配电网可靠性评估的四状态空间模型计算一供一备配电网的故障率。
优选地,根据工作系统和备用系统的故障数据,分别获取第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率包括:
根据从数据库获取到的第一电源系统A1、第二电源系统A2、配电线路A、负荷母线A、电源系统B、配电线路B、负荷母线B因接地、短路、雷击或人为因素造成的故障数据,计算第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率。
优选地,根据工作系统和备用系统的维修数据,分别获取第一电源系统A1的维修率、第二电源系统A2的维修率、配电线路A的维修率、负荷母线A的维修率及电源系统B的维修率、配电线路B的维修率、负荷母线B的维修率包括:
根据从数据库获取到的第一电源系统A1、第二电源系统A2、配电线路A、负荷母线A、电源系统B、配电线路B、负荷母线B因接地、短路、雷击或人为因素造成的故障数据,计算第一电源系统A1的维修率、第二电源系统A2的维修率、配电线路A的维修率、负荷母线A的维修率及电源系统B的维修率、配电线路B的维修率、负荷母线B的维修率。
优选地,根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第一工作子系统的负荷母线A可靠性的二状态空间模型包括:
根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率,构建在第一电源系统A1、配电线路A、负荷母线A发生m重故障的情况下第一工作子系统的负荷母线A可靠性的二状态空间模型。
优选地,根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作子系统的故障率及维修率包括:
根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作系统的故障率及发生m重故障的维修率。
优选地,根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第二工作子系统的负荷母线A可靠性的二状态空间模型包括:
根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率,构建在第二电源系统A2、配电线路A、负荷母线A发生m重故障的情况下第二工作子系统的负荷母线A可靠性的二状态空间模型。
优选地,根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算第二工作子系统的故障率及维修率包括:
根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算工作系统的故障率及发生m重故障的维修率。
优选地,根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率构建负荷母线B可靠性的二状态空间模型包括:
根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率,构建在电源系统B、配电线路B、负荷母线B发生m重故障的情况下负荷母线B可靠性的二状态空间模型。
优选地,根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及维修率包括:
根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及发生m重故障的维修率。
本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估装置,包括:
第一获取模块,用于根据工作系统和备用系统的故障数据,分别获取第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率;
第二获取模块,用于根据工作系统和备用系统的维修数据,分别获取第一电源系统A1的维修率、第二电源系统A2的维修率、配电线路A的维修率、负荷母线A的维修率及电源系统B的维修率、配电线路B的维修率、负荷母线B的维修率;
第一构建模块,用于根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第一工作子系统的负荷母线A可靠性的二状态空间模型,第一工作子系统的负荷母线A可靠性的二状态空间模型为:
Figure GDA0002605253080000061
式中,a11、a12、a21和a22均为A矩阵元素,A矩阵元素根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率计算得到;
第一计算模块,用于根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作子系统的故障率及维修率;
第二构建模块,用于根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第二工作子系统的负荷母线A可靠性的二状态空间模型,第二工作子系统的负荷母线A可靠性的二状态空间模型与第一工作子系统的负荷母线A可靠性的二状态空间模型构建方式一致;
第二计算模块,用于根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算第二工作子系统的故障率及维修率;
第三构建模块,用于根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率构建负荷母线B可靠性的二状态空间模型,负荷母线B可靠性的二状态空间模型为:
Figure GDA0002605253080000071
式中,b11、b12、b21和b22均为B矩阵元素,B矩阵元素根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率计算得到;
第三计算模块,用于根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及维修率;
第四构建模块,用于根据第一工作子系统的故障率及维修率、第二工作子系统的故障率及维修率、备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型,一供一备配电网可靠性评估的四状态空间模型为:
Figure GDA0002605253080000072
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A,λA1、λA2和λB-A分别为第一工作子系统的故障率、第一工作子系统的故障率和备用系统的故障率,μA1、μA2和μB-A分别为第一工作子系统的维修率、第一工作子系统的维修率和备用系统的维修率;
第四计算模块,用于根据一供一备配电网可靠性评估的四状态空间模型计算一供一备配电网的故障率。
从以上技术方案可以看出,本发明实施例具有以下优点:
本发明实施例提供了一种四状态空间的一供一备配电网供电可靠性评估方法,对工作系统的电源系统为双母线接线、备用系统的电源系统为单母线接线的四状态空间的一供一备配电网考虑配电线路和负荷母线故障率、维修率以及备用模型转化率等的影响,构建基于四状态空间的一供一备配电网供电可靠性评估模型,可以计算涵盖工作系统和备用系统所有电源、线路和负荷母线故障率和维修率影响的一供一备配电网供电可靠性水平,反映了工作系统和备用系统线路和负荷母线等元件数量随负荷母线供电可靠性的变化情况,反映了工作系统和备用系统元件故障状态和检修状态对任意负荷母线供电可靠性的影响机理,反映了工作系统和备用系统互为备用运行并提高供电可靠性水平的机理,为配电网供电可靠性提供理论指导,为配电网可持续性运行提供必要的技术支撑,解决了目前电力系统传统可靠性评估方法很少同时考虑元件或系统故障率、维修率、转换率以及电网运行方式变化的影响,更少考虑备用元件或系统故障率、维修率、运行率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足的技术问题。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。
图1为本发明实施例提供的一种一供一备配电系统结构示意图;
图2为本发明实施例提供的一供一备配电系统的四状态空间示意图;
图3为本发明实施例提供的一供一备配电系统供电可靠性评估的四状态空间示意图;
图4为本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法的一个实施例的流程示意图。
具体实施方式
本发明实施例提供了一种四状态空间的一供一备配电网供电可靠性评估方法,用于解决目前电力系统传统可靠性评估方法很少同时考虑元件或系统故障率、维修率、转换率以及电网运行方式变化的影响,更少考虑备用元件或系统故障率、维修率、运行率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足的技术问题。
为使得本发明的发明目的、特征、优点能够更加的明显和易懂,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,下面所描述的实施例仅仅是本发明一部分实施例,而非全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。
为便于理解,首先对本发明实施例中提供的一种四状态空间的一供一备配电网供电可靠性评估方法所针对的一供一备配电系统进行详细的描述。
工作系统、备用系统、备用母线;
工作系统包括有电源系统A、电源母线A(图中Am2)、配电线路A(图中2a)、负荷母线A(图中3a),电源系统包括第一电源系统A1(图中Am1a)和第二电源系统A2(图中Am1b),第一电源系统A1与电源母线A、配电线路A、负荷母线A构成第一工作子系统,第二电源系统A2与电源母线A、配电线路A2a、负荷母线A构成第二工作子系统,第一工作子系统和第二工作子系统构成工作系统;
备用系统包括有电源系统B(图中Bm)、电源母线B(图中B1)、配电线路B(图中2b)、负荷母线B(图中3b),工作系统还包括有工作断路器5,备用系统还包括有备用断路器6;其中,图中的A1、A2、A3、…、
Figure GDA0002605253080000091
分别为负荷母线A1、负荷母线A2、负荷母线A3、…、负荷母线ANA;B1、B2、B3、…、
Figure GDA0002605253080000092
分别为负荷母线B1、负荷母线B2、负荷母线B3、…、负荷母线BNB
工作系统通过工作断路器5经备用母线4与备用断路器6连接。
工作系统的电源系统采用双母线接线方式时一供一备配电网有四个状态,其一是工作系统1(即第一工作子系统,为便于描述,以下用工作系统1进行代替描述)、工作系统2(即第二工作子系统,为便于描述,以下用工作系统2进行代替描述)和备用系统均处于正常状态;其二是工作系统1处于故障状态,而工作系统2和备用系统处于正常状态;其三是工作系统1、工作系统2均处于故障状态,而备用系统处于正常状态;其四是工作系统1、工作系统2和备用系统均处于故障状态,称为四状态空间,如图2所示。一供一备配电网供电可靠性评估的四状态空间如图3所示。(图中,U为正常状态,D为故障状态)。
基于四状态空间的工作系统的电源系统采用双母线接线方式时一供一备配电网供电可靠性评估的基本原理是由第一电源系统A1以及NA条配电线路A和NA条负荷母线A组成的工作系统1形成一个串联系统,由第二电源系统A2以及NA条配电线路A和NA条负荷母线A组成的工作系统2形成一个串联系统,由NB条配电线路A和NB条负荷母线A组成的备用系统也形成一个串联系统,三个串联系统形成一个互为备用的供电系统。借助多次电路转换过程和环节来提高不同负荷点的供电可靠性水平:1)在第一电源系统A1故障时由备用断路器闭合将负荷转由第二电源系统A2供电;或2)在第二电源系统A2故障时由工作断路器闭合将负荷转由第一电源系统A1供电;或3)在第一电源系统A1和第二电源系统A2均故障时由备用母线上备用断路器闭合将负荷转由电源系统B供电。
以下将对本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法的一个实施例进行详细的描述。
请参阅图4,本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法的一个实施例包括:
101、根据工作系统和备用系统的故障数据,分别获取第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率;
102、根据工作系统和备用系统的维修数据,分别获取第一电源系统A1的维修率、第二电源系统A2的维修率、配电线路A的维修率、负荷母线A的维修率及电源系统B的维修率、配电线路B的维修率、负荷母线B的维修率;
103、根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第一工作子系统的负荷母线A可靠性的二状态空间模型,第一工作子系统的负荷母线A可靠性的二状态空间模型为:
Figure GDA0002605253080000111
式中,a11、a12、a21和a22均为A矩阵元素,A矩阵元素根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率计算得到;
104、根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作子系统的故障率及维修率;
105、根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第二工作子系统的负荷母线A可靠性的二状态空间模型,第二工作子系统的负荷母线A可靠性的二状态空间模型与第一工作子系统的负荷母线A可靠性的二状态空间模型构建方式一致;
106、根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算第二工作子系统的故障率及维修率;
107、根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率构建负荷母线B可靠性的二状态空间模型,负荷母线B可靠性的二状态空间模型为:
Figure GDA0002605253080000112
式中,b11、b12、b21和b22均为B矩阵元素,B矩阵元素根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率计算得到;
108、根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及维修率;
109、根据第一工作子系统的故障率及维修率、第二工作子系统的故障率及维修率、备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型,一供一备配电网可靠性评估的四状态空间模型为:
Figure GDA0002605253080000113
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A,λA1、λA2和λB-A分别为第一工作子系统的故障率、第一工作子系统的故障率和备用系统的故障率,μA1、μA2和μB-A分别为第一工作子系统的维修率、第一工作子系统的维修率和备用系统的维修率;
1010、根据一供一备配电网可靠性评估的四状态空间模型计算一供一备配电网的故障率。
本发明实施例提供了一种四状态空间的一供一备配电网供电可靠性评估方法,对工作系统的电源系统为双母线接线、备用系统的电源系统B为单母线接线的四状态空间的一供一备配电网考虑配电线路A和负荷母线A故障率、维修率以及备用模型转化率等的影响,构建基于四状态空间的一供一备配电网供电可靠性评估模型,可以计算涵盖工作系统和备用系统所有电源、线路和负荷母线A故障率和维修率影响的一供一备配电网供电可靠性水平,反映了工作系统和备用系统线路和负荷母线A等元件数量随负荷母线A供电可靠性的变化情况,反映了工作系统和备用系统元件故障状态和检修状态对任意负荷母线A供电可靠性的影响机理,反映了工作系统和备用系统互为备用运行并提高供电可靠性水平的机理,为配电网供电可靠性提供理论指导,为配电网可持续性运行提供必要的技术支撑,解决了目前电力系统传统可靠性评估方法很少同时考虑元件或系统故障率、维修率、转换率以及电网运行方式变化的影响,更少考虑备用元件或系统故障率、维修率、运行率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足的技术问题。
以上为对本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法的一个实施例详细的描述,以下将对本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法的另一个实施例进行详细的描述。
201、根据从数据库获取到的第一电源系统A1、第二电源系统A2、配电线路A、负荷母线A、电源系统B、配电线路B、负荷母线B因接地、短路、雷击或人为因素造成的故障数据,计算第一电源系统A1的故障率λSAm1a、第二电源系统A2的故障率λSAm1b、配电线路A的故障率λSALi,i=1,2,...,NA、负荷母线A的故障率λSABi,i=1,2,...,NA及电源系统B的故障率λSBm、配电线路B的故障率λSBLi,i=1,2,...,NB、负荷母线B的故障率λSBBi,i=1,2,...,NB
202、根据从数据库获取到的第一电源系统A1、第二电源系统A2、配电线路A、负荷母线A、电源系统B、配电线路B、负荷母线B因接地、短路、雷击或人为因素造成的故障数据,计算第一电源系统A1的维修率μSAm1a、第二电源系统A2的维修率μSAm1b、配电线路A的维修率μSALi,i=1,2,...,NA、负荷母线A的维修率μSABi,i=1,2,...,NA及电源系统B的维修率μSBm、配电线路B的维修率μSBi,i=1,2,...,NB、负荷母线B的维修率μSBBi,i=1,2,...,NB
203、根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率,构建在第一电源系统A1、配电线路A、负荷母线A发生m重故障的情况下第一工作子系统的负荷母线A可靠性的二状态空间模型;
根据第一工作子系统与第一电源系统A1的连接关系以及配电线路A和负荷母线A的故障率和维修率特征,针对不同负荷母线A在电源母线A与备用母线之间的相对关系,考虑第一电源系统A1、配电线路A和负荷母线A等三种元件发生m重故障的情况,构建第一工作子系统第k(k=1,2,...,NA)条负荷母线A可靠性的二状态空间模型:
Figure GDA0002605253080000131
式中,仅在第一工作子系统线路上发生m重故障时:
Figure GDA0002605253080000132
Figure GDA0002605253080000133
Figure GDA0002605253080000134
Figure GDA0002605253080000135
仅在第一工作子系统负荷母线A上发生m重故障时:
Figure GDA0002605253080000136
Figure GDA0002605253080000141
Figure GDA0002605253080000142
Figure GDA0002605253080000143
在第一电源系统A1及配电线路A上发生m重故障时:
Figure GDA0002605253080000144
Figure GDA0002605253080000145
Figure GDA0002605253080000146
Figure GDA0002605253080000147
在第一电源系统A1及负荷母线A上发生m重故障时:
Figure GDA0002605253080000148
Figure GDA0002605253080000149
Figure GDA00026052530800001410
Figure GDA00026052530800001411
在配电线路A和负荷母线A上发生m重故障时:
Figure GDA00026052530800001412
Figure GDA00026052530800001413
Figure GDA00026052530800001414
Figure GDA0002605253080000151
在第一电源系统A1、配电线路A和负荷母线A上发生m重故障时:
Figure GDA0002605253080000152
Figure GDA0002605253080000153
Figure GDA0002605253080000154
Figure GDA0002605253080000155
式中,kSAm1a为第一电源系统A1故障状态,当故障时kSAm1a=1,当未故障时kSAm1a=0;kSALi为第一工作子系统第i条配电线路A故障状态,当故障时kSALi=1,当未故障时kSALi=0,
Figure GDA0002605253080000156
NFAL为第一工作子系统的配电线路A发生故障的数量;kSABi为第一工作子系统第i条负荷母线A故障状态,当故障时kSABi=1,当未故障时kSABi=0,
Figure GDA0002605253080000157
204、根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作系统的故障率及发生m重故障的维修率;
利用[PA1 PA2]·A=[PA1 PA2]及PA1+PA2=1,计算第一工作子系统故障率λA1=PA2,发生m重故障的维修率为μA1=a21
205、根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率,构建在第二电源系统A2、配电线路A、负荷母线A发生m重故障的情况下第二工作子系统的负荷母线A可靠性的二状态空间模型;
根据第二工作子系统与第二电源系统A2的连接关系以及配电线路A和负荷母线A的故障率和维修率特征,针对不同负荷母线A在电源母线A与备用母线之间的相对关系,考虑第二电源系统A2、配电线路A和负荷母线A等三种元件发生m重故障的情况,构建第二工作子系统第k(k=1,2,...,NA)条负荷母线A可靠性的二状态空间模型:
Figure GDA0002605253080000161
式中,仅在第二工作子系统的配电线路A上发生m重故障时:
Figure GDA0002605253080000162
Figure GDA0002605253080000163
Figure GDA0002605253080000164
Figure GDA0002605253080000165
仅在第二工作子系统的负荷母线A上发生m重故障时:
Figure GDA0002605253080000166
Figure GDA0002605253080000167
Figure GDA0002605253080000168
Figure GDA0002605253080000169
在第二电源系统A2及其配电线路A上发生m重故障时:
Figure GDA00026052530800001610
Figure GDA00026052530800001611
Figure GDA00026052530800001612
Figure GDA00026052530800001613
在第二电源系统A2及其负荷母线A上发生m重故障时:
Figure GDA0002605253080000171
Figure GDA0002605253080000172
Figure GDA0002605253080000173
Figure GDA0002605253080000174
在第二工作子系统的配电线路A和负荷母线A上发生m重故障时:
Figure GDA0002605253080000175
Figure GDA0002605253080000176
Figure GDA0002605253080000177
Figure GDA0002605253080000178
在第二电源系统A2、配电线路A和负荷母线A上发生m重故障时:
Figure GDA0002605253080000179
Figure GDA00026052530800001710
Figure GDA00026052530800001711
Figure GDA00026052530800001712
式中,kSAm1b为第二电源系统A2故障状态,当故障时kSAm1b=1,当未故障时kSAm1b=0;kSALi为第二工作子系统第i条配电线路A故障状态,当故障时kSALi=1,当未故障时kSALi=0,
Figure GDA00026052530800001713
NFAL为第二工作子系统配电线路A发生故障的数量;kSABi为第二工作子系统第i条负荷母线A故障状态,当故障时kSABi=1,当未故障时kSABi=0,
Figure GDA0002605253080000181
206、根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算第二工作系统的故障率及发生m重故障的维修率;
利用[PA1 PA2]·A=[PA1 PA2]及PA1+PA2=1,计算第二工作子系统故障率λA2=PA2,发生m重故障的维修率为μA2=a21
207、根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率,构建在电源系统B、配电线路B、负荷母线B发生m重故障的情况下负荷母线B可靠性的二状态空间模型:
Figure GDA0002605253080000182
式中,仅在配电线路B上发生m重故障时:
Figure GDA0002605253080000183
Figure GDA0002605253080000184
Figure GDA0002605253080000185
Figure GDA0002605253080000186
仅在负荷母线B上发生m重故障时:
Figure GDA0002605253080000187
Figure GDA0002605253080000188
Figure GDA0002605253080000189
Figure GDA00026052530800001810
Figure GDA0002605253080000191
在电源系统B和配电线路B上发生m重故障时:
Figure GDA0002605253080000192
Figure GDA0002605253080000193
Figure GDA0002605253080000194
Figure GDA0002605253080000195
在电源系统B和负荷母线B上发生m重故障时:
Figure GDA0002605253080000196
Figure GDA0002605253080000197
Figure GDA0002605253080000198
Figure GDA0002605253080000199
在配电线路B和负荷母线B上发生m重故障时:
Figure GDA00026052530800001910
Figure GDA00026052530800001911
Figure GDA00026052530800001912
Figure GDA0002605253080000201
在电源系统B、配电线路B和负荷母线B上发生m重故障时:
Figure GDA0002605253080000202
Figure GDA0002605253080000203
Figure GDA0002605253080000204
Figure GDA0002605253080000205
式中,kSB为电源系统B故障状态,当故障时kSB=1,当未故障时kSB=0;kSBLi为从备用母线至电源系统B之间的第i条配电线路B故障状态,当故障时kSBLi=1,当未故障时kSBLi=0,
Figure GDA0002605253080000206
NFBL为从备用母线至电源系统B之间的配电线路B发生故障的数量;kSBBi为从备用母线至电源系统B之间的第i条负荷母线B故障状态,当故障时kSBBi=1,当未故障时kSBBi=0,
Figure GDA0002605253080000207
NFBB为从备用母线至电源系统B之间的负荷母线B发生故障的数量;kSA-BLi为从工作系统第k负荷母线A至备用母线之间的剩余工作系统第i条配电线路A故障状态,当故障时kSA-BLi=1,当未故障时kSA-BLi=0,
Figure GDA0002605253080000208
NFB-AL为从工作系统第k负荷母线A至备用母线之间的剩余工作系统配电线路A发生故障的数量;kSA-BBi为从工作系统第k负荷母线A至备用母线之间的剩余工作系统第i条负荷母线A故障状态,当故障时kSA-BBi=1,当未故障时kSA-BBi=0,
Figure GDA0002605253080000209
NFB-AB为从工作系统第k负荷母线A至备用母线之间的剩余工作系统负荷母线A发生故障的数量;NFBL+NFBB+NFB-AL+NFB-AB=m。
208、根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及发生m重故障的维修率;
利用[PB1 PB2]·B=[PB1 PB2]及PB1+PB2=1,计算备用系统的故障率λB-A=PB2,发生m重故障的维修率为μB-A=b21
209、根据第一工作子系统的故障率及维修率、第二工作子系统的故障率及维修率、备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型:
Figure GDA0002605253080000211
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A
2010、根据一供一备配电网可靠性评估的四状态空间模型计算一供一备配电网的故障率。
利用[PC1 PC2 PC3 PC4]·C=[PC1 PC2 PC3 PC4]及PC1+PC2+PC3+PC4=1,计算工作系统的电源系统采用双母线接线时一供一备配电网的故障率λ=PC4
本发明实施例提供了一种四状态空间的一供一备配电网供电可靠性评估方法,对工作系统的电源系统为双母线接线、备用系统的电源系统为单母线接线的四状态空间的一供一备配电网考虑配电线路和负荷母线故障率、维修率以及备用模型转化率等的影响,构建基于四状态空间的一供一备配电网供电可靠性评估模型,可以计算涵盖工作系统和备用系统所有电源、线路和负荷母线故障率和维修率影响的一供一备配电网供电可靠性水平,反映了工作系统和备用系统线路和负荷母线等元件数量随负荷母线供电可靠性的变化情况,反映了工作系统和备用系统元件故障状态和检修状态对任意负荷母线供电可靠性的影响机理,反映了工作系统和备用系统互为备用运行并提高供电可靠性水平的机理,为配电网供电可靠性提供理论指导,为配电网可持续性运行提供必要的技术支撑,解决了目前电力系统传统可靠性评估方法很少同时考虑元件或系统故障率、维修率、转换率以及电网运行方式变化的影响,更少考虑备用元件或系统故障率、维修率、运行率以及电网运行方式变化的影响,计算方法适用性、实用性和应用性也难以得到满足的技术问题。
以上为对本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估方法的另一个实施例的详细描述,以下将对本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估装置进行详细的描述。
本发明实施例提供的一种四状态空间的一供一备配电网供电可靠性评估装置,包括:
第一获取模块301,用于根据工作系统和备用系统的故障数据,分别获取第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率;
第二获取模块302,用于根据工作系统和备用系统的维修数据,分别获取第一电源系统A1的维修率、第二电源系统A2的维修率、配电线路A的维修率、负荷母线A的维修率及电源系统B的维修率、配电线路B的维修率、负荷母线B的维修率;
第一构建模块303,用于根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第一工作子系统的负荷母线A可靠性的二状态空间模型,第一工作子系统的负荷母线A可靠性的二状态空间模型为:
Figure GDA0002605253080000221
式中,a11、a12、a21和a22均为A矩阵元素,A矩阵元素根据第一电源系统A1的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率计算得到;
第一计算模块304,用于根据第一工作子系统的负荷母线A可靠性的二状态空间模型计算第一工作子系统的故障率及维修率;
第二构建模块305,用于根据第二电源系统A2的故障率和维修率、配电线路A的故障率和维修率、负荷母线A的故障率和维修率构建第二工作子系统的负荷母线A可靠性的二状态空间模型,第二工作子系统的负荷母线A可靠性的二状态空间模型与第一工作子系统的负荷母线A可靠性的二状态空间模型构建方式一致;
第二计算模块306,用于根据第二工作子系统的负荷母线A可靠性的二状态空间模型计算第二工作子系统的故障率及维修率;
第三构建模块307,用于根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率构建负荷母线B可靠性的二状态空间模型,负荷母线B可靠性的二状态空间模型为:
Figure GDA0002605253080000231
式中,b11、b12、b21和b22均为B矩阵元素,B矩阵元素根据电源系统B的故障率和维修率、配电线路B的故障率和维修率、负荷母线B的故障率和维修率计算得到;
第三计算模块308,用于根据负荷母线B可靠性的二状态空间模型计算备用系统的故障率及维修率;
第四构建模块309,用于根据第一工作子系统的故障率及维修率、第二工作子系统的故障率及维修率、备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型,一供一备配电网可靠性评估的四状态空间模型为:
Figure GDA0002605253080000232
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A,λA1、λA2和λB-A分别为第一工作子系统的故障率、第一工作子系统的故障率和备用系统的故障率,μA1、μA2和μB-A分别为第一工作子系统的维修率、第一工作子系统的维修率和备用系统的维修率;
第四计算模块3010,用于根据一供一备配电网可靠性评估的四状态空间模型计算一供一备配电网的故障率。
所属领域的技术人员可以清楚地了解到,为描述的方便和简洁,上述描述的系统,装置和单元的具体工作过程,可以参考前述方法实施例中的对应过程,在此不再赘述。
在本申请所提供的几个实施例中,应该理解到,所揭露的系统,装置和方法,可以通过其它的方式实现。例如,以上所描述的装置实施例仅仅是示意性的,例如,所述单元的划分,仅仅为一种逻辑功能划分,实际实现时可以有另外的划分方式,例如多个单元或组件可以结合或者可以集成到另一个系统,或一些特征可以忽略,或不执行。另一点,所显示或讨论的相互之间的耦合或直接耦合或通信连接可以是通过一些接口,装置或单元的间接耦合或通信连接,可以是电性,机械或其它的形式。
所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或者全部单元来实现本实施例方案的目的。
另外,在本发明各个实施例中的各功能单元可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中。上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。
所述集成的单元如果以软件功能单元的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。基于这样的理解,本发明的技术方案本质上或者说对现有技术做出贡献的部分或者该技术方案的全部或部分可以以软件产品的形式体现出来,该计算机软件产品存储在一个存储介质中,包括若干指令用以使得一台计算机设备(可以是个人计算机,服务器,或者网络设备等)执行本发明各个实施例所述方法的全部或部分步骤。而前述的存储介质包括:U盘、移动硬盘、只读存储器(ROM,Read-OnlyMemory)、随机存取存储器(RAM,RandomAccess Memory)、磁碟或者光盘等各种可以存储程序代码的介质。
以上所述,以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。

Claims (10)

1.一种四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,包括:
工作系统、备用系统、备用母线;
所述工作系统包括有电源系统A、电源母线A、配电线路A、负荷母线A,所述电源系统A包括第一电源系统A1和第二电源系统A2,所述第一电源系统A1与所述电源母线A、所述配电线路A、所述负荷母线A构成第一工作子系统,所述第二电源系统A2与所述电源母线A、所述配电线路A、所述负荷母线A构成第二工作子系统,所述第一工作子系统和所述第二工作子系统构成所述工作系统;
所述备用系统包括有电源系统B、电源母线B、配电线路B、负荷母线B,所述工作系统还包括有工作断路器,所述备用系统还包括有备用断路器;
所述工作系统通过所述工作断路器经所述备用母线与所述备用断路器连接;
方法步骤包括:根据所述工作系统和所述备用系统的故障数据,分别获取所述第一电源系统A1的故障率、所述第二电源系统A2的故障率、所述配电线路A的故障率、所述负荷母线A的故障率及所述电源系统B的故障率、所述配电线路B的故障率、所述负荷母线B的故障率;
根据所述工作系统和所述备用系统的维修数据,分别获取所述第一电源系统A1的维修率、所述第二电源系统A2的维修率、所述配电线路A的维修率、所述负荷母线A的维修率及所述电源系统B的维修率、所述配电线路B的维修率、所述负荷母线B的维修率;
根据所述第一电源系统A1的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率构建所述第一工作子系统的负荷母线A可靠性的二状态空间模型,所述第一工作子系统的负荷母线A可靠性的二状态空间模型为:
Figure FDA0002605253070000011
式中,a11、a12、a21和a22均为A矩阵元素,所述A矩阵元素根据所述第一电源系统A1的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率计算得到;
根据所述第一工作子系统的负荷母线A可靠性的二状态空间模型计算所述第一工作子系统的故障率及维修率;
根据所述第二电源系统A2的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率构建所述第二工作子系统的负荷母线A可靠性的二状态空间模型,所述第二工作子系统的负荷母线A可靠性的二状态空间模型与所述第一工作子系统的负荷母线A可靠性的二状态空间模型构建方式一致;
根据所述第二工作子系统的负荷母线A可靠性的二状态空间模型计算所述第二工作子系统的故障率及维修率;
根据所述电源系统B的故障率和维修率、所述配电线路B的故障率和维修率、所述负荷母线B的故障率和维修率构建所述负荷母线B可靠性的二状态空间模型,所述负荷母线B可靠性的二状态空间模型为:
Figure FDA0002605253070000021
式中,b11、b12、b21和b22均为B矩阵元素,所述B矩阵元素根据所述电源系统B的故障率和维修率、所述配电线路B的故障率和维修率、所述负荷母线B的故障率和维修率计算得到;
根据所述负荷母线B可靠性的二状态空间模型计算所述备用系统的故障率及维修率;
根据所述第一工作子系统的故障率及维修率、所述第二工作子系统的故障率及维修率、所述备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型,所述一供一备配电网可靠性评估的四状态空间模型为:
Figure FDA0002605253070000022
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A,λA1A2和λB-A分别为所述第一工作子系统的故障率、所述第一工作子系统的故障率和所述备用系统的故障率,μA1、μA2和μB-A分别为所述第一工作子系统的维修率、所述第一工作子系统的维修率和所述备用系统的维修率;
根据所述一供一备配电网可靠性评估的四状态空间模型计算所述一供一备配电网的故障率。
2.根据权利要求1所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述工作系统和所述备用系统的故障数据,分别获取所述第一电源系统A1的故障率、所述第二电源系统A2的故障率、所述配电线路A的故障率、所述负荷母线A的故障率及所述电源系统B的故障率、所述配电线路B的故障率、所述负荷母线B的故障率包括:
根据从数据库获取到的所述第一电源系统A1、所述第二电源系统A2、所述配电线路A、所述负荷母线A、所述电源系统B、所述配电线路B、所述负荷母线B因接地、短路、雷击或人为因素造成的故障数据,计算所述第一电源系统A1的故障率、所述第二电源系统A2的故障率、所述配电线路A的故障率、所述负荷母线A的故障率及所述电源系统B的故障率、所述配电线路B的故障率、所述负荷母线B的故障率。
3.根据权利要求1所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述工作系统和所述备用系统的维修数据,分别获取所述第一电源系统A1的维修率、所述第二电源系统A2的维修率、所述配电线路A的维修率、所述负荷母线A的维修率及所述电源系统B的维修率、所述配电线路B的维修率、所述负荷母线B的维修率包括:
根据从数据库获取到的所述第一电源系统A1、所述第二电源系统A2、所述配电线路A、所述负荷母线A、所述电源系统B、所述配电线路B、所述负荷母线B因接地、短路、雷击或人为因素造成的故障数据,计算所述第一电源系统A1的维修率、所述第二电源系统A2的维修率、所述配电线路A的维修率、所述负荷母线A的维修率及所述电源系统B的维修率、所述配电线路B的维修率、所述负荷母线B的维修率。
4.根据权利要求1所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述第一电源系统A1的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率构建所述第一工作子系统的负荷母线A可靠性的二状态空间模型包括:
根据所述第一电源系统A1的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率,构建在所述第一电源系统A1、所述配电线路A、所述负荷母线A发生m重故障的情况下所述第一工作子系统的负荷母线A可靠性的二状态空间模型。
5.根据权利要求4所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述第一工作子系统的负荷母线A可靠性的二状态空间模型计算所述第一工作子系统的故障率及维修率包括:
根据所述第一工作子系统的负荷母线A可靠性的二状态空间模型计算所述第一工作子系统的故障率及发生m重故障的维修率。
6.根据权利要求1所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述第二电源系统A2的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率构建所述第二工作子系统的负荷母线A可靠性的二状态空间模型包括:
根据所述第二电源系统A2的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率,构建在所述第二电源系统A2、所述配电线路A、所述负荷母线A发生m重故障的情况下所述第二工作子系统的负荷母线A可靠性的二状态空间模型。
7.根据权利要求6所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述第二工作子系统的负荷母线A可靠性的二状态空间模型计算所述第二工作子系统的故障率及维修率包括:
根据所述第二工作子系统的负荷母线A可靠性的二状态空间模型计算所述工作系统的故障率及发生m重故障的维修率。
8.根据权利要求1所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述电源系统B的故障率和维修率、所述配电线路B的故障率和维修率、所述负荷母线B的故障率和维修率构建所述负荷母线B可靠性的二状态空间模型包括:
根据所述电源系统B的故障率和维修率、所述配电线路B的故障率和维修率、所述负荷母线B的故障率和维修率,构建在所述电源系统B、所述配电线路B、所述负荷母线B发生m重故障的情况下所述负荷母线B可靠性的二状态空间模型。
9.根据权利要求8所述的四状态空间的一供一备配电网供电可靠性评估方法,其特征在于,所述根据所述负荷母线B可靠性的二状态空间模型计算所述备用系统的故障率及维修率包括:
根据所述负荷母线B可靠性的二状态空间模型计算所述备用系统的故障率及发生m重故障的维修率。
10.一种四状态空间的一供一备配电网供电可靠性评估装置,其特征在于,包括:
第一获取模块,用于根据工作系统和备用系统的故障数据,分别获取第一电源系统A1的故障率、第二电源系统A2的故障率、配电线路A的故障率、负荷母线A的故障率及电源系统B的故障率、配电线路B的故障率、负荷母线B的故障率;
第二获取模块,用于根据所述工作系统和所述备用系统的维修数据,分别获取所述第一电源系统A1的维修率、所述第二电源系统A2的维修率、所述配电线路A的维修率、所述负荷母线A的维修率及所述电源系统B的维修率、所述配电线路B的维修率、所述负荷母线B的维修率;
第一构建模块,用于根据所述第一电源系统A1的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率构建第一工作子系统的负荷母线A可靠性的二状态空间模型,所述第一工作子系统的负荷母线A可靠性的二状态空间模型为:
Figure FDA0002605253070000051
式中,a11、a12、a21和a22均为A矩阵元素,所述A矩阵元素根据所述第一电源系统A1的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率计算得到;
第一计算模块,用于根据所述第一工作子系统的负荷母线A可靠性的二状态空间模型计算所述第一工作子系统的故障率及维修率;
第二构建模块,用于根据所述第二电源系统A2的故障率和维修率、所述配电线路A的故障率和维修率、所述负荷母线A的故障率和维修率构建第二工作子系统的负荷母线A可靠性的二状态空间模型,所述第二工作子系统的负荷母线A可靠性的二状态空间模型与所述第一工作子系统的负荷母线A可靠性的二状态空间模型构建方式一致;
第二计算模块,用于根据所述第二工作子系统的负荷母线A可靠性的二状态空间模型计算所述第二工作子系统的故障率及维修率;
第三构建模块,用于根据所述电源系统B的故障率和维修率、所述配电线路B的故障率和维修率、所述负荷母线B的故障率和维修率构建负荷母线B可靠性的二状态空间模型,所述负荷母线B可靠性的二状态空间模型为:
Figure FDA0002605253070000061
式中,b11、b12、b21和b22均为B矩阵元素,所述B矩阵元素根据所述电源系统B的故障率和维修率、所述配电线路B的故障率和维修率、所述负荷母线B的故障率和维修率计算得到;
第三计算模块,用于根据所述负荷母线B可靠性的二状态空间模型计算所述备用系统的故障率及维修率;
第四构建模块,用于根据所述第一工作子系统的故障率及维修率、所述第二工作子系统的故障率及维修率、所述备用系统的故障率及维修率构建一供一备配电网可靠性评估的四状态空间模型,所述一供一备配电网可靠性评估的四状态空间模型为:
Figure FDA0002605253070000062
式中,c11=1-λA1A2,c22=1-λA2A1,c33=1-λB-AA2,c44=1-μB-A,λA1、λA2和λB-A分别为所述第一工作子系统的故障率、所述第一工作子系统的故障率和所述备用系统的故障率,μA1、μA2和μB-A分别为所述第一工作子系统的维修率、所述第一工作子系统的维修率和所述备用系统的维修率;
第四计算模块,用于根据所述一供一备配电网可靠性评估的四状态空间模型计算所述一供一备配电网的故障率。
CN201710566318.XA 2017-07-12 2017-07-12 一种四状态空间的一供一备配电网供电可靠性评估方法 Expired - Fee Related CN107292533B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710566318.XA CN107292533B (zh) 2017-07-12 2017-07-12 一种四状态空间的一供一备配电网供电可靠性评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710566318.XA CN107292533B (zh) 2017-07-12 2017-07-12 一种四状态空间的一供一备配电网供电可靠性评估方法

Publications (2)

Publication Number Publication Date
CN107292533A CN107292533A (zh) 2017-10-24
CN107292533B true CN107292533B (zh) 2020-10-23

Family

ID=60101367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710566318.XA Expired - Fee Related CN107292533B (zh) 2017-07-12 2017-07-12 一种四状态空间的一供一备配电网供电可靠性评估方法

Country Status (1)

Country Link
CN (1) CN107292533B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5170310A (en) * 1990-11-29 1992-12-08 Square D Company Fail-resistant solid state interruption system
JP2006254666A (ja) * 2005-03-14 2006-09-21 Chugoku Electric Power Co Inc:The 系統切替手順計画方法、系統切替手順計画システム、プログラム、および記録媒体
CN101251835A (zh) * 2008-04-07 2008-08-27 昆明理工大学 一种±800kV换流站主接线可靠性评估方法
CN101446990A (zh) * 2008-08-18 2009-06-03 中国电力科学研究院 一种大干扰概率电压稳定性的评估方法
CN103778274A (zh) * 2013-12-06 2014-05-07 天津大学 考虑隐性故障的超高压线路继电保护系统可靠性评估方法
CN104734171A (zh) * 2015-04-16 2015-06-24 合肥工业大学 一种用于配电网可靠性评估的电动汽车充电站建模方法及其应用

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5170310A (en) * 1990-11-29 1992-12-08 Square D Company Fail-resistant solid state interruption system
JP2006254666A (ja) * 2005-03-14 2006-09-21 Chugoku Electric Power Co Inc:The 系統切替手順計画方法、系統切替手順計画システム、プログラム、および記録媒体
CN101251835A (zh) * 2008-04-07 2008-08-27 昆明理工大学 一种±800kV换流站主接线可靠性评估方法
CN101446990A (zh) * 2008-08-18 2009-06-03 中国电力科学研究院 一种大干扰概率电压稳定性的评估方法
CN103778274A (zh) * 2013-12-06 2014-05-07 天津大学 考虑隐性故障的超高压线路继电保护系统可靠性评估方法
CN104734171A (zh) * 2015-04-16 2015-06-24 合肥工业大学 一种用于配电网可靠性评估的电动汽车充电站建模方法及其应用

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《双重化继电保护系统可靠性的五状态空间模型与评估方法》;郑风雷;《电系统自动化》;20161025;第40卷(第20期);第43-49页 *
《多元件并列运行电力系统供电可靠性评估方法》;袁炜灯;《电气工程学报》;20170228;第12卷(第2期);第26-30页 *

Also Published As

Publication number Publication date
CN107292533A (zh) 2017-10-24

Similar Documents

Publication Publication Date Title
CN109103874B (zh) 考虑负荷特性与分布式电源接入的配电网可靠性评估方法
Beyza et al. The effects of the high penetration of renewable energies on the reliability and vulnerability of interconnected electric power systems
Johnson et al. A Monte Carlo methodology for earthquake impact analysis on the electrical grid
CN102968556A (zh) 一种基于概率分布的配网可靠性判断方法
Billinton et al. Station reliability evaluation using a Monte Carlo approach
CN105701574B (zh) 一种故障率非恒定的配电系统可靠性评估方法
CN103825272A (zh) 一种基于解析法的含分散风电的配电网可靠性确定方法
CN107292532B (zh) 一种五状态空间的一供一备配电网供电可靠性评估方法
CN111143764A (zh) 基于扩散理论的结构复杂配网可靠性评估方法
CN107301479B (zh) 基于自然灾害风险的输电系统多场景规划方法
Vadlamudi et al. Dependability and security-based failure considerations in protection system reliability studies
CN111401719A (zh) 电网的动态风险评估方法及装置
Lin et al. Scenario generation and reduction methods for power flow examination of transmission expansion planning
JP2008154378A (ja) 潮流計算方法及びその装置
CN108400584A (zh) 一种基于相关分析匹配度的微电网故障诊断方法
Marseguerra et al. Monte Carlo estimation of the differential importance measure: application to the protection system of a nuclear reactor
CN112713594B (zh) 一种微电网仿真控制系统
CN107292533B (zh) 一种四状态空间的一供一备配电网供电可靠性评估方法
CN107292116B (zh) 一种三状态空间的一供一备配电网供电可靠性评估方法
Billinton et al. Sensitivity of system operating considerations in generating capacity adequacy evaluation
Abdullah et al. Non-communication and artificial neural network based photovoltaic monitoring using the existing impedance relay
CN107832920A (zh) 海上风电场集群输电网可靠性评估方法和系统
Feng et al. Reliability evaluation for distribution system based on probabilistic model checking
CN109861214B (zh) 判断区域电网暂态功角稳定薄弱线路的方法、系统
Ding et al. Optimal spinning reserve allocation strategy under uncertainties and contingencies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201023

Termination date: 20210712