CN107288669A - A kind of Anchor Agent erecting device - Google Patents
A kind of Anchor Agent erecting device Download PDFInfo
- Publication number
- CN107288669A CN107288669A CN201710658876.9A CN201710658876A CN107288669A CN 107288669 A CN107288669 A CN 107288669A CN 201710658876 A CN201710658876 A CN 201710658876A CN 107288669 A CN107288669 A CN 107288669A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- anchor agent
- foldable
- pallet
- tapping pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 49
- 239000010959 steel Substances 0.000 claims abstract description 49
- 238000010079 rubber tapping Methods 0.000 claims abstract description 46
- 229910001220 stainless steel Inorganic materials 0.000 claims description 3
- 239000010935 stainless steel Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 7
- 238000010276 construction Methods 0.000 abstract description 6
- 230000007115 recruitment Effects 0.000 abstract description 5
- 239000003795 chemical substances by application Substances 0.000 description 35
- 239000002699 waste material Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/008—Anchoring or tensioning means
Abstract
The invention discloses a kind of Anchor Agent erecting device, including steel pipe, pallet and foldable tapping pin;The steel pipe is that pallet is provided with the steel pipe that upper and lower side is equipped with opening, steel pipe, and pallet lower end is provided with foldable tapping pin;The foldable tapping pin is fixedly connected on pallet lower end, and extends downwardly out outside steel pipe.The advantage of the invention is that:(1) it is simple in construction, easy to operate:Anchor Agent is loaded in steel pipe, by steel pipe upper end opening alignment square, foldable tapping pin is promoted, Anchor Agent is sent into square bottom discloses reality, foldable tapping pin can be opened to regulation to the length needed when eye is deep;(2) material is saved;(3) routine operation needs 3 people's operations, and people's operation is only needed using the present apparatus, reduces recruitment;(4) consumption, raising efficiency when saving;(5) operating personnel step on ladder or platform easily slips, using eliminating this potential safety hazard after the present apparatus;(6) present apparatus makes simple, and cost is low.
Description
Technical field
The present invention relates to and mine laneway rockbolt installation field, a kind of more particularly to Anchor Agent erecting device.
Background technology
During tunnelling, fixing anchor bar is generally required, the fixation of anchor pole typically needs following manner to carry out:In working face
Top, which is helped, opens up anchor pole eyelet;Then the Anchor Agent for fixing anchor bar is being inserted into anchor pole eyelet;Finally anchor pole is inserted again
In the anchor pole eyelet for entering to have had been charged into Anchor Agent.Anchor pole eyelet is vertically arranged, is obliquely installed or is horizontally disposed with.Anchor Agent is solid
Shape, in strip, and two ends end is spherical in shape.
For a long time, during anchor bolt construction operation, it is always artificial operation that Anchor Agent, which is installed, and operating personnel are in operating process
In, there is the possibility that the country rock loosened by top plate injures by a crashing object;When running into tunnel of the height more than 3 meters, also need to set up operating platform or
Ladder is stepped on to ascend a height operation.In addition, during execute-in-place, Anchor Agent is also often disclosed or fallen down up, back and forth repeatedly, directly
Connect influence driving and manufacturing schedule.
Therefore, it is badly in need of a kind of simple in construction, easy to operate, safely and effectively Anchor Agent erecting device at present.
The content of the invention
Have it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of simple in construction, easy to operate, safety
The Anchor Agent erecting device of effect.
The present invention is achieved by the following technical solutions:A kind of Anchor Agent erecting device, including steel pipe, pallet and can roll over
Folded tapping pin;The steel pipe is that pallet is provided with the steel pipe that upper and lower side is equipped with opening, steel pipe, and pallet lower end is disclosed provided with foldable
Bar;The foldable tapping pin is fixedly connected on pallet lower end, and extends downwardly out outside steel pipe.
One of preferred embodiment as the present invention, the steel pipe is thin-wall stainless steel round steel pipe, and steel pipe upper end is open
Size and Anchor Agent matching size close.
One of preferred embodiment as the present invention, the open internal diameter size in the steel pipe upper end is slightly larger than the external diameter of Anchor Agent
Size.
One of preferred embodiment as the present invention, the steel pipe lower end is open interior provided with a gear concordant with steel pipe lower end
The perforation crossed for foldable tapping pin is provided with the middle part of plate, baffle plate.
One of preferred embodiment as the present invention, the baffle plate is specially ring baffle, and the internal diameter size of perforation is slightly less than
The outside dimension of pallet.
One of preferred embodiment as the present invention, the pallet is round tray, and the middle part of pallet lower end is provided with foldable
Tapping pin.
One of preferred embodiment as the present invention, the foldable tapping pin includes leading between at least two tapping pins, two tapping pins
Movable bolt is crossed vertically to be connected.
One of preferred embodiment as the present invention, the tapping pin is circular tapping pin, and single tapping pin length is 600mm.
One of preferred embodiment as the present invention, the open internal diameter size in the steel pipe upper end is 30mm, the external diameter of pallet
Size is 22mm.
The advantage of the present invention compared with prior art is:
(1) it is simple in construction, easy to operate:Anchor Agent is loaded in steel pipe, steel pipe upper end opening alignment square is promoted
Foldable tapping pin, is sent to square bottom by Anchor Agent and discloses reality, foldable tapping pin can be opened to regulation to the length needed when eye is deep;
(2) material is saved:Usual manually installed Anchor Agent, once disclosing to enter, Anchor Agent is just extruded damage, it is necessary to weight
It is new to install, waste of materials;After the present apparatus, Anchor Agent waste is greatly reduced;
(3) recruitment is reduced:Routine operation needs 3 people's operations (people installs Anchor Agent, and a people passs material, people's staircase), uses
The present apparatus only needs people's operation, reduces recruitment;
(4) consumption, raising efficiency when saving:When tunnel is high more than 3 meters, operating platform need to be set up by installing Anchor Agent, be installed
Afterwards, dismantling operation platform is also needed, is needed by worker's skilled operation degree 8-12 minutes, and conventional direct labor installs Anchor Agent
Averagely take as 3 minutes;Averagely taken using the present apparatus as 1 minute, greatly improve operating efficiency;
(5) safe operation:Operating personnel step on ladder or platform easily slips, and using being eliminated after the present apparatus, this safety is hidden
Suffer from;
(6) cost is low:The present apparatus makes simple, and cost is low.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the Anchor Agent erecting device in embodiment 1.
In figure:1 is steel pipe, and 11 be ring baffle, and 12 be perforation, and 2 be pallet, and 3 be foldable tapping pin, and 31 be tapping pin, 32
It is Anchor Agent for movable bolt, 4.
Embodiment
Embodiments of the invention are elaborated below, the present embodiment is carried out lower premised on technical solution of the present invention
Implement, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following implementations
Example.
Embodiment 1
As shown in figure 1, a kind of Anchor Agent erecting device of the present embodiment, is used cooperatively with Anchor Agent 4, including steel pipe 1, support
Disk 2 and foldable tapping pin 3;Steel pipe 1 is that pallet 2 is provided with the steel pipe 1 that upper and lower side is equipped with opening, steel pipe 1, and the lower end of pallet 2 is set
There is foldable tapping pin 3;Foldable tapping pin 3 is fixedly connected on the lower end of pallet 2, and extends downwardly out outside steel pipe 1.
Steel pipe 1 is specially thin-wall stainless steel round steel pipe, and the open internal diameter size in the upper end of steel pipe 1 is 30mm, with external diameter
Size is engaged for 28mm Anchor Agent 4;A ring baffle 11 concordant with the lower end of steel pipe 1, ring are provided with the lower end of steel pipe 1 is open
The perforation 12 at the middle part of shape baffle plate 11 is crossed for foldable tapping pin 3, and the internal diameter size of perforation 12 is slightly less than the outer diameter ruler of pallet 2
It is very little, pallet 2 is limited in steel pipe 1 and does up and down.
Pallet 2 is specially round tray, and the outside dimension of pallet 2 is 22mm, and the middle part of the lower end of pallet 2 is disclosed provided with foldable
Bar 3.
Foldable tapping pin 3 includes connected vertically by movable bolt 32 between three tapping pins 31, each two tapping pin 31, lower end
Tapping pin 31 activity folded against can be realized by the tapping pin 31 of the opposite upper of movable bolt 32;Wherein, tapping pin 31 is specially to justify
Shape tapping pin, the single length of tapping pin 31 is 600mm.
Operation principle:
Anchor Agent 4 is loaded in steel pipe 1, by the upper end of steel pipe 1 opening alignment square, foldable tapping pin 3 is promoted, will anchor
Agent 4 is sent to square bottom and discloses reality;When eye is deep, can by movable bolt 32 by the single tapping pin 31 of foldable tapping pin 3 from rugosity
State is opened to the length to needs.
The advantage of the present apparatus is:
(1) it is simple in construction, easy to operate:Anchor Agent 4 is loaded in steel pipe 1, by the upper end of steel pipe 1 opening alignment square,
Foldable tapping pin 3 is promoted, Anchor Agent 4 is sent into square bottom discloses reality, and eye can open foldable tapping pin 3 regulation to needs when deep
Length;
(2) material is saved:Usual manually installed Anchor Agent 4, once disclose to enter, Anchor Agent 4 be just extruded damage, it is necessary to
Reinstall, waste of materials;After the present apparatus, the waste of Anchor Agent 4 is greatly reduced;
(3) recruitment is reduced:Routine operation needs 3 people's operations (people installs Anchor Agent 4, and a people passs material, people's staircase), uses
The present apparatus only needs people's operation, reduces recruitment;
(4) consumption, raising efficiency when saving:When tunnel is high more than 3 meters, operating platform need to be set up by installing Anchor Agent 4, be installed
Afterwards, dismantling operation platform is also needed, is needed by worker's skilled operation degree 8-12 minutes, and conventional direct labor installs Anchor Agent
4 averagely take as 3 minutes;Averagely taken using the present apparatus as 1 minute, greatly improve operating efficiency;
(5) safe operation:Operating personnel step on ladder or platform easily slips, and using being eliminated after the present apparatus, this safety is hidden
Suffer from;
(6) cost is low:The present apparatus makes simple, and cost is low.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.
Claims (9)
1. a kind of Anchor Agent erecting device, it is characterised in that including steel pipe, pallet and foldable tapping pin;Above and below the steel pipe is
End, which is equipped with the steel pipe of opening, steel pipe, is provided with pallet, and pallet lower end is provided with foldable tapping pin;The foldable tapping pin, which is fixed, to be connected
Pallet lower end is connected to, and is extended downwardly out outside steel pipe.
2. Anchor Agent erecting device according to claim 1, it is characterised in that the steel pipe is thin-wall stainless steel round
The matching size of steel pipe, the open size in steel pipe upper end and Anchor Agent is closed.
3. Anchor Agent erecting device according to claim 2, it is characterised in that the open internal diameter size in the steel pipe upper end
Slightly larger than the outside dimension of Anchor Agent.
4. Anchor Agent erecting device according to claim 1, it is characterised in that in the steel pipe lower end is open provided with one with
The perforation crossed for foldable tapping pin is provided with the middle part of the concordant baffle plate in steel pipe lower end, baffle plate.
5. Anchor Agent erecting device according to claim 4, it is characterised in that the baffle plate is specially ring baffle, is worn
The internal diameter size in hole is slightly less than the outside dimension of pallet.
6. Anchor Agent erecting device according to claim 1, it is characterised in that under the pallet is round tray, pallet
The middle part at end is provided with foldable tapping pin.
7. Anchor Agent erecting device according to claim 1, it is characterised in that the foldable tapping pin includes at least two
It is connected vertically by movable bolt between tapping pin, two tapping pins.
8. Anchor Agent erecting device according to claim 7, it is characterised in that the tapping pin is circular tapping pin, single to disclose
Pole length is 600mm.
9. according to any described Anchor Agent erecting devices of claim 1-8, it is characterised in that open interior in the steel pipe upper end
Footpath size is 30mm, and the outside dimension of pallet is 22mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710658876.9A CN107288669A (en) | 2017-08-04 | 2017-08-04 | A kind of Anchor Agent erecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710658876.9A CN107288669A (en) | 2017-08-04 | 2017-08-04 | A kind of Anchor Agent erecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107288669A true CN107288669A (en) | 2017-10-24 |
Family
ID=60105325
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710658876.9A Pending CN107288669A (en) | 2017-08-04 | 2017-08-04 | A kind of Anchor Agent erecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288669A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202493279U (en) * | 2012-03-26 | 2012-10-17 | 山西焦煤集团有限责任公司 | Anchor rod cartridge installation machine |
CN207064001U (en) * | 2017-08-04 | 2018-03-02 | 淮南矿业(集团)有限责任公司 | A kind of Anchor Agent erecting device |
-
2017
- 2017-08-04 CN CN201710658876.9A patent/CN107288669A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202493279U (en) * | 2012-03-26 | 2012-10-17 | 山西焦煤集团有限责任公司 | Anchor rod cartridge installation machine |
CN207064001U (en) * | 2017-08-04 | 2018-03-02 | 淮南矿业(集团)有限责任公司 | A kind of Anchor Agent erecting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207064001U (en) | A kind of Anchor Agent erecting device | |
CN203954494U (en) | A kind of deep well rescue device | |
CN107288669A (en) | A kind of Anchor Agent erecting device | |
CN205421928U (en) | From upset strutting arrangement | |
CN203394032U (en) | Inside-cylinder climb-type operation frame | |
CN103696569A (en) | Overhead steel-beam platform dismounting device and method | |
CN204126658U (en) | A kind of mine support device | |
CN207032824U (en) | A kind of building engineering construction tile is installed with multi-functional manned device | |
CN203374282U (en) | Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system | |
CN205858384U (en) | A kind of roadway construction preventer | |
CN208534513U (en) | A kind of Anchor Agent sleeve | |
CN209384606U (en) | A kind of adjustable Super High scaffold | |
CN203640290U (en) | High-altitude erected steel beam platform dismounting device | |
CN202520374U (en) | Safety guard for slag removing hole of ventilation shaft in tunnel | |
CN207130887U (en) | Pre-buried channel-section steel closeouts | |
CN109610507A (en) | Nerve of a covering running gear between a kind of support of open-cut station | |
CN104747229A (en) | Safe mining method of high gas area driving working face in low gas mine | |
CN108798732A (en) | Anchor Agent sleeve | |
CN218760005U (en) | Rest oxygen supply cabin for long-distance tunnel construction | |
CN215057541U (en) | Tunnel tunnelling dust prevention device | |
CN216518132U (en) | Assembled simple operation platform for sticking and rescuing in inclined shaft reverse-pulling reaming construction | |
CN204040510U (en) | A kind of safety protective door for elevator hoistways | |
CN205502549U (en) | Split type scaffold of hanging | |
CN208430989U (en) | A kind of fixation device of fracture well head | |
CN205894726U (en) | Whole launching appliance of elevator entrance to a cave door head cutting concrete piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171024 |