CN109610507A - Nerve of a covering running gear between a kind of support of open-cut station - Google Patents

Nerve of a covering running gear between a kind of support of open-cut station Download PDF

Info

Publication number
CN109610507A
CN109610507A CN201811642561.6A CN201811642561A CN109610507A CN 109610507 A CN109610507 A CN 109610507A CN 201811642561 A CN201811642561 A CN 201811642561A CN 109610507 A CN109610507 A CN 109610507A
Authority
CN
China
Prior art keywords
covering
nerve
aluminium alloy
mesh screen
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811642561.6A
Other languages
Chinese (zh)
Inventor
梁玉钊
冯静收
何白琳
罗维
罗庆华
胡如成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Electric Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201811642561.6A priority Critical patent/CN109610507A/en
Publication of CN109610507A publication Critical patent/CN109610507A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets

Abstract

The present invention relates to the coverings of station bracing in open cut construction section Dense mesh screen, nerve of a covering running gear between the station support of specially a kind of manual hand manipulation, the device includes aluminium alloy conduit (1), the fixinig plate (2) of fixed aluminium alloy conduit (1), fixinig plate (2) is anchored in the screw (3) of track girder concrete side, reinforce the plastic dowel sleeve (4) that screw (3) are contacted with concrete, the pulley (5) being installed in aluminium alloy conduit (1), it is connected to Dense mesh screen (8) of the pulley (5) as nerve of a covering on foundation pit, it is fixed on the cap (10) that the anti-limited slip wheel in aluminium alloy conduit (1) both ends (5) skids off.Compared with prior art, the configuration of the present invention is simple, low cost, it is easily operated, it can be operated outside foundation pit protective fence of standing by two workers using 2.5m long band hook bamboo pole, worker falls the security risk of foundation pit when can avoid foundation pit covering, the covering suitable for station bracing in open cut construction section.

Description

Nerve of a covering running gear between a kind of support of open-cut station
Technical field
The present invention relates to dust-proof Covering domain, nerve of a covering row between the open-cut station support of especially a kind of manual hand manipulation Walking apparatus.
Background technique
Xi'an municipal government is to carry out Dust Improvement, iron hand haze work, it is desirable that subway work project must carry out exposed soil hundred Divide hundred coverings, currently, generally using Dense mesh screen similar in foundation pit size, both ends use rope to be tied to branch for covering on station pit Support beam closes on fixed point, needs worker station margin of foundation pit to carry out Dense mesh screen covering or pack up, because standing in deep basal pit marginal operation, deposits The security risk fallen in foundation pit in operation, and take time and effort, it is very big to the efficiency and security risk presence of foundation pit covering Restriction.
Summary of the invention
The object of the invention is to provide the open-cut station support of manual hand manipulation a kind of to overcome above-mentioned insufficient Between nerve of a covering running gear, the apparatus structure is simple, easily operated, and worker can be made to stand outside foundation pit protective fence and carry out foundation pit covering behaviour Make, and easy to operate, manpower can be saved well, covering is time-consuming short, and Safety assurance measures are good.
The purpose of the present invention can be achieved through the following technical solutions:
Nerve of a covering running gear between a kind of support of open-cut station, including Dense mesh screen (7), Dense mesh screen (7) both ends pass through activity Steel loop (6) connects pulley (5), and pulley (5) is mounted in walking slideway, and walking slideway is anchored in the interior of two track girders of foundation pit Side, walking slideway end are equipped with hook (9), and the link (8) of Dense mesh screen (7) end can be hung on hook (9).
Dense mesh screen (7) two sides are equipped with row's steel ring hole (11), movable steel loop (6) connection steel ring hole (11) and pulley (5).
Slideway of walking includes aluminium alloy conduit (1) and fixinig plate (2), and fixinig plate (2) is vertically mounted on aluminium alloy conduit (1) The back side, fixinig plate (2) is mounted on track girder medial surface by bolt (3).
The both ends of aluminium alloy conduit (1) have cap (10).
Steel ring hole (11) spacing 0.25-0.35m, diameter 0.5-1.5cm.
Fixinig plate (2) installs one every 0.5-.07m.
Compared with prior art, the beneficial effects of the present invention are embodied in:
(1) structure is simple, low cost, easily operated;
(2) Dense mesh screen is connected on pulley using movable steel loop, and when Dense mesh screen breakage can be carried out by disassembly activity steel loop Replacement is replaced convenient and efficient;
(3) Dense mesh screen walking slideway is fixed on concrete side, avoids and interferes to other process construction.And it walks Conduit is aluminium alloy, is not easy to corrode, and can be used for a long time;
(4) worker stands foundation pit fence outside using band hook two people of bamboo pole cooperation, can will cover net unfolding and pack up, avoid Operation, falls into the security risk in foundation pit by the foundation pit of station.
Detailed description of the invention
Attached drawing 1 is the general structure schematic diagram of apparatus of the present invention;
Attached drawing 2 is the side structure schematic diagram of apparatus of the present invention;
Attached drawing 3 is the top view of nerve of a covering device in the present invention;
Figure label: 1 it is aluminium alloy conduit, 2 is fixinig plate, 3 is bolt, 4 is plastic dowel sleeve, 5 is pulley, 6 is living Dynamic steel loop, 7 be Dense mesh screen, 8 be A50 steel loop, 9 be link up with, 10 be cap, 11 be 1cm steel ring hole.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Nerve of a covering running gear between the open-cut station support of manual hand manipulation a kind of, as shown in Figure 1, 2, 3, the device Composition are as follows:
Nerve of a covering: including Dense mesh screen 7, the steel ring hole 11 of a 1cm is arranged every 0.3m for fixed both ends, using movable steel loop It is connect in 6 sets of steel ring holes 11 with pulley 5, A50 steel loop 8 is installed at 7 both ends of Dense mesh screen, for hanging over the extension of side wall after Dense mesh screen expansion On hook 9.
Walking slideway: the fixinig plate 2 including aluminium alloy conduit 1 and fixed aluminium alloy conduit 1, fixinig plate (2) are anchored in rail Road beam concrete side is fixed by bolt and 3 with the plastic dowel sleeve 4 in concrete, the cunning being installed in aluminium alloy conduit 1 Wheel 5, the cap 10 that 1 both ends of aluminium alloy conduit have anti-limited slip wheel 5 to skid off.The aluminium alloy conduit 1 is fixed on two siding track of foundation pit Road beam sides is in same level axis, 1 back side of aluminium alloy conduit, one fixinig plate 2 of every 0.6m right angle setting, fixinig plate 2 It is anchored in track beam sides by bolt and plastic dowel sleeve 4, is mounted to walking slideway.
Specific application method are as follows: on the hook 9 that the steel loop 8 of Dense mesh screen 7 is hung over to walking slideway one end, 7 liang of Dense mesh screen The steel ring hole 11 of side by steel loop 6 connect pulley 5, worker stand foundation pit fence outside using band hook two people of bamboo pole cooperation, can will It covers net unfolding and packs up.
The present invention not only can guarantee foundation pit closing Dense mesh screen covering, but also can prevent covering Dense mesh screen by the foundation pit of worker station from crashing into base The security risk in hole, structure is simple, easy to operate, and foundation pit Dense mesh screen covers very between open-cut station supporting beam.
It above are only specific embodiments of the present invention, but the present invention is not limited thereto, it is all to be conceived using this to the present invention The change for carrying out unsubstantiality, should all be included in the protection scope of the present invention.

Claims (6)

1. nerve of a covering running gear between a kind of open-cut station support, including Dense mesh screen (7), it is characterised in that: Dense mesh screen (7) both ends Pulley (5) are connected by movable steel loop (6), pulley (5) is mounted in walking slideway, and walking slideway is anchored in two tracks of foundation pit The inside of beam, walking slideway end are equipped with hook (9), and the link (8) of Dense mesh screen (7) end can be hung on hook (9).
2. nerve of a covering running gear between open-cut station support according to claim 1, it is characterised in that: Dense mesh screen (7) two Side is equipped with row's steel ring hole (11), movable steel loop (6) connection steel ring hole (11) and pulley (5).
3. nerve of a covering running gear between open-cut station according to claim 1 support, it is characterised in that: walking slideway includes Aluminium alloy conduit (1) and fixinig plate (2), fixinig plate (2) are vertically mounted on the back side of aluminium alloy conduit (1), and fixinig plate (2) passes through Bolt (3) is mounted on track girder medial surface.
4. nerve of a covering running gear between open-cut station support according to claim 3, it is characterised in that: aluminium alloy conduit (1) both ends have cap (10).
5. nerve of a covering running gear between open-cut station support according to claim 2, it is characterised in that: between steel ring hole (11) Away from 0.25-0.35m, diameter 0.5-1.5cm.
6. nerve of a covering running gear between open-cut station support according to claim 3, it is characterised in that: fixinig plate (2) is every One is installed every 0.5-.07m.
CN201811642561.6A 2018-12-29 2018-12-29 Nerve of a covering running gear between a kind of support of open-cut station Pending CN109610507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811642561.6A CN109610507A (en) 2018-12-29 2018-12-29 Nerve of a covering running gear between a kind of support of open-cut station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811642561.6A CN109610507A (en) 2018-12-29 2018-12-29 Nerve of a covering running gear between a kind of support of open-cut station

Publications (1)

Publication Number Publication Date
CN109610507A true CN109610507A (en) 2019-04-12

Family

ID=66017317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811642561.6A Pending CN109610507A (en) 2018-12-29 2018-12-29 Nerve of a covering running gear between a kind of support of open-cut station

Country Status (1)

Country Link
CN (1) CN109610507A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910612A (en) * 2020-08-19 2020-11-10 中建八局第四建设有限公司 Telescopic dust screen

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000312553A (en) * 1999-03-01 2000-11-14 Yuichi Watanabe Method for sanitarily maintaining sandbox
JP3608568B1 (en) * 2003-11-12 2005-01-12 謹治 竹内 The structure of the foundation of the building consisting of the ground improvement body and the solid foundation, and the foundation construction method for the ground improvement
CN204754261U (en) * 2015-06-16 2015-11-11 中国十七冶集团有限公司 Safe foundation ditch faces limit protector
CN207376821U (en) * 2017-08-13 2018-05-18 中交一公局桥隧工程有限公司 A kind of electronic rain shade suitable on Metro station excavation
CN207714339U (en) * 2017-12-29 2018-08-10 中铁十八局集团第五工程有限公司 Zip mode covering device for foundation pit
CN207775894U (en) * 2017-11-02 2018-08-28 中国建筑第八工程局有限公司 It can turnover type foundation pit dustproof network structure
CN108756262A (en) * 2018-07-06 2018-11-06 上海宝冶集团有限公司 A kind of foundation pit large span covers system automatically

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000312553A (en) * 1999-03-01 2000-11-14 Yuichi Watanabe Method for sanitarily maintaining sandbox
JP3608568B1 (en) * 2003-11-12 2005-01-12 謹治 竹内 The structure of the foundation of the building consisting of the ground improvement body and the solid foundation, and the foundation construction method for the ground improvement
CN204754261U (en) * 2015-06-16 2015-11-11 中国十七冶集团有限公司 Safe foundation ditch faces limit protector
CN207376821U (en) * 2017-08-13 2018-05-18 中交一公局桥隧工程有限公司 A kind of electronic rain shade suitable on Metro station excavation
CN207775894U (en) * 2017-11-02 2018-08-28 中国建筑第八工程局有限公司 It can turnover type foundation pit dustproof network structure
CN207714339U (en) * 2017-12-29 2018-08-10 中铁十八局集团第五工程有限公司 Zip mode covering device for foundation pit
CN108756262A (en) * 2018-07-06 2018-11-06 上海宝冶集团有限公司 A kind of foundation pit large span covers system automatically

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910612A (en) * 2020-08-19 2020-11-10 中建八局第四建设有限公司 Telescopic dust screen

Similar Documents

Publication Publication Date Title
CN206341631U (en) One kind suspension vertical greening device
CN109610507A (en) Nerve of a covering running gear between a kind of support of open-cut station
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN204738226U (en) Arched bridge main arch bottom plate rail formula tool car
CN103742193B (en) The mounting method of the soft filter pipe of a kind of underground goaf hydraulic fill
CN109162466A (en) Room level units formula curtain wall installing structure and method
CN206844692U (en) A kind of semi-automatic safety protective shed for high-rise building construction
CN205875168U (en) A prevent structure of falling for foundation ditch steel shotcrete
CN213419165U (en) Mine mining engineering monitoring and early warning device
CN204125116U (en) Wellhead blowout preventor checking maintenance platform
CN211549732U (en) Novel supporting device for coal mine tunnel
CN204661194U (en) Firedamp sensor jacking system
CN202308947U (en) Cable trough of thin seam scraper conveyor
CN203834484U (en) Multifunctional protection cage
CN205936683U (en) Flexible stand hydraulically controlled check valve and relief valve protector
CN208534513U (en) A kind of Anchor Agent sleeve
CN207472142U (en) A kind of well blasting protection device
CN107604829B (en) A kind of pier cap beam tensioning assembled tensioning job platform and preparation method thereof
CN104695848A (en) Novel vertical shaft safety ladder
CN206616875U (en) A kind of building safety protector
CN110130669A (en) A kind of manually digging hole operation safety protection cover
CN220815696U (en) Sliding push-pull type temporary roof protection device for underground roadway
CN108798732A (en) Anchor Agent sleeve
CN208791069U (en) The sliding lifting device of water pump
CN204716264U (en) A kind of forestope temporary lining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 550003 No. 23, jujube Road, Yunyan District, Guizhou, Guiyang

Applicant after: CHINA RAILWAY NO.5 ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY WUJU GROUP ELECTRIC WORKS ENGINEERING Corp.

Address before: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Applicant before: CHINA RAILWAY NO.5 ENGINEERING GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY WUJU GROUP ELECTRIC WORKS ENGINEERING Corp.

CB02 Change of applicant information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412

RJ01 Rejection of invention patent application after publication