CN107288662A - A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method - Google Patents
A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method Download PDFInfo
- Publication number
- CN107288662A CN107288662A CN201710725459.1A CN201710725459A CN107288662A CN 107288662 A CN107288662 A CN 107288662A CN 201710725459 A CN201710725459 A CN 201710725459A CN 107288662 A CN107288662 A CN 107288662A
- Authority
- CN
- China
- Prior art keywords
- inclined shaft
- poured
- sets
- concrete
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 238000005266 casting Methods 0.000 claims abstract description 9
- 239000000203 mixture Substances 0.000 claims abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 230000032258 transport Effects 0.000 description 15
- 238000000034 method Methods 0.000 description 4
- 238000005086 pumping Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000003756 stirring Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000009885 systemic effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/04—Transport of mined material in gravity inclines; in staple or inclined shafts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method:Inclined shaft penetrates main hole from tunnel side, concrete after mix enters the collecting bin of inclined shaft bottom by the chute installed on inclined shaft, then both sides casting area is transported to by delivery pump, each casting area is carried out subregion and poured using four sets of end templates and two sets of side arch templates, the present invention solves spoil disposal transport by inclined shaft chute and concrete enters the interference that hole pours transport parallel operations, relay is pumped by main tunnel and overcomes flexible transport in hole, concrete transportation and pick the narrow and small difficulty of bottom equipment larger passage, add the template configuration mode combination subregion of 2 sets of side and roof arch to pour by 4 sets of end templates to add the scope of operation and optimize space, ensure to accelerate construction speed on the premise of construction quality and safety.
Description
Technical field
The present invention relates to a kind of construction method of tunnel-liner, and in particular to point of a kind of concrete incline shaft transport and tunnel
Area's casting method.
Background technology
When tunnel cross-section is smaller, the inclined shaft gradient reaches 24 °, the discrepancy in elevation reach 213.5m and more than, inclined shaft length reaches
During 575.75m, the Bian Wa sides lining cutting of inclined shaft tunnel is difficult to, to ensure construction safety and engineering safety after the completion of excavation how
Realize in hole that transport is not disturbed, the way traffic space of the inside lining parallel operations of concrete transportation hole and transport channel is construction
When problem.The country now build similar tunnel, in order to ensure tunnel-liner can typically take without interruption full hole pick completely bottom and
Bottom cushion is poured finish after concentrate and pour, in hole in the mode of the main material such as transport concrete and reinforcing bar selecting sequence operation, hole
Concrete is transported using tank car.This kind of engineering method by process due to being arranged, the narrow limitation of transporting equipment and operating area, during either simplex sequence
Between it is long, need exact sequence operation, last process directly restricts the implementation of subsequent processing, and construction speed is slow, not motor-driven, dumb,
There is larger hidden danger to job safety.Therefore there is no a set of compared with system, peace in tunnel construction sections for middle narrow-bore tunnel in the prior art
Entirely, quick construction method.
The content of the invention
The technical problem to be solved in the present invention is:A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining are provided
Build construction method, with overcome prior art exist activity time length, construction organization is loose, work efficiency is low, cost is high, inter process not
The problems such as energy parallel operations, tunnel concrete transport are discontinuously, construction equipment is dumb motor-driven.
Technical scheme
A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method:Inclined shaft penetrates master from tunnel side
Concrete after hole, mix enters the collecting bin of inclined shaft bottom by the chute installed on inclined shaft, is then transported to by delivery pump
Both sides casting area, each casting area is carried out subregion and poured using four sets of end templates and two sets of side arch templates.
It is as follows that subregion pours order:
First, reinforcing bar row is into after flowing water, and end template and floor bow member that first first, the firstth area of making pours storehouse erect abutment wall arch
Frame, sidewall template, install arch bow member, arch template;
2nd, the end template and floor bow member that making second pours storehouse;
3rd, the first storehouse is poured;
4th, after solidifying, the sidewall template and arch template in a upper storehouse are removed, and is installed to next storehouse;The orlop template of making the 3rd
With bottom plate bow member;
5th, the second storehouse is poured;
6th, repeat step four, five is until poured the firstth area, and the whole moulds of dismounting are transported to next area.
7th, repeat step one to six, completes pouring for the secondth area and subsequent zone.
Inclined shaft bottom sets the collecting bin more than 2.5m3.
When inclined shaft uses a chute, inclined shaft pin sets a concrete pump to switch by delivery pump bend pipe and realized
The switching that upper and lower tunnel concrete is poured;Inclined shaft realizes concrete transportation grade separation when setting two chutes by the setting of elevation
Transport and switching.
The same scope of operation, which is set, when subregion is poured is no more than 200m.
Beneficial effects of the present invention:
Spoil disposal transport is solved by inclined shaft chute and concrete enters the interference that hole pours transport parallel operations, passes through main tunnel
Pumping relay overcomes flexible transport in hole, concrete transportation and picks the narrow and small difficulty of bottom equipment larger passage, passes through 4 sets of bed dies
Plate adds the template configuration mode combination subregion of 2 sets of side and roof arch to pour to add the scope of operation and optimize space, it is ensured that construction quality and
Construction speed is accelerated on the premise of safety.
Concrete stirring system is installed in inclined shaft near top, concrete mixing finishes that to be directly entered incline shaft transport special spacious
Mouthful chute enters inclined shaft bottom collecting bin buffering, then transports casting area to by delivery pump, it is possible to achieve concrete it is continuous
Transport, raising pours efficiency.
It can simultaneously be erected with previous set template using more a set of bed die with continuous placing, realize that continuous remove erects simultaneously
Mode accelerate the vertical speed of tearing open of template, improve the service efficiency and speed of perfusion of template.
Brief description of the drawings:
Fig. 1 is concrete inclined shaft structure for conveying of the invention.
Fig. 2 is subregion formwork for placing structure chart of the present invention.
Embodiment:
Such as Fig. 1, inclined shaft penetrates main hole from tunnel side, and the inclination angle of inclined shaft is to be provided with chute on 17-24 °, inclined shaft, on inclined shaft top
Concrete after concrete stirring system, mix is installed near portion gathering materials for inclined shaft bottom is entered by the chute installed on inclined shaft
Storehouse, collecting bin, which is more than below 2.5m3, collecting bin, installs delivery pump and two delivery pump bend pipes by concrete conveyance to two sections
Pouring in face, hole between the horizontal transport gradient -0.24% to 0.24% for tunnel, can be achieved to pump intermediate haulage up to 1.4km descendings,
Single pump relay is farthest up to 640m.Go out in hole in order to which the unimpeded selection section relatively for ensureing flexible transport passage is larger as conveying
The lay down location of pump, separate unit pumping distance no more than 600m.
Inclined shaft can also set two chutes, at this moment just realize the transport of concrete transportation grade separation by the setting of elevation and cut
Change.
The same scope of operation, which is set, when subregion is poured is no more than 200m.Each casting area uses four sets of end templates and two sets of sides
Arch template is poured, and it is as follows that specific subregion pours order:
First, reinforcing bar row is into after flowing water, end template and floor bow member that first first, one area of making pours storehouse, erect abutment wall bow member,
Sidewall template, installs arch bow member, arch template;
2nd, the end template and floor bow member that making second pours storehouse;
3rd, the first storehouse is poured;
4th, after solidifying, the sidewall template and arch template in a upper storehouse are removed, and is installed to next storehouse;The orlop template of making the 3rd
With bottom plate bow member;
5th, the second storehouse is poured;
6th, repeat step four, five is until poured the firstth area, and the whole moulds of dismounting are transported to next area.
7th, repeat step one to six, completes pouring for the secondth area and subsequent zone.
By this construction method, establish concrete inclined shaft sliding chute transportation, main tunnel pumping intermediate haulage, concrete subregion and pour
Build, the systemic construction system of template configuration mode.
Claims (5)
1. a kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method, it is characterised in that:Inclined shaft is from tunnel
Road side penetrates the collecting bin that the concrete after main hole, mix enters inclined shaft bottom by the chute installed on inclined shaft, Ran Houtong
Cross delivery pump and transport both sides casting area to, each casting area is carried out subregion and poured using four sets of end templates and two sets of side arch templates
Build.
2. the long inclined shaft narrow-bore tunnel concrete transportation of heavy grade according to claim 1 and lining construction method, it is special
Levy and be that the step of subregion is poured is as follows:
First, reinforcing bar row is into after flowing water, end template and floor bow member that first first, one area of making pours storehouse, erect abutment wall bow member,
Sidewall template, installs arch bow member, arch template;
2nd, the end template and floor bow member that making second pours storehouse;
3rd, the first storehouse is poured;
4th, after solidifying, the sidewall template and arch template in a upper storehouse are removed, and is installed to next storehouse;The orlop template of making the 3rd
With bottom plate bow member;
5th, the second storehouse is poured;
6th, repeat step four, five is until poured the firstth area, and the whole moulds of dismounting are transported to next area;
7th, repeat step one to six, completes pouring for the secondth area and subsequent zone.
3. the long inclined shaft narrow-bore tunnel concrete transportation of heavy grade according to claim 2 and lining construction method, it is special
Levy and be:Inclined shaft bottom sets the collecting bin more than 2.5m3.
4. the long inclined shaft narrow-bore tunnel concrete transportation of heavy grade according to claim 1 or 2 and lining construction method, its
It is characterised by:When inclined shaft uses a chute, it is real that inclined shaft pin sets a concrete pump to switch by delivery pump bend pipe
The switching that existing upper and lower tunnel concrete is poured;Realize that concrete transportation is stood by the setting of elevation during inclined shaft two chutes of setting
Ship defeated and switching.
5. the long inclined shaft narrow-bore tunnel concrete transportation of a kind of heavy grade according to claim 1 and lining construction method,
It is characterized in that:The same section scope of operation that pours is set no more than 200m when subregion is poured.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710725459.1A CN107288662A (en) | 2017-08-22 | 2017-08-22 | A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710725459.1A CN107288662A (en) | 2017-08-22 | 2017-08-22 | A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107288662A true CN107288662A (en) | 2017-10-24 |
Family
ID=60107048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710725459.1A Pending CN107288662A (en) | 2017-08-22 | 2017-08-22 | A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288662A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108506022A (en) * | 2018-03-02 | 2018-09-07 | 辽宁西北供水有限责任公司 | A kind of long range jacked piles with small section concrete transportation and lining construction method |
CN111499282A (en) * | 2020-04-17 | 2020-08-07 | 中铁二局集团有限公司 | Preparation method and application of concrete |
CN111734446A (en) * | 2020-06-16 | 2020-10-02 | 中建三局基础设施建设投资有限公司 | Concrete transportation method for small-diameter tunnel of narrow working well |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201357833Y (en) * | 2009-03-11 | 2009-12-09 | 中国水利水电第一工程局有限公司 | Multifunctional conveying trolley used in inclined shaft |
CN202628172U (en) * | 2012-06-08 | 2012-12-26 | 云南建工水利水电建设有限公司 | Concrete conveying device for construction of inclined shaft |
CN103628910A (en) * | 2013-11-29 | 2014-03-12 | 中铁八局集团有限公司 | Big-gradient inclined shaft track transportation system and transportation method thereof |
CN103899091A (en) * | 2014-04-15 | 2014-07-02 | 中国十九冶集团有限公司 | Long-distance gentle-slope concrete conveying device |
-
2017
- 2017-08-22 CN CN201710725459.1A patent/CN107288662A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201357833Y (en) * | 2009-03-11 | 2009-12-09 | 中国水利水电第一工程局有限公司 | Multifunctional conveying trolley used in inclined shaft |
CN202628172U (en) * | 2012-06-08 | 2012-12-26 | 云南建工水利水电建设有限公司 | Concrete conveying device for construction of inclined shaft |
CN103628910A (en) * | 2013-11-29 | 2014-03-12 | 中铁八局集团有限公司 | Big-gradient inclined shaft track transportation system and transportation method thereof |
CN103899091A (en) * | 2014-04-15 | 2014-07-02 | 中国十九冶集团有限公司 | Long-distance gentle-slope concrete conveying device |
Non-Patent Citations (1)
Title |
---|
郭得福: "有轨斜井中混凝土溜槽设计及应用", 《中国土木工程学会第十四届年会暨隧道及地下工程分会第十六届年会》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108506022A (en) * | 2018-03-02 | 2018-09-07 | 辽宁西北供水有限责任公司 | A kind of long range jacked piles with small section concrete transportation and lining construction method |
CN111499282A (en) * | 2020-04-17 | 2020-08-07 | 中铁二局集团有限公司 | Preparation method and application of concrete |
CN111499282B (en) * | 2020-04-17 | 2021-11-09 | 中铁二局集团有限公司 | Preparation method and application of concrete |
CN111734446A (en) * | 2020-06-16 | 2020-10-02 | 中建三局基础设施建设投资有限公司 | Concrete transportation method for small-diameter tunnel of narrow working well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499410B (en) | Tunnel-liner side wall concrete is by window placement layer by layer method | |
CN107288662A (en) | A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method | |
CN106272943A (en) | Insulating light wall board assembly line | |
BG112575A (en) | Method of underground mining of mineral resources | |
CN101705825B (en) | Transport method and equipment in super-large diameter shield method tunnel construction | |
CN101929341A (en) | Construction method for TBM synchronization lining | |
CN108166525A (en) | Semi-prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof | |
CN111852521B (en) | Mouth-shaped piece assembling trolley for construction of internal structure of large-section shield tunnel and synchronous construction method | |
CN110578532A (en) | Gob-side entry retaining arrangement method | |
CN108086354A (en) | Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof | |
CN103470272A (en) | Trolley for concrete construction on multiple sections by employing mining method and construction method thereof | |
CN206874291U (en) | One kind two serves as a contrast chute and enters modular system by window | |
CN104328717A (en) | CRTS III type slab ballastless track self-compacting concrete casting tooling and method | |
CN204783052U (en) | Tunnel platform truck lining cutting slant chute multiwindow is feeding device simultaneously | |
CN105736012B (en) | A kind of tunnel lining concrete grouting device | |
CN117536648A (en) | Tunnel lining automatic layering window-by-window pouring trolley and pouring method | |
CN101956557B (en) | Concrete transport system | |
JP2014084568A (en) | Concrete placing system and concrete placing method | |
CN206439053U (en) | Mould trolley is hanged in the lining cutting of tunnel inverted arch | |
CN205636746U (en) | A device that is used for power station underground factory building concrete to put in storage fast | |
CN106321116B (en) | A kind of tunnel is dug and the construction method of lining concrete parallel operations | |
CN105862868B (en) | A kind of apparatus and method quickly put in storage for underground workshop concrete | |
CN209258814U (en) | Mine funnel is unloaded on a kind of underground moving two sides | |
CN109826650A (en) | A kind of single-track tunnel lining trolley automation cloth system and construction method | |
CN208165931U (en) | A kind of aerial concrete transportation device for small-sized precast block centralized production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171024 |