CN107288662A - A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method - Google Patents

A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method Download PDF

Info

Publication number
CN107288662A
CN107288662A CN201710725459.1A CN201710725459A CN107288662A CN 107288662 A CN107288662 A CN 107288662A CN 201710725459 A CN201710725459 A CN 201710725459A CN 107288662 A CN107288662 A CN 107288662A
Authority
CN
China
Prior art keywords
inclined shaft
poured
sets
concrete
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710725459.1A
Other languages
Chinese (zh)
Inventor
何志敏
何志平
刘玉府
黄勇
邓理游
唐明秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201710725459.1A priority Critical patent/CN107288662A/en
Publication of CN107288662A publication Critical patent/CN107288662A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/04Transport of mined material in gravity inclines; in staple or inclined shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method:Inclined shaft penetrates main hole from tunnel side, concrete after mix enters the collecting bin of inclined shaft bottom by the chute installed on inclined shaft, then both sides casting area is transported to by delivery pump, each casting area is carried out subregion and poured using four sets of end templates and two sets of side arch templates, the present invention solves spoil disposal transport by inclined shaft chute and concrete enters the interference that hole pours transport parallel operations, relay is pumped by main tunnel and overcomes flexible transport in hole, concrete transportation and pick the narrow and small difficulty of bottom equipment larger passage, add the template configuration mode combination subregion of 2 sets of side and roof arch to pour by 4 sets of end templates to add the scope of operation and optimize space, ensure to accelerate construction speed on the premise of construction quality and safety.

Description

A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method
Technical field
The present invention relates to a kind of construction method of tunnel-liner, and in particular to point of a kind of concrete incline shaft transport and tunnel Area's casting method.
Background technology
When tunnel cross-section is smaller, the inclined shaft gradient reaches 24 °, the discrepancy in elevation reach 213.5m and more than, inclined shaft length reaches During 575.75m, the Bian Wa sides lining cutting of inclined shaft tunnel is difficult to, to ensure construction safety and engineering safety after the completion of excavation how Realize in hole that transport is not disturbed, the way traffic space of the inside lining parallel operations of concrete transportation hole and transport channel is construction When problem.The country now build similar tunnel, in order to ensure tunnel-liner can typically take without interruption full hole pick completely bottom and Bottom cushion is poured finish after concentrate and pour, in hole in the mode of the main material such as transport concrete and reinforcing bar selecting sequence operation, hole Concrete is transported using tank car.This kind of engineering method by process due to being arranged, the narrow limitation of transporting equipment and operating area, during either simplex sequence Between it is long, need exact sequence operation, last process directly restricts the implementation of subsequent processing, and construction speed is slow, not motor-driven, dumb, There is larger hidden danger to job safety.Therefore there is no a set of compared with system, peace in tunnel construction sections for middle narrow-bore tunnel in the prior art Entirely, quick construction method.
The content of the invention
The technical problem to be solved in the present invention is:A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining are provided Build construction method, with overcome prior art exist activity time length, construction organization is loose, work efficiency is low, cost is high, inter process not The problems such as energy parallel operations, tunnel concrete transport are discontinuously, construction equipment is dumb motor-driven.
Technical scheme
A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method:Inclined shaft penetrates master from tunnel side Concrete after hole, mix enters the collecting bin of inclined shaft bottom by the chute installed on inclined shaft, is then transported to by delivery pump Both sides casting area, each casting area is carried out subregion and poured using four sets of end templates and two sets of side arch templates.
It is as follows that subregion pours order:
First, reinforcing bar row is into after flowing water, and end template and floor bow member that first first, the firstth area of making pours storehouse erect abutment wall arch Frame, sidewall template, install arch bow member, arch template;
2nd, the end template and floor bow member that making second pours storehouse;
3rd, the first storehouse is poured;
4th, after solidifying, the sidewall template and arch template in a upper storehouse are removed, and is installed to next storehouse;The orlop template of making the 3rd With bottom plate bow member;
5th, the second storehouse is poured;
6th, repeat step four, five is until poured the firstth area, and the whole moulds of dismounting are transported to next area.
7th, repeat step one to six, completes pouring for the secondth area and subsequent zone.
Inclined shaft bottom sets the collecting bin more than 2.5m3.
When inclined shaft uses a chute, inclined shaft pin sets a concrete pump to switch by delivery pump bend pipe and realized The switching that upper and lower tunnel concrete is poured;Inclined shaft realizes concrete transportation grade separation when setting two chutes by the setting of elevation Transport and switching.
The same scope of operation, which is set, when subregion is poured is no more than 200m.
Beneficial effects of the present invention:
Spoil disposal transport is solved by inclined shaft chute and concrete enters the interference that hole pours transport parallel operations, passes through main tunnel Pumping relay overcomes flexible transport in hole, concrete transportation and picks the narrow and small difficulty of bottom equipment larger passage, passes through 4 sets of bed dies Plate adds the template configuration mode combination subregion of 2 sets of side and roof arch to pour to add the scope of operation and optimize space, it is ensured that construction quality and Construction speed is accelerated on the premise of safety.
Concrete stirring system is installed in inclined shaft near top, concrete mixing finishes that to be directly entered incline shaft transport special spacious Mouthful chute enters inclined shaft bottom collecting bin buffering, then transports casting area to by delivery pump, it is possible to achieve concrete it is continuous Transport, raising pours efficiency.
It can simultaneously be erected with previous set template using more a set of bed die with continuous placing, realize that continuous remove erects simultaneously Mode accelerate the vertical speed of tearing open of template, improve the service efficiency and speed of perfusion of template.
Brief description of the drawings:
Fig. 1 is concrete inclined shaft structure for conveying of the invention.
Fig. 2 is subregion formwork for placing structure chart of the present invention.
Embodiment:
Such as Fig. 1, inclined shaft penetrates main hole from tunnel side, and the inclination angle of inclined shaft is to be provided with chute on 17-24 °, inclined shaft, on inclined shaft top Concrete after concrete stirring system, mix is installed near portion gathering materials for inclined shaft bottom is entered by the chute installed on inclined shaft Storehouse, collecting bin, which is more than below 2.5m3, collecting bin, installs delivery pump and two delivery pump bend pipes by concrete conveyance to two sections Pouring in face, hole between the horizontal transport gradient -0.24% to 0.24% for tunnel, can be achieved to pump intermediate haulage up to 1.4km descendings, Single pump relay is farthest up to 640m.Go out in hole in order to which the unimpeded selection section relatively for ensureing flexible transport passage is larger as conveying The lay down location of pump, separate unit pumping distance no more than 600m.
Inclined shaft can also set two chutes, at this moment just realize the transport of concrete transportation grade separation by the setting of elevation and cut Change.
The same scope of operation, which is set, when subregion is poured is no more than 200m.Each casting area uses four sets of end templates and two sets of sides Arch template is poured, and it is as follows that specific subregion pours order:
First, reinforcing bar row is into after flowing water, end template and floor bow member that first first, one area of making pours storehouse, erect abutment wall bow member, Sidewall template, installs arch bow member, arch template;
2nd, the end template and floor bow member that making second pours storehouse;
3rd, the first storehouse is poured;
4th, after solidifying, the sidewall template and arch template in a upper storehouse are removed, and is installed to next storehouse;The orlop template of making the 3rd With bottom plate bow member;
5th, the second storehouse is poured;
6th, repeat step four, five is until poured the firstth area, and the whole moulds of dismounting are transported to next area.
7th, repeat step one to six, completes pouring for the secondth area and subsequent zone.
By this construction method, establish concrete inclined shaft sliding chute transportation, main tunnel pumping intermediate haulage, concrete subregion and pour Build, the systemic construction system of template configuration mode.

Claims (5)

1. a kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method, it is characterised in that:Inclined shaft is from tunnel Road side penetrates the collecting bin that the concrete after main hole, mix enters inclined shaft bottom by the chute installed on inclined shaft, Ran Houtong Cross delivery pump and transport both sides casting area to, each casting area is carried out subregion and poured using four sets of end templates and two sets of side arch templates Build.
2. the long inclined shaft narrow-bore tunnel concrete transportation of heavy grade according to claim 1 and lining construction method, it is special Levy and be that the step of subregion is poured is as follows:
First, reinforcing bar row is into after flowing water, end template and floor bow member that first first, one area of making pours storehouse, erect abutment wall bow member, Sidewall template, installs arch bow member, arch template;
2nd, the end template and floor bow member that making second pours storehouse;
3rd, the first storehouse is poured;
4th, after solidifying, the sidewall template and arch template in a upper storehouse are removed, and is installed to next storehouse;The orlop template of making the 3rd With bottom plate bow member;
5th, the second storehouse is poured;
6th, repeat step four, five is until poured the firstth area, and the whole moulds of dismounting are transported to next area;
7th, repeat step one to six, completes pouring for the secondth area and subsequent zone.
3. the long inclined shaft narrow-bore tunnel concrete transportation of heavy grade according to claim 2 and lining construction method, it is special Levy and be:Inclined shaft bottom sets the collecting bin more than 2.5m3.
4. the long inclined shaft narrow-bore tunnel concrete transportation of heavy grade according to claim 1 or 2 and lining construction method, its It is characterised by:When inclined shaft uses a chute, it is real that inclined shaft pin sets a concrete pump to switch by delivery pump bend pipe The switching that existing upper and lower tunnel concrete is poured;Realize that concrete transportation is stood by the setting of elevation during inclined shaft two chutes of setting Ship defeated and switching.
5. the long inclined shaft narrow-bore tunnel concrete transportation of a kind of heavy grade according to claim 1 and lining construction method, It is characterized in that:The same section scope of operation that pours is set no more than 200m when subregion is poured.
CN201710725459.1A 2017-08-22 2017-08-22 A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method Pending CN107288662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710725459.1A CN107288662A (en) 2017-08-22 2017-08-22 A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710725459.1A CN107288662A (en) 2017-08-22 2017-08-22 A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method

Publications (1)

Publication Number Publication Date
CN107288662A true CN107288662A (en) 2017-10-24

Family

ID=60107048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710725459.1A Pending CN107288662A (en) 2017-08-22 2017-08-22 A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method

Country Status (1)

Country Link
CN (1) CN107288662A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506022A (en) * 2018-03-02 2018-09-07 辽宁西北供水有限责任公司 A kind of long range jacked piles with small section concrete transportation and lining construction method
CN111499282A (en) * 2020-04-17 2020-08-07 中铁二局集团有限公司 Preparation method and application of concrete
CN111734446A (en) * 2020-06-16 2020-10-02 中建三局基础设施建设投资有限公司 Concrete transportation method for small-diameter tunnel of narrow working well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201357833Y (en) * 2009-03-11 2009-12-09 中国水利水电第一工程局有限公司 Multifunctional conveying trolley used in inclined shaft
CN202628172U (en) * 2012-06-08 2012-12-26 云南建工水利水电建设有限公司 Concrete conveying device for construction of inclined shaft
CN103628910A (en) * 2013-11-29 2014-03-12 中铁八局集团有限公司 Big-gradient inclined shaft track transportation system and transportation method thereof
CN103899091A (en) * 2014-04-15 2014-07-02 中国十九冶集团有限公司 Long-distance gentle-slope concrete conveying device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201357833Y (en) * 2009-03-11 2009-12-09 中国水利水电第一工程局有限公司 Multifunctional conveying trolley used in inclined shaft
CN202628172U (en) * 2012-06-08 2012-12-26 云南建工水利水电建设有限公司 Concrete conveying device for construction of inclined shaft
CN103628910A (en) * 2013-11-29 2014-03-12 中铁八局集团有限公司 Big-gradient inclined shaft track transportation system and transportation method thereof
CN103899091A (en) * 2014-04-15 2014-07-02 中国十九冶集团有限公司 Long-distance gentle-slope concrete conveying device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭得福: "有轨斜井中混凝土溜槽设计及应用", 《中国土木工程学会第十四届年会暨隧道及地下工程分会第十六届年会》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506022A (en) * 2018-03-02 2018-09-07 辽宁西北供水有限责任公司 A kind of long range jacked piles with small section concrete transportation and lining construction method
CN111499282A (en) * 2020-04-17 2020-08-07 中铁二局集团有限公司 Preparation method and application of concrete
CN111499282B (en) * 2020-04-17 2021-11-09 中铁二局集团有限公司 Preparation method and application of concrete
CN111734446A (en) * 2020-06-16 2020-10-02 中建三局基础设施建设投资有限公司 Concrete transportation method for small-diameter tunnel of narrow working well

Similar Documents

Publication Publication Date Title
CN106499410B (en) Tunnel-liner side wall concrete is by window placement layer by layer method
CN107288662A (en) A kind of long inclined shaft narrow-bore tunnel concrete transportation of heavy grade and lining construction method
CN106272943A (en) Insulating light wall board assembly line
BG112575A (en) Method of underground mining of mineral resources
CN101705825B (en) Transport method and equipment in super-large diameter shield method tunnel construction
CN101929341A (en) Construction method for TBM synchronization lining
CN108166525A (en) Semi-prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof
CN111852521B (en) Mouth-shaped piece assembling trolley for construction of internal structure of large-section shield tunnel and synchronous construction method
CN110578532A (en) Gob-side entry retaining arrangement method
CN108086354A (en) Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof
CN103470272A (en) Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN206874291U (en) One kind two serves as a contrast chute and enters modular system by window
CN104328717A (en) CRTS III type slab ballastless track self-compacting concrete casting tooling and method
CN204783052U (en) Tunnel platform truck lining cutting slant chute multiwindow is feeding device simultaneously
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN117536648A (en) Tunnel lining automatic layering window-by-window pouring trolley and pouring method
CN101956557B (en) Concrete transport system
JP2014084568A (en) Concrete placing system and concrete placing method
CN206439053U (en) Mould trolley is hanged in the lining cutting of tunnel inverted arch
CN205636746U (en) A device that is used for power station underground factory building concrete to put in storage fast
CN106321116B (en) A kind of tunnel is dug and the construction method of lining concrete parallel operations
CN105862868B (en) A kind of apparatus and method quickly put in storage for underground workshop concrete
CN209258814U (en) Mine funnel is unloaded on a kind of underground moving two sides
CN109826650A (en) A kind of single-track tunnel lining trolley automation cloth system and construction method
CN208165931U (en) A kind of aerial concrete transportation device for small-sized precast block centralized production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024