CN107288571A - Integrated layered gas distribution and pressure measurement process for gas well - Google Patents

Integrated layered gas distribution and pressure measurement process for gas well Download PDF

Info

Publication number
CN107288571A
CN107288571A CN201710546263.6A CN201710546263A CN107288571A CN 107288571 A CN107288571 A CN 107288571A CN 201710546263 A CN201710546263 A CN 201710546263A CN 107288571 A CN107288571 A CN 107288571A
Authority
CN
China
Prior art keywords
integrated
packer
measuring cell
production
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710546263.6A
Other languages
Chinese (zh)
Other versions
CN107288571B (en
Inventor
杨野
张永平
徐德奎
马文海
李俊亮
刘淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Original Assignee
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd, Daqing Oilfield Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201710546263.6A priority Critical patent/CN107288571B/en
Publication of CN107288571A publication Critical patent/CN107288571A/en
Application granted granted Critical
Publication of CN107288571B publication Critical patent/CN107288571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Measuring Fluid Pressure (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to the technical field of oil field oil extraction engineering, and belongs to an integrated layered gas distribution and pressure measurement process for a gas well. The invention solves the problems that the conventional eccentric production allocator can only allocate one layer by throwing and fishing at one time, the process structure is complex and the operation cost is high. The device consists of a control monitoring device and an underground layered mining pipe column, wherein the control monitoring device consists of a ground controller (1), a steel wire controller (2) and a steel wire operation vehicle (3), and the underground layered mining pipe column consists of an oil pipe (4), a suspension packer (5), a Y341 integrated production allocation packer (6), a Y341 balance packer (7), a ball seat (8) and an integrated layered gas allocation pressure gauge (9); the invention has the advantages of one-time casting and fishing, capability of simultaneously realizing the capacity allocation of two different production layers and the dynamic and static pressure monitoring before and after the mouth of the production layer, simple casting and fishing process, less casting and fishing times and the like.

Description

A kind of gas well integrated form layering distribution and pressure measurement technique
Technical field
The present invention relates to oil extraction in oil field field of engineering technology, belong to a kind of gas well integrated form layering distribution and pressure measurement technique.
Background technology
Current gas field generally using centering type point excavating technology, the technology utilization eccentric production mandrel realize single payzone pressure measurement, With production, a pulling can only allocate one layer, and process structure is complicated, operating cost is high.Therefore the present invention is have developed, the invented technology Two different payzone dynamic pressure parameters are accurately measured by a pulling, foundation is provided for the production capacity allotment between each layer, it is real Existing two payzones are allocated simultaneously, are a kind of low-cost high-efficiency technique, are met requirement of the gas field to separate zone production.
The content of the invention
It is an object of the invention to provide can a pulling realize the accurate pressure measurement of two different payzones, a kind of gas with production Well integrated form is layered distribution and pressure measurement technique.
The present invention is realized by following device:The present apparatus is by control monitoring device and laminated distributor under well mining tubular column two Part is constituted, and control monitoring device is made up of ground controller, steel wire controller and steel wire operation car, wherein steel wire controller It is connected with steel wire operation car by cable and data wire;Laminated distributor under well mining tubular column is by oil pipe, hanging packer, Y341 integrated forms With production packer, Y341 balances packer, ball seat, integrated form layering distribution measuring cell composition;Wherein ball seat upper end is put down with Y341 Packer lower contact of weighing is threadedly coupled, and Y341 balance packer top connections are connected with tubing round thread, the oil pipe other end and Y341 collection An accepted way of doing sth is with packer lower contact threaded connection is produced, and Y341 integrated forms are with production packer top connected pipes, and the oil pipe other end is with hanging Packer lower contact threaded connection is hung, Y341 is integrated to be layered distribution measuring cell with production packer built with integrated form;The present invention is Realized by following steps:
A, laminated distributor under well mining tubular column is connected in the order described above first, wherein Y341 is integrated dead with being provided with production packer The integrated form layering distribution measuring cell of mouthpiece;
B, after pressing crack construction terminates, the laminated distributor under well mining tubular column that tripping in has been connected under kill-job state;
C, packer setting:After laminated distributor under well mining tubular column tripping in production capacity desired depth, 20MPa is suppressed in oil pipe, repeatedly three Secondary, voltage stabilizing 10min realizes hanging packer, Y341 integrated forms with production packer, three packers of Y341 balance packers simultaneously Set;
D, tubing string and testing seal about packer:Ground is suppressed, and forms tri- pressure steps of 10-15-20MPa, and integrated form layering distribution is surveyed Pressure instrument records the change that pressure is set inside oil pipe outside head of liquid and oil pipe respectively, and oil jacket annular space suppresses 5MPa, passes through steel Silk controller control steel wire operation car pulls integrated form layering distribution measuring cell out, and integrated form is layered distribution measuring cell with being connected ground Data in controller connection playback layering distribution measuring cell;If pressure curve is three pressure steps, contrast oil in oil pipe Pressure and casing pressure value, two values are unequal, you can judge that the realizations of three packers are set, otherwise not set;
E, measurement payzone pressure:Coiled tubing gaslift recovers gas well liquid loading ability, treats the gas testing end of job, true according to oil testing result Fixed correspondence control valve diameter, the diameter valve is loaded in integrated form layering distribution measuring cell, will it is integrated with production measuring cell and Steel wire operation car is attached, and integrated put into production measuring cell to Y341 is integrated is matched somebody with somebody in production packer, 3 days left sides of opening well and making production Pressure sensor measures before upper and lower two layers of mouth, static pressure is moved after mouth respectively before the right side, integrated form layering distribution measuring cell mouth, after mouth Power;
F, determine valve diameter:Control steel wire operation car to pull integrated form out by steel wire controller to be layered distribution measuring cell, will collect It is connected into production measuring cell with ground controller, ground data playback is obtained
Before the mouth of two different payzones, pressure curve after mouth, calculate adjustment integrated form layering distribution measuring cell according to deliverability equation The corresponding valve diameter of interior two payzones;
G, regulation valve:The valve that previous step is determined loads in integrated form layering distribution measuring cell, will by steel wire operation car Integrated form layering distribution measuring cell input Y341 is integrated with production packer, and drive a well operation.
Compared with the prior art the present invention has the following advantages that:
1), integrated form had both been layered the seating nipple of distribution measuring cell with production packer as integrated form in the present invention, but also with packing The effect of gas-bearing formation, two throttling valves and three pressure sensors built in integrated form layering distribution measuring cell, a pulling can be same The class reservoir productivities of Shi Shixian two allocate and payzone mouth before, sound state pressure monitoring after mouth, pulling technique is simple, and operating efficiency is high, Reduce construction cost.
2), the present invention can delivery of solid foam discharging agent and vortex drainage gas production technique in supporting oil pipe.
Brief description of the drawings:Fig. 1 is the field application general illustration of the present invention;Fig. 2 is laminated distributor under well mining tubular column schematic diagram.
Embodiment:The invention will be further described below in conjunction with the accompanying drawings, the present invention be by following device come Realize:The present apparatus is made up of control monitoring device and laminated distributor under well mining tubular column two parts, and control monitoring device is controlled by ground Instrument 1 processed, steel wire controller 2 and steel wire operation car 3 are constituted, and wherein steel wire controller 2 passes through cable and data with steel wire operation car 3 Line is connected;Laminated distributor under well mining tubular column is insulated by oil pipe 4, hanging packer 5, Y341 integrated forms with production packer 6, Y341 balances Device 7, ball seat 8, integrated form layering distribution measuring cell 9 are constituted;Wherein the upper end of ball seat 8 balances the lower contact screw thread of packer 7 with Y341 Connection, the Y341 balance top connections of packer 7 are threadedly coupled with oil pipe 4, and the other end of oil pipe 4 is with Y341 integrated forms with production packer 6 Lower contact is threadedly coupled, and Y341 integrated forms are matched somebody with somebody under the production top connected pipes 4 of packer 6, the other end of oil pipe 4 and hanging packer 5 Joint
Threaded connection, Y341 is integrated to be layered distribution measuring cell 9 with production packer 6 built with integrated form;The present invention is by following Step is realized:
A, laminated distributor under well mining tubular column is connected in the order described above first, wherein Y341 is integrated with being provided with production packer 6 The integrated form layering distribution measuring cell 9 of dead mouthpiece;
B, after pressing crack construction terminates, the laminated distributor under well mining tubular column that tripping in has been connected under kill-job state;
C, packer setting:After laminated distributor under well mining tubular column tripping in production capacity desired depth, 20MPa is suppressed in oil pipe 4, repeatedly three Secondary, voltage stabilizing 10min realizes hanging packer 5, Y341 integrated forms with production packer 6, Y341 balance 7 three packers of packer Set simultaneously;
D, tubing string and testing seal about packer:Ground is suppressed, and forms tri- pressure steps of 10-15-20MPa, and integrated form layering distribution is surveyed Pressure instrument 9 records the change that pressure is set inside the outside head of liquid of oil pipe 4 and oil pipe 4 respectively, and oil jacket annular space is suppressed 5MPa, passed through The control steel wire operation of steel wire controller 2 car 3 pulls integrated form layering distribution measuring cell 9 out, and integrated form layering distribution measuring cell 9 is with connecting Data in the connection playback layering distribution of ground plane controller 1 measuring cell 9;If pressure curve is three pressure platforms in oil pipe 4 Rank, contrast oil pressure and casing pressure value, two values are unequal, you can judge that three packers realizations are set, otherwise not set;
E, measurement payzone pressure:The gaslift of coiled tubing 4 recovers gas well liquid loading ability, the gas testing end of job is treated, according to oil testing result It is determined that correspondence control valve diameter, the diameter valve is loaded in integrated form layering distribution measuring cell 9, by integrated with production measuring cell 9 are attached with steel wire operation car 3, integrated put into production measuring cell 9 to Y341 is integrated are matched somebody with somebody in production packer 6, opening well and making production 3 Before it or so, the mouth of integrated form layering distribution measuring cell 9, after mouth pressure sensor measure respectively before upper and lower two layers of mouth, sound after mouth State pressure;
F, determine valve diameter:Control steel wire operation car 3 to pull integrated form out by steel wire controller 2 and be layered distribution measuring cell 9, will It is integrated with production measuring cell 9 be connected with ground controller 1, ground data playback, obtain two difference payzones mouth before, pressure after mouth Curve, the corresponding valve diameter of two payzones in adjustment integrated form layering distribution measuring cell 9 is calculated according to deliverability equation;
G, regulation valve:The valve that previous step is determined loads in integrated form layering distribution measuring cell 9, passes through steel wire operation car 3 Integrated form layering distribution measuring cell 9 puts into Y341 is integrated with production packer 6, drive a well operation.

Claims (1)

1. a kind of gas well integrated form layering distribution and pressure measurement technique, the technique are realized by following device:
The present apparatus is made up of control monitoring device and laminated distributor under well mining tubular column two parts, and control monitoring device is by ground control Instrument(1), steel wire controller(2)And steel wire operation car(3)Composition, wherein steel wire controller(2)With steel wire operation car(3)Pass through electricity Cable and data wire connection;Laminated distributor under well mining tubular column is by oil pipe(4), hanging packer(5), Y341 integrated forms with production packer (6), Y341 balance packer(7), ball seat(8), integrated form layering distribution measuring cell(9)Composition;Wherein ball seat(8)Upper end with Y341 balances packer(7)Lower contact is threadedly coupled, Y341 balance packers(7)Top connection and oil pipe(4)Threaded connection, oil pipe (4)The other end is with Y341 integrated forms with production packer(6)Lower contact is threadedly coupled, and Y341 integrated forms are with production packer(6)Top Connected pipes(4), oil pipe(4)The other end and hanging packer(5)Lower contact is threadedly coupled, and Y341 is integrated with production packer(6) Distribution measuring cell is layered built with integrated form(9);It is characterized in that:It is logical that a kind of gas well integrated form, which is layered distribution and pressure measurement technique, Following steps are crossed to realize:
A, laminated distributor under well mining tubular column is connected in the order described above first, wherein Y341 is integrated with production packer(6)Inside it is furnished with Integrated form layering distribution measuring cell with dead mouthpiece(9);
B, after pressing crack construction terminates, the laminated distributor under well mining tubular column that tripping in has been connected under kill-job state;
C, packer setting:After laminated distributor under well mining tubular column tripping in production capacity desired depth, oil pipe(4)20MPa is inside suppressed, repeatedly Three times, voltage stabilizing 10min realizes hanging packer(5), Y341 integrated forms with production packer(6), Y341 balance packer(7)Three Individual packer is set simultaneously;
D, tubing string and testing seal about packer:Ground is suppressed, and forms tri- pressure steps of 10-15-20MPa, and integrated form layering distribution is surveyed Press instrument(9)Oil pipe is recorded respectively(4)Outside head of liquid and oil pipe(4)Inside sets the change of pressure, and oil jacket annular space is suppressed 5MPa, passes through steel wire controller(2)Control steel wire operation car(3)Pull integrated form layering distribution measuring cell out(9), integrated form layering Distribution measuring cell(9)With being connected ground controller(1)Connection playback layering distribution measuring cell(9)Interior data;If oil pipe(4) Interior pressure curve is three pressure steps, contrast oil pressure and casing pressure value, and two values are unequal, you can judges that three packers are realized and sits Envelope, otherwise not set;
E, measurement payzone pressure:Coiled tubing(4)Gaslift recovers gas well liquid loading ability, the gas testing end of job is treated, according to gas testing knot Fruit determines correspondence control valve diameter, and the diameter valve is loaded into integrated form layering distribution measuring cell(9)It is interior, surveyed integrated with production Press instrument(9)With steel wire operation car(3)It is attached, by integrated with production measuring cell(9)Input is integrated with production packer to Y341(6) It is interior, opening well and making production 3 days or so, integrated form layering distribution measuring cell(9)Pressure sensor measures upper and lower two respectively before mouth, after mouth Before layer mouth, static pressure is moved after mouth;
F, determine valve diameter:Pass through steel wire controller(2)Control steel wire operation car(3)Pull integrated form layering distribution measuring cell out (9), by integrated with production measuring cell(9)With ground controller(1)Connection, ground data playback obtains the mouth of two different payzones Before, pressure curve after mouth, according to deliverability equation calculate adjustment integrated form layering distribution measuring cell(9)The corresponding gas of interior two payzones Outspoken footpath;
G, regulation valve:The valve that previous step is determined loads integrated form layering distribution measuring cell(9)It is interior, pass through steel wire operation car (3)Integrated form is layered distribution measuring cell(9)Put into Y341 integrated with production packer(6)Interior, drive a well operation.
CN201710546263.6A 2017-07-06 2017-07-06 Integrated layered gas distribution and pressure measurement process for gas well Active CN107288571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710546263.6A CN107288571B (en) 2017-07-06 2017-07-06 Integrated layered gas distribution and pressure measurement process for gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710546263.6A CN107288571B (en) 2017-07-06 2017-07-06 Integrated layered gas distribution and pressure measurement process for gas well

Publications (2)

Publication Number Publication Date
CN107288571A true CN107288571A (en) 2017-10-24
CN107288571B CN107288571B (en) 2020-08-11

Family

ID=60101027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710546263.6A Active CN107288571B (en) 2017-07-06 2017-07-06 Integrated layered gas distribution and pressure measurement process for gas well

Country Status (1)

Country Link
CN (1) CN107288571B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469281A (en) * 2019-08-08 2019-11-19 中国石油天然气股份有限公司 A kind of hermetic seal completion method and its completion tubular column and methods for using them
CN113530503A (en) * 2021-08-27 2021-10-22 吕远 Survey, transfer, adopt layering oil recovery system of integration

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201218080Y (en) * 2008-07-08 2009-04-08 中国石油天然气股份有限公司 New process pipe column for gas well partial pressure test
WO2009154500A1 (en) * 2008-06-19 2009-12-23 Schlumberger Canada Limited Method for optimizing reservoir production analysis
CN101769129A (en) * 2009-12-31 2010-07-07 刘玉文 Integral layering gas recovery technology tubular column and application method thereof
CN203808984U (en) * 2013-10-30 2014-09-03 中国石油天然气股份有限公司 Test tubular column of two-layer commingled production gas well dynamic reserves
CN105422061A (en) * 2015-12-09 2016-03-23 中国石油天然气股份有限公司 Intelligent testing, adjusting and monitoring process device for split injection well and testing, adjusting and monitoring method thereof
CN105888650A (en) * 2016-04-15 2016-08-24 中国石油天然气股份有限公司 Gas well storage type integrated layered production allocation pressure gauge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009154500A1 (en) * 2008-06-19 2009-12-23 Schlumberger Canada Limited Method for optimizing reservoir production analysis
CN201218080Y (en) * 2008-07-08 2009-04-08 中国石油天然气股份有限公司 New process pipe column for gas well partial pressure test
CN101769129A (en) * 2009-12-31 2010-07-07 刘玉文 Integral layering gas recovery technology tubular column and application method thereof
CN203808984U (en) * 2013-10-30 2014-09-03 中国石油天然气股份有限公司 Test tubular column of two-layer commingled production gas well dynamic reserves
CN105422061A (en) * 2015-12-09 2016-03-23 中国石油天然气股份有限公司 Intelligent testing, adjusting and monitoring process device for split injection well and testing, adjusting and monitoring method thereof
CN105888650A (en) * 2016-04-15 2016-08-24 中国石油天然气股份有限公司 Gas well storage type integrated layered production allocation pressure gauge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469281A (en) * 2019-08-08 2019-11-19 中国石油天然气股份有限公司 A kind of hermetic seal completion method and its completion tubular column and methods for using them
CN113530503A (en) * 2021-08-27 2021-10-22 吕远 Survey, transfer, adopt layering oil recovery system of integration

Also Published As

Publication number Publication date
CN107288571B (en) 2020-08-11

Similar Documents

Publication Publication Date Title
JP6838172B2 (en) Pressure control of independent gas containing system in multiple coal seams Single pump mining equipment and mining method
CN103498662B (en) A kind of cement sheath structural integrity dynamics experimental device
CN106018100A (en) Multifunctional true-triaxial rock drilling test system
CN107632116A (en) A kind of three-dimensional grouting model test servo-control system and test method
CN105464644B (en) A kind of well head pressure monitoring method and control system
CN106840977A (en) Slurry filling imitation device
CN107976391A (en) A kind of fractured rock disturbance seepage characteristic test seepage instrument and test system
CN202903654U (en) Testing device for friction coefficient of contact surface between pile and soil or between open caisson wall and soil or between tailings
CN108825213A (en) A kind of single interior multiple seam gas pressure measurement device and method of drilling
CN107449678A (en) Large-scale triaxial shear test devices and methods therefor in situ
CN107288571A (en) Integrated layered gas distribution and pressure measurement process for gas well
CN203035188U (en) Test experimental device for adhering sand casing pipe cement bond strength
CN103207137A (en) Device for fully automatically measuring penetration rate and void ratio of compact rock under dynamic confining pressure
CN104848988A (en) Simple calibration apparatus of embedded earth pressure box in sandy soil medium
CN104215655B (en) A kind of frozen soil three-dimensional heat conducting coefficient measurement device and method
CN105067450B (en) Measure the device and method of poroelastic medium Biot coefficient under High Temperature High Pressure
CN105259038B (en) Pipeline Resistant heave performance testing device under the conditions of hypergravity
CN109281319A (en) A kind of automated intelligent grouting system and match paste-making method, cement slurry density mensuration
CN107796706A (en) Concrete sample Hydraulic fracturing test sealing device and implementation under axial force
CN107542411A (en) A kind of multi-channel tube and the method using its progress seperated layer water injection
CN202325497U (en) Simulation experiment device for influence of reservoir parameter variation on acoustic logging
CN106761610A (en) Layered water injection process tubular column and method thereof
CN105891087A (en) Device and method for measuring porosity and grain breakage rate of compressed piled sand
CN109975125A (en) The pressure water experimental facilities and method detected based on coal body or rock-mass relaxing circle
CN102914485A (en) Device and method for testing deviation factor of natural gas in porous medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant