CN107282323B - A kind of separative unit replacing options of horizontal three-stage cyclone separator - Google Patents
A kind of separative unit replacing options of horizontal three-stage cyclone separator Download PDFInfo
- Publication number
- CN107282323B CN107282323B CN201710579914.1A CN201710579914A CN107282323B CN 107282323 B CN107282323 B CN 107282323B CN 201710579914 A CN201710579914 A CN 201710579914A CN 107282323 B CN107282323 B CN 107282323B
- Authority
- CN
- China
- Prior art keywords
- separative unit
- upper body
- lower case
- horizontal
- bearing diagonal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B04—CENTRIFUGAL APPARATUS OR MACHINES FOR CARRYING-OUT PHYSICAL OR CHEMICAL PROCESSES
- B04C—APPARATUS USING FREE VORTEX FLOW, e.g. CYCLONES
- B04C11/00—Accessories, e.g. safety or control devices, not otherwise provided for, e.g. regulators, valves in inlet or overflow ducting
Abstract
The invention discloses a kind of separative unit replacing options of horizontal three-stage cyclone separator, feature is to include the following steps, vertically oriented support frame first is set in the bottom of the lower case of horizontal three-stage cyclone separator, old separative unit is supported into fixation along the vertical direction, upper body is separated with external pipe cutting again, then upper body respectively and after lower case and old separative unit cutting, is successively hung out upper body with old separative unit by crane respectively;After the bottom of new separative unit be put into vertically oriented support frame inner support with crane fixing, the upper body originally dismantled is hung to the top of lower case with loop wheel machine, upper body and lower case centering are welded, new separative unit and upper body centering are welded again, then restore the connection of upper body and external pipe;Advantage is to greatly reduce difficulty of construction, effectively increases installation accuracy, and replacement process is quick and convenient.
Description
Technical field
The present invention relates to a kind of replacing options of large scale equipment, especially a kind of separation list of horizontal three-stage cyclone separator
First replacing options.
Background technique
Three-stage cyclone separator is the third level in petroleum refining industry in fluid catalytic cracking distillation system energy recycle device
Cyclone separator, effect is the catalyst that two stage cyclone separator preceding in regenerator is failed to separate from regenerated flue gas
Separation of particles comes out, and the high temperature and high pressure flue gas purified is provided for smoke gas turbine machine, so that it is guaranteed that turbine operates steadily in the long term.
So three-stage cyclone separator is the key equipment for determining fluid catalytic cracking distillation system energy recycle device service life.
Since treating capacity changes, efficiency decline, a variety of causes such as the internals such as single tube, partition and expansion joint damage are needed to three-level whirlwind
Separator device is transformed and replaces.For current horizontal three-stage cyclone separator, there is no effectively to inner part
From the method that unit is replaced, generally integral product can only be removed and be replaced, replace long in time limit, heavy workload, at
This is very high.
Summary of the invention
That technical problem to be solved by the invention is to provide a kind of replacement process is quick and convenient, construction cost is lower and installs
The separative unit replacing options of horizontal three-stage cyclone separator with high accuracy.
The technical scheme of the invention to solve the technical problem is: a kind of separation of horizontal three-stage cyclone separator
Unit replacement method, comprising the following steps:
(1) vertically oriented support frame is set in the bottom of the lower case of horizontal three-stage cyclone separator, by old separation
Unit supports fixation along the vertical direction;
(2) cutting of upper body and external pipe is separated, then by upper body respectively with lower case and old point
It is cut off from unit, then hung upper body with loop wheel machine;
(3) old separative unit is sling with loop wheel machine from vertically oriented support frame, and is hung out from the top of lower case,
New separative unit is hung in loop wheel machine from the top of lower case again, is then put into the bottom of new separative unit vertically perpendicular
On straight positioning supporting frame;
(4) upper body originally dismantled is hung to the top of lower case with loop wheel machine, by upper body and lower case
Centering welding, then new separative unit and upper body centering are welded;
(5) restore the connection of upper body and external pipe;
(6) vertically oriented support frame is removed, the replacement process to separative unit is completed.
The vertically oriented support frame includes more horizontal shores, bearing diagonal beam, column and reinforcing beam, the peace
Dress hole group the first mounting hole corresponding with the bearing diagonal beam that includes quantity and quantity corresponding with the column second are pacified
Hole is filled, first mounting hole is located at the top of second mounting hole, and the lower end of the bearing diagonal beam supports setting
In first mounting hole, the upper end apical grafting of the bearing diagonal beam is supported on the bottom conical surface of the separative unit
On, bearing diagonal beam described in more is uniformly distributed around the separative unit, and the horizontal shore is fixed at phase
Between bearing diagonal beam described in adjacent two, the bottom end of the column is arranged in second mounting hole, and described is vertical
The junction of the horizontal shore and the bearing diagonal beam, the reinforcing beam branch is arranged in the vertical apical grafting in the top of column
Support is arranged between the bearing diagonal beam and the column.Each supporting beam and column cooperate, and support strength is higher,
The upper end apical grafting of bearing diagonal beam is supported on the bottom conical surface of separative unit, is played the positioning action to separative unit, is improved
Position precision when separative unit centering welds, greatly reduces difficulty of construction.
Be provided between the bearing diagonal beam and the lower case the first arc installation backing plate, the column with
Be provided between the lower case the second arc installation backing plate, the top of the bearing diagonal beam be fixedly installed with it is described
Separative unit bottom cone match curved support backing plate.It is easy for installation, further enhance the positioning to separative unit
Effect.
The quantity of the bearing diagonal beam is the six roots of sensation.Support and locating effect are preferable and easy for installation.
When vertically oriented support frame is arranged, mounting hole group is first opened up on the lining of the bottom of lower case, is being installed
Vertically oriented support frame is set in the group of hole, old separative unit is supported into fixation along the vertical direction;Removing vertically oriented support
After frame, restore the lining being arranged in mounting hole group.
Before new separative unit and upper body centering welding, lifting lug and guide chain are first set in upper body, will be led
Chain is connect with the side of new separative unit, is arranged one for the same of centering in the center of the bottom of new separative unit
Heart degree measures line, and one piece of concentricity is arranged in the bottom of concentricity measurement line and measures plummet, when new separative unit and upper case
When body centering, judge whether the concentricity of new separative unit meets the requirements by the position of measurement concentricity measurement plummet,
The angle position of new separative unit is adjusted until concentricity meets the requirements by guide chain when undesirable.
Compared with the prior art, the advantages of the present invention are as follows elder generations in the bottom of the lower case of horizontal three-stage cyclone separator
Vertically oriented support frame is set, old separative unit is supported into fixation along the vertical direction, then upper body and external pipe are cut
Cut separation, then by upper body respectively and after lower case and the cutting of old separative unit, by crane by upper body with it is old
Separative unit successively hang out respectively, the individual weight of each section is relatively small, therefore requires the crane capacity of crane opposite
It is lower;It, will be original with loop wheel machine after the bottom of new separative unit is put into vertically oriented support frame inner support with crane fixing
The upper body of disassembly is hung to the top of lower case, and upper body and lower case centering are welded, then by new separation list
Member is welded with upper body centering, then restores the connection of upper body and external pipe, since new separative unit is vertical
Positioning supporting frame positioning, therefore difficulty of construction and the time of new separative unit centering welding are greatly reduced, it effectively increases
Installation accuracy shortens the whole duration, and entire replacement process is very quick and convenient, and construction cost is lower, saves material.
Detailed description of the invention
Fig. 1 is step flow diagram of the invention;
Fig. 2 is the partial structure diagram one of horizontal three-stage cyclone separator in the present invention;
Fig. 3 is the partial structure diagram two of horizontal three-stage cyclone separator in the present invention;
Fig. 4 is the partial structure diagram three of horizontal three-stage cyclone separator in the present invention.
Specific embodiment
The present invention will be described in further detail below with reference to the embodiments of the drawings.
A kind of embodiment one: separative unit replacing options of horizontal three-stage cyclone separator, comprising the following steps:
(1) vertically oriented support frame 2 is set in the bottom of the lower case 1 of horizontal three-stage cyclone separator, by old point
Support fixation along the vertical direction from unit 3;
(2) upper body 4 and external pipe (figure is not shown) cutting is separated, then by upper body 4 respectively with lower part
Shell 1 and the cutting of old separative unit 3, then hung upper body 4 with loop wheel machine;
(3) old separative unit 3 is sling with loop wheel machine from vertically oriented support frame, and is hung from the top of lower case 1
Out, then with loop wheel machine by new separative unit 5 it is hung in from the top of lower case 1, it is then that the bottom of new separative unit 5 is vertical
It is put on vertically oriented support frame 2;
(4) upper body 4 originally dismantled is hung to the top of lower case 1 with loop wheel machine, by upper body 4 and lower case
The welding of 1 centering of body, then new separative unit 5 and 4 centering of upper body are welded;
(5) restore the connection of upper body 4 and external pipe;
(6) vertically oriented support frame 2 is removed, the replacement process to separative unit is completed.
Embodiment two: rest part is the same as example 1, the difference is that vertically oriented support frame 2 is arranged
When, mounting hole group first is opened up on the lining 11 of the bottom of lower case 1, vertically oriented support frame 2 is set in mounting hole group,
Old separative unit 3 is supported to fixation along the vertical direction;After removing vertically oriented support frame 2, restore to be arranged in mounting hole group
Interior lining 11.
Embodiment three: rest part is the same as example 1, the difference is that vertically oriented support frame 2 includes the six roots of sensation
Horizontal shore 21, bearing diagonal beam 22, column 23 and reinforcing beam 24, mounting hole group include quantity corresponding with bearing diagonal beam 22
One mounting hole 25 and quantity second mounting hole 26 corresponding with column 23, the first mounting hole 25 are located at the upper of the second mounting hole 26
The lower end support in portion, bearing diagonal beam 22 is arranged in the first mounting hole 25, and it is single that the upper end apical grafting of bearing diagonal beam 22 is supported on separation
On the bottom conical surface of member, more bearing diagonal beams 22 are uniformly distributed around separative unit, and horizontal shore 21 is fixed at adjacent
Two bearing diagonal beams 22 between, the bottom end of column 23 is arranged in the second mounting hole 26, and the vertical apical grafting in the top of column 23 is set
Set in the junction of horizontal shore 21 and bearing diagonal beam 22, the support of reinforcing beam 24 setting bearing diagonal beam 22 and column 23 it
Between.Wherein, the quantity of horizontal shore 21, bearing diagonal beam 22, column 23 and reinforcing beam 24 can also be four or eight.
Example IV: rest part is identical as embodiment three, the difference is that bearing diagonal beam 22 and lower case 1 it
Between be provided with the first arc installation backing plate 27, be provided between column 23 and lower case 1 second arc installation backing plate 28, tiltedly prop up
The top of support beam 22 is fixedly installed the curved support backing plate 29 with the bottom cone match of separative unit.
Embodiment five: rest part is the same as example 1, the difference is that by new separative unit 5 and upper case
Before the welding of 4 centering of body, lifting lug 6 and guide chain (figure is not shown) are first set in upper body 4, by guide chain and new separative unit 5
Side connection, the bottom of new separative unit 5 center be arranged one for centering concentricity measurement line (figure not
Display), one piece of concentricity is set in the bottom of concentricity measurement line and measures plummet (figure is not shown), when new separative unit 5 with
When 4 centering of upper body, the position of plummet is measured by measurement concentricity to judge whether the concentricity of new separative unit 5 accords with
Close require, adjusted when undesirable by guide chain new separative unit 5 angle position until concentricity meet the requirements for
Only.
Claims (4)
1. a kind of separative unit replacing options of horizontal three-stage cyclone separator, it is characterised in that the following steps are included:
(1) vertically oriented support frame is set in the bottom of the lower case of horizontal three-stage cyclone separator, it is vertically oriented being arranged
When support frame, mounting hole group is first opened up on the lining of the bottom of lower case, vertically oriented support is set in mounting hole group
Old separative unit is supported fixation by frame along the vertical direction;
(2) cutting of upper body and external pipe is separated, then by upper body respectively with lower case and old separation list
Member cutting, then hung upper body with loop wheel machine;
(3) old separative unit is sling with loop wheel machine from vertically oriented support frame, and is hung out from the top of lower case, then use
Loop wheel machine hangs in new separative unit from the top of lower case, and it is vertical fixed to be then put into the bottom of new separative unit vertically
On the support frame of position, the vertically oriented support frame includes more horizontal shores, bearing diagonal beam, column and reinforcing beam, described
Mounting hole group include quantity and corresponding first mounting hole of the bearing diagonal beam and quantity corresponding with the column
Two mounting holes, first mounting hole are located at the top of second mounting hole, the lower end support of the bearing diagonal beam
It is arranged in first mounting hole, the upper end apical grafting of the bearing diagonal beam is supported on the bottom cone of the separative unit
On face, bearing diagonal beam described in more is uniformly distributed around the separative unit, and the horizontal shore is fixed at
Between bearing diagonal beam described in adjacent two, the bottom end of the column is arranged in second mounting hole, described
The junction of the horizontal shore and the bearing diagonal beam, the reinforcing beam is arranged in the vertical apical grafting in the top of column
Support is arranged between the bearing diagonal beam and the column;
(4) upper body originally dismantled is hung to the top of lower case with loop wheel machine, by upper body and lower case centering
Welding, then new separative unit and upper body centering are welded;
(5) restore the connection of upper body and external pipe;
(6) vertically oriented support frame is removed, the lining being arranged in mounting hole group is restored, completes the replacement to separative unit
Journey.
2. a kind of separative unit replacing options of horizontal three-stage cyclone separator according to claim 1, it is characterised in that
Be provided between the bearing diagonal beam and the lower case the first arc installation backing plate, the column and it is described under
The second arc installation backing plate is provided between portion's shell, the top of the bearing diagonal beam is fixedly installed and the separation list
The curved support backing plate of the bottom cone match of member.
3. a kind of separative unit replacing options of horizontal three-stage cyclone separator according to claim 1, it is characterised in that
The quantity of the bearing diagonal beam is the six roots of sensation.
4. a kind of separative unit replacing options of horizontal three-stage cyclone separator according to claim 1, it is characterised in that
By new separative unit with before the welding of upper body centering, lifting lug and guide chain are first set in upper body, by guide chain and newly
The side of separative unit connects, and a concentricity for centering is arranged in the center of the bottom of new separative unit and measures
Line is arranged one piece of concentricity in the bottom of concentricity measurement line and measures plummet, when new separative unit and upper body centering,
The position of plummet is measured to judge whether the concentricity of new separative unit meets the requirements by measurement concentricity, is wanted when not meeting
The angle position of new separative unit is adjusted until concentricity meets the requirements by guide chain when asking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710579914.1A CN107282323B (en) | 2017-07-17 | 2017-07-17 | A kind of separative unit replacing options of horizontal three-stage cyclone separator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710579914.1A CN107282323B (en) | 2017-07-17 | 2017-07-17 | A kind of separative unit replacing options of horizontal three-stage cyclone separator |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107282323A CN107282323A (en) | 2017-10-24 |
CN107282323B true CN107282323B (en) | 2019-06-14 |
Family
ID=60100654
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710579914.1A Active CN107282323B (en) | 2017-07-17 | 2017-07-17 | A kind of separative unit replacing options of horizontal three-stage cyclone separator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107282323B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109468664B (en) * | 2018-12-27 | 2021-07-20 | 登封电厂集团铝合金有限公司 | Replacement method of reactor in electrolytic tank purification system |
CN111102554B (en) * | 2019-12-16 | 2021-10-15 | 东方电气(广州)重型机器有限公司 | Rapid installation method of large-scale assembly |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5045098A (en) * | 1990-08-13 | 1991-09-03 | The Spencer Turbine Company | Bag separator |
WO2015065618A1 (en) * | 2013-10-29 | 2015-05-07 | Dow Global Technologies Llc | A cyclonic separation assembly having a low residence time plenum arranged in a fluidized bed reactor vessel |
CN205999789U (en) * | 2016-08-08 | 2017-03-08 | 中交一公局第三工程有限公司 | Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device |
-
2017
- 2017-07-17 CN CN201710579914.1A patent/CN107282323B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5045098A (en) * | 1990-08-13 | 1991-09-03 | The Spencer Turbine Company | Bag separator |
WO2015065618A1 (en) * | 2013-10-29 | 2015-05-07 | Dow Global Technologies Llc | A cyclonic separation assembly having a low residence time plenum arranged in a fluidized bed reactor vessel |
CN205999789U (en) * | 2016-08-08 | 2017-03-08 | 中交一公局第三工程有限公司 | Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device |
Non-Patent Citations (2)
Title |
---|
反应再生器内旋风分离器的安装创新法;张继选等;《石油工程建设》;20040228;第30卷(第1期);第57-59页 |
重油催化装置两器大型内件更换工艺改进;杨红忠等;《甘肃科技》;20090731;第25卷(第13期);第14-16页 |
Also Published As
Publication number | Publication date |
---|---|
CN107282323A (en) | 2017-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107282323B (en) | A kind of separative unit replacing options of horizontal three-stage cyclone separator | |
CN101476410B (en) | Mounting and demounting method for roof plate formwork support platform of concrete silo | |
CN101899540B (en) | Construction method for overhauling blast furnace and keeping furnace shell and cooling wall | |
CN209010976U (en) | Filled Steel Tubular Arch Bridge regularization fixture | |
CN208586876U (en) | A kind of detachable tubular pillar operating platform | |
CN201785410U (en) | Furnace shell and cooling wall suspension type retaining device for blast furnace overhaul | |
CN205576759U (en) | Symmetrical propulsion system of synchronization of bridge cantilever crane dress in -process | |
CN102530381B (en) | Support system for assembling and transporting seal heads of large container and seal head transport method | |
CN109210275A (en) | A kind of I-beam pipe installation bracket | |
CN208735013U (en) | A kind of movable hanger of small size pipeline | |
JP3565371B2 (en) | How to replace the reactor pressure vessel | |
CN107781504B (en) | Integrated dismounting method for overhead pipeline | |
CN109185008A (en) | It is a kind of large size four body of axial-flow Kaplan connection hang assembling balance construction method | |
CN109810716A (en) | The construction method replaced simultaneously for coke dry quenching furnace bracket brick and cooling section masonry | |
CN110102727A (en) | Continuous casting machine fan-shaped segment replaces guide rail installation method | |
CN110392602A (en) | The low liquid drop separator of structure height | |
JP3731389B2 (en) | Installation method of inner cylinder for blast furnace dust remover | |
CN216762965U (en) | Structure of iron removing tank | |
CN215948942U (en) | Inverted cone-shaped concrete discharging bin with lining plate | |
CN218136061U (en) | Adjustable arch rib assembling jig frame | |
CN215164752U (en) | A hang basket that is arranged in bridge construction staple bolt system to ann to tear open | |
CN211539991U (en) | Storage tank flip-chip equipment | |
CN106320683B (en) | The cone steel coal hopper installation platform of ultra-large type boundling polygon coal bunker group | |
CN107816629B (en) | Permanent support and rubber membrane sealing gas tank provided with same | |
CN105839541A (en) | Construction method for rigid frame bridge No.0 section non-welding support and structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |