CN107271944A - A kind of full-automatic termination of program control type current transformer - Google Patents

A kind of full-automatic termination of program control type current transformer Download PDF

Info

Publication number
CN107271944A
CN107271944A CN201710432187.6A CN201710432187A CN107271944A CN 107271944 A CN107271944 A CN 107271944A CN 201710432187 A CN201710432187 A CN 201710432187A CN 107271944 A CN107271944 A CN 107271944A
Authority
CN
China
Prior art keywords
current transformer
full
stage
automatic
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710432187.6A
Other languages
Chinese (zh)
Other versions
CN107271944B (en
Inventor
何娜
覃剑
刘鹍
张福州
刘刚
黄嘉鹏
蒋卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710432187.6A priority Critical patent/CN107271944B/en
Publication of CN107271944A publication Critical patent/CN107271944A/en
Application granted granted Critical
Publication of CN107271944B publication Critical patent/CN107271944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/02Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • G01R1/0416Connectors, terminals

Abstract

The invention discloses a kind of full-automatic termination of program control type current transformer, described device includes:Auxiliary connection platform, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, control unit, tested current transformer, control unit is all connected with auxiliary connection platform, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, tested current transformer, and twin-stage standard current transformer, current lifting device, full-automatic wiring unit, tested current transformer, control unit and auxiliary connection platform are all connected with;Full-automatic wiring unit carries out automatic connection to tested current transformer, standard two-stage current transformer and current lifting device;Operating efficiency can be improved by realizing, and reduce the technique effect of the uncertainty of measurement process.

Description

A kind of full-automatic termination of program control type current transformer
Technical field
The present invention relates to field of power transmission, in particular it relates to a kind of full-automatic termination of program control type current transformer.
Background technology
According to JJG313-2010《Verification of Measuring Current Transformer》The regulation of vertification regulation:As standard 0.05 to 0.01 grade of current transformer must 2 years be to be examined and determine in a cycle, and each change must be examined and determine during calibrating.As standard Current transformer, its no-load voltage ratio scope is generally 5 to 2000/5,1A, and 0.05 to 0.01 grade of accuracy rating, no-load voltage ratio scope is wide, etc. Level requires different, and the situation of wrong line, inefficiency occur in actually calibrating;Furthermore different to same standard device Because each patching operations personnel are not necessarily identical in no-load voltage ratio verification process, different no-load voltage ratio wire contacts are not necessarily good, can cause The uncertainty increase that same tested transformer is deteriorated, may cause qualified transformer to be considered as unqualified.
The content of the invention
The invention provides a kind of full-automatic termination of program control type current transformer, solve existing wiring efficiency compared with Technical problem that is low, easily malfunctioning, realizes and realizes automatic connection using the device in the application, and efficiency and accuracy rate are higher Technique effect.
In order to solve scene because standard no-load voltage ratio scope is wide, class requirement is different, and wrong occurs in actually calibrating The situation of line, inefficiency;And in the different no-load voltage ratio verification process of same standard device because of each patching operations personnel not Certain identical, different no-load voltage ratio wire contacts are not necessarily good, the uncertainty increase that same tested transformer can be caused to be deteriorated, The problems such as qualified transformer is considered as unqualified may be caused, this application provides a kind of program control type current transformer is full-automatic Termination, it is possible to increase operating efficiency, reduces the uncertainty of measurement process.
The purpose of the present invention is implemented by the following technical programs:
A kind of full-automatic termination of program control type current transformer, including the auxiliary connection being connected with tested current transformer Platform, twin-stage standard current transformer, current lifting device and control unit, auxiliary connection platform is to tested current transformer, standard twin-stage electricity Current transformer and current lifting device carry out full-automatic wiring;The primary side string of the two-stage current transformer and tested current transformer Connection, the secondary side signal of the two is compared;The current lifting device provides 0 to 6000A high currents;Described control unit is used to control Relay on-off.
Further, auxiliary connection platform includes, primary connection part, secondary connection part, and the primary connection part will Conducting heavy current copper bar La, Lb, Lb1, Lb2, Lb4 and L1, L2, L3 ... the L10 of full-automatic wiring unit are led by high current Line is connected to binding post La, Lb, Lb1, Lb2, Lb4 and L1 of auxiliary connection platform primary connection panel, L2, L3 ... L10 conveniently The external tested current transformer primary side binding post of connection.The secondary connection part by relay control panel it is multiple after Normally opened contact K1, K2, K3 ... K16 of electrical equipment are connected to auxiliary connection platform secondary connection panel binding post K1, K2, K3 ... K16, external tested Current Transformer Secondary side terminal of convenient connection.
Further, two-stage current transformer electric current ratio is 5~5000A/5A and 5A/1A, and accuracy rating is 0.002 grade. Two-stage current transformer be used as standard, for same electric current than tested current transformer be compared, its ratio of precision be detected High 2 accuracy grades of current transformer.
Further, current lifting device output 0~6000A high currents, supply two-stage current transformer and tested current transformer Primary side, formed detecting current transformer when primary circuit;
Further, control unit is used for the folding for controlling all relays and contactor.
Further, device also includes temperature polling instrument, and temperature polling instrument enters to the temperature of high-current conductor and contact point Row in real time monitoring, by thermal resistance sensor gather 16 temperature control points temperature, through temperature polling instrument by 16 channel temperature values by RS232 communication transfers implement temperature monitoring and control to host computer.
Further, relay status monitoring system is tracked prison to the folding condition for performing the relay of no-load voltage ratio switching Survey, the relay switching variable of corresponding actions is acquired in time, show corresponding states, alarm prompt is carried out to malfunction.
Further, humiture environmental monitoring system is monitored to the humiture of device local environment, passes through humiture The ambient temperature and humidity of sensor real-time acquisition device there and then and by RS232 communication transfers to host computer.
Full-automatic wiring unit carries out automatic connection, tool to tested current transformer, two-stage current transformer and current lifting device Body is:
Full-automatic wiring unit includes two-stage current transformer, and once secondary automatic connection and tested current transformer be once Secondary automatic connection.Two-stage current transformer primary side binding post Lb, L2, L3 ... L8 connects different by high current wire Conducting copper Lb, L2, L3 ... L8, conducting copper Lb, L2, L3 ... L8 connections relay normally open contact 1, relay normally open The public conducting copper COM ends of connection two-stage current transformer of contact 2, are similarly detected the same twin-stage of current transformer primary side wiring Current transformer primary side mode of connection, its primary side Lb, Lb1, Lb2, Lb4 and L2, L3 ... L10 connections relay normally open are touched Point 1, the public conducting copper COM1 of the tested current transformer of the connection of normally opened contact 2.The primary side polar end of two-stage current transformer La, L1 are connected with tested current transformer primary side polar end La, L1 by high current wire, common port COM and COM1 difference Current lifting device output end is connect, primary circuit is formed, the break-make of control relay realizes two-stage current transformer and tested Current Mutual Inductance Device primary side automatic connection.The secondary side automatic connection of two-stage current transformer and tested current transformer is with a side joint line side Method.Two-stage current transformer secondary side common port com leads to mutual-inductor tester T0 terminals, is detected Current Transformer Secondary side Common port com1 leads to current capacity case Z ends, and is connected to mutual-inductor tester Tx ends through the current capacity case other end, real Existing two-stage current transformer and the automatic connection of tested Current Transformer Secondary side.
Further, device workflow is as follows:
1) auxiliary connection platform primary side patch panel binding post La, Lb, L1, L2, L3 ... L10 is passed through into high current wire Tested current transformer primary side binding post La, Lb, L1, L2, L3 ... the L10 of connection, such as tested current transformer primary side does not have Some binding posts, auxiliary connection platform can be not brought up.By auxiliary connection platform secondary side patch panel binding post K1, K2, K3 ... K16 By tested Current Transformer Secondary side joint terminal K1, K2, K3 ... the K16 of second test line connection, current transformer two is detected Secondary side without binding post, auxiliary connection platform can be not brought up;
2) the tested current transformer relevant parameter of device input;
3) device is according to all relay foldings of no-load voltage ratio automatic decision;
Specifications parameter and wiring of the present invention by the way of nameplate copy and bar code management to tested current transformer Information is acquired and asset management, supports unified assets to file, error information inquiry, storage, historical data compare and by Current transformer running status is examined to assess.Device is 5~5000A/5A, 1A towards electric current ratio, and accuracy rating is 0.05 to 0.01 Level current transformer is examined and determine.Each electric current of two-stage current transformer is detected Current Mutual Inductance than automatically switching in checking procedure Device primary connection and secondary connection are disposably completed, and each electric current is sequentially automatically performed calibrating than automatically switching.Support any electric current Extension wiring more primary and secondary than current transformer, as long as the electric current ratio that standard has can all correspond to wiring.In division of labor wiring When, without correspondence nameplate, no-load voltage ratio is checked, primary connection end and secondary connection end only need to be corresponded to the patch panel of termination , device automatically according to typing name plate information automatic switchover binding post, whole process completed by PC control termination, Wrong rate is reduced, testing efficiency is improved.Two-stage current transformer and tested current transformer primary side in full-automatic wiring unit Automatic connection part is connected to the conducting copper of correspondence mark by the primary side binding post of transformer by high current wire, no Same conducting copper connects the normally opened contact of the high-power export-oriented magnetic latching relay of WJ32E-12 types, and relay common port connects Meet the public conducting copper COM and COM1 of transformer primary side non-polar end.Two-stage current transformer in full-automatic wiring unit The high-power export-oriented magnetic latching relay of WJ32E-12 types used with tested current transformer primary side automatic connection part, is touched Point impedance is small, and resistance is stable, and uniformity is strong, using Pulse Width Control, strong antijamming capability, it is to avoid the misoperation in test, enhancing The stability of work.The conduction of connection transformer primary side binding post and relay normally open contact in full-automatic wiring unit Copper bar uses high-quality tin-coated copper bar, and big by electric current, impedance is small, and the physical dimension of copper material largely avoided electric current kelvin effect, Reduce eddy-current loss.Conducting copper is fixed using phenolic resin insulating materials in full-automatic wiring unit, the other gold of insulation Belong to material, dielectric strength is high, the physical attribute of material can reduce vibration and the noise in up-flow.The metal structure of auxiliary connection platform Top-quality rubber and Sound-proof material are used between part and full-automatic wiring unit, effectively the hard of buffer metal structural member and copper bar can be connected Connect, can reduce and receive vibration and noise.Instant playback standard and tested current transformer primary connection information in verification With secondary connection information and electric current ratio, while anti-to polarity, no-load voltage ratio is wrong, out-of-limit to wait false wiring to be alerted.Solve scene by Wide in standard no-load voltage ratio scope, class requirement is different, and the situation of wrong line, inefficiency occur in actually calibrating;And Because each patching operations personnel are not necessarily identical in the different no-load voltage ratio verification process of same standard device, different no-load voltage ratio wiring connect Touch not necessarily good, the uncertainty increase that same tested transformer can be caused to be deteriorated may cause qualified transformer quilt The problems such as being considered as unqualified.Operating efficiency is improved, reduces the uncertainty of measurement process.
One or more technical schemes that the application is provided, have at least the following technical effects or advantages:
The present invention only need to be connected to auxiliary connection by primary connection end is corresponding with secondary connection end when examining and determine current transformer Platform patch panel;No-load voltage ratio switches, automatically controls whole process by host computer and control termination completion;Solve scene due to Standard no-load voltage ratio scope is wide, and class requirement is different, and the situation of wrong line, inefficiency occur in actually calibrating;And Because each patching operations personnel are not necessarily identical in no-load voltage ratio verification process different to same standard device, different no-load voltage ratio wire contacts Uncertainty increase not necessarily good, that same tested transformer can be caused to be deteriorated, may cause qualified transformer by regarding For it is unqualified the problems such as, operating efficiency can be improved by realizing, reduce measurement process uncertainty technique effect.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention;
Fig. 1 is the structured flowchart of the full-automatic termination of program control type current transformer described in the embodiment of the present invention;
Fig. 2 is the test philosophy figure of the full-automatic termination of program control type current transformer described in the embodiment of the present invention;
Fig. 3 is the primary connection figure of the full-automatic termination of program control type current transformer described in the embodiment of the present invention.
Embodiment
The invention provides a kind of full-automatic termination of program control type current transformer, solve existing wiring efficiency compared with Technical problem that is low, easily malfunctioning, realizes and realizes automatic connection using the device in the application, and efficiency and accuracy rate are higher Technique effect.
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting mutually, the application's Feature in embodiment and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also Implemented with the other modes in the range of being different from being described herein using other, therefore, protection scope of the present invention is not by under The limitation of specific embodiment disclosed in face.
This application provides a kind of full-automatic termination of program control type current transformer, described device includes:
Auxiliary connection platform, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, control unit, tested electric current Transformer, control unit and auxiliary connection platform, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, tested electric current Transformer is all connected with, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, tested current transformer, control unit It is all connected with auxiliary connection platform;Full-automatic wiring unit is to being tested current transformer, standard two-stage current transformer and current lifting device Carry out automatic connection;The primary side of the two-stage current transformer is connected with the primary side of tested current transformer, control unit The secondary side signal of the secondary side of two-stage current transformer and tested current transformer is compared;The current lifting device is used to carry Power supply stream;Described control unit is used for control device repeat circuit break-make, relay on-off status checkout, Ampereconductors and contact The inspection of point temperature change, the temperature-humidity monitoring of device local environment.
Wherein, auxiliary connection platform includes, primary connection part, secondary connection part, and primary connection part is by tested electric current The primary side of transformer and the primary side of twin-stage standard current transformer are separately fixed at wire on different conducting coppers, and two The secondary side of secondary side and twin-stage standard current transformer that secondary connection part is tested current transformer is connected to apparatus surface pair Answer on binding post.
As shown in Figure 1, 2, 3, Fig. 3 be two-stage current transformer BL0816 primary connections figure and current lifting device output connection figure, Fig. 3 lower ends are from left to right followed successively by:Current lifting device output tap, current lifting device output LB common ports (0-5000A), standard BL0816 primary connections, standard BL0816 primary connection terminals;A kind of full-automatic termination of program control type current transformer, Including the twin-stage standard current transformer 101 being connected with tested current transformer, current lifting device 102 and full-automatic termination once Connection part 103,104 and secondary connection part 105,106, standard 101 is connected with the primary side of tested current transformer, The secondary side signal of the two is compared, and the secondary side non-polar end of twin-stage standard current transformer 101 is connected to full-automatic wiring dress To is put, tested current transformer non-polar end is connected to full-automatic termination Tx, and both polar ends are connected to full-automatic wiring Device K, the B5 of twin-stage standard current transformer 101 is connected to full-automatic termination D, by Control System Software control once, two The folding of secondary connection part relay.
It is connected to complete successively by primary side, the secondary side of tested current transformer and twin-stage standard current transformer 101 are all On the corresponding binding post of automatic connection device, i.e. primary connection part 103,104 and secondary connection part 105,106.Current lifting device 102 are connected with the primary side 103 of twin-stage standard current transformer 101 and tested current transformer primary side 104 respectively, control system System judges several circles of current lifting device punching and then control relay folding according to the no-load voltage ratio of tested current transformer.
Method of testing is as follows:
1) two-stage current transformer, current lifting device, tested current transformer primary side, secondary side and device are connected;
2) the tested current transformer relevant parameter of device input;
3) device is according to all relay foldings of no-load voltage ratio automatic decision;
Specifications parameter and wiring of the present invention by the way of nameplate copy and bar code management to tested current transformer Information is acquired and asset management, supports unified assets to file, error information inquiry, storage, historical data compare and by Current transformer running status is examined to assess.Device is 5~5000A/5A, 1A towards electric current ratio, and precision is 0.05~0.01 grade of electricity Current transformer is examined and determine.In checking procedure Plays current transformer and each electric current ratio primary connection of tested current transformer and Secondary connection is disposably completed, and each electric current is automatically performed calibrating than order.Support any current ratio current transformer once with two Secondary extension wiring, as long as the electric current ratio that standard has can all correspond to wiring.When dividing the work wiring, without correspondence nameplate, verification No-load voltage ratio, only need to correspond to primary connection end and secondary connection end the patch panel of termination, device is automatically according to record The name plate information automatic switchover binding post entered, whole process is completed by PC control termination, reduces wrong rate, improves test Efficiency.Handover module of device and secondary handover module use high-power export-oriented magnetic latching relay, contact resistance Small, resistance is stable, and uniformity is strong, using Pulse Width Control, strong antijamming capability, it is to avoid the misoperation in test, enhances work Stability.Using the tin plating bronze medal of high-quality, big by electric current, impedance is small, and the physical dimension of copper material largely avoided electric current collection skin Effect, reduces eddy-current loss.Using phenolic resin insulating materials, dielectric strength is high, and the physical attribute of material can reduce up-flow In vibration and noise.Using top-quality rubber and the Hard link of the effective buffer metal product of Sound-proof material and bronze medal, it can reduce and inhale Receive and vibrate and noise.Instant playback standard and tested current transformer primary connection information and secondary connection information in verification And electric current ratio, while anti-to polarity, no-load voltage ratio is wrong, out-of-limit to wait false wiring to be alerted.Scene is solved due to standard no-load voltage ratio model Enclose wide, class requirement is different, the situation of wrong line, inefficiency occur in actually calibrating;And to same standard Because each patching operations personnel are not necessarily identical in device difference no-load voltage ratio verification process, different no-load voltage ratio wire contacts are not necessarily good, The uncertainty increase that same tested transformer is deteriorated can be caused, qualified transformer may be caused to be considered as unqualified etc. and asked Topic.Operating efficiency is improved, reduces the uncertainty of measurement process.
One or more technical schemes that the application is provided, have at least the following technical effects or advantages:
The present invention only need to be connected to auxiliary connection by primary connection end is corresponding with secondary connection end when examining and determine current transformer Platform patch panel;No-load voltage ratio switches, automatically controls whole process by host computer and control termination completion;Solve scene due to Standard no-load voltage ratio scope is wide, and class requirement is different, and the situation of wrong line, inefficiency occur in actually calibrating;And Because each patching operations personnel are not necessarily identical in no-load voltage ratio verification process different to same standard device, different no-load voltage ratio wire contacts Uncertainty increase not necessarily good, that same tested transformer can be caused to be deteriorated, may cause qualified transformer by regarding For it is unqualified the problems such as, operating efficiency can be improved by realizing, reduce measurement process uncertainty technique effect.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (8)

1. a kind of full-automatic termination of program control type current transformer, it is characterised in that described device includes:
Auxiliary connection platform, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, control unit, tested Current Mutual Inductance Device, control unit and auxiliary connection platform, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, tested Current Mutual Inductance Device is all connected with, twin-stage standard current transformer, current lifting device, full-automatic wiring unit, tested current transformer, control unit with it is auxiliary Junction board is helped to be all connected with;Full-automatic wiring unit is carried out to tested current transformer, standard two-stage current transformer and current lifting device Automatic connection;The primary side of the two-stage current transformer is connected with the primary side of tested current transformer, and control unit will be double The level secondary side of current transformer is compared with the secondary side signal of tested current transformer;The current lifting device is used to provide electricity Stream;Described control unit is used for control device repeat circuit break-make, relay on-off status checkout, Ampereconductors and contact point temperature Degree change inspection, the temperature-humidity monitoring of device local environment.
2. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that auxiliary connection platform Including:Primary connection part, secondary connection part, primary connection part is by the primary side of tested current transformer and twin-stage standard The primary side of current transformer is separately fixed at wire on different conducting coppers, and secondary connection part is tested current transformer Secondary side and the secondary side of twin-stage standard current transformer be connected on the corresponding binding post of apparatus surface.
3. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that described full-automatic Wiring unit carries out automatic connection to tested current transformer, standard two-stage current transformer and current lifting device, is specially:
Automatic connection includes:Once secondary automatic connection and tested current transformer are once secondary connects automatically for two-stage current transformer Line;Two-stage current transformer primary side binding post Lb, L2, L3 ... L8 connected respectively by wire conducting copper Lb, L2, L3 ... L8, conducting copper Lb, L2, L3 ... L8 connections relay normally open contact 1, the connection twin-stage electricity of relay normally open contact 2 The public conducting copper COM ends of current transformer, are detected current transformer primary side Lb, Lb1, Lb2, Lb4 and L2, L3 ... L10 and connect Contact relay normally opened contact 1, the public conducting copper COM1 of the tested current transformer of the connection of normally opened contact 2;Two-stage current transformer Primary side polar end La, L1 be connected with tested current transformer primary side polar end La, L1 by wire, common port COM and COM1 connects current lifting device output end respectively, forms primary circuit, and the break-make of control relay realizes two-stage current transformer and tested Current transformer primary side automatic connection;The secondary side automatic connection method of two-stage current transformer and tested current transformer with Primary side mode of connection is identical;Two-stage current transformer secondary side common port com leads to mutual-inductor tester T0 terminals, is detected Current Transformer Secondary side common port com1 leads to current capacity case Z ends, and is connected to mutual inductance through the current capacity case other end Device tester Tx ends, realize two-stage current transformer and the automatic connection of tested Current Transformer Secondary side.
4. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that the twin-stage mark Quasi- current transformer ratio is 5~5000A/5A and 5A/1A, and accuracy rating is 0.002 grade.
5. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that the current lifting device Output 0 supplies the primary side of twin-stage standard current transformer to 6000A electric currents.
6. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that the control list Member is used to monitor the temperature of Ampereconductors and contact point in real time, and the temperature of 16 temperature control points is gathered by thermal resistance sensor Degree, through temperature polling instrument by 16 channel temperature values by RS232 communication transfers to host computer, implement temperature monitoring and control.
7. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that the control list The folding condition that member is used for the relay to performing no-load voltage ratio switching is tracked monitoring, in time to the relay switch of corresponding actions Amount is acquired, and shows corresponding states, and alarm prompt is carried out to malfunction.
8. the full-automatic termination of program control type current transformer according to claim 1, it is characterised in that the control list Member is used for the temperature-humidity monitoring to device local environment, gathers the ambient temperature and humidity of there and then in real time by Temperature Humidity Sensor And by RS232 communication transfers to host computer.
CN201710432187.6A 2017-06-09 2017-06-09 Full-automatic wiring device of program-controlled current transformer Active CN107271944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710432187.6A CN107271944B (en) 2017-06-09 2017-06-09 Full-automatic wiring device of program-controlled current transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710432187.6A CN107271944B (en) 2017-06-09 2017-06-09 Full-automatic wiring device of program-controlled current transformer

Publications (2)

Publication Number Publication Date
CN107271944A true CN107271944A (en) 2017-10-20
CN107271944B CN107271944B (en) 2020-06-23

Family

ID=60067635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710432187.6A Active CN107271944B (en) 2017-06-09 2017-06-09 Full-automatic wiring device of program-controlled current transformer

Country Status (1)

Country Link
CN (1) CN107271944B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111487576A (en) * 2020-04-30 2020-08-04 浙江省方正校准有限公司 Miniature current transformer measuring device based on direct measurement method
CN112731258A (en) * 2021-01-13 2021-04-30 国网新疆电力有限公司营销服务中心(资金集约中心、计量中心) Auxiliary wiring device of current transformer
CN113702892A (en) * 2021-08-27 2021-11-26 国网江苏省电力有限公司营销服务中心 Continuous vibration test device for electronic current transformer and use method of continuous vibration test device
CN114823088A (en) * 2022-06-23 2022-07-29 国网湖北省电力有限公司营销服务中心(计量中心) Standard transformer and using method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102540128A (en) * 2012-02-13 2012-07-04 江西省电力科学研究院 Method for automatically calibrating error of combined three-phase current transformer
CN205301567U (en) * 2016-01-12 2016-06-08 江苏省电力公司电力科学研究院 Special high tension current transformer calibration system
CN105929354A (en) * 2016-06-29 2016-09-07 国家电网公司 Automatic calibrating device and method for large current transformer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102540128A (en) * 2012-02-13 2012-07-04 江西省电力科学研究院 Method for automatically calibrating error of combined three-phase current transformer
CN205301567U (en) * 2016-01-12 2016-06-08 江苏省电力公司电力科学研究院 Special high tension current transformer calibration system
CN105929354A (en) * 2016-06-29 2016-09-07 国家电网公司 Automatic calibrating device and method for large current transformer

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵修民: "0.002级双级电流互感器的研制", 《仪表技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111487576A (en) * 2020-04-30 2020-08-04 浙江省方正校准有限公司 Miniature current transformer measuring device based on direct measurement method
CN112731258A (en) * 2021-01-13 2021-04-30 国网新疆电力有限公司营销服务中心(资金集约中心、计量中心) Auxiliary wiring device of current transformer
CN113702892A (en) * 2021-08-27 2021-11-26 国网江苏省电力有限公司营销服务中心 Continuous vibration test device for electronic current transformer and use method of continuous vibration test device
CN114823088A (en) * 2022-06-23 2022-07-29 国网湖北省电力有限公司营销服务中心(计量中心) Standard transformer and using method thereof
CN114823088B (en) * 2022-06-23 2022-09-23 国网湖北省电力有限公司营销服务中心(计量中心) Standard transformer and using method thereof

Also Published As

Publication number Publication date
CN107271944B (en) 2020-06-23

Similar Documents

Publication Publication Date Title
CN107271944A (en) A kind of full-automatic termination of program control type current transformer
US6777952B2 (en) Method and apparatus for testing cables
KR950029776A (en) LAN cable test apparatus and method
CN112182846A (en) On-line monitoring and diagnosing method and device of tap switch and storage medium
CN108469569A (en) A kind of Intelligentized test system for electric coupler
US20060193444A1 (en) Line testing apparatus and method
CN104049201A (en) Testing method, device and system for printed circuit boards
CN106569108B (en) A kind of the resistance test system and detection method of interchanger
CN101963641B (en) Conductor bundle detection system
CN102854452B (en) Printed circuit board assembly (PCBA) function testing device and testing method thereof
WO2023169601A1 (en) Inlet current simulator apparatus and pre-commissioning method
CN105137258A (en) Intelligent early-warning control device for high-voltage test grounding
CN201527458U (en) Conductor bundle detecting device
CN107255791A (en) A kind of full-automatic verification system of program control type current transformer
CN105866667A (en) Loop resistance test method for two-terminal-grounding circuit breaker
CN109598996B (en) Load cutting training system for distribution transformer area
CN207502679U (en) A kind of breaker temperature rises power consumption characteristics test system
CN107340469B (en) GIS combined electrical activity characteristic test instrument and use method
CN112698128A (en) Relay protection function verification short circuit device and method
CN112415253A (en) Circuit and system for testing working current of circuit board
CN111751715A (en) Be applied to primary loop detection device of circuit breaker
CN207268766U (en) Detection device for Rimless photovoltaic module insulation pressure-resistant equipment
Wang et al. The Research of Building Electrical Fault Diagnosis Based on Experimental Platform
CN111273197B (en) Electrical equipment testing method and device
CN113985270B (en) Method, system and medium for detecting switching time sequence of on-load tap-changer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant