CN107269236A - A kind of folding working rig rail set - Google Patents
A kind of folding working rig rail set Download PDFInfo
- Publication number
- CN107269236A CN107269236A CN201710608047.XA CN201710608047A CN107269236A CN 107269236 A CN107269236 A CN 107269236A CN 201710608047 A CN201710608047 A CN 201710608047A CN 107269236 A CN107269236 A CN 107269236A
- Authority
- CN
- China
- Prior art keywords
- folding
- working rig
- trapped orbit
- tongue platform
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003032 molecular docking Methods 0.000 claims abstract 2
- 230000000694 effects Effects 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 3
- 238000007665 sagging Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 abstract description 18
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
Abstract
A kind of folding working rig rail set, fixed tongue platform, tongue platform is folded to be linked into an integrated entity by folding pin hinge formula, trapped orbit is arranged on the lower section of fixed tongue platform, the top of working rig is arranged on trapped orbit, folding track is installed in the left side of trapped orbit, folding track is connected with the folding tongue platform above it, folding track is set together to be folded with tongue platform is folded, folding track, operation function is slided on folding track after trapped orbit links into an integrated entity, working rig pintle hook lock is connected to the upper left side of trapped orbit by locking pin hinge formula, unblock pressure head is installed in the lower section for folding tongue platform, unblock pressure head pushes down the left side of working rig pintle hook lock, can be supporting with the folding tongue platform of Drilling derrick two-layer platform, the locking mechanism of setting can not skid off trapped orbit with trapped orbit in folding track without working rig when completely docking, the requirement of working rig sliding scale can be met, the repertoire of working rig can be played, the work of pick-and-place drilling rod during drilling well is set to fully achieve mechanization.
Description
Technical field
The present invention is a kind of corollary equipment of oil field welldrilling, is to be applied to the rail that drilling well two-layer platform moves up dynamic working rig
Road is specifically a kind of folding working rig rail set.
Background technology
Drilling derrick two-layer platform, which installs movable workover rig, to be needed to be provided with the smooth track of total travel insertion, Drilling derrick
The main operation area of two-layer platform is referred to as tongue platform(Because shape is gained the name as tongue), tongue platform point two parts a, part is fixed tongue platform, one
Part is folds tongue platform, and fixed tongue platform is the flexible hinge type connection of looseness with tongue platform is folded, and folding tongue platform when conveying in sections turns over
Turnover collapses small profile and is easy to entrucking to carry.In order to realize do mechanization operation, working rig is have developed, described working rig can be certainly
Dynamic crawl drilling rod.Described working rig needs the lower section attachment rail in tongue platform, described working rig is slided in orbit.But
Tongue platform is arranged to after folding tongue platform, and existing track can be only installed at the lower section of fixed tongue platform, and the length of fixed tongue platform has
Limit, therefore, the track below fixed tongue platform can not meet the requirement of described working rig sliding scale, it is impossible to play institute
The repertoire for the working rig stated, the work of pick-and-place drilling rod is from fully achieving mechanization when preventing drilling well.
The content of the invention
It is an object of the invention to provide a kind of folding working rig rail set, make it can be with Drilling derrick two-layer platform
Folding tongue platform it is supporting, overcome above-mentioned problem, meet the requirement of working rig sliding scale, play whole work(of working rig
Can, the work of pick-and-place drilling rod during drilling well is fully achieved mechanization, mitigate the labor intensity of workman.
The object of the present invention is achieved like this:Including fixed tongue platform, fold tongue platform, folding track, unblock pressure head, locking
Bearing pin, working rig pintle hook lock, trapped orbit, folding bearing pin, working rig, fixed tongue platform, folding tongue platform are connected by folding pin hinge formula
One is connected into, turning folding on folding tongue platform can be made around bearing pin rotation is folded by folding tongue platform, and trapped orbit is arranged on fixed tongue platform
Lower section, the top of working rig is arranged on trapped orbit, operation function is horizontally slipped on trapped orbit, in trapped orbit
Folding track is installed in left side, and folding track is connected with the folding tongue platform above it, folding track is together rolled over tongue platform is folded
Folded, operation function is slided on folding track after folding track, trapped orbit link into an integrated entity, and working rig pintle hook lock is by locking bearing pin
Hinge type is connected to the upper left side of trapped orbit, in the position of centre of gravity and weight on both sides when the left and right sides of working rig pintle hook lock is without constraint
Around locking bearing pin rotation working rig pintle hook lock right side can be made sagging under difference effect, make folding track with trapped orbit without complete right
Working rig can not skid off trapped orbit when connecing, and unblock pressure head is installed in the lower section for folding tongue platform, and unblock pressure head pushes down working rig lock
The left side of card, working rig pintle hook lock is suffered restraints can not rotate.
One piece of guide plate is respectively installed in the front and rear sides on the left side of trapped orbit, the left end book right-hand member of guide plate is thick, two pieces
Guide plate, which is symmetrically mounted on behind the front and rear sides on the left side of trapped orbit, forms guide channel wide outside and narrow inside, and described guide channel draws
Lead folding track and trapped orbit Dock With Precision Position.
The beneficial effects of the invention are as follows:Folding track can together be folded with tongue platform is folded, folding track, trapped orbit connection
Operation function is slided on folding track after integral, and the locking mechanism of setting is no complete right in folding track and trapped orbit
Working rig can not skid off trapped orbit when connecing, it is ensured that safety work.Therefore, the folding that the present invention can be with Drilling derrick two-layer platform
Tongue platform is supporting, overcomes the problem of existing now, can meet the requirement of working rig sliding scale, can play whole work(of working rig
Can, the work of pick-and-place drilling rod during drilling well is fully achieved mechanization, mitigate the labor intensity of workman significantly.
Brief description of the drawings
Fig. 1 is the structure chart of the present invention.
Fig. 2 is the top view after part 3,5,8 is assembled integrally in Fig. 1.
Embodiment
The example that the present invention is implemented is illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1, fixed tongue platform 1 is included to the example that the present invention is implemented, tongue platform 2, folding track 3, unblock pressure head is folded
4th, guide plate 5, locking bearing pin 6, working rig pintle hook lock 7, trapped orbit 8, folding bearing pin 9, working rig 10, fixed tongue platform 1, folding tongue
Platform 2 is linked into an integrated entity by the hinge type of folding bearing pin 9, and folding tongue platform 2 can rotate around bearing pin 9 is folded, and make to turn down on folding tongue platform 2
Folded, trapped orbit 8 is arranged on the lower section of fixed tongue platform 1, and the top of working rig 10 is arranged on trapped orbit 8, makes working rig 10
It can be horizontally slipped on trapped orbit 8, folding track 3, folding track 3 and the folding above it are installed in the left side of trapped orbit 8
Folded tongue platform 2 is connected, and folding track 3 is together folded with tongue platform 2 is folded, after folding track 3, trapped orbit 8 link into an integrated entity
Working rig 10 can be slided on folding track 3(Working rig 10 can be slided on folding track 3 from trapped orbit 8), working rig lock
Card 7 is connected to the upper left side of trapped orbit 8 by the hinge type of locking bearing pin 6, on both sides when the left and right sides of working rig pintle hook lock 7 is without constraint
Position of centre of gravity and weight difference effect is lower to be rotated around bearing pin 6 is locked(Right side weight left side is light), make under the right side of working rig pintle hook lock 7
Hang down, working rig 10 is folding tongue platform 2 from skidding off trapped orbit 8 when preventing folding track 3 completely to dock with trapped orbit 8
Lower section unblock pressure head 4 is installed, unblock pressure head 4 pushes down the left side of working rig pintle hook lock 7, and working rig pintle hook lock 7 is suffered restraints can not
Rotation.One piece of guide plate 5 is respectively installed in the front and rear sides on the left side of trapped orbit 8, the left end book right-hand member of guide plate 5 is thick, two pieces
Guide plate 5, which is symmetrically mounted on, forms guide channel 11 wide outside and narrow inside behind the front and rear sides on the left side of trapped orbit 8(In eight shape),
The described guiding folding track 3 of guide channel 11 and the Dock With Precision Position of trapped orbit 8, reaches that " folding track 3, trapped orbit 8 are connected into
Working rig 10 can be slided on folding track 3 after one " requirement, as shown in Figure 2.
When Drilling derrick two-layer platform needs removal of home, fold tongue platform 2 and rotated around bearing pin 9 is folded, fold the Foldable of tongue platform 2
Track 3 rotates, and is folded folding tongue platform 2, folding track 3, folds and drives unblock pressure head 4 to be rotated away from making when tongue platform 2 is folded
Industry machine pintle hook lock 7, unblock pressure head 4 can not push down working rig pintle hook lock 7, and working rig pintle hook lock 7 loses constraint, and working rig pintle hook lock 7 just can be around
Locking bearing pin 6 turns clockwise, and right side is sagging, and stop working rig 10 is not when folding track 3 is docked completely with trapped orbit 8
Working rig 10 skids off trapped orbit 8.Drilling derrick two-layer platform is transported to well site and folded after tongue platform 2, the reset of folding track 3, solution
Lock pressure head 4 pushes down the left side of working rig pintle hook lock 7 again, and working rig pintle hook lock 7 is suffered restraints can not rotate, and working rig pintle hook lock 7 is not
When can rotate, the location on trapped orbit 8 of working rig pintle hook lock 7 does not hinder the slip of working rig 10, and working rig 10 can
Slid freely on folding track 3, trapped orbit 8.
After folding tongue platform 2, folding track 3 are folded, the profile of Drilling derrick two-layer platform diminishes, and can carry.
Described working rig 10 is Chinese patent 201420332733.0《Derrick upper table surface puts column robot》Etc
Equipment.
It is locking mechanism to unlock pressure head 4, locking bearing pin 6, the mechanism of the composition of working rig pintle hook lock 7.
Claims (2)
1. a kind of folding working rig rail set, including fixed tongue platform(1), fold tongue platform(2), folding track(3), unblock
Pressure head(4), locking bearing pin(6), working rig pintle hook lock(7), trapped orbit(8), fold bearing pin(9), working rig(10), fixed tongue platform
(1), fold tongue platform(2)By folding bearing pin(9)Hinge type links into an integrated entity, and folds tongue platform(2)Can be around folding bearing pin(9)Rotation,
Make folding tongue platform(2)Upper turning folding, trapped orbit(8)Installed in fixed tongue platform(1)Lower section, working rig(10)Top install
In trapped orbit(8)On, make working rig(10)Can be in trapped orbit(8)On horizontally slip, it is characterized in that:In trapped orbit(8)
Left side install folding track(3), folding track(3)With the folding tongue platform above it(2)Connection, makes folding track(3)Can be with
Fold tongue platform(2)Together fold, folding track(3), trapped orbit(8)Working rig after linking into an integrated entity(10)Can be in folding track
(3)It is upper to slide, working rig pintle hook lock(7)By locking bearing pin(6)Hinge type is connected to trapped orbit(8)Upper left side, working rig lock
Card(7)Left and right sides without constraint when both sides position of centre of gravity and weight difference effect under can around locking bearing pin(6)Rotation, makes operation
Machine pintle hook lock(7)Right side is sagging, makes folding track(3)With trapped orbit(8)Without working rig when completely docking(10)It can not skid off
Trapped orbit(8), folding tongue platform(2)Lower section install unblock pressure head(4), unlock pressure head(4)Push down working rig pintle hook lock(7)'s
Left side, makes working rig pintle hook lock(7)Suffering restraints to rotate.
2. a kind of folding working rig rail set according to claim 1, it is characterized in that:In trapped orbit(8)'s
The front and rear sides on the left side are respectively installed by one piece of guide plate(5), guide plate(5)Left end book right-hand member it is thick, two pieces of guide plates(5)Symmetrical peace
Mounted in trapped orbit(8)The left side front and rear sides after form guide channel wide outside and narrow inside(11), described guide channel(11)Draw
Lead folding track(3)With trapped orbit(8)Dock With Precision Position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710608047.XA CN107269236A (en) | 2017-07-24 | 2017-07-24 | A kind of folding working rig rail set |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710608047.XA CN107269236A (en) | 2017-07-24 | 2017-07-24 | A kind of folding working rig rail set |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107269236A true CN107269236A (en) | 2017-10-20 |
Family
ID=60078073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710608047.XA Pending CN107269236A (en) | 2017-07-24 | 2017-07-24 | A kind of folding working rig rail set |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107269236A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725655A (en) * | 2019-11-05 | 2020-01-24 | 中国海洋石油集团有限公司 | Drilling pipe processing workstation |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2010203128A1 (en) * | 2010-07-22 | 2012-02-09 | Cs Gas Pty Ltd | A foldable skid mounted control unit for gas wells |
CN103437724A (en) * | 2013-08-28 | 2013-12-11 | 宝鸡石油机械有限责任公司 | Pipe column supporting device for drilling platform |
CN203515385U (en) * | 2013-08-29 | 2014-04-02 | 宝鸡石油机械有限责任公司 | Racking platform drill-pipe stand supporting device |
CN103993842A (en) * | 2014-06-15 | 2014-08-20 | 武汉市元博智能控制技术研究设计院(有限合伙) | Novel racking platform pipe discharging system for land rig |
CN104005722A (en) * | 2014-06-23 | 2014-08-27 | 张成功 | Upright column robot placed on derrick upper platform |
CN104097560A (en) * | 2014-07-29 | 2014-10-15 | 零八一电子集团四川红轮机械有限公司 | Truck carriage covering device |
CN203925343U (en) * | 2014-06-23 | 2014-11-05 | 张成功 | Derrick upper table surface is put column robot |
CN105523145A (en) * | 2015-12-25 | 2016-04-27 | 广州船舶及海洋工程设计研究院 | Capturing rod structure |
CN105804674A (en) * | 2016-05-18 | 2016-07-27 | 北京海格立斯智能装备技术有限公司 | Oilfield well servicing system for overhaul operation |
CN206071489U (en) * | 2016-09-22 | 2017-04-05 | 胜利油田胜兴集团有限责任公司 | A kind of oil pipe collection of operation field falls apart |
CN207063926U (en) * | 2017-07-24 | 2018-03-02 | 张成功 | A kind of folding working rig rail set |
-
2017
- 2017-07-24 CN CN201710608047.XA patent/CN107269236A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2010203128A1 (en) * | 2010-07-22 | 2012-02-09 | Cs Gas Pty Ltd | A foldable skid mounted control unit for gas wells |
CN103437724A (en) * | 2013-08-28 | 2013-12-11 | 宝鸡石油机械有限责任公司 | Pipe column supporting device for drilling platform |
CN203515385U (en) * | 2013-08-29 | 2014-04-02 | 宝鸡石油机械有限责任公司 | Racking platform drill-pipe stand supporting device |
CN103993842A (en) * | 2014-06-15 | 2014-08-20 | 武汉市元博智能控制技术研究设计院(有限合伙) | Novel racking platform pipe discharging system for land rig |
CN104005722A (en) * | 2014-06-23 | 2014-08-27 | 张成功 | Upright column robot placed on derrick upper platform |
CN203925343U (en) * | 2014-06-23 | 2014-11-05 | 张成功 | Derrick upper table surface is put column robot |
CN104097560A (en) * | 2014-07-29 | 2014-10-15 | 零八一电子集团四川红轮机械有限公司 | Truck carriage covering device |
CN105523145A (en) * | 2015-12-25 | 2016-04-27 | 广州船舶及海洋工程设计研究院 | Capturing rod structure |
CN105804674A (en) * | 2016-05-18 | 2016-07-27 | 北京海格立斯智能装备技术有限公司 | Oilfield well servicing system for overhaul operation |
CN206071489U (en) * | 2016-09-22 | 2017-04-05 | 胜利油田胜兴集团有限责任公司 | A kind of oil pipe collection of operation field falls apart |
CN207063926U (en) * | 2017-07-24 | 2018-03-02 | 张成功 | A kind of folding working rig rail set |
Non-Patent Citations (1)
Title |
---|
张超;何军国;张勇;刘畅;仝兆盘;: "HXJ135E人工岛海洋钻修机的研制", 石油机械, no. 03 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725655A (en) * | 2019-11-05 | 2020-01-24 | 中国海洋石油集团有限公司 | Drilling pipe processing workstation |
CN110725655B (en) * | 2019-11-05 | 2021-05-11 | 中国海洋石油集团有限公司 | Drilling pipe processing workstation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9926753B2 (en) | Parking system for a pipe racker on a drilling rig | |
RU2609041C1 (en) | Manipulator of injector of flexible pipes | |
US9260929B2 (en) | Mobile rig and method | |
CA2924982C (en) | Mobile well servicing units and related methods | |
US8365816B2 (en) | Method and apparatus for conducting earth borehole operations | |
US8904716B2 (en) | Bi-directionally raisable drilling rig mast | |
US8863449B2 (en) | Substructure of a mobile drilling rig with a movable center floor section | |
US9410382B2 (en) | Drilling rig carriage movable along racks and including pinions driven by electric motors | |
US9816319B2 (en) | Slant drill rig tong cart | |
US10711540B2 (en) | Catwalk and crane system | |
BR122019008143B1 (en) | Elevator and method for engaging a rigid segment of tube without a boss that has a substantially circular cross-section | |
AU2010224672B2 (en) | Improved downhole device | |
US8875447B2 (en) | Mast and guy wire systems for use with long lateral completion systems and method | |
CA2834898A1 (en) | Transportable well service platform | |
CN206768569U (en) | A kind of mining pedestrian bridge | |
US20130341002A1 (en) | Pipe clamp mechanism and method | |
CN109154182B (en) | Telescopic top drive with torque tube | |
CN207063926U (en) | A kind of folding working rig rail set | |
CN107269236A (en) | A kind of folding working rig rail set | |
CN104727745B (en) | Method and apparatus for setting up drilling rig | |
US3718266A (en) | Oil well derrick substructure with carriages for blowout preventers | |
CA2982786C (en) | Catwalk system and method | |
NO20170718A1 (en) | Pipe transport system and method | |
US1801220A (en) | Folding door | |
US20130341046A1 (en) | System and method for controlling surface equipment to insert and remove tubulars with a well under pressure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |