CN107268947A - The construction method of arc flue perforate - Google Patents

The construction method of arc flue perforate Download PDF

Info

Publication number
CN107268947A
CN107268947A CN201710443697.3A CN201710443697A CN107268947A CN 107268947 A CN107268947 A CN 107268947A CN 201710443697 A CN201710443697 A CN 201710443697A CN 107268947 A CN107268947 A CN 107268947A
Authority
CN
China
Prior art keywords
flue
brick
perforate
arc
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710443697.3A
Other languages
Chinese (zh)
Other versions
CN107268947B (en
Inventor
张峰
贺欣
于景峰
刘应乐
刘秀芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710443697.3A priority Critical patent/CN107268947B/en
Publication of CN107268947A publication Critical patent/CN107268947A/en
Application granted granted Critical
Publication of CN107268947B publication Critical patent/CN107268947B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/02Vertical ducts; Channels, e.g. for drainage for carrying away waste gases, e.g. flue gases; Building elements specially designed therefor, e.g. shaped bricks or sets thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)
  • Special Wing (AREA)

Abstract

The invention provides a kind of construction method of arc flue perforate.Including:Protector installation steps, protector is laid on flue top plate close to the position for treating opening area;Construction equipment making step, makes door type frame, arc roll-over protective structure and other auxiliary machine tools;Reinforced concrete flue opening step, door type frame is installed on after after the predeterminated position of opening area, cutting perforate is carried out to reinforced concrete flue;Brick refractory brick flue opening step, arc roll-over protective structure is installed between flue top plate and fire resisting bricked arch roof, and perforate is carried out to brick fireproof flue;Personnel's monitoring, hole closing and protection step, cover perforate hole, monitor flue pressure, and flue duct and in time cap holes are installed in perforate after finishing;Site clearing step, is cleared up the building waste of job site.The present invention is simple to operate to be applicable, and efficiency is higher, prevents external force from concentrating caused flue arch crown to be caved in by external force, it is ensured that during Demolition Construction, the normal daily production of coke oven.

Description

The construction method of arc flue perforate
Technical field
The present invention relates to engineering construction technical field of construction, in particular to a kind of construction party of arc flue perforate Method.
Background technology
At present, various commercial plants and facility inside becoming increasingly popular with energy-conserving and environment-protective theory, old industrial enterprise Heat recovery technology upgrading transformation become increasingly prevalent, in order to which the flue gas of high temperature or low temperature is used, its In brick arc flue perforate improvement project it is more and more.
In general, flue includes concrete roof and arch crown, brick flue is divided into layering annular and builds by laying bricks or stones and be layered Staggeredly build by laying bricks or stones, such as during waste heat recovery is carried out to coke oven low-temperature flue gas, the flue gas discharged using coke oven is set up as thermal source One waste heat boiler and auxiliary facility, flue gas are returned again in flue after being reclaimed by waste heat boiler, are gone out by smoke stack emission Go, accordingly, it would be desirable to open flue gas leadout hole, flashboard hole and flue gas entrance hole on chimney main chimney flue top plate.
In flue openings in the ceiling operation, workmen typically stands directly on arch crown and carries out perforate to flue top plate Operation, when perforated area is larger, construction space can become narrow and small, and the construction operation to workmen is made troubles, also, arc Shape vault, so as to bring harmful effect to whole production, can also be caused workmen to fall into by easily being caved in during external force The security incident of flue.
As can be seen that prior art is difficult to accomplish both to ensure the safety of brick arc flue and normal production, ensure to apply again The safety of workman person.
The content of the invention
In consideration of it, the present invention proposes a kind of construction method of arc flue perforate, it is intended to solve existing flue perforate skill Art is easily caused arch crown and caved in, so as to bring the problem of adversely affecting and easily cause security incident to normal production.
On one side, the present invention proposes a kind of construction method of arc flue perforate, comprises the following steps:Protector Installation steps, protector is laid on flue top plate close to the position for treating opening area;
Construction equipment making step, makes door type frame, arc roll-over protective structure and other auxiliary machine tools;The perforate of reinforced concrete flue is walked Suddenly, the door type frame is installed on described after after the predeterminated position of opening area, cutting perforate is carried out to reinforced concrete flue;It is brick Refractory brick flue opening step, the arc roll-over protective structure is installed between flue top plate and fire resisting bricked arch roof, to the brick Build fireproof flue and carry out perforate;Personnel's monitoring, hole closing and protection step, cover perforate hole, monitor flue pressure, perforate Flue duct and in time cap holes are installed after finishing;Site clearing step, is cleared up the building waste of job site.
Further, in the construction method of above-mentioned arc flue perforate, the construction equipment making step also includes:Make Bquster and brick-clamping device.
Further, in the construction method of above-mentioned arc flue perforate, in the construction equipment making step, the gate The composition material of frame is channel-section steel and I-steel.
Further, in the construction method of above-mentioned arc flue perforate, in the construction equipment making step, the arc Roll-over protective structure includes:Outer layer arch ring and internal layer arch ring;Wherein, the outer layer arch ring is suspended in the upper of the arch crown of brick refractory brick Side, the internal layer arch ring is placed in below the arch crown of brick refractory brick;The internal layer arch ring is connected with the outer layer arch ring, And it is connected to the top plate for treating perforate flue.
Further, in the construction method of above-mentioned arc flue perforate, the reinforced concrete flue opening step is further wrapped Include:Line setting sub-step, in the default position of opening line setting of reinforced concrete flue top plate, door type frame is positioned over and treats perforate The predeterminated position in region;Drill sub-step, in the reinforced concrete flue top plate drilling;Sub-step is cut, according to the line position The cutting flue roof support with reinforced concrete is put, the reinforced concrete block of cutting is hung into the flue roof support with reinforced concrete and entrucking Outward transport.
Further, in the construction method of above-mentioned arc flue perforate, in the line setting sub-step, according to perforate chi Very little point of perforate at least twice.
Further, in the construction method of above-mentioned arc flue perforate, the brick refractory brick flue opening step enters one Step includes:Arc roll-over protective structure sub-step is installed, after refractory brick arc flue top plate builds partition wall by laying bricks or stones, arc roll-over protective structure be installed on Between the partition wall of flue top plate and fire resisting bricked arch roof;Brick fireproof flue removes sub-step, remove successively refratory insulating brick and Clay brick.
Further, in the construction method of above-mentioned arc flue perforate, the brick fireproof flue is removed in sub-step, right The clay brick built by laying bricks or stones in layering annular, bquster is stamped in the clay brick both sides do not removed, progressively removes resistance to from top to both sides Fiery clay brick, after the first arch chamotte brick perforate is finished, installs the internal layer arch ring of arc roll-over protective structure, supports the second arch fire resisting Clay brick, removes second and encircles chamotte brick;The internal layer arch ring of arc roll-over protective structure is shifted, the 3rd is removed and encircles chamotte brick, with This analogizes, until whole fire resisting bricked arch roof perforates are finished.
The present invention has the advantages that:
1st, simple to operate to be applicable, efficiency is higher, and labor intensity is greatly reduced;
2nd, the bearing capacity of flue vault is taken full advantage of, has disperseed flue supporting power, prevents external force from concentrating the cigarette caused Road arch crown is caved in by external force, it is ensured that during Demolition Construction, the normal daily production of coke oven;
3rd, the special tool equipments such as door type frame, safe arc frame are employed, the progress of brick arc flue perforate is improved, contracted The short engineering time, improve efficiency;
4th, fire resisting brick baffle has been built by laying bricks or stones, it is ensured that will not mutually collaborate between flue.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantages and benefit is common for this area Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the flow chart of the construction method of arc flue perforate provided in an embodiment of the present invention;
Fig. 2 is the mounting structure schematic diagram of arc roll-over protective structure in brick arc flue provided in an embodiment of the present invention;
Fig. 3 is the another flow chart of the construction method of arc flue perforate provided in an embodiment of the present invention;
Fig. 4 is the another flow chart of the construction method of arc flue perforate provided in an embodiment of the present invention.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing the disclosure in accompanying drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Complete conveys to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, the flow chart of the construction method of arc flue perforate provided in an embodiment of the present invention is shown in figure.Such as Shown in figure, the technique comprises the following steps:.
Protector installation steps S1, protector is laid on flue top plate close to the position for treating opening area.
Specifically, on flue top plate close to the position for treating opening area carry out the protectors such as laying guard rail and The safe preparation that workmen should be noted.
Construction equipment making step S2, makes door type frame, arc roll-over protective structure and other auxiliary machine tools.Specifically, Ke Yixuan With being that channel-section steel and I-steel make door type frame.It is for instance possible to use [200 channel-section steels, I200 I-steel make 2400mm it is high, Door type frame wide 2000mm.When it is implemented, the size of door type frame can be determined according to actual conditions.Can from channel-section steel or Steel plate etc. makes arc roll-over protective structure.Other equipments can including bquster etc. equipment.
Referring to Fig. 2, the mounting structure figure of arc roll-over protective structure in arc flue provided in an embodiment of the present invention is shown in figure. As seen from the figure:It is fire resisting bricked arch roof 1 inside flue, is divided into two layers, upper strata is insulating brick 11, lower floor is clay brick 12.It is viscous Cob brick is built by laying bricks or stones or is layered for layering annular and staggeredly builds by laying bricks or stones;Outside is square armored concrete flue 2.
Arc roll-over protective structure in the present embodiment can include:Outer layer arch ring 3 and internal layer arch ring 4.Outer layer arch ring 3 is suspended in brick The top of the arch crown of refractory brick is built, internal layer arch ring puts 4 below the arch crown of brick refractory brick;Internal layer arch ring 4 with it is outer Stringcourse circle 3 is connected, and is connected to the top plate for treating perforate flue.When it is implemented, can be by the first bindiny mechanism 5 by outer layer Arch ring 3 is fixed on the top plate for treating perforate flue.Engaging lug is provided with the vault of internal layer arch ring 4, the engaging lug is provided with perforate, The perforate that outer layer arch ring 3 can be hooked on engaging lug by one end of the second bindiny mechanism 6 is connected with internal layer arch ring 3, and second The other end of bindiny mechanism 6 is fixed on the top plate for treating perforate flue.The two ends of internal layer arch ring 4 can pass through the 3rd bindiny mechanism 7 It is connected.Wherein, the first bindiny mechanism 5, the second bindiny mechanism 6 and the 3rd bindiny mechanism 7 can be by leading screw, flower basket bolt, grooves The parts such as steel, steel plate are constituted, and the annexation of each part is well known to those skilled in the art, and here is omitted.
Reinforced concrete flue opening step S3, the door type frame is installed on it is described after after the predeterminated position of opening area, it is right Reinforced concrete flue carries out cutting perforate.Reinforced concrete flue opening step S3 further comprises:
Line setting sub-step S31, in the default position of opening line setting of reinforced concrete flue top plate, door type frame is placed In the predeterminated position for treating opening area.Specifically, during line setting, perforate at least twice can be divided according to bore size, for example Four pieces of armored concrete flue sheets to be cut can be marked off in the region for treat perforate according to bore size perforate in four times.
Drill sub-step S32, in the reinforced concrete flue top plate drilling.Specifically, it can be drilled using 100mm water drillings, In order to which the hook hook done using reinforcing bar is reeved, it is drilled after 100mm holes and is blocked using plug, prevents rainwater and apply Work current flue.
Sub-step S33 is cut, the flue roof support with reinforced concrete is cut according to the scribing position, by the reinforcing bar of cutting Concrete block hangs the flue roof support with reinforced concrete and entrucking outward transport.
Specifically, using Buddha's warrior attendant chain rope saw cutting machine, flue armored concrete is cut in position to the layout line, when one block of reinforcing bar The three sides cutting of concrete is finished, only during surplus one side, does support using door type frame, and sling reinforced concrete block (for example using chain block 23 tons of chain block can be used), then cut last one side reinforced concrete;Cutting pulls hoist and plays reinforced concrete after finishing Block is hung at the top of reinforced concrete flue, then slings entrucking outward transport (can for example select 25t crane) using crane;Use in time Plank closes floss hole, by that analogy, progressively removes remaining three pieces of armored concrete flue sheets, and whole perforate is finished.
Brick refractory brick flue opening step S4, flue top plate and fire resisting bricked arch roof are installed on by the arc roll-over protective structure Between, perforate is carried out to the brick fireproof flue.The step may further include:
Arc roll-over protective structure sub-step S41 is installed, after refractory brick arc flue top plate builds partition wall by laying bricks or stones, arc roll-over protective structure pacified Between partition wall loaded on flue top plate and fire resisting bricked arch roof.
Specifically, after the perforate of armored concrete flue sheet is finished, starting to build by laying bricks or stones on refractory brick arc flue top prevents phase Arc roll-over protective structure, is then installed between the partition wall of flue top plate and fire resisting bricked arch roof by the partition wall mutually collaborated.
Brick fireproof flue removes sub-step S42, and refratory insulating brick and clay brick are removed successively.
Specifically, first layer refratory insulating brick can be removed using cleaver, crowbar and hammer etc. and removes the resistance to fire screen of first layer Hot brick, and clean out;Then second layer clay brick is removed.When removing clay brick, to prevent clay brick stress is unbalance suddenly from collapsing Collapse, the clay brick built by laying bricks or stones for layering annular is stamped bquster in the clay brick both sides do not removed, progressively torn open from top to both sides Except chamotte brick, after the first arch chamotte brick perforate is finished, the internal layer arch ring of arc roll-over protective structure is installed, the second arch is supported Chamotte brick, removes second and encircles chamotte brick;The internal layer arch ring of arc roll-over protective structure is shifted, the 3rd is removed and encircles fire clay Brick, by that analogy, until whole fire resisting bricked arch roof perforates are finished.Staggeredly clay brick is built by laying bricks or stones for layering:The arch staggeredly built by laying bricks or stones It is preferable that top turns security, it is not easy to caves in and falls to inside flue, making for bquster can be determined according to on-site actual situations Use situation.
Personnel's monitoring, hole closing and protection step S5, cover perforate hole, monitor flue pressure, and perforate is pacified after finishing Fill flue duct and in time cap holes.
Specifically, it is real-time using related monitoring device in Tapping procedures, it is necessary to arrange special messenger to guard coke oven production process Monitor flue pressure, run into pressure oscillation it is larger when, sent using intercom to workmen stop immediately construction signal.Open Plank and refractory fiber blanket coverage hole are used during hole in time, it is to avoid influence coke oven flue is normally produced;Perforate is finished, cleared up After clean, flue is installed immediately, and carry out close measure.
Site clearing step S6, is cleared up the building waste of job site.
Specifically, the building waste to scene residual is cleaned, equipment used in work progress etc. is dismantled and playbacked.
In summary, the construction method of the arc flue perforate in the present embodiment, simple to operate to be applicable, efficiency is higher, and And labor intensity is greatly reduced;The bearing capacity of flue vault is taken full advantage of, has disperseed flue supporting power, external force collection is prevented In the flue arch crown that causes caved in by external force, it is ensured that during Demolition Construction, the normal daily production of coke oven;Employ door The special tool equipments such as type frame, safe arc frame, improve the progress of brick arc flue perforate, shorten the engineering time, improve Efficiency;Fire resisting brick baffle is built by laying bricks or stones, it is ensured that will not mutually collaborate between flue.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (8)

1. a kind of construction method of arc flue perforate, it is characterised in that comprise the following steps:
Protector installation steps, protector is laid on flue top plate close to the position for treating opening area;
Construction equipment making step, makes door type frame, arc roll-over protective structure and other auxiliary machine tools;
Reinforced concrete flue opening step, the door type frame is installed on it is described after after the predeterminated position of opening area, to reinforced concrete Flue carries out cutting perforate;
Brick refractory brick flue opening step, the arc roll-over protective structure is installed between flue top plate and fire resisting bricked arch roof, Perforate is carried out to the brick fireproof flue;
Personnel's monitoring, hole closing and protection step, cover perforate hole, monitor flue pressure, perforate installs flue after finishing Pipeline and in time cap holes;
Site clearing step, is cleared up the building waste of job site.
2. the construction method of arc flue perforate according to claim 1, it is characterised in that the construction equipment makes step Suddenly also include:Make bquster and brick-clamping device.
3. the construction method of arc flue perforate according to claim 1, it is characterised in that the construction equipment makes step In rapid, the composition material of the door type frame is channel-section steel and I-steel.
4. the construction method of arc flue perforate according to claim 1, it is characterised in that the construction equipment makes step In rapid, the arc roll-over protective structure includes:Outer layer arch ring and internal layer arch ring;Wherein,
The outer layer arch ring is suspended in the top of the arch crown of brick refractory brick, and the internal layer arch ring is placed in brick refractory brick Below arch crown;
The internal layer arch ring is connected with the outer layer arch ring, and is connected to the top plate for treating perforate flue.
5. the construction method of arc flue perforate according to any one of claim 1 to 4, it is characterised in that the steel Muscle concrete flue opening step further comprises:
Line setting sub-step, in the default position of opening line setting of reinforced concrete flue top plate, door type frame is positioned over and waited out The predeterminated position of bore region;
Drill sub-step, in the reinforced concrete flue top plate drilling;
Sub-step is cut, the flue roof support with reinforced concrete is cut according to the scribing position, the reinforced concrete block of cutting is hung From the flue roof support with reinforced concrete and entrucking outward transport.
6. the construction method of arc flue perforate according to claim 5, it is characterised in that the line setting sub-step In, according to bore size point perforate at least twice.
7. the construction method of arc flue perforate according to claim 6, it is characterised in that the brick refractory brick flue Opening step further comprises:
Arc roll-over protective structure sub-step is installed, after refractory brick arc flue top plate builds partition wall by laying bricks or stones, arc roll-over protective structure is installed on cigarette Between the partition wall of road top plate and fire resisting bricked arch roof;
Brick fireproof flue removes sub-step, and refratory insulating brick and clay brick are removed successively.
8. the construction method of arc flue perforate according to claim 7, it is characterised in that the brick fireproof flue is torn open Except in sub-step, the clay brick built by laying bricks or stones for layering annular stamps bquster, progressively from top in the clay brick both sides do not removed Chamotte brick is removed to both sides, after the first arch chamotte brick perforate is finished, the internal layer arch ring of arc roll-over protective structure, support are installed Firmly the second arch chamotte brick, removes second and encircles chamotte brick;The internal layer arch ring of arc roll-over protective structure is shifted, the 3rd arch is removed resistance to Fiery clay brick, by that analogy, until whole fire resisting bricked arch roof perforates are finished.
CN201710443697.3A 2017-06-13 2017-06-13 The construction method of arc flue aperture Active CN107268947B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710443697.3A CN107268947B (en) 2017-06-13 2017-06-13 The construction method of arc flue aperture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710443697.3A CN107268947B (en) 2017-06-13 2017-06-13 The construction method of arc flue aperture

Publications (2)

Publication Number Publication Date
CN107268947A true CN107268947A (en) 2017-10-20
CN107268947B CN107268947B (en) 2019-08-02

Family

ID=60066660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710443697.3A Active CN107268947B (en) 2017-06-13 2017-06-13 The construction method of arc flue aperture

Country Status (1)

Country Link
CN (1) CN107268947B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339482A (en) * 2018-10-15 2019-02-15 上海宝钢节能环保技术有限公司 A kind of boring method of underground flue
CN110655929A (en) * 2018-06-28 2020-01-07 上海梅山钢铁股份有限公司 Online hole opening method for chimney with brick-concrete structure of coke oven

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374356A (en) * 2012-04-25 2013-10-30 五冶集团上海有限公司 Flue arch crown online opening pipe connecting method for smoke waste-heat utilization of coke oven
CN104962296A (en) * 2015-06-25 2015-10-07 天津二十冶建设有限公司 Coke oven basis flue fast construction method free of top die erecting
CN206144252U (en) * 2016-10-31 2017-05-03 北京京诚科林环保科技有限公司 Concrete chimney that contains newly -increased flue trompil

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374356A (en) * 2012-04-25 2013-10-30 五冶集团上海有限公司 Flue arch crown online opening pipe connecting method for smoke waste-heat utilization of coke oven
CN104962296A (en) * 2015-06-25 2015-10-07 天津二十冶建设有限公司 Coke oven basis flue fast construction method free of top die erecting
CN206144252U (en) * 2016-10-31 2017-05-03 北京京诚科林环保科技有限公司 Concrete chimney that contains newly -increased flue trompil

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110655929A (en) * 2018-06-28 2020-01-07 上海梅山钢铁股份有限公司 Online hole opening method for chimney with brick-concrete structure of coke oven
CN109339482A (en) * 2018-10-15 2019-02-15 上海宝钢节能环保技术有限公司 A kind of boring method of underground flue

Also Published As

Publication number Publication date
CN107268947B (en) 2019-08-02

Similar Documents

Publication Publication Date Title
KR100982602B1 (en) Method of removing remaining pig iron from blast furnace
CN107268947A (en) The construction method of arc flue perforate
CN102692131A (en) Method for overhauling fire-resistant material for annular air duct and chute in coke dry quenching furnace
CN106522581A (en) Method for demolish chimney manually
CN102483305B (en) Method of demolishing furnace of multilayered-refractory structure
CN107419918A (en) A kind of Historical Buildings periphery single-layer frame retains method for dismounting
CN110820608A (en) Existing railway passenger station-entering overbridge dismantling method
CN108518083A (en) The Demolition Construction method of main sintering building
CN110079338B (en) Coke oven body dismantling and rebuilding method
CN110485752B (en) High-rise building dismantling method and machine
CN110685459A (en) Breaking hammer dismantling construction method for dismantling hoist bent from lower part
CN106996698B (en) A kind of dismounting and discharge method of coke dry quenching furnace inner lining refractory
CN107543025B (en) Construction method for dismantling thin-shell dome of gas tank
JP4528876B2 (en) Dismantling method of multi-layer refractory furnace
CN105862897A (en) Original-groove casting construction method for shallow foundation of sandy mudstone foundation
CN108342533B (en) blast furnace residual iron safe discharging opening control method
CN108049655A (en) A kind of Demolition Construction method of the pipeline with insulating and wearing-resistant lining
CN112980468A (en) Construction method of online flue tapping and non-stop baffle valve production system
JP2008075295A (en) Chimney dismantling method
CN109339482A (en) A kind of boring method of underground flue
CN110066664A (en) The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered
CN109837102B (en) Method for quickly removing refractory masonry of large coke oven body
CN116478705A (en) Online perforating and butt joint construction method for vault flue
CN116478706A (en) Online opening and installation method for flue shutter
CN117683954A (en) Safety environment protection method for blowing out extra-large blast furnace in favor of discharging clean residual iron

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant