CN110066664A - The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered - Google Patents

The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered Download PDF

Info

Publication number
CN110066664A
CN110066664A CN201810060161.8A CN201810060161A CN110066664A CN 110066664 A CN110066664 A CN 110066664A CN 201810060161 A CN201810060161 A CN 201810060161A CN 110066664 A CN110066664 A CN 110066664A
Authority
CN
China
Prior art keywords
small
burner
smoldered
small burner
coke
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810060161.8A
Other languages
Chinese (zh)
Other versions
CN110066664B (en
Inventor
雷智慧
任社安
张丽红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810060161.8A priority Critical patent/CN110066664B/en
Publication of CN110066664A publication Critical patent/CN110066664A/en
Application granted granted Critical
Publication of CN110066664B publication Critical patent/CN110066664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/02Brickwork, e.g. casings, linings, walls

Abstract

The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered; characterized by the following steps: a, the small protection board that machine, the small burner side of coke side furnace roof is cut and disassembled; b, the small burner of cokery side furnace roof is removed; c, 4-10 layers of clay brick is processed; form grout hole; d, firedoor frame top cordage is removed, blowing cleans, ceramic fibre rope filling, and the small burner of e, cokery side is built.The method for maintaining that 7.63 meters of small burners of coke oven of the invention are smoldered, which has, rebuilds entire coke oven end position sealing system, measure is strong, strong operability, effect are obvious, eliminate small burner smoke event, meet production and environmental requirement, grouting material materials are precisely and the advantages of reduce maintenance engineering cost.

Description

The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered
Technical field
The present invention relates to a kind of maintenance of coke oven methods, specifically, being a kind of maintenance that 7.63 meters of small burners of coke oven are smoldered Method.
Background technique
7.63 meters of coke ovens are in long-term production process, the expansion that refractory brick generates, and the machinery such as ram is outer in addition The problems such as power effect is easy to that the small jamb brick of coke oven is caused to loosen, and firedoor frame top refractory fibre rope damages.These coke oven components Damage directly contributes the sealing performance decline of coking furnace shaft burner, and occurs small burner in process of production and smolder situation, seriously Production operation is influenced, environmental pollution is caused.
Therefore, the small burner for the coking furnace shaft smoldered occur urgently is repaired.
Summary of the invention
The purpose of the present invention is to propose that a kind of 7.63 meters of small burners of coke oven for rebuilding entire coke oven end position sealing emit The method for maintaining of cigarette.
To achieve the above object, the technical solution of the invention is as follows:
The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered, it is characterised in that the following steps are included:
A, the small protection board of machine, the small burner side of coke side furnace roof is cut and disassembled
Small protection board is fixed on furnace stay using iron wire first, then come loose small protection board top thick stick bolt, adopts near furnace stay Small protection board is cut with cutting tool, when cutting must not injure furnace stay, beat groove to cut surface after the completion of cutting, be convenient for Later period welding;
B, the small burner of cokery side furnace roof is removed
After the small protection board of the small burner side of furnace roof surface railing, attached plate, pusher side and the small burner side of coke side cutting disassembling, remove Then the small burner refractory brick of furnace roof, the clinker tile of first demolition machine, coke side remove 4-10 layers of clay brick, clear up side wall and the 3rd layer Refractory brick marshalling;
C, 4-10 layers of clay brick is processed, grout hole is formed
The clay brick for processing 4-10 layers, in one knife of clay brick end beveled, length 50mm;4 blocks of clay bricks of every layer of processing are formed The grout hole of two arranged adjacents keeps 4-10 layers of clay brick all identical as the 10th layer, ultimately forms from the 4th layer and is communicated to furnace The grout hole on top;
D, firedoor frame top cordage is removed, blowing cleans, ceramic fibre rope filling
Ceramic fibre rope between firedoor frame top and burner thrust plate is removed, blowing cleans, is filled with grout hopper from grout hole Enter grouting material, prevent mud from splashing, then it is closely knit to dip in mortar filling for progress ceramic fibre rope;
E, the small burner of cokery side is built
It first builds 4-10 layers of clay brick, must assure that mortar is full when building clay brick, grouting hole is vertical, not faulting of slab ends;It is viscous Cob brick masonry appearance is smooth, not faulting of slab ends, guarantees that the small protection board installation of burner is smooth, then fills to the grout hole of small burner Slurry finally builds the surface clinker tile of 11th layer refractory brick and machine, coke side, completes the reparation that small burner is smoldered.
The method for maintaining that 7.63 meters of small burners of coke oven of the invention are smoldered can also be using technical measures below come into one Step is realized.
Method above-mentioned, wherein the grouting material adds 2% waterglass to be modulated to flow regime using clay chamotte.
Method above-mentioned, wherein the waterglass specification is I class of Pyatyi or 75 °.
Method above-mentioned, wherein the specific gravity of the grouting material is 1.5-1.7.
Method above-mentioned, wherein each grout hole is in the milk in three times, each time interval when the grout hole is in the milk For 1-1.5h.
Method above-mentioned, wherein the grouting quantity of the 1-2 times burner position grout hole is every time 2 when the grout hole is in the milk Bucket, every barrel of 6 liters of grouting materials.
After adopting the above technical scheme, the method for maintaining that 7.63 meters of small burners of coke oven of the invention are smoldered is with following excellent Point:
1, entire coke oven end position sealing system is rebuild, measure is strong, strong operability, effect are obvious;
2, small burner smoke event is eliminated, production and environmental requirement are met;
3, grouting material materials are accurate, reduce maintenance engineering cost.
Detailed description of the invention
Fig. 1 is the small furnace head structure schematic diagram of coke side of the embodiment of the present invention;
Fig. 2 is the small furnace head structure schematic diagram of pusher side of the embodiment of the present invention;
Fig. 3 is the 10th layer plane figure of coke side of the embodiment of the present invention;
Fig. 4 is the 10th layer plane figure of pusher side of the embodiment of the present invention;
Fig. 5 is the sealed structural schematic diagram between the firedoor frame top and burner thrust plate of the embodiment of the present invention.
In figure: the small burner of 1 coke side, 2 small protection boards, 3 grout holes, 4 stoke holes, 5 the 3rd layers of refractory brick, 6 the 10th layers of fire resisting Brick, 7 11th layer refractory brick, the small burner of 8 pusher sides, 9 tedges, 10 carbonizing chambers, 11 carbonizing chambers cross dome brick, 12 sliding layers, 13 furnace roofs Semi-silica brick, 14 burner thrust plates, 15 ceramic fibre ropes, 16 sealing devices, 17 firedoor frames.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
The method for maintaining that 7.63 meters of small burners of coke oven of the invention are smoldered, comprising the following steps:
Referring now to Fig. 1 and Fig. 2, Fig. 1 is the small furnace head structure schematic diagram of coke side of the embodiment of the present invention, and Fig. 2 is that the present invention is implemented The small furnace head structure schematic diagram of pusher side of example.As shown, the outside of small 2 stoke hole 4 of burner of coke side, the small burner 2 of coke side Inside is lined with small burner refractory brick, and grout hole 3 is equipped within the scope of the 3rd layer of refractory brick -11th layer refractory brick;It is equally small in pusher side The inside in the outside of 2 tedge 9 of burner, the small burner 2 of coke side is lined with small burner refractory brick, in the 3rd layer of refractory brick -11th layer fire resisting Grout hole 3 is equipped within the scope of brick.
A, the small small protection board in burner side of cokery side furnace roof is cut and disassembled
Small protection board is fixed on furnace stay using iron wire first, the small protection board top thick stick bolt that then comes loose is adopted near furnace stay Small protection board is cut with tool.Since small protection board is thicker, when cutting, must not hurt furnace stay.To cutting after the completion of cutting Face beats groove, convenient for welding below.
B, the small burner of cokery side furnace roof is removed
After the small protection board cutting disassembling in the small burner side of furnace roof surface railing, attached plate, cokery side, the small burner fire resisting of furnace roof is removed Brick.Cokery side clinker tile is first removed, 4-10 floor (113, No. 114) clay brick is then removed.Then side wall and the 3rd layer of fire resisting are cleared up Brick setting.
C, No. 114 bricks are processed, grout hole is formed
Fig. 3 is the 10th layer plane figure of coke side of the embodiment of the present invention, and Fig. 4 is the 10th layer plane figure of pusher side of the embodiment of the present invention. 4-10 floor (113, No. 114) clay brick is processed, one knife of end beveled, length 50mm;Every layer processing 4 pieces No. 114 viscous Cob brick forms 2 grout holes, such as following figure.It is 4-10 layers, all identical as the 10th layer, ultimately form the grouting from the 4th layer to furnace roof Hole is also convenient for post-grouting.
D, firedoor frame top cordage is removed, blowing cleans, ceramic fibre rope filling
Fig. 5 is the sealed structural schematic diagram between the firedoor frame top and burner thrust plate of the embodiment of the present invention.To firedoor frame top Ceramic fibre rope between burner thrust plate is removed, blowing cleans, is in the milk, and is then carried out ceramic fibre rope and is dipped in mortar filling It is closely knit.Due to the position be it is horizontal, self-control specific purpose tool be in the milk.In addition the consistency of grouting material will be more greatly.Grouting material Using clay chamotte (KC-W), additional 2% waterglass (I class of Pyatyi or 75 °) is modulated to flow regime (specific gravity 1.5- with water 1.7 are advisable).
E, the small burner of cokery side is built
First build 113, No. 114 clay brick of 4-10 floor.It must assure that mortar is full when masonry, grouting hole is vertical, not faulting of slab ends. Masonry appearance is smooth, not faulting of slab ends, guarantees that the small protection board installation of burner is smooth.Then it is in the milk to the grout hole of small burner, most 11th layer refractory brick and surface clinker tile are built afterwards, complete the reparation that small burner is smoldered.
The grouting material composition that the method for maintaining that 7.63 meters of small burners of coke oven of the invention are smoldered uses: furnace roof grouting is using viscous Native chamotte (KC-W), additional 2% waterglass (I class of Pyatyi or 75 °), being modulated to flow regime with water, (specific gravity is that 1.2-1.6 is Preferably).Grout hopper must be used by pouring into mud to grout hole, prevent mud from splashing.Each grout hole is in the milk in three times, often Secondary time interval 1-1.5h.The 1-2 times 2 barrels every time of burner position grout hole (about 6 liter/barrel).
The present invention has substantive distinguishing features and significant technological progress, the dimension that 7.63 meters of small burners of coke oven of the invention are smoldered It repairs method and removes the small protection board of small burner of coking furnace shaft, refractory brick etc., redesign the grouting mouth of small furnace head position, then weigh It newly builds small burner refractory brick and welds small protection board, on the one hand improve the sealing performance of coking furnace shaft burner, be allowed to not smolder, It meets environmental requirements;On the other hand, the grouting mouth of redesign can be in the milk in daily production process, meet production need It wants.
The method for maintaining that 7.63 meters of small burners of coke oven of the invention are smoldered is in husky steel, the small burner maintenance of 7.63 meters of coke ovens of Ma Gang It is used in engineering project, ensure that the leakproofness at entire coke oven end position after construction, no longer smolder, effect is obvious, receives The affirmative of relevant departments and unit.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of method for maintaining that 7.63 meters of small burners of coke oven are smoldered, it is characterised in that the following steps are included:
A, the small protection board of machine, the small burner side of coke side furnace roof is cut and disassembled
Small protection board is fixed on furnace stay using iron wire first, then come loose small protection board top thick stick bolt, adopts near furnace stay Small protection board is cut with cutting tool, when cutting must not injure furnace stay, beat groove to cut surface after the completion of cutting, be convenient for Later period welding;
B, the small burner of cokery side furnace roof is removed
After the small protection board of the small burner side of furnace roof surface railing, attached plate, pusher side and the small burner side of coke side cutting disassembling, remove Then the small burner refractory brick of furnace roof, the clinker tile of first demolition machine, coke side remove 4-10 layers of clay brick, clear up side wall and the 3rd layer Refractory brick marshalling;
C, 4-10 layers of clay brick is processed, grout hole is formed
The clay brick for processing 4-10 layers, in one knife of clay brick end beveled, length 50mm;4 blocks of clay bricks of every layer of processing are formed The grout hole of two arranged adjacents keeps 4-10 layers of clay brick all identical as the 10th layer, ultimately forms from the 4th layer and is communicated to furnace The grout hole on top;
D, firedoor frame top cordage is removed, blowing cleans, ceramic fibre rope filling
Ceramic fibre rope between firedoor frame top and burner thrust plate is removed, blowing cleans, is filled with grout hopper from grout hole Enter grouting material, prevent mud from splashing, then it is closely knit to dip in mortar filling for progress ceramic fibre rope;
E, the small burner of cokery side is built
It first builds 4-10 layers of clay brick, must assure that mortar is full when building clay brick, grouting hole is vertical, not faulting of slab ends;It is viscous Cob brick masonry appearance is smooth, not faulting of slab ends, guarantees that the small protection board installation of burner is smooth, then fills to the grout hole of small burner Slurry finally builds the surface clinker tile of 11th layer refractory brick and machine, coke side, completes the reparation that small burner is smoldered.
2. the method for maintaining that the small burner of 7.63 meters of coke ovens as described in claim 1 is smoldered, which is characterized in that the grouting material is adopted 2% waterglass is added to be modulated to flow regime with clay chamotte.
3. the method for maintaining that the small burner of 7.63 meters of coke ovens as claimed in claim 2 is smoldered, which is characterized in that the waterglass rule Lattice are I class of Pyatyi or 75 °.
4. the method for maintaining that the small burner of 7.63 meters of coke ovens as described in claim 1 is smoldered, which is characterized in that the grouting material Specific gravity is 1.5-1.7.
5. the method for maintaining that the small burner of 7.63 meters of coke ovens as described in claim 1 is smoldered, which is characterized in that the grout hole fills When slurry, each grout hole is in the milk in three times, and each time interval is 1-1.5h.
6. the method for maintaining that the small burner of 7.63 meters of coke ovens as described in claim 1 is smoldered, which is characterized in that the grout hole fills When slurry, the grouting quantity of the 1-2 times burner position grout hole is 2 barrels every time, every barrel of 6 liters of grouting materials.
CN201810060161.8A 2018-01-22 2018-01-22 Maintenance method for smoke emission of small burner of 7.63-meter coke oven Active CN110066664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810060161.8A CN110066664B (en) 2018-01-22 2018-01-22 Maintenance method for smoke emission of small burner of 7.63-meter coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810060161.8A CN110066664B (en) 2018-01-22 2018-01-22 Maintenance method for smoke emission of small burner of 7.63-meter coke oven

Publications (2)

Publication Number Publication Date
CN110066664A true CN110066664A (en) 2019-07-30
CN110066664B CN110066664B (en) 2021-01-19

Family

ID=67364760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810060161.8A Active CN110066664B (en) 2018-01-22 2018-01-22 Maintenance method for smoke emission of small burner of 7.63-meter coke oven

Country Status (1)

Country Link
CN (1) CN110066664B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293011A (en) * 2021-05-31 2021-08-24 马鞍山钢铁股份有限公司 Coke oven head sealing masonry structure and masonry method thereof
CN115353894A (en) * 2022-07-29 2022-11-18 中冶焦耐(大连)工程技术有限公司 Coke oven roof structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3474058D1 (en) * 1984-01-12 1988-10-20 Giuseppe Carrara Procedure and furnace to incinerate materialswithout producing smoke
CN102146294A (en) * 2011-02-23 2011-08-10 中冶焦耐(大连)工程技术有限公司 Method for increasing air tightness of coke oven top and oven top structure
CN102504837A (en) * 2011-10-28 2012-06-20 马钢(集团)控股有限公司 Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
CN206544995U (en) * 2017-03-16 2017-10-10 石家庄钢铁有限责任公司 A kind of coke oven coke side smoke gas collecting apparatus
CN107286964A (en) * 2016-04-05 2017-10-24 五冶集团上海有限公司 A kind of job platform repaired for coke oven end
CN106010588B (en) * 2016-05-23 2019-06-04 内蒙古包钢钢联股份有限公司 The firedoor frame of large capacity coke oven is smoldered processing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3474058D1 (en) * 1984-01-12 1988-10-20 Giuseppe Carrara Procedure and furnace to incinerate materialswithout producing smoke
CN102146294A (en) * 2011-02-23 2011-08-10 中冶焦耐(大连)工程技术有限公司 Method for increasing air tightness of coke oven top and oven top structure
CN102504837A (en) * 2011-10-28 2012-06-20 马钢(集团)控股有限公司 Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
CN107286964A (en) * 2016-04-05 2017-10-24 五冶集团上海有限公司 A kind of job platform repaired for coke oven end
CN106010588B (en) * 2016-05-23 2019-06-04 内蒙古包钢钢联股份有限公司 The firedoor frame of large capacity coke oven is smoldered processing method
CN206544995U (en) * 2017-03-16 2017-10-10 石家庄钢铁有限责任公司 A kind of coke oven coke side smoke gas collecting apparatus

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘武镛等: "《炼焦热工管理》", 31 January 2011 *
张丽红等: "焦炉热态施工的质量控制", 《四川建筑》 *
黄志球等: "焦炉各部位耐材损坏原因分析与处理方法", 《工业建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293011A (en) * 2021-05-31 2021-08-24 马鞍山钢铁股份有限公司 Coke oven head sealing masonry structure and masonry method thereof
CN115353894A (en) * 2022-07-29 2022-11-18 中冶焦耐(大连)工程技术有限公司 Coke oven roof structure

Also Published As

Publication number Publication date
CN110066664B (en) 2021-01-19

Similar Documents

Publication Publication Date Title
CN101225718B (en) Construction method of steel reinforced concrete chimney
CN103059883A (en) Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN103509566B (en) Overhaul construction method of double chute position of dry quenching furnace
CN110066664A (en) The method for maintaining that a kind of small burner of 7.63 meters of coke ovens is smoldered
CN114181719A (en) Large coke oven building and building process
CN106833684A (en) A kind of bracket structure and its construction method for extending coke dry quenching furnace service life
CN110079338B (en) Coke oven body dismantling and rebuilding method
CN102373063B (en) Bricklaying loading method of coke oven
CN109796992A (en) Oven top of coke oven is coaling the hot online Replacement procedure in hole
CN110540842B (en) Furnace body repairing method for recycling coke oven after overall shutdown
CN102304367B (en) Coke oven body mending process
CN107449272A (en) A kind of building method of swinging metallurgical smelting oven refractory
CN206599532U (en) A kind of bracket structure for extending coke dry quenching furnace service life
CN109837102B (en) Method for quickly removing refractory masonry of large coke oven body
CN203501785U (en) Suspended precast block and one-piece casting combined furnace top construction
CN109401761B (en) Coke oven top structure with high air tightness and construction method thereof
CN109652100A (en) A method of being overhauled based on 6 meters of oven top of coke oven improves production environment
CN101748894A (en) Auxiliary quick construction method of temporary light rail in coke furnace building thermal state project
CN111059911B (en) Innovative building method for lime shaft furnace body refractory material
CN111365998A (en) Stepping furnace formed refractory brick and using method thereof
CN113108287A (en) Construction method for building expansion device of household garbage incineration boiler
CN202511630U (en) Side-embedded fire resistant combination brick
CN101149155B (en) Building method of flame path wall of roaster
CN209456537U (en) A kind of vertical perpendicular tank magnesium reducing furnace top construction
CN203432332U (en) Fireproof apparatus for tertiary air duct

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant