CN107268888A - A kind of precast beam structure - Google Patents

A kind of precast beam structure Download PDF

Info

Publication number
CN107268888A
CN107268888A CN201710638521.3A CN201710638521A CN107268888A CN 107268888 A CN107268888 A CN 107268888A CN 201710638521 A CN201710638521 A CN 201710638521A CN 107268888 A CN107268888 A CN 107268888A
Authority
CN
China
Prior art keywords
beam body
lower floor
cage bar
precast
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710638521.3A
Other languages
Chinese (zh)
Inventor
王亚超
陈诚
吴立勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Building Friend Technology (kunshan) Co Ltd
Original Assignee
Building Friend Technology (kunshan) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building Friend Technology (kunshan) Co Ltd filed Critical Building Friend Technology (kunshan) Co Ltd
Priority to CN201710638521.3A priority Critical patent/CN107268888A/en
Publication of CN107268888A publication Critical patent/CN107268888A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/22Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line

Abstract

The invention belongs to the realm of building construction, disclose a kind of precast beam structure, including the first beam body and the second beam body, the axis of first beam body and the second beam body along its length is located along the same line, first beam body and the second beam body are connected by lower floor's cage bar, and lower floor's cage bar sequentially passes through the first beam body along its length and the second beam body is set.The present invention passes through said structure, first beam body and the second beam body are connected to become an entirety, this structure can cause tower crane in a lifting operation while slinging two beam bodies, realize the beam two of three post two across mounting structure, solve the lifting of job site tower crane often, the problem of efficiency is low, the cycle is long.

Description

A kind of precast beam structure
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of precast beam structure.
Background technology
In the realm of building construction, building prefabricated components are general first in factory's concentration pre-casting production, then transport to job site Installed, improve construction speed, reduced artificial input, save construction cost.But current precast beam and prefabricated post Common installation form be the beam one of two post one across form, when job site needs to install a large amount of precast beams, precast beam can only be single Branch is lifted, for skyscraper, and tower crane lifting number of times increase, lifting efficiency reduction, engineering time cost is higher.
The content of the invention
It is an object of the invention to provide a kind of precast beam structure, the precast beam is connected two beam bodies by lower floor's cage bar Through an entirety is connected as, solve job site lifting often, the problem of efficiency is low, the cycle is long.
For up to this purpose, the present invention uses following technical scheme:
A kind of precast beam structure, including the first beam body and the second beam body, first beam body and the second beam body are along length side To axis be located along the same line, first beam body and the second beam body are connected by lower floor's cage bar, and lower floor's cage bar is equal First beam body is sequentially passed through along its length and the second beam body is set.
Lower floor's cage bar through the first beam body and the second beam body is arranged by Mechanics Calculation, two beam bodies are connected as one It is overall, at the construction field (site) by a lifting operation just can realize with the prefabricated post formation beam two of three post two across mounting structure, section Lifting number of times is saved, accelerates lifting progress, shortens whole construction period.
Further, first beam body and the second beam body are arranged at intervals.When being installed with prefabricated post, compartment overlap joint In the beam two of three post two across in prefabricated post centrally located in this mounting structure.
Further, first beam body and the second beam body are respectively stretched out in the two ends of lower floor's cage bar.Lower floor's cage bar Two ends extension is overlapped on the beam two of three post two across being located in this mounting structure in the prefabricated post of both sides, reaches that Bar Anchorage is long Degree is required.
Further, the extension of lower floor's cage bar is L-shaped or " one " font.Its concrete form is according to different Installation needs to be chosen.
Further, first beam body and the second beam body are embedded with some stirrups along its length.Stirrup point encrypted area Set with non-encrypted area, stirrup is used for fixing the position of lower floor's cage bar, prevent in follow-up concreting lower floor's cage bar by Extrude and deform, shift, moreover it is possible to good framework of steel reinforcement is formed together with the various reinforcing bars in precast beam structure, improve precast beam The compression strength of structure.
Further, the stirrup is open rectangle stirrup, enclosing square stirrup or groined type stirrup etc., its concrete form Select according to actual needs.
Compared with prior art, advantages of the present invention and have the beneficial effect that:The precast beam structure of the present invention passes through lower floor master First beam body and the second beam body are connected as an entirety, for construction site is especially for skyscraper, tower by muscle Lift up into lifting operation of row just can realize the beam two of three post two across mounting structure, save lifting number of times, accelerate lift into Degree, improves lifting efficiency, shortens construction period.
Brief description of the drawings
Fig. 1 is precast beam structure schematic diagram of the present invention;
Fig. 2 is the mounting structure schematic diagram of precast beam of the present invention and prefabricated post.
In figure:
1st, precast beam structure;11st, the first beam body;12nd, the second beam body;13rd, lower floor's cage bar;2nd, prefabricated post.
Embodiment
For make present invention solves the technical problem that, the technical scheme that uses and the technique effect that reaches it is clearer, below Technical scheme is further illustrated with reference to accompanying drawing and by embodiment.
The present embodiment provides a kind of precast beam structure 1, as shown in figure 1, the precast beam structure 1 includes the first beam body 11 and the Two beam bodies 12, axis of first beam body 11 with the second beam body 12 along its length is located along the same line and structure is identical, Two beam bodies are arranged at intervals and by lower floor's cage bar 13 through being connected to become an entirety, lower floor's cage bar 13 along its length according to Secondary to run through the first beam body 11 and the second beam body 12 is set, the first beam body 11 and the second beam body are stretched out in the two ends of lower floor's cage bar 13 respectively 12, extension is L-shaped or " one " font structure, to reach the requirement of bar construction anchorage length.By in the first beam body 11 Lower floor's cage bar 13 is set with running through in the second beam body 12, two beam bodies are connected to become an entirety, so constructed at the scene When, tower crane is once lifted just can be stretched while sling two beam bodies by the compartment in the middle of two beam bodies and two ends The reinforcing bar part gone out is installed in three prefabricated posts 2, formed therewith the beam two of three post two across mounting structure, as shown in Fig. 2 so as to Saving lifting number of times is reached, accelerates lifting progress, improves efficiency of construction, shorten the purpose of construction period.It is understood that under The radical of layer cage bar 13 and the structure type of stretching beam body part can be determined according to specific construction requirement, in the present embodiment In, the radical of lower floor's cage bar 13 is chosen for two, and the part that lower floor's cage bar 13 stretches out beam body two ends is in " one " font structure.
Further, lower floor's cage bar 13 is located at the bottom of the first beam body 11 and the second beam body 12 in the present embodiment, prefabricated Beam is primarily subjected to bending load, is embedded in lower floor's cage bar 13 therein and plays structural effect, is disposed at beam body bottom, energy Preferably bear bending load.
Further, the first beam body 11 and the second beam body 12 are disposed with some stirrups by structural requirement along its length (not shown), specifically, stirrup point encrypted area and non-encrypted area are set.Stirrup is used for bearing shearing force and fixed lower floor master The position of muscle 13, prevents that lower floor's cage bar 13 is squeezed and deformed, shifts in follow-up concreting, moreover it is possible to precast beam knot Various reinforcing bars in structure 1 form good framework of steel reinforcement together, improve the compression strength of precast beam structure 1.Encrypted area and Fei Jia Mi Qu setting form ensure that precast beam structure 1 meets structural requirement.Above-mentioned stirrup can be open rectangle stirrup, closing Rectangle hoop or groined type stirrup etc., preferred open rectangle stirrup in the present embodiment.
The precast beam structure 1 that the present invention is provided is applied to pure frame structure, is built in the large-scale room such as utilities building supermarket Using efficiency of construction can be significantly improved in structure, construction cost is reduced, such as being promoted the use of in building field certainly will can obtain aobvious The economic benefit of work.
Obviously, the above embodiment of the present invention is just for the sake of clear explanation example of the present invention, and is not pair The restriction of embodiments of the present invention.For those of ordinary skill in the field, may be used also on the basis of the above description To make other changes in different forms.There is no necessity and possibility to exhaust all the enbodiments.It is all this Any modifications, equivalent substitutions and improvements made within the spirit and principle of invention etc., should be included in the claims in the present invention Protection domain within.

Claims (6)

1. a kind of precast beam structure (1), it is characterised in that including the first beam body (11) and the second beam body (12), first beam The axis of body (11) and the second beam body (12) along its length is located along the same line, first beam body (11) and the second beam body (12) connected by lower floor's cage bar (13), lower floor's cage bar (13) sequentially passes through first beam body (11) along its length Set with the second beam body (12).
2. precast beam structure (1) according to claim 1, it is characterised in that first beam body (11) and the second beam body (12) it is arranged at intervals.
3. precast beam structure (1) according to claim 1, it is characterised in that the two ends of lower floor's cage bar (13) are divided equally First beam body (11) and the second beam body (12) are not stretched out.
4. precast beam structure (1) according to claim 3, it is characterised in that the extension of lower floor's cage bar (13) L-shaped or " one " font.
5. precast beam structure (1) according to claim 1, it is characterised in that first beam body (11) and the second beam body (12) some stirrups are embedded with along its length.
6. precast beam structure (1) according to claim 5, it is characterised in that the stirrup is open rectangle stirrup, closing Rectangle hoop or groined type stirrup.
CN201710638521.3A 2017-07-31 2017-07-31 A kind of precast beam structure Pending CN107268888A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710638521.3A CN107268888A (en) 2017-07-31 2017-07-31 A kind of precast beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710638521.3A CN107268888A (en) 2017-07-31 2017-07-31 A kind of precast beam structure

Publications (1)

Publication Number Publication Date
CN107268888A true CN107268888A (en) 2017-10-20

Family

ID=60076146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710638521.3A Pending CN107268888A (en) 2017-07-31 2017-07-31 A kind of precast beam structure

Country Status (1)

Country Link
CN (1) CN107268888A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0657879A (en) * 1992-08-13 1994-03-01 P S Co Ltd Precast concrete flat beam and erection thereof
JP2007332548A (en) * 2006-06-12 2007-12-27 Shimizu Corp Column-beam joint structure
KR20100050142A (en) * 2008-11-05 2010-05-13 이호찬 Steel concrete composite crossbeam and construction method using the same
CN102900168A (en) * 2012-10-08 2013-01-30 沈阳建筑大学 Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
CN204691033U (en) * 2015-05-12 2015-10-07 华汇工程设计集团股份有限公司 A kind of superposed beam prefabricated units for integral precast groined type building cover structure
CN105569264A (en) * 2016-02-24 2016-05-11 刘家文 Double-faced superposed beam and construction method thereof
CN105839846A (en) * 2016-03-22 2016-08-10 哈尔滨工业大学 Prefabricated reinforced concrete composite beam
CN106437026A (en) * 2016-10-21 2017-02-22 季兆桐 One-step formed multispan prefabricated beam and construction method thereof
CN207160414U (en) * 2017-07-31 2018-03-30 中民筑友建筑科技(昆山)有限公司 A kind of precast beam structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0657879A (en) * 1992-08-13 1994-03-01 P S Co Ltd Precast concrete flat beam and erection thereof
JP2007332548A (en) * 2006-06-12 2007-12-27 Shimizu Corp Column-beam joint structure
KR20100050142A (en) * 2008-11-05 2010-05-13 이호찬 Steel concrete composite crossbeam and construction method using the same
CN102900168A (en) * 2012-10-08 2013-01-30 沈阳建筑大学 Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
CN204691033U (en) * 2015-05-12 2015-10-07 华汇工程设计集团股份有限公司 A kind of superposed beam prefabricated units for integral precast groined type building cover structure
CN105569264A (en) * 2016-02-24 2016-05-11 刘家文 Double-faced superposed beam and construction method thereof
CN105839846A (en) * 2016-03-22 2016-08-10 哈尔滨工业大学 Prefabricated reinforced concrete composite beam
CN106437026A (en) * 2016-10-21 2017-02-22 季兆桐 One-step formed multispan prefabricated beam and construction method thereof
CN207160414U (en) * 2017-07-31 2018-03-30 中民筑友建筑科技(昆山)有限公司 A kind of precast beam structure

Similar Documents

Publication Publication Date Title
CN103046645B (en) A kind of whole casting structure and construction method of Large-span Precast
CN108755951B (en) Energy dissipation and shock absorption beam column joint of precast prestressed concrete frame
CN106245820B (en) A kind of segmentation prestressing force Self-resetting damage concentration is prefabricated to wave shear wall
CN105781142B (en) The ruggedized construction and reinforcement means of post are taken out for building structure top layer
CN103821257A (en) Prestress steel plate shear wall
CN106760073A (en) Assembly concrete lining structural assembly
CN207160414U (en) A kind of precast beam structure
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN202323717U (en) Cantilever type pre-stress hoop and special tensioning device thereof
CN108374555A (en) Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure and method
CN102733603A (en) Construction method for irregular floors with large span by utilizing high-strength steel strands
CN102936957A (en) Construction method for optimizing arrangement of steel bars in structural steel concrete structure
CN110512800A (en) A kind of steel and concrete combined structure system and construction method
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN103821259B (en) The combined steel plate shearing force wall that a kind of tensile force of belt supports
CN208415690U (en) A kind of steel ripple crust and prestressed concrete combination beam
CN203939144U (en) For the device of connecting building structure shear wall and concrete floor
CN107268888A (en) A kind of precast beam structure
CN207003719U (en) A kind of prefabricated steel faced wall with steel bar girder
CN202831219U (en) Large-span precast monolithic concrete structure
CN208363611U (en) Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure
CN104264782A (en) Assembling integral pre-stress framework structure and construction method thereof
CN211114317U (en) Steel bar truss composite floor slab
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN107965054A (en) A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 215324 room 2, Jin Rong Road, Jinxi, Kunshan, Suzhou, Jiangsu, China, 177

Applicant after: KUNSHAN ZHONGMIN ZHUYOU SMART MANUFACTURING BUILDING TECHNOLOGY Co.,Ltd.

Address before: 215324 room 2, Jin Rong Road, Jinxi, Kunshan, Suzhou, Jiangsu, China, 177

Applicant before: CMIG DRAWIN TECHNOLOGY INDUSTRY Group Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020

RJ01 Rejection of invention patent application after publication