CN107268888A - A kind of precast beam structure - Google Patents
A kind of precast beam structure Download PDFInfo
- Publication number
- CN107268888A CN107268888A CN201710638521.3A CN201710638521A CN107268888A CN 107268888 A CN107268888 A CN 107268888A CN 201710638521 A CN201710638521 A CN 201710638521A CN 107268888 A CN107268888 A CN 107268888A
- Authority
- CN
- China
- Prior art keywords
- beam body
- lower floor
- cage bar
- precast
- along
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009435 building construction Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 12
- 230000003014 reinforcing effect Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
- E04C3/22—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to the realm of building construction, disclose a kind of precast beam structure, including the first beam body and the second beam body, the axis of first beam body and the second beam body along its length is located along the same line, first beam body and the second beam body are connected by lower floor's cage bar, and lower floor's cage bar sequentially passes through the first beam body along its length and the second beam body is set.The present invention passes through said structure, first beam body and the second beam body are connected to become an entirety, this structure can cause tower crane in a lifting operation while slinging two beam bodies, realize the beam two of three post two across mounting structure, solve the lifting of job site tower crane often, the problem of efficiency is low, the cycle is long.
Description
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of precast beam structure.
Background technology
In the realm of building construction, building prefabricated components are general first in factory's concentration pre-casting production, then transport to job site
Installed, improve construction speed, reduced artificial input, save construction cost.But current precast beam and prefabricated post
Common installation form be the beam one of two post one across form, when job site needs to install a large amount of precast beams, precast beam can only be single
Branch is lifted, for skyscraper, and tower crane lifting number of times increase, lifting efficiency reduction, engineering time cost is higher.
The content of the invention
It is an object of the invention to provide a kind of precast beam structure, the precast beam is connected two beam bodies by lower floor's cage bar
Through an entirety is connected as, solve job site lifting often, the problem of efficiency is low, the cycle is long.
For up to this purpose, the present invention uses following technical scheme:
A kind of precast beam structure, including the first beam body and the second beam body, first beam body and the second beam body are along length side
To axis be located along the same line, first beam body and the second beam body are connected by lower floor's cage bar, and lower floor's cage bar is equal
First beam body is sequentially passed through along its length and the second beam body is set.
Lower floor's cage bar through the first beam body and the second beam body is arranged by Mechanics Calculation, two beam bodies are connected as one
It is overall, at the construction field (site) by a lifting operation just can realize with the prefabricated post formation beam two of three post two across mounting structure, section
Lifting number of times is saved, accelerates lifting progress, shortens whole construction period.
Further, first beam body and the second beam body are arranged at intervals.When being installed with prefabricated post, compartment overlap joint
In the beam two of three post two across in prefabricated post centrally located in this mounting structure.
Further, first beam body and the second beam body are respectively stretched out in the two ends of lower floor's cage bar.Lower floor's cage bar
Two ends extension is overlapped on the beam two of three post two across being located in this mounting structure in the prefabricated post of both sides, reaches that Bar Anchorage is long
Degree is required.
Further, the extension of lower floor's cage bar is L-shaped or " one " font.Its concrete form is according to different
Installation needs to be chosen.
Further, first beam body and the second beam body are embedded with some stirrups along its length.Stirrup point encrypted area
Set with non-encrypted area, stirrup is used for fixing the position of lower floor's cage bar, prevent in follow-up concreting lower floor's cage bar by
Extrude and deform, shift, moreover it is possible to good framework of steel reinforcement is formed together with the various reinforcing bars in precast beam structure, improve precast beam
The compression strength of structure.
Further, the stirrup is open rectangle stirrup, enclosing square stirrup or groined type stirrup etc., its concrete form
Select according to actual needs.
Compared with prior art, advantages of the present invention and have the beneficial effect that:The precast beam structure of the present invention passes through lower floor master
First beam body and the second beam body are connected as an entirety, for construction site is especially for skyscraper, tower by muscle
Lift up into lifting operation of row just can realize the beam two of three post two across mounting structure, save lifting number of times, accelerate lift into
Degree, improves lifting efficiency, shortens construction period.
Brief description of the drawings
Fig. 1 is precast beam structure schematic diagram of the present invention;
Fig. 2 is the mounting structure schematic diagram of precast beam of the present invention and prefabricated post.
In figure:
1st, precast beam structure;11st, the first beam body;12nd, the second beam body;13rd, lower floor's cage bar;2nd, prefabricated post.
Embodiment
For make present invention solves the technical problem that, the technical scheme that uses and the technique effect that reaches it is clearer, below
Technical scheme is further illustrated with reference to accompanying drawing and by embodiment.
The present embodiment provides a kind of precast beam structure 1, as shown in figure 1, the precast beam structure 1 includes the first beam body 11 and the
Two beam bodies 12, axis of first beam body 11 with the second beam body 12 along its length is located along the same line and structure is identical,
Two beam bodies are arranged at intervals and by lower floor's cage bar 13 through being connected to become an entirety, lower floor's cage bar 13 along its length according to
Secondary to run through the first beam body 11 and the second beam body 12 is set, the first beam body 11 and the second beam body are stretched out in the two ends of lower floor's cage bar 13 respectively
12, extension is L-shaped or " one " font structure, to reach the requirement of bar construction anchorage length.By in the first beam body 11
Lower floor's cage bar 13 is set with running through in the second beam body 12, two beam bodies are connected to become an entirety, so constructed at the scene
When, tower crane is once lifted just can be stretched while sling two beam bodies by the compartment in the middle of two beam bodies and two ends
The reinforcing bar part gone out is installed in three prefabricated posts 2, formed therewith the beam two of three post two across mounting structure, as shown in Fig. 2 so as to
Saving lifting number of times is reached, accelerates lifting progress, improves efficiency of construction, shorten the purpose of construction period.It is understood that under
The radical of layer cage bar 13 and the structure type of stretching beam body part can be determined according to specific construction requirement, in the present embodiment
In, the radical of lower floor's cage bar 13 is chosen for two, and the part that lower floor's cage bar 13 stretches out beam body two ends is in " one " font structure.
Further, lower floor's cage bar 13 is located at the bottom of the first beam body 11 and the second beam body 12 in the present embodiment, prefabricated
Beam is primarily subjected to bending load, is embedded in lower floor's cage bar 13 therein and plays structural effect, is disposed at beam body bottom, energy
Preferably bear bending load.
Further, the first beam body 11 and the second beam body 12 are disposed with some stirrups by structural requirement along its length
(not shown), specifically, stirrup point encrypted area and non-encrypted area are set.Stirrup is used for bearing shearing force and fixed lower floor master
The position of muscle 13, prevents that lower floor's cage bar 13 is squeezed and deformed, shifts in follow-up concreting, moreover it is possible to precast beam knot
Various reinforcing bars in structure 1 form good framework of steel reinforcement together, improve the compression strength of precast beam structure 1.Encrypted area and Fei Jia
Mi Qu setting form ensure that precast beam structure 1 meets structural requirement.Above-mentioned stirrup can be open rectangle stirrup, closing
Rectangle hoop or groined type stirrup etc., preferred open rectangle stirrup in the present embodiment.
The precast beam structure 1 that the present invention is provided is applied to pure frame structure, is built in the large-scale room such as utilities building supermarket
Using efficiency of construction can be significantly improved in structure, construction cost is reduced, such as being promoted the use of in building field certainly will can obtain aobvious
The economic benefit of work.
Obviously, the above embodiment of the present invention is just for the sake of clear explanation example of the present invention, and is not pair
The restriction of embodiments of the present invention.For those of ordinary skill in the field, may be used also on the basis of the above description
To make other changes in different forms.There is no necessity and possibility to exhaust all the enbodiments.It is all this
Any modifications, equivalent substitutions and improvements made within the spirit and principle of invention etc., should be included in the claims in the present invention
Protection domain within.
Claims (6)
1. a kind of precast beam structure (1), it is characterised in that including the first beam body (11) and the second beam body (12), first beam
The axis of body (11) and the second beam body (12) along its length is located along the same line, first beam body (11) and the second beam body
(12) connected by lower floor's cage bar (13), lower floor's cage bar (13) sequentially passes through first beam body (11) along its length
Set with the second beam body (12).
2. precast beam structure (1) according to claim 1, it is characterised in that first beam body (11) and the second beam body
(12) it is arranged at intervals.
3. precast beam structure (1) according to claim 1, it is characterised in that the two ends of lower floor's cage bar (13) are divided equally
First beam body (11) and the second beam body (12) are not stretched out.
4. precast beam structure (1) according to claim 3, it is characterised in that the extension of lower floor's cage bar (13)
L-shaped or " one " font.
5. precast beam structure (1) according to claim 1, it is characterised in that first beam body (11) and the second beam body
(12) some stirrups are embedded with along its length.
6. precast beam structure (1) according to claim 5, it is characterised in that the stirrup is open rectangle stirrup, closing
Rectangle hoop or groined type stirrup.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710638521.3A CN107268888A (en) | 2017-07-31 | 2017-07-31 | A kind of precast beam structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710638521.3A CN107268888A (en) | 2017-07-31 | 2017-07-31 | A kind of precast beam structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107268888A true CN107268888A (en) | 2017-10-20 |
Family
ID=60076146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710638521.3A Pending CN107268888A (en) | 2017-07-31 | 2017-07-31 | A kind of precast beam structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107268888A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0657879A (en) * | 1992-08-13 | 1994-03-01 | P S Co Ltd | Precast concrete flat beam and erection thereof |
JP2007332548A (en) * | 2006-06-12 | 2007-12-27 | Shimizu Corp | Column-beam joint structure |
KR20100050142A (en) * | 2008-11-05 | 2010-05-13 | 이호찬 | Steel concrete composite crossbeam and construction method using the same |
CN102900168A (en) * | 2012-10-08 | 2013-01-30 | 沈阳建筑大学 | Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall |
CN204691033U (en) * | 2015-05-12 | 2015-10-07 | 华汇工程设计集团股份有限公司 | A kind of superposed beam prefabricated units for integral precast groined type building cover structure |
CN105569264A (en) * | 2016-02-24 | 2016-05-11 | 刘家文 | Double-faced superposed beam and construction method thereof |
CN105839846A (en) * | 2016-03-22 | 2016-08-10 | 哈尔滨工业大学 | Prefabricated reinforced concrete composite beam |
CN106437026A (en) * | 2016-10-21 | 2017-02-22 | 季兆桐 | One-step formed multispan prefabricated beam and construction method thereof |
CN207160414U (en) * | 2017-07-31 | 2018-03-30 | 中民筑友建筑科技(昆山)有限公司 | A kind of precast beam structure |
-
2017
- 2017-07-31 CN CN201710638521.3A patent/CN107268888A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0657879A (en) * | 1992-08-13 | 1994-03-01 | P S Co Ltd | Precast concrete flat beam and erection thereof |
JP2007332548A (en) * | 2006-06-12 | 2007-12-27 | Shimizu Corp | Column-beam joint structure |
KR20100050142A (en) * | 2008-11-05 | 2010-05-13 | 이호찬 | Steel concrete composite crossbeam and construction method using the same |
CN102900168A (en) * | 2012-10-08 | 2013-01-30 | 沈阳建筑大学 | Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall |
CN204691033U (en) * | 2015-05-12 | 2015-10-07 | 华汇工程设计集团股份有限公司 | A kind of superposed beam prefabricated units for integral precast groined type building cover structure |
CN105569264A (en) * | 2016-02-24 | 2016-05-11 | 刘家文 | Double-faced superposed beam and construction method thereof |
CN105839846A (en) * | 2016-03-22 | 2016-08-10 | 哈尔滨工业大学 | Prefabricated reinforced concrete composite beam |
CN106437026A (en) * | 2016-10-21 | 2017-02-22 | 季兆桐 | One-step formed multispan prefabricated beam and construction method thereof |
CN207160414U (en) * | 2017-07-31 | 2018-03-30 | 中民筑友建筑科技(昆山)有限公司 | A kind of precast beam structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103046645B (en) | A kind of whole casting structure and construction method of Large-span Precast | |
CN108755951B (en) | Energy dissipation and shock absorption beam column joint of precast prestressed concrete frame | |
CN106930436B (en) | Reinforced concrete shear wall with built-in prestressed steel diagonal bracing | |
CN106245820B (en) | A kind of segmentation prestressing force Self-resetting damage concentration is prefabricated to wave shear wall | |
CN105781142B (en) | The ruggedized construction and reinforcement means of post are taken out for building structure top layer | |
CN103821257A (en) | Prestress steel plate shear wall | |
CN108374555A (en) | Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure and method | |
CN203440948U (en) | Precast concrete double-plate shear wall with built-in diagonal bracing | |
CN106760073A (en) | Assembly concrete lining structural assembly | |
CN207160414U (en) | A kind of precast beam structure | |
CN202323717U (en) | Cantilever type pre-stress hoop and special tensioning device thereof | |
CN103821259B (en) | The combined steel plate shearing force wall that a kind of tensile force of belt supports | |
CN102733603A (en) | Construction method for irregular floors with large span by utilizing high-strength steel strands | |
CN110512800A (en) | A kind of steel and concrete combined structure system and construction method | |
CN103924676B (en) | Prestressing force connects beams of concrete concrete-filled circular steel tube column node | |
CN203939144U (en) | For the device of connecting building structure shear wall and concrete floor | |
CN208415690U (en) | A kind of steel ripple crust and prestressed concrete combination beam | |
CN107268888A (en) | A kind of precast beam structure | |
CN202466839U (en) | Reinforced concrete frame beam cable rib configuring structure | |
CN207003719U (en) | A kind of prefabricated steel faced wall with steel bar girder | |
CN202831219U (en) | Large-span precast monolithic concrete structure | |
CN208363611U (en) | Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure | |
CN104264782A (en) | Assembling integral pre-stress framework structure and construction method thereof | |
CN211114317U (en) | Steel bar truss composite floor slab | |
CN105220609B (en) | Combined beam self-anchored suspension bridge and construction process thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 215324 room 2, Jin Rong Road, Jinxi, Kunshan, Suzhou, Jiangsu, China, 177 Applicant after: KUNSHAN ZHONGMIN ZHUYOU SMART MANUFACTURING BUILDING TECHNOLOGY Co.,Ltd. Address before: 215324 room 2, Jin Rong Road, Jinxi, Kunshan, Suzhou, Jiangsu, China, 177 Applicant before: CMIG DRAWIN TECHNOLOGY INDUSTRY Group Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171020 |
|
RJ01 | Rejection of invention patent application after publication |