CN107265317A CN201710192677.3A CN201710192677A CN107265317A CN 107265317 A CN107265317 A CN 107265317A CN 201710192677 A CN201710192677 A CN 201710192677A CN 107265317 A CN107265317 A CN 107265317A
Authority
CN
China
Prior art keywords
principal arm
adjustment unit
crane
arm
capstan winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710192677.3A
Other languages
Chinese (zh)
Inventor
H·D·维利姆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liebherr Werk Ehingen GmbH
Original Assignee
Liebherr Werk Ehingen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liebherr Werk Ehingen GmbH filed Critical Liebherr Werk Ehingen GmbH
Publication of CN107265317A publication Critical patent/CN107265317A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/66Outer or upper end constructions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/82Luffing gear

Abstract

The present invention relates to a kind of method for unloader lifter, the particularly principal arm of mobilecrane, wherein described crane tool has the principal arm of amplitude-variable, is particularly telescopic principal arm and at least one adjustment unit, the adjustment unit is used to adjust at least one variable amplitude support to operate the auxiliary installed in the principal arm head, wherein described adjustment unit is hinged on the principal arm when without using auxiliary, and opposing torque is produced in the principal arm, to unload at least one amplitude oil cylinder of the principal arm and/or the principal arm.

Description

Method and crane for unloader lifter principal arm
Technical field
The present invention relates to it is a kind of for unloader lifter, particularly mobilecrane principal arm method, wherein this Heavy-duty machine has the principal arm and at least one adjustment unit of an amplitude-variable, and the adjustment unit is used to adjust at least one variable amplitude support To operate the auxiliary installed in principal arm head (also referred to as variable-amplitude auxiliary arm).
Background technology
Crane, particularly mobilecrane are configured with principal arm, and the principal arm can be constructed as telescopic arm.According to should With purpose and in order to improve maximum lifting height, in the head of principal arm auxiliary can be installed again.Pass through one or more luffings Support operates this variable-amplitude auxiliary arm with the hauling rope of matching.Adjustment unit passes through the regulation capstan winch on crane To operate, and act on necessary hauling rope to change the variable phase angle of variable-amplitude auxiliary arm.
If mobilecrane is difficult to complete lifting, then can not generally also use variable-amplitude auxiliary arm, because occur Loading moment is too big.Described component is run described previously for luffing, such as variable amplitude support, hauling rope and regulation capstan winch are this In the case of keep useless because crane implement just with telescopic principal arm lifting.
The criterion for being considered as limiting payload in this case is typically amplitude oil cylinder or possible scalable Principal arm.It is desirable to just realize the unloading of component without significantly changing existing crane structure, can further improve Maximum load torque.
The content of the invention
Therefore the purpose of the present invention be, it is possible to increase the bearing capacity of this crane, especially make full use of it is existing In the case of lifting thermomechanical components.
The purpose is resolved by a kind of method according to claim 1 characteristic.This method it is favourable Extension referring to dependent claims.
The starting point that this method is implemented is the crane with amplitude-variable principal arm He at least one adjustment unit, wherein regulation is single Member is generally used for adjusting at least one variable amplitude support.This variable amplitude support is determined for operating the luffing pair installed in principal arm head Arm/auxiliary.
Faced now according to the present invention, when not needing auxiliary, especially when removing auxiliary, abnormally using tune Save unit.It is hinged to for this adjustment unit on principal arm, for producing opposing torque on principal arm.The opposing torque is preferably gram Take loading moment.So as to realize the unloading at least one amplitude oil cylinder of principal arm and/or principal arm at least in part.So as to The payload of maximum possible can be improved using existing lifting thermomechanical components.Particularly buy this with variable amplitude support Crane is simultaneously familiar with the client of its characteristic and can benefit from the method according to the invention.Because in the fortune without variable-amplitude auxiliary arm recommended Payload capacity can be further improved in row, the lifting thermomechanical components needed for this are that crane network operator is existing, because This does not produce extra cost.
Particularly advantageously, adjustment unit is coaster, and its top sheave is hinged on principal arm, is particularly hinged to the upper of principal arm At 1/3rd.Lower sheave is preferably rotatably hinged on capstan winch, is especially hinged on the capstan winch support got on the bus.Adopted by this Capstan winch generally corresponds to the capstan winch that after all be used to operate variable-amplitude auxiliary arm/auxiliary.By capstan winch, coaster can be tensioned, And to necessary torque or tractive force is brought in principal arm to be unloaded to arm configuration or one or more amplitude oil cylinders.
Provided in a kind of particularly advantageous extension of the present invention, to adjustment unit, the progress of special capstan driving device The control matched somebody with somebody.This control or regulation are advantageously carried out according to the actual variable phase angle of principal arm.
It still further provides power regulation or displacement regulation.It is excellent when adjustment unit or capstan driving device carry out power regulation Measured tractive force on principal arm and/or the hinge of the adjustment unit on regulation capstan winch is adjusted to predefined set by selection of land Determine tractive force.
It is contemplated that displacement regulation works as front curve with respect to principal arm during transposition section in place.So as to attempt always to adjust Save the constant setting bending of holding of principal arm, and control to adjust the respective drive of capstan winch accordingly.Setting bending can be preferably Detected by adjustment unit namely coaster rope length, therefore as used herein is displacement regulation.
When not needing adjustment unit to unload principal arm, adjustment unit must be rested in reliably on crane.This is special Suitable for the road transport of crane.It is this according to a kind of preferred extension, the top sheave of adjustment unit is in order to carry out crane Transport and be stored in the opening of the lower sheave set by this.It is particularly preferred that lower sheave has a suitable folder Device is held to accommodate the axis of rolling of top sheave, particularly pulley.A kind of forked clamping device is suitable, wherein top sheave The axis of rolling is stored in prong.It is contemplated that lower sheave is rotatable by the capstan winch support of cantilever and regulation capstan winch Ground is connected.Cantilever preferably extends beyond lower sheave, and forms in end the forked opening of device.
In addition to the method according to the invention, the present invention relates equally to a kind of crane, and it is adapted for carrying out according to this The method of invention.Corresponding to this, crane includes the principal arm and at least one adjustment unit of at least one amplitude-variable, the tune Section unit is generally designed to adjust auxiliary/variable-amplitude auxiliary arm by one or more variable amplitude supports.Adjustment unit so carrys out structure Make so that the adjustment unit abnormally can be hinged on principal arm, by the way that enough drawing tensions can be brought on principal arm, To unload principal arm and/or at least one amplitude oil cylinder.A kind of control/adjusting means driven for capstan winch is additionally provided with, It is responsible for foregoing power regulation and/or displacement regulation.
According to the advantages and features of the crane of the present invention so as to the advantages and features corresponding to the method according to the invention. It is not repeated to illustrate.
Crane includes the device for variable adjustment lifting radius in the ideal case.
Preferably adjustment unit is constructed as the coaster with least one top sheave and lower sheave.Lower sheave can be with Alternatively there is clamping device to accommodate top sheave.Other clamping device is also used as clamp forks to construct, to accommodate upper cunning The axis of rolling of wheel.This simplifies the dismounting of the upper surface in clamping device, and it is reliable in clamping device to realize top sheave Storage is in favor of transport.
Coaster has the grooving of a multiple-limb, special at least ten, preferably at least 16.
Preferably, the lower sheave of the coaster of adjustment unit is rotatably hinged on regulation capstan winch, the particularly regulation is twisted On the capstan winch support of disk.For connection purpose, preferably by joint angle support, the cantilever is realized in lower sheave with adjusting Save rotatable connection between capstan winch or capstan winch support.It preferably includes at least one integrated load cell, to measure Tractive force produced by adjustment unit, and detect the tractive force applied on principal arm.
Because possible tension force is almost all brought in principal arm point by point by adjustment unit or coaster, targetedly Strengthen principal arm in the hinge area of adjusting means and meet purpose in ground.In jib system, preferably in adjustment unit institute Middle at least one reinforcement structure of setting of winding up for the principal arm being hinged to, this is suitable.
Brief description of the drawings
Other advantages and features of the present invention are hereinafter explained in detail by one embodiment shown in the accompanying drawings. Wherein:
Fig. 1 shows the schematic diagram for the mobilecrane for being provided with auxiliary;
Fig. 2 shows the application for unloading principal arm according to the adjustment unit of the present invention, and
Fig. 3 shows the detail drawing that the lower sheave of adjustment unit is installed on regulation capstan winch.
Embodiment
Fig. 1 shows the schematic side elevation according to crane of the invention, particularly mobilecrane.For simplification Diagram, only depicts jib system.It is made up of a principal arm 10, and the principal arm is constructed as known telescopic arm.Principal arm It is hinged on the getting on the bus of crane 10 amplitude-variables.At least one amplitude oil cylinder 11 is used to implement luffing motion.
Luffing pair is mounted with by adapter 14 in the head of innermost flexible joint arm 12, namely on its ring set 13 Arm 20.Luffing motion of the variable-amplitude auxiliary arm 20 in luffing plane by two variable amplitude supports 21,22 and corresponding bracing wire 23 come Realize.Adjustment unit 30 is combined for operation bracing wire 23 with regulation capstan winch 40 and thereby become for the angle of variable-amplitude auxiliary arm 20 Change.Adjustment unit 30 is constructed as the coaster with top sheave 31 and lower sheave 32.
When not needing variable-amplitude auxiliary arm 20, adjustment unit 30 is used to unload jib system according to the present invention, it is especially useful in unload Carry the structure of telescopic arm 10 and amplitude oil cylinder 11.Due to realizing during crane is run to principal arm 10 and amplitude oil cylinder 11 unloading, so obtaining the flexibility higher in crane lifting.
Fig. 2 shows the application for unloading principal arm 10 according to the adjustment unit 30 of the present invention.The upper cunning of adjustment unit 30 Wheel 31 is arranged on for this on ring set 16 of flexible joint arm 15 of penultimate.Lower sheave 32 is rotatably mounted by cantilever 33 On the capstan winch support 41 of regulation capstan winch 40.Coaster 30 is implemented using a twisted rope 34, and it has preferably been passed around 16 times.
A measuring box 50 is integrated with cantilever 33, to detect in adjustment unit 30 by e measurement technology Power, and thereby tension force of the detection produced by principal arm 10, and it is transferred to crane controller.
The driving of the capstan winch of capstan winch 40 is adjusted according to the change angle adjusted of principal arm 10.Herein or provide A kind of power regulation, wherein being setting tension force in the tension adjustment produced by this.The measured value of measuring box 50 is used as actual value.Or Person also provides the regulation carried out according to the bending of principal arm 10.So as to adjust the setting bending of principal arm 10 herein, it is for example It can be measured by the rope length of the coaster of adjustment unit 30.
Fig. 3 again illustrates the detail drawing of installation of the lower sheave 32 on capstan winch 40.Lower sheave 32 is as described previously by angle brace The phase bolt connection of capstan winch support 41 of frame 33 rotatably with capstan winch 40.There is measuring box 50 in cantilever 33, to detect The pulling force of generation.Other cantilever 33 protrudes past lower sheave 32, and forms forked opening 35 along the direction of top sheave 31.Can be with Accommodate the roller bearing of top sheave 31 in the opening when not needed, and ensure to be used to transport.Forked opening 35 constitutes a clamping Device, it allows the top sheave 31 for simply and suitably accommodating deactivation.
Because on the ring set 16 for being applied to the tension force point-like of adjustment unit 30 the flexible joint arm 15 of penultimate, its It is reinforced by pointedly setting one or more reinforcement structures in winding up, and thereby prevents undesirable bending. It is possible thereby to improve the maximum achievable tractive force in jib system.

Claims (11)

1. a kind of method for unloader lifter, the particularly principal arm of mobilecrane, wherein have can for the crane tool The principal arm of luffing, particularly telescopic principal arm and at least one adjustment unit, the adjustment unit are used to adjust at least one Variable amplitude support is arranged on the auxiliary of the principal arm head to operate,
Characterized in that,
The adjustment unit is hinged on the principal arm when without using auxiliary, and produces opposing torque in the principal arm, with Unload at least one amplitude oil cylinder of the principal arm and/or the principal arm.
2. according to the method described in claim 1, it is characterised in that the adjustment unit is coaster, its top sheave is hinged to institute State on principal arm, particularly at upper 1/3rd of the principal arm, and lower sheave can be rotatably set in capstan winch, particularly pair On the capstan winch support of the regulation capstan winch of arm.
3. according to any method of the preceding claims, it is characterised in that the adjustment unit, particularly capstan winch drive Dynamic device is controlled or adjusted according to the variable phase angle of the principal arm and/or the extension elongation of the flexible principal arm.
4. method according to claim 3, it is characterised in that carry out the adjustment unit or the capstan driving device Power is adjusted, wherein particularly adjustment unit tractive force measured on pin joint on the principal arm is adjusted to make a reservation for Setting tractive force.
5. the method according to claim 3 or 4, it is characterised in that the adjustment unit is adjusted to keep constant master The setting bending of arm, wherein the setting bending can preferably be detected by the rope length of the adjustment unit.
6. according to any method of the preceding claims, it is characterised in that the top sheave of the adjustment unit in order to Carry out crane transport and be stored in the opening of the lower sheave, especially by the capstan winch support of the lower sheave by Accommodate.
7. a kind of crane for being adapted for carrying out the method according to any one of preceding claims, the crane has variable The principal arm of width and at least one adjustment unit, the adjustment unit are used to adjust the auxiliary for being arranged on the principal arm head at least One variable amplitude support, it is characterised in that
The adjustment unit may be hingedly attached on the principal arm when without using auxiliary, and be opened suitable for being produced on the principal arm Power, to unload at least one amplitude oil cylinder of the principal arm and/or the principal arm at least in part.
8. crane according to claim 7, it is characterised in that the adjustment unit is coaster, it has at least one Top sheave and lower sheave, wherein the lower sheave has clamping device to accommodate the top sheave.
9. crane according to claim 7, it is characterised in that the clamping device is clamp forks, to accommodate on described The axis of rolling of pulley.
10. the crane according to any one of claim 7 to 9, it is characterised in that the lower sheave passes through connecting angle brace Frame is rotatably hinged on regulation capstan winch, is particularly hinged on its capstan winch support, wherein being preferably integrated at least one Power measuring box, with the tractive force produced by measuring in the joint angle support.
11. the crane according to any one of claim 7 to 10, it is characterised in that the principal arm is in the regulation dress In the hinge area of top sheave put, the particularly adjusting means, particularly include in the winding up of the principal arm to A few reinforcement structure, to limit extra increased tractive force by the adjustment unit.
CN201710192677.3A 2016-03-31 2017-03-28 Method and crane for unloader lifter principal arm Pending CN107265317A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102016003897.7 2016-03-31
DE102016003897.7A DE102016003897B4 (en) 2016-03-31 2016-03-31 Procedure for relieving the main boom of a crane and crane

Publications (1)

Publication Number Publication Date
CN107265317A true CN107265317A (en) 2017-10-20

Family

ID=59885254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710192677.3A Pending CN107265317A (en) 2016-03-31 2017-03-28 Method and crane for unloader lifter principal arm

Country Status (2)

Country Link
CN (1) CN107265317A (en)
DE (1) DE102016003897B4 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004087557A1 (en) * 2003-04-02 2004-10-14 Terex-Demag Gmbh & Co. Kg Two-piece main boom for a latice-boom crane and method for erection thereof
CN101638207A (en) * 2008-07-30 2010-02-03 利勃海尔爱茵根有限公司 Telescopic arm of crane and method for reinforcing through guy wire
CN102923585A (en) * 2012-11-13 2013-02-13 郑州新大方重工科技有限公司 Telescopic crane
CN104709833A (en) * 2015-01-30 2015-06-17 徐工集团工程机械股份有限公司 Novel luffing rib ropewalking crawler crane

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19929549B4 (en) * 1999-06-23 2006-01-12 Terex-Demag Gmbh & Co. Kg Telescopic crane with boom extension

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004087557A1 (en) * 2003-04-02 2004-10-14 Terex-Demag Gmbh & Co. Kg Two-piece main boom for a latice-boom crane and method for erection thereof
CN101638207A (en) * 2008-07-30 2010-02-03 利勃海尔爱茵根有限公司 Telescopic arm of crane and method for reinforcing through guy wire
CN102923585A (en) * 2012-11-13 2013-02-13 郑州新大方重工科技有限公司 Telescopic crane
CN104709833A (en) * 2015-01-30 2015-06-17 徐工集团工程机械股份有限公司 Novel luffing rib ropewalking crawler crane

Also Published As

Publication number Publication date
DE102016003897A1 (en) 2017-10-05
DE102016003897B4 (en) 2021-05-12

Similar Documents

Publication Publication Date Title
US10221048B2 (en) Crane assembly
US7416169B2 (en) Hoisting-cable drive comprising a single bottom-hook block and two winches
US8622228B2 (en) Boom hoist transportation system and crane using same
US8813981B2 (en) Anti-two block system for a crane assembly
CN103670908B (en) Transportation system for wind turbine blade
US6695158B2 (en) Crane with self-raising mast
US10604387B2 (en) Crane
CN101659378A (en) Lift and superlift device thereof
CN102241370B (en) Crane and method for erecting the crane
US8863964B2 (en) Crane
US4976361A (en) Mobile crane comprising a telescopic boom
US20120199543A1 (en) Boom for a crane assembly
US11673775B2 (en) Vehicle crane and method for reducing the loading on its jib
CN101723260B (en) Superlift device for telescopic boom and telescopic boom type crane
WO2020085314A1 (en) Crane device, method for determining number of falls, and program
US4204664A (en) Winch mechanism for crane
CN1039984C (en) Hose reeling device
CN105384094A (en) Method for operating a crane and crane
US11420851B2 (en) Tower crane with automatic folding and unfolding stanchion
US4993911A (en) Mobile crane
JP6448098B2 (en) Saddle seat / hook system
CN107265317A (en) Method and crane for unloader lifter principal arm
CN111332409A (en) Chain stopper and using method thereof
CN108792943B (en) Hoisting device with coaxial parallel hoisting and crane and engineering machinery
CN106115516B (en) Crane, super lifting device and its pretension steel wire rope control method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171020