CN107265068A - Formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material - Google Patents
Formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material Download PDFInfo
- Publication number
- CN107265068A CN107265068A CN201610231997.0A CN201610231997A CN107265068A CN 107265068 A CN107265068 A CN 107265068A CN 201610231997 A CN201610231997 A CN 201610231997A CN 107265068 A CN107265068 A CN 107265068A
- Authority
- CN
- China
- Prior art keywords
- mine car
- rotation
- unloaded
- formula mine
- formula
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 title claims abstract description 21
- 230000005484 gravity Effects 0.000 claims abstract description 8
- 238000013016 damping Methods 0.000 claims abstract description 5
- 230000035939 shock Effects 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 239000013536 elastomeric material Substances 0.000 claims description 2
- 238000005242 forging Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 238000000465 moulding Methods 0.000 claims description 2
- 125000006850 spacer group Chemical group 0.000 claims description 2
- 238000003466 welding Methods 0.000 claims description 2
- 239000013590 bulk material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The present invention announces a kind of rotation transported for loose unpacked material and unloads formula mine car continuous orbit transportation system, formula mine car is unloaded comprising rotation, drive sprocket, draw chain group, unload sprocket wheel, protection device is arrested in chain rupture, alter course sprocket wheel, uplink path, downing track, track support frame, load guider, rotation unloads formula mine car and passes through connecting bridge, traction chain group is connected in series to form rotation and unloads formula mine car group, series connection mine car group passes through drive sprocket, track support frame, alter course sprocket wheel, load guider head and the tail connection and form closed-loop system, when formula mine car group work operation (during except unloading upset) is unloaded in rotation, mine car rotating shaft center line is in horizontality all the time, mine car center of gravity is all the time under rotating shaft center's line, rotation unloads formula mine car group by automatically continuously being loaded under guider constraint during Load System, when unloading point is unloaded, each rotation unloads formula mine car compartment and does 360 degree of rotations around rotary shaft under the constraint of mine car damping unit, in rotary course, loose unpacked material is unloaded automatically under gravity.
Description
Technical field
The present invention relates to it is a kind of for loose unpacked material transport rotation unload formula mine car continuous orbit transportation system, can to loose unpacked material implement any angle,
Large conveying quantity, continuity, automatic transportation.
Background technology
Loose unpacked material transport known equipment in current mine mainly has:For level, the dump truck for tilting conveying, rubber conveyer, track ore deposit
Car;Wound form, friction type winder for large conveying quantity mine vertical-lift;The various bucket elevators of fortune are carried for small freight volume.It is above-mentioned to be equipped in
All there is respective shortcoming in actual use:There is freight charges height, have pollution shortcoming in dump truck transport;There is angle limitation in belt conveyor haulage;
Wound form, friction type winder can only back and forth be run, and there is control complexity, equipment costliness problem;Orbit mine car transport is limited by strict angle;
Various bucket elevator freight volumes are limited.
The content of the invention
In order to overcome the problem of any of the above conveying equipment is present, the present invention proposes that formula ore deposit is unloaded in a kind of rotation for being used for loose unpacked material transport of brand new
Car continuous orbit transportation system.
The present invention solves conventional bulk material transport system and there is the technical scheme that problem used:Formula is unloaded in a kind of rotation transported for loose unpacked material
Mine car continuous orbit transportation system, including rotation unload formula mine car, drive sprocket, traction chain group, unloading sprocket wheel, chain rupture and arrest protection device, changed course chain
Wheel, uplink path, downing track, track support frame, loading guider;Rotation, which unloads formula mine car and is connected in series to form rotation by traction chain group, unloads formula mine car
Group, mine car group connects the enclosed ring-type transportation system formed by drive sprocket, track support frame, changed course sprocket wheel, loading guider head and the tail, is
System can realize any angle automation continuative transport work.
It is further:Described rotation unload formula mine car comprising compartment, rotary shaft, wheel, traction connecting bridge, guiding hopper edge, traction connecting bridge,
Mine tram wheel is connected with rotary shaft, is arranged on mine car compartment both sides by rotary shaft, when formula mine car work operation (during except unloading upset) is unloaded in rotation, each
Mine car rotating shaft center line is in horizontality all the time, and center of gravity is all the time under rotating shaft center's line, and formula mine car compartment is unloaded in each rotation during unloaded operation
360 degree can be done around rotary shaft to rotate freely.
Protection device is arrested in described chain rupture can comprising support, left gripper, gripper axle, right gripper, spacing back-moving spring, left gripper and right gripper
To be rotated around gripper axle, when the traction connecting bridge being connected on haulage chain arrests protection device by chain rupture, left gripper and right gripper are forced open,
Connecting bridge is drawn by rear, left gripper and right gripper are closed automatically under gravity and spacing back-moving spring synergy.
The rotary shaft that described traction chain group unloads formula mine car by drawing connecting bridge, rotation by four Gent type annulus haulage chains is constituted, and traction chain group passes through
Traction connecting bridge, which is realized, unloads being connected in series, drawing for formula mine car to multiple rotations, forms mine car group.
Mine car compartment rotary damping device is housed on described unloading sprocket wheel.
Described loading guider includes mucking pan, guider, during operation, and rotation unloads the guiding hopper of formula mine car along under guider constraint
Pass through, material unloads the compartment of formula mine car by mucking pan into rotation, and formula mine car is unloaded in rotation constraint of the guider to guiding hopper edge, and compartment passes through dress
It will not be swung when carrying chute because loading impact.
Uplink path, downing track are fixed on the inside of track support frame, and operation mine car passage up and down is left on the inside of two tracks.
Described traction connecting bridge includes crane span structure, bridge pin, connection fork, balance connecting pin, and four Gent type annulus haulage chains pass through with drawing connecting bridge
Bridge pin, balance connecting pin be hinged, then stress balance is realized by rotary shaft.
Shock ring is provided between spoke and wheel hub in described mine tram wheel, shock ring is made by elastomeric material.
Described special type annulus haulage chain, which is included, carries load-bearing interface on common ring, load-bearing ring, connection ring, load-bearing ring, load-bearing ring can be direct
Forging molding or welding fabrication, common ring and refitting central spacer are set.
Brief description of the drawings
Formula mine car continuous orbit transportation system structure figure is unloaded in the rotation that Fig. 1 is the present invention.
Fig. 2 is that formula mine car (1) structure chart is unloaded in rotation.
Fig. 3 is that protection device (5) structure chart is arrested in chain rupture.
Fig. 4 is traction chain group (3) structure chart.
Fig. 5 is special type annulus haulage chain (3.1) structure chart
Fig. 6 is connecting bridge (1.4) structure chart
Fig. 7 is unloading sprocket wheel (4) structure chart
Fig. 8 is to load guider (10) structure chart
Fig. 9 is track support frame (9) structure chart
Figure 10 is that formula tramcar wheel (1.3) structure chart is unloaded in rotation
In figure:1st, formula mine car is unloaded in rotation, and 1.1, compartment, 1.2, rotary shaft, 1.3, wheel, 1.4, traction connecting bridge, 1.5, guiding hopper edge,
2nd, drive sprocket, 3, traction chain group, 3.1, special type annulus haulage chain, 4, unloading sprocket wheel, 4.1, compartment rotary damping device, 5, chain rupture grabs
Catch protection device, 5.1, support, 5.2, left gripper, 5.3, gripper axle, 5.4, right gripper, 5.5, spacing back-moving spring, 6, changed course sprocket wheel, 7,
Uplink path, 8, downing track, 9, track support frame, 10, load guider, 10.1, mucking pan, 10.2, guider.
Embodiment
The following is the specific embodiment of the present invention, in conjunction with accompanying drawing, the present invention will be further described.
As shown in Figures 1 to 10, formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material, including rotation unload formula mine car 1,
Protection device 5, changed course sprocket wheel 6, uplink path 7, downing track 8, track are arrested in drive sprocket 2, traction chain group 3, unloading sprocket wheel 4, chain rupture
Support frame 9, loading guider 10;Rotation unloads formula mine car 1 and is connected in series to form rotation by connecting bridge 1.4, traction chain group 3 and unloads formula mine car group, goes here and there
Connection mine car group connects the enclosed ring system of formation by drive sprocket 2, track support frame 9, changed course sprocket wheel 6, loading guider 10 from beginning to end,
System is inputted by the power of drive sprocket 2, it is possible to achieve any angle automation continuative transport work;
Rotation unloads formula mine car 1 and includes compartment 1.1, rotary shaft 1.2, wheel 1.3, connecting bridge 1.4, guiding hopper along 1.5;Connecting bridge 1.4, mine tram wheel
1.3 are connected with rotary shaft 1.2, and the both sides of mine car compartment 1.1 are arranged on by rotary shaft 1.2;Traction chain group 3 is realized to multiple by connecting bridge 1.4
Head and the tail connection, the traction of formula mine car 1 are unloaded in rotation, form enclosed ring-type mine car group;The rotation of enclosed ring-type unloads formula mine car group in work operation (except unloading upset
When) when, each center line of mine car rotary shaft 1.2 is in horizontality all the time, and mine car center of gravity is revolved under the center line of rotary shaft 1.2, unloaded all the time
The compartment 1.1 of formula mine car 1 is unloaded in each rotation when carrying work can do 360 degree of rotations around rotary shaft 1.2, when rotation unloads formula mine car 1 by unloading sprocket wheel 4,
Rotation unloads formula mine car 1 and automatic 360 degree of upsets is realized under the effect of mine car damping unit, and loose unpacked material is unloaded automatically under self gravitation effect.
Chain rupture arrests protection device 5 and includes support 5.1, left gripper 5.2, gripper axle 5.3, right gripper 5.4, spacing back-moving spring 5.5;Support
5.1 are fixed on track support frame 9, and when the connecting bridge 1.4 of connection traction chain group 3 arrests protection device 5 by chain rupture, left gripper 5.2 and the right side are grabbed
Pawl 5.4 is forced open;Connecting bridge 1.4 by rear, left gripper 5.2 and right gripper 5.4 under gravity and the synergy of spacing back-moving spring 5.5 from
Dynamic closure;Realize and arrest automatically when up traction chain group 3 is broken.
Load guider 10 and include mucking pan 10.1, guider 10.2, during system operation, rotation unload the guiding hopper of formula mine car 1 along 1.5
Run forward under the constraint of guider 10.2, material unloads the compartment 1.1 of formula mine car 1 by mucking pan 10.1 into rotation, in guider 10.2
Under constraint, compartment 1.1 will not be swung;System realizes continuous automatic loading.
Claims (10)
1. formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material, it is characterised in that:System comprising rotation unload formula mine car (1), drive sprocket (2), traction chain group (3), unloading sprocket wheel (4), chain rupture arrest protection device (5), changed course sprocket wheel (6), uplink path (7), downing track (8), track support frame (9), load guider (10);Rotation, which unloads formula mine car (1) and is connected in series to form rotation by traction chain group (3), unloads formula mine car group, mine car group is by drive sprocket (2), track support frame (9), changed course sprocket wheel (6), the enclosed ring-type transportation system for loading guider (10) head and the tail connection formation, and system can realize any angle automation continuative transport work.
2. formula mine car continuous orbit transportation system is unloaded in the rotation according to claim 1 transported for loose unpacked material, it is characterised in that:Rotation unloads formula mine car (1) and includes compartment (1.1), rotary shaft (1.2), wheel (1.3), draw connecting bridge (1.4), guiding hopper edge (1.5), draw connecting bridge (1.4), mine tram wheel (1.3) is connected with rotary shaft (1.2), mine car compartment (1.1) both sides are arranged on by rotary shaft (1.2), when formula mine car (1) work operation (during except unloading upset) is unloaded in rotation, each mine car rotary shaft (1.2) center line is in horizontality all the time, center of gravity is all the time under rotary shaft (1.2) center line, each rotation, which unloads formula mine car (1) compartment (1.1) and can do 360 degree around rotary shaft (1.2), during unloaded operation rotates freely.
3. formula mine car continuous orbit transportation system is unloaded in the rotation according to claim 1 transported for loose unpacked material, it is characterised in that:Chain rupture arrests protection device (5) and includes support (5.1), left gripper (5.2), gripper axle (5.3), right gripper (5.4), spacing back-moving spring (5.5), left gripper (5.2) and right gripper (5.4) can rotate around gripper axle (5.3), when the traction connecting bridge (1.4) being connected on haulage chain (3) arrests protection device (5) by chain rupture, left gripper (5.2) and right gripper (5.4) are forced open, connecting bridge (1.4) is drawn by rear, left gripper (5.2) and right gripper (5.4) are closed automatically under gravity and spacing back-moving spring (5.5) synergy.
4. formula mine car continuous orbit transportation system is unloaded in the rotation according to claim 1 transported for loose unpacked material, it is characterised in that:The rotary shaft (1.2) that traction chain group (3) unloads formula mine car (1) by drawing connecting bridge (1.4), rotation by four Gent type annulus haulage chains (3.1) is constituted, traction chain group (3) is realized by drawing connecting bridge (1.4) and multiple revolve is unloaded being connected in series of formula mine car (1), drawn, and forms mine car group.
5. formula mine car continuous orbit transportation system is unloaded in the rotation according to claim 1 transported for loose unpacked material, it is characterised in that:Unload and mine car compartment rotary damping device (4.1) is housed on sprocket wheel (4).
6. formula mine car continuous orbit transportation system is unloaded in the rotation according to claim 1 transported for loose unpacked material, it is characterised in that:Load guider (10) and include mucking pan (10.1), guider (10.2), during operation, the guiding hopper that formula mine car (1) is unloaded in rotation passes through along (1.5) under guider (10.2) constraint, material unloads the compartment (1.1) of formula mine car (1) by mucking pan (10.1) into rotation, formula mine car (1) is unloaded in rotation constraint of the guider (10.2) to guiding hopper along (1.5), and compartment (1.1) when mucking pan (10.1) because loading impact by that will not swing.
7. formula mine car continuous orbit transportation system is unloaded in the rotation according to claim 1 transported for loose unpacked material, it is characterised in that:Uplink path (7), downing track (8) are fixed on the inside of track support frame (9), and operation mine car passage up and down is left on the inside of two tracks.
8. traction connecting bridge (1.4) according to claim 2, it is characterised in that:Draw connecting bridge (1.4) and include crane span structure (1.4.1), bridge pin (1.4.2), connection fork (1.4.3), balance connecting pin (1.4.4), four Gent type annulus haulage chains (3.1) are hinged by the bridge pin (1.4.2) with traction connecting bridge (1.4), balance connecting pin (1.4.4), then realize stress balance by rotary shaft (1.2).
9. mine tram wheel (1.3) according to claim 2, it is characterised in that:Shock ring (1.3.2) is provided between spoke (1.3.3) and wheel hub (1.3.1) in mine tram wheel (1.3), shock ring (1.3.2) is made by elastomeric material.
10. special type annulus haulage chain (3.1) in chain group (3) is drawn according to claim 4, it is characterised in that:Special type annulus haulage chain (3.1) includes common ring (3.1.1), load-bearing ring (3.1.2), connection ring (3.1.3), load-bearing interface is carried on load-bearing ring (3.1.2), load-bearing ring (3.1.2) can be direct forging molding, can also be welding fabrication, common ring and refitting central spacer are set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610231997.0A CN107265068A (en) | 2016-04-09 | 2016-04-09 | Formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610231997.0A CN107265068A (en) | 2016-04-09 | 2016-04-09 | Formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107265068A true CN107265068A (en) | 2017-10-20 |
Family
ID=60052560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610231997.0A Pending CN107265068A (en) | 2016-04-09 | 2016-04-09 | Formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107265068A (en) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032427A (en) * | 1987-10-02 | 1989-04-19 | C-I-L公司 | Chain-bucket conveyer system |
CN1138551A (en) * | 1995-06-16 | 1996-12-25 | 石川岛播磨重工业株式会社 | Continuous unloader |
JP2008105848A (en) * | 2006-10-27 | 2008-05-08 | Showa Kikai Shoji Kk | Pivoted type conveyer |
CN201190018Y (en) * | 2008-04-14 | 2009-02-04 | 湘潭港建输送设备有限公司 | Self-balancing hopper type hoister |
CN201745597U (en) * | 2010-07-09 | 2011-02-16 | 卢月雄 | Instant anti-running-away device for mine car/skip in inclined shaft |
CN103057903A (en) * | 2013-01-25 | 2013-04-24 | 世林(漯河)冶金设备有限公司 | Long-service-life efficient safe type chain belt tray type conveyor |
CN203143514U (en) * | 2013-01-01 | 2013-08-21 | 李瑞勇 | Nondestructive elevator |
CN203173298U (en) * | 2013-04-15 | 2013-09-04 | 广西梧州茂圣茶业有限公司 | Tea lifting machine |
CN103662622A (en) * | 2013-12-20 | 2014-03-26 | 大连佳林设备制造有限公司 | Bucket elevator for smashed materials |
CN203544923U (en) * | 2013-07-26 | 2014-04-16 | 无锡市长荣输送机械有限公司 | Snakelike chain bucket conveyor |
CN104192534A (en) * | 2014-08-28 | 2014-12-10 | 中冶长天国际工程有限责任公司 | Chain conveyer and chain breakage protection method |
CN104192533A (en) * | 2014-08-28 | 2014-12-10 | 中冶长天国际工程有限责任公司 | Chain breakage protection device for ascending section of conveying chain and conveyer |
CN104444087A (en) * | 2014-12-05 | 2015-03-25 | 河北天择重型机械有限公司 | Vertical shaft hopper type continuous lifting system |
CN104528265A (en) * | 2015-01-04 | 2015-04-22 | 袁福德 | Water transport type conveying machine for buildings, electric power, water conservancy and mines |
CN204324189U (en) * | 2014-12-12 | 2015-05-13 | 上饶中材机械有限公司 | A kind of large-scale bucket chain conveyor |
-
2016
- 2016-04-09 CN CN201610231997.0A patent/CN107265068A/en active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032427A (en) * | 1987-10-02 | 1989-04-19 | C-I-L公司 | Chain-bucket conveyer system |
CN1138551A (en) * | 1995-06-16 | 1996-12-25 | 石川岛播磨重工业株式会社 | Continuous unloader |
JP2008105848A (en) * | 2006-10-27 | 2008-05-08 | Showa Kikai Shoji Kk | Pivoted type conveyer |
CN201190018Y (en) * | 2008-04-14 | 2009-02-04 | 湘潭港建输送设备有限公司 | Self-balancing hopper type hoister |
CN201745597U (en) * | 2010-07-09 | 2011-02-16 | 卢月雄 | Instant anti-running-away device for mine car/skip in inclined shaft |
CN203143514U (en) * | 2013-01-01 | 2013-08-21 | 李瑞勇 | Nondestructive elevator |
CN103057903A (en) * | 2013-01-25 | 2013-04-24 | 世林(漯河)冶金设备有限公司 | Long-service-life efficient safe type chain belt tray type conveyor |
CN203173298U (en) * | 2013-04-15 | 2013-09-04 | 广西梧州茂圣茶业有限公司 | Tea lifting machine |
CN203544923U (en) * | 2013-07-26 | 2014-04-16 | 无锡市长荣输送机械有限公司 | Snakelike chain bucket conveyor |
CN103662622A (en) * | 2013-12-20 | 2014-03-26 | 大连佳林设备制造有限公司 | Bucket elevator for smashed materials |
CN104192534A (en) * | 2014-08-28 | 2014-12-10 | 中冶长天国际工程有限责任公司 | Chain conveyer and chain breakage protection method |
CN104192533A (en) * | 2014-08-28 | 2014-12-10 | 中冶长天国际工程有限责任公司 | Chain breakage protection device for ascending section of conveying chain and conveyer |
CN104444087A (en) * | 2014-12-05 | 2015-03-25 | 河北天择重型机械有限公司 | Vertical shaft hopper type continuous lifting system |
CN204324189U (en) * | 2014-12-12 | 2015-05-13 | 上饶中材机械有限公司 | A kind of large-scale bucket chain conveyor |
CN104528265A (en) * | 2015-01-04 | 2015-04-22 | 袁福德 | Water transport type conveying machine for buildings, electric power, water conservancy and mines |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206664402U (en) | Mining dump truck | |
CN210418002U (en) | Multi-inlet single-outlet type continuous elevator | |
CN108455174A (en) | Formula mine car continuous orbit transportation system is unloaded in a kind of rotation for loose unpacked material transport | |
CN204823331U (en) | Harbour handling machine | |
CN104860021B (en) | Mechanical automatic discharging bucket elevator and control method | |
CN206705086U (en) | Formula mine car continuous orbit transportation system is unloaded in a kind of rotation for loose unpacked material transport | |
CN108483059A (en) | Device for discharging and conveyer | |
CN206606702U (en) | For express parcel sorting and the compound belt feeder of handling | |
CN207697595U (en) | A kind of vehicle-mounted telescopic conveyer belt automatic discharging equipment | |
CN107265068A (en) | Formula mine car continuous orbit transportation system is unloaded in a kind of rotation transported for loose unpacked material | |
CN206032764U (en) | Automatic loading mechanism of unloading | |
CN208199803U (en) | Device for discharging and conveyer | |
CN210028715U (en) | Recovery chute applied to continuous rail transport system | |
CN207481898U (en) | A kind of dual-purpose tipping bucket type lorry | |
CN217172258U (en) | Material carrying system | |
CN105905609A (en) | Conveying and transporting device for heavy and fragile parcels | |
CN203975800U (en) | A kind of rotation material casting load-transfer device | |
CN205573952U (en) | A unload formula mine car soon for bulk material transportation | |
US3260352A (en) | Railway elevator for transporting material up an incline | |
CN206645411U (en) | Freight-handling equipment | |
CN205471696U (en) | Interior river course harbour handling device | |
CN204847452U (en) | Unloading device | |
CN205892212U (en) | Simple and easy goods uninstallation device | |
CN205771105U (en) | Feeding system | |
WO2024192759A1 (en) | Bidirectional telescopic conveyor for container packing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171020 |
|
WD01 | Invention patent application deemed withdrawn after publication |