CN107256787B - A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition - Google Patents

A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition Download PDF

Info

Publication number
CN107256787B
CN107256787B CN201710609876.XA CN201710609876A CN107256787B CN 107256787 B CN107256787 B CN 107256787B CN 201710609876 A CN201710609876 A CN 201710609876A CN 107256787 B CN107256787 B CN 107256787B
Authority
CN
China
Prior art keywords
buchholz relay
solenoid
oil
inspection
buchholz
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710609876.XA
Other languages
Chinese (zh)
Other versions
CN107256787A (en
Inventor
林晓铭
连鸿松
宋仕江
陈君
江锦昌
邓颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Nanping Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Nanping Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Nanping Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710609876.XA priority Critical patent/CN107256787B/en
Publication of CN107256787A publication Critical patent/CN107256787A/en
Application granted granted Critical
Publication of CN107256787B publication Critical patent/CN107256787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/40Structural association with built-in electric component, e.g. fuse
    • H01F27/402Association of measuring or protective means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3277Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
    • G01R31/3278Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches of relays, solenoids or reed switches
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/40Structural association with built-in electric component, e.g. fuse
    • H01F27/402Association of measuring or protective means
    • H01F2027/404Protective devices specially adapted for fluid filled transformers

Abstract

The present invention relates to a kind of dual transformer Buchholz relay device of experiment free of demolition and application methods, the device includes two Buchholz relays, examine oil inlet pipe, examine flowline and inspection module, one end of each Buchholz relay is equipped with one and works respectively to be examined into solenoid and one into solenoid, the other end of each Buchholz relay is equipped with the solenoid and one that works out and verifies solenoid respectively, examine the oil outlet of one end connection inspection module of oil inlet pipe, it examines the other end correspondence of oil inlet pipe to examine into solenoid with one to be connected to, examine the oil inlet of one end connection inspection module of flowline, it examines the other end of flowline to correspond to and verifies that solenoid is connected to one.Compared with prior art, the present invention, to improving transformer job security and reducing human and material resources, improves working efficiency and is of great significance in inspection and replacement without having a power failure, without dismantling, without draining the oil.

Description

A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition
Technical field
The present invention relates to a kind of transformer Buchholz relay devices, more particularly, to a kind of dual transformer of experiment free of demolition Buchholz relay device and application method.
Background technology
Traditional main transformer Buchholz relay mounting structure is as depicted in figs. 1 and 2, and transformer includes ontology 1, conservator 8, conservator company Take over 7, main transformer body connecting tube 3 etc., conservator 8 are mounted on the top of transformer, and one end of old Buchholz relay 5 passes through main transformer sheet Body connecting tube 3 connects the ontology 1 of transformer, and the other end of old Buchholz relay 5 connects conservator 8, main transformer by conservator connecting tube 7 Ontology connecting tube 3 is equipped with old Buchholz relay inlet valve 4, and conservator connecting tube 7 is equipped with old Buchholz relay delivery valve 6, becomes It is each filled with insulating oil 2 in depressor ontology 1, conservator 8, old Buchholz relay 5, conservator connecting tube 7 and main transformer body connecting tube 3, it is existing Transformer Buchholz relay after a period of use, when testing, need to have a power failure transformer, also need transformer interior insulation Oil is drained the oil to Buchholz relay installation site hereinafter, Buchholz relay to be measured is then unloaded, by the Buchholz relay of new qualification It installs, the old Buchholz relay under dismantling need to bring back laboratory and be detected, and such as disqualified upon inspection, then scrap, and such as detection is closed Lattice, then arrange to use when once mounting, existing traditional transformer Buchholz relay detection need to waste a large amount of manpower and materials, and program is numerous It is trivial, the time is long.
What is more important, new Buchholz relay is after transformer puts into operation again, because in disassembly process, transformer is drained the oil Bubble is will produce, weight watt protection cannot be thrown immediately and light watt of signal can only be thrown, be after transformer station high-voltage side bus 2-3 hours, observation watt In this relay really without aggregation gas when, could throw weight watt protection pressing plate, transformer is protected without weight watt and is run within the scope of this time, There are insecurity, failure when just in case occurring to jump weight watt protection will lead to fault spread, or even transformer is caused to burn The pernicious consequence ruin, exploded.
Invention content
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of experiments free of demolition Dual transformer Buchholz relay device and application method, in inspection and replacement without having a power failure, without dismantling, without draining the oil, Without putting inside transformer oil when replacement, and weight watt protection operation can be put into always, to improving transformer job security and subtracting Few human and material resources improve working efficiency and are of great significance.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of dual transformer Buchholz relay device of experiment free of demolition, including two Buchholz relays, examine oil inlet pipe, Examine flowline and inspection module, one end of each Buchholz relay be equipped with respectively one work into solenoid and one examine into Solenoid, the other end of each Buchholz relay are equipped with the solenoid and one that works out and verify solenoid respectively, Two solenoids that work out are respectively connected to the conservator of transformer, and two work and are respectively connected to transformer into solenoid Ontology examines one end of oil inlet pipe to connect the oil outlet of inspection module, examines the other end of oil inlet pipe to correspond to and examines oil inlet with one Solenoid valve be connected to, it is described examine flowline one end connection inspection module oil inlet, examine flowline the other end correspond to One verifies that solenoid is connected to;
In use, a Buchholz relay is in working condition, another Buchholz relay is stand-by state, watt under working condition Corresponding work of this relay opens into solenoid, the solenoid that works out and examines into solenoid, verifies electromagnetic oil Valve is closed, and the Buchholz relay under stand-by state is corresponding to work into solenoid, the solenoid that works out, examines into electromagnetic oil Valve and verify that solenoid is turned off;
When testing to any Buchholz relay, Buchholz relay to be detected is directly entered test status, if to be checked The Buchholz relay of survey is in working condition before entering test status, then in handoff procedure another Buchholz relay by stand-by state into Enter working condition, corresponding work of the Buchholz relay under test status is closed and examined into solenoid, the solenoid that works out It tests into solenoid, verify that solenoid is opened with after examining oil inlet pipe, flowline being examined to be connected to respectively, inspection module fortune Row, if inspection result is qualification, qualified Buchholz relay returns to stand-by state, will not if inspection result is unqualified Insulating oil in qualified Buchholz relay is put to inspection module, replaces Buchholz relay, and inspection module is to the gas after replacement Relay refills insulating oil, and the Buchholz relay after replacement enters stand-by state, before Buchholz relay enters working condition Always insulating oil is full of in cavity.
The inspection module includes examining cycle oil storage tank and Buchholz relay verification unit, and the Buchholz relay is examined Unit includes circulating pump, flow speed controller and detection controller, and the oil inlet connection of cycle oil storage tank is examined to examine flowline, inspection The oil outlet for testing cycle oil storage tank connects the oil inlet of circulating pump, the oil outlet of the circulating pump by recycling reservoir delivery valve Connection examines oil inlet pipe, the flow speed controller to connect circulating pump, and the detection controller is separately connected Buchholz relay and stream Fast controller.
The inspection cycle oil storage tank is equipped with electro connecting pressure gauge and safety valve, increases when examining pressure in cycle oil storage tank Greatly to electro connecting pressure gauge set pressure value when, safety valve action, pressure release to setting pressure value below after, safety valve close It closes.
The inspection module is set in removable vehicle body.
The oil outlet of the detection controller control loop pump conveys insulating oil into Buchholz relay to be detected, passes through Flow speed controller adjusts the flow velocity and pressure of insulating oil, carrys out the different abnormalities of analogue transformer, if in the transformation of each simulation Under the abnormality of device, Buchholz relay to be detected can correspond to and send out correct signal value, then the inspection of the Buchholz relay It is qualification to test result, conversely, then unqualified.
A kind of application method of such as dual transformer Buchholz relay device of above-mentioned experiment free of demolition, including following step Suddenly:
1)Inspection module is configured in advance, set content includes:Examine Buchholz relay experimental procedure, require and To the operation order of each solenoid valve under criterion and each state;
2)It controls a Buchholz relay to be in working condition, another Buchholz relay is stand-by state;
4)When testing to any Buchholz relay, Buchholz relay to be detected is directly entered test status, if waiting for The Buchholz relay of detection is in working condition before entering test status, then in handoff procedure another Buchholz relay by stand-by state Into working condition;
5)Under test status, circulation of oil flow flow direction when inspection module is run is:It is passed through successively from the oil outlet of inspection module Examine oil inlet pipe, Buchholz relay to be detected, the oil inlet for examining flowline to be recycled to inspection module;
6)Flow velocity and pressure is carried out to circulation of oil flow by adjusting inspection module to control, to Buchholz relay to be detected into Performing check, if inspection result is qualification, qualified Buchholz relay returns to stand-by state, and inspection man makees to terminate, inspection module Recycling examines oil inlet pipe and examines the insulating oil in flowline, removes and examines oil inlet pipe and examine flowline, if inspection result is It is unqualified, then follow the steps 7);
7)By underproof Buchholz relay, examines oil inlet pipe and the insulating oil in flowline is examined to put to inspection module, Replace qualified Buchholz relay, inspection module refills insulating oil to qualified Buchholz relay after replacement, is closed after replacement The Buchholz relay of lattice enters stand-by state, and inspection man makees to terminate, and inspection module recycling is examined oil inlet pipe and examined in flowline Insulating oil, remove examine oil inlet pipe and examine flowline;
8)Two Buchholz relays alternately working condition, Buchholz relay enters in working condition front cavity to be filled always Full insulating oil.
It further include step:According to the data of inspection module diagnosis to step 7)Underproof Buchholz relay under middle replacement It is accordingly repaired, is tested again after reparation, if qualified, as using next time, if can not repair, done and scrap place Reason.
Compared with prior art, the present invention has the following advantages:
1, the present invention switches over operation by corresponding two double Buchholz relays, can easily realize two gas relays Device works, examines each other, replacing and the purpose of stand-by state, and inspection module automatically switches solenoid valve and examines Buchholz relay, The manual operation that thoroughly solves above-mentioned traditional transformer Buchholz relay is cumbersome, needs the shortcomings of power failure operation.With traditional transformation Device Buchholz relay is compared, the present invention in inspection and replacement without have a power failure, without dismantling, without put inside transformer oil, more For importantly, because this patent uses handover module, there is no traditional Buchholz relays after inspection or replacement, need to be in transformer The insecurity for restarting to exit the weight watt protection of transformer Buchholz relay in the 2-3 to put into operation times hour, and now extensively Being compared using traditional Buchholz relay has huge advantage.
2, the oil outlet of detection controller control loop pump conveys insulating oil into Buchholz relay to be detected, passes through stream The flow velocity and pressure of fast controller adjustment insulating oil carry out the true abnormality of difference of analogue transformer, it can be achieved that different become The demand that Buchholz relay is examined under the abnormality of depressor improves testing accuracy, greatly improves the safety of transformer work.
When 3, examining, inspection module refills insulating oil to the Buchholz relay after replacement, the gas relay after replacement Device enters stand-by state, and Buchholz relay enters is full of insulating oil always in working condition front cavity, by this step, gas after Electric appliance can be directly entered pipeline between transformer and conservator and work at any time, including throw weight watt protection and throw light watt of protection, The problems such as without will produce bubble.
Description of the drawings
Fig. 1 is traditional main transformer Buchholz relay scheme of installation;
Fig. 2 is that traditional main transformer Buchholz relay installs schematic top plan view;
Fig. 3 is the dual transformer Buchholz relay device scheme of installation of experiment free of demolition;
Fig. 4 is that the dual transformer Buchholz relay device of experiment free of demolition installs schematic top plan view;
Fig. 5 is schematic diagram of first Buchholz relay as work Buchholz relay flow;
Fig. 6 is schematic diagram of second Buchholz relay as work Buchholz relay flow;
Fig. 7 is that the first Buchholz relay device is tested the schematic diagram of flow;
Fig. 8 is that the first Buchholz relay device is tested the schematic top plan view of flow;
Fig. 9 is that the second Buchholz relay device is tested the schematic top plan view of flow;
Figure 10 be experiment free of demolition double main transformer Buchholz relay devices in detection controller control operation principle box Figure.
In figure, 1- ontologies;2- insulating oils;3- main transformer body connecting tubes;The old Buchholz relay inlet valves of 4-;The old gas of 5- after Electric appliance;The old Buchholz relay delivery valves of 6-;7- conservator connecting tubes;8- conservators;9- first works into solenoid;First watt of 10- This relay;11- first works out solenoid;12- first is examined into solenoid;13- first verifies solenoid; 14- examines oil inlet pipe;15- examines flowline;16- work oil inlet threeways;17- work flow tees;18- the second gas relays Device;19- second works into solenoid;20- second works out solenoid;21- second is examined into solenoid;22- second Verify solenoid;23- examines cycle oil storage tank;24- inspection modules;25- safety valves;26- contact pressure tables;27- is vented Valve;28- reservoir delivery valves;29- first examines oil inlet threeway;30- first examines flow tee;31- second examines oil inlet three It is logical;32- second examines flow tee.
Specific implementation mode
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
As shown in Figure 3 and Figure 4, the dual transformer Buchholz relay device of a kind of experiment free of demolition, including two gas after Electric appliance, handover module and inspection module 24, two Buchholz relays are respectively the first Buchholz relay 10 and the second gas relay Device 18, two Buchholz relays can switch mutually as work Buchholz relay and spare Buchholz relay, handover module and inspection Can respectively two Buchholz relays be carried out in X -ray inspection X and online gas relay of the replacement through disqualified upon inspection by testing module 24 Device.
Handover module includes:First work into solenoid 9, first work out solenoid 11, first examine oil inlet electricity Magnet valve 12, first verify solenoid 13, second work into solenoid 19, second work out solenoid 20, second examine It tests into solenoid 21 and second and verifies solenoid 22 and connecting tube component, the main transformer body on the ontology 1 of transformer Connecting tube 3 is separately connected first and is worked and worked into one end of solenoid 9 and second into electromagnetic oil by the oil inlet threeway 16 that works One end of valve 19, first other end to work into solenoid 9 are separately connected the first inspection by the first inspection oil inlet threeway 29 Into one end of one end of solenoid 12 and the first Buchholz relay 10, the other end of the first Buchholz relay 10 passes through the first inspection It tests flow tee 30 and is separately connected one end that first verifies solenoid 13 and one end that first works out solenoid 11, Two other ends to work into solenoid 19 are separately connected second by the second inspection oil inlet threeway 31 and examine into solenoid 21 One end and the second Buchholz relay 18 one end, the other end of the second Buchholz relay 18 passes through second and examines flow tee 32 It is separately connected one end that second verifies solenoid 22 and one end that second works out solenoid 20, the first fuel-displaced electricity of work The other end of magnet valve 11 and second work out solenoid 20 the other end by work flow tee 17 connect conservator 8 on Conservator connecting tube 7;
Meanwhile the oil outlet of inspection module 24 is by examining the connection of oil inlet pipe 14 first to examine into the another of solenoid 12 It holds or second examines the other end into solenoid 21, the oil inlet of inspection module 24, which passes through, examines first inspection of the connection of flowline 15 Test out the other end of solenoid 13 or the other end that second verifies solenoid 22.
Two Buchholz relays are arranged in parallel on the pipeline between the ontology 1 and conservator 8 of transformer by handover module, together When also two Buchholz relays are connect with inspection module 24 respectively.Handover module is cut-off by each solenoid valve, control insulation Oily 2 stream controls single double Buchholz relays as work Buchholz relay, inspection gas respectively in the trend of each threeway to reach Relay or spare Buchholz relay, and the control handover operation purpose when examining, replacing Buchholz relay.
Inspection module 24 is not for having a power failure to two Buchholz relays, not exiting work Buchholz relay guard mode Under in X -ray inspection X, as spare if to examining qualified Buchholz relay, such as verify unqualified Buchholz relay, can be straight It is connected on line to be replaced, using the qualified Buchholz relay replaced with as spare, either still replaced watt in test status This relay status, only need to be by operating handover module, it is not necessary that transformer has a power failure, without putting 1 oil of transformer body, nothing The work Buchholz relay protective device that normal operation need to be exited, does not influence the normal operation of power transformer.
Inspection module 24 is integral mounted on removable vehicle body shape, and inspection module 24 includes examining cycle 23 He of oil storage tank Buchholz relay verification unit is examined in cycle oil storage tank 23 and lays in the insulating oil 2 for having a certain amount of qualification, and cycle oil storage tank is examined 23 can accommodate the trapped fuel by being released in Buchholz relay and its pipeline, also can trapped fuel in storage tank be squeezed into Buchholz relay and its pipe In road, cycle oil storage tank 23 is examined to be equipped with electro connecting pressure gauge 26, safety valve 25 and blow valve 27 etc., and be equipped with voltage limiting value, In carrying out Buchholz relay checkout procedure, such as contingency is suppressed excessively high, when pressure is more than setting value, electro connecting pressure gauge 26 Action, 25 pressure release of safety valve ensure that system is safe, and when below pressure release to setting value, safety valve 25 is automatically closed;
Buchholz relay verification unit includes circulating pump, flow speed controller and detection controller, examines cycle oil storage tank 23 Oil inlet connection examine flowline 15, examine cycle oil storage tank 23 oil outlet by recycle reservoir delivery valve 28 connection follows The oil outlet connection of the oil inlet of ring pump, circulating pump examines oil inlet pipe 14, flow speed controller to connect circulating pump, detect controller Input terminal is separately connected light watt of alarm signal on Buchholz relay, weight watt action contact signal feedback end and electro connecting pressure gauge 26 Output end, the output end for detecting controller are separately connected the control terminal of each solenoid valve, the control terminal of flow speed controller and safety valve 25 control terminals, detection controller can be PLC controller, can also be other micro-chip processors.
It includes detection control program unit to detect controller, and control test Buchholz relay is programmed with for pre-setting The programs such as experimental procedure, requirement and criterion can carry out operation and control, to being examined to inspection module 24 and each solenoid valve Whether surveying Buchholz relay inspection data, to carry out analyzing and diagnosing automatically qualified, in the event of failure, can failure judgement what position, Fault degree etc..
The oil outlet of detection controller control loop pump conveys insulating oil 2 into Buchholz relay to be detected, passes through stream The flow velocity and pressure of fast controller adjustment insulating oil 2, carry out the different abnormalities of analogue transformer, if in the transformer of each simulation Abnormality under, Buchholz relay to be detected can correspond to and send out correct signal value, then the inspection of the Buchholz relay As a result it is qualification, conversely, then unqualified.
In use, a Buchholz relay is in working condition, another Buchholz relay is stand-by state, watt under working condition Corresponding work of this relay opens into solenoid, the solenoid that works out and examines into solenoid, verifies electromagnetic oil Valve is closed, and the Buchholz relay under stand-by state is corresponding to work into solenoid, the solenoid that works out, examines into electromagnetic oil Valve and verify that solenoid is turned off.As shown in figure 5, when the first Buchholz relay 10 is work Buchholz relay, the first work Make to open into the solenoid 11 that works out of solenoid 9 and first, first examines into solenoid 12, first and verify electromagnetic oil Valve 13, second work into solenoid 19, second work out solenoid 20, second examine into solenoid 21, second examine Go out solenoid 22 to be turned off.As shown in fig. 6, when the second Buchholz relay 18 is work Buchholz relay, the second work oil inlet Solenoid valve 19 and second work out solenoid 20 unlatching, second examine into solenoid 21, second verify solenoid 22, First work into solenoid 9, first work out solenoid 11, first examine into solenoid 12, first and examine fuel-displaced electricity Magnet valve 13 is turned off.Arrow in Fig. 5-Fig. 9 indicates the flow direction of insulating oil.
When testing to any Buchholz relay, Buchholz relay to be detected is directly entered test status, if to be checked The Buchholz relay of survey is in working condition before entering test status, then in handoff procedure another Buchholz relay by stand-by state into Enter working condition, corresponding work of the Buchholz relay under test status is closed and examined into solenoid, the solenoid that works out It tests into solenoid, verify that solenoid is opened with after examining oil inlet pipe 14, flowline 15 being examined to be connected to respectively, inspection module 24 operations, if inspection result is qualification, qualified Buchholz relay returns to stand-by state, if inspection result is unqualified, Insulating oil 2 in underproof Buchholz relay is put to inspection module 24, replaces Buchholz relay, inspection module 24 is to replacement Buchholz relay afterwards refills insulating oil 2, and the Buchholz relay after replacement enters stand-by state, and Buchholz relay enters work Make to be full of insulating oil 2 in state front cavity always.
A kind of application method of such as dual transformer Buchholz relay device of above-mentioned experiment free of demolition, including following step Suddenly:
1)The detection controller of inspection module 24 is configured in advance, set content includes:Examine Buchholz relay To the operation order of each solenoid valve under experimental procedure, requirement and criterion and each state;
2)It controls a Buchholz relay to be in working condition, another Buchholz relay is stand-by state;
4)When testing to any Buchholz relay, Buchholz relay to be detected is directly entered test status, if waiting for The Buchholz relay of detection is in working condition before entering test status, then in handoff procedure another Buchholz relay by stand-by state Into working condition;
5)Under test status, circulation of oil flow flow direction when inspection module 24 is run is:From the oil outlet of inspection module 24 according to The secondary oil inlet that inspection module 24 is recycled to through inspection oil inlet pipe 14, Buchholz relay to be detected, inspection flowline 15;
6)Flow velocity and pressure control are carried out to circulation of oil flow by adjusting inspection module 24, to Buchholz relay to be detected It tests, if inspection result is qualification, qualified Buchholz relay returns to stand-by state, and inspection man makees to terminate, and examines mould The recycling of block 24 examines oil inlet pipe 14 and examines the insulating oil 2 in flowline 15, and dismounting examines oil inlet pipe 14 and examines flowline 15, If inspection result is unqualified, 7 are thened follow the steps);
7)By underproof Buchholz relay, examines oil inlet pipe 14 and the insulating oil 2 in flowline 15 is examined to put to inspection Module 24, replaces qualified Buchholz relay, and inspection module 24 refills insulating oil to qualified Buchholz relay after replacement 2, qualified Buchholz relay enters stand-by state after replacement, and inspection man makees to terminate, and oil inlet pipe 14 is examined in the recycling of inspection module 24 With the insulating oil 2 in inspection flowline 15, removes and examine oil inlet pipe 14 and inspection flowline 15;
The data diagnosed according to inspection module 24 accordingly repair the underproof Buchholz relay under replacing, and repair It tests again afterwards, if qualified, as using next time, if can not repair, do and scrap processing;
8)Two Buchholz relays alternately working condition, Buchholz relay enters in working condition front cavity to be filled always Full insulating oil 2.
As is seen in figs 7-10, a kind of realization method of specific work process is illustrated below:
1)Detection controller is configured in advance, i.e., programming Control is examined the experimental procedure of Buchholz relay, is required, with And the programs such as criterion, operating control procedure establishment is carried out to the solenoid valve of each switching.
2)When the first 10 normal operation of Buchholz relay, first works works out electromagnetic oil into solenoid 9 and first Valve 11 maintains a normally open state, and first examines into solenoid 12 and first and verify that solenoid 13 is closed.At this time in conservator 8 Insulating oil 2 by conservator connecting tube 7, work flow tee 17, first work out solenoid 11, the first Buchholz relay 10, First works into solenoid 9, work oil inlet threeway 16, main transformer body connecting tube 3 etc., the insulating oil 2 with the ontology 1 of transformer It communicates.
3)The second Buchholz relay 18 is in stand-by state at this time, second works work into solenoid 19, second it is fuel-displaced Solenoid valve 20, second, which are examined into solenoid 21, second, verifies that solenoid 22 is in off state.
4)When needing to test to 10 relay of the first Buchholz relay, the work of the second Buchholz relay 18 is first opened Make to work out solenoid 20 into solenoid and second.
5)By light watt of signal of the second Buchholz relay 18 and weight watt trip protection pressing plate input, the second Buchholz relay 18 It puts into operation.
6)The light watt of signal and weight watt trip protection pressing plate, the first Buchholz relay 10 for exiting the first Buchholz relay 10 move back Go out operation.
7)It closes first and works and work out solenoid 11 into solenoid 9 and first.
8)Inspection module 24 is pushed by transformer, oil inlet pipe 14 will be examined to be connected to first and examined into 12 He of solenoid Between the outlet of circulating pump.
9)By examine flowline 15 be connected to first verify solenoid 13 and examine cycle oil storage tank 23 import it Between.
10)Opening first, which is examined into solenoid 12, first, verifies solenoid 13 and oil storage tank delivery valve.
11)The circulating pump and detection controller of Buchholz relay verification unit are opened, circulation of oil flow flows at this time:From cycle Pump discharge is fuel-displaced through examining oil inlet pipe 14 to the first to examine into solenoid 12, being examined to the first Buchholz relay 10, to first Solenoid valve 13, through examining flowline 15 to the import for examining cycle oil storage tank 23, then by oil storage tank delivery valve to pump inlet, Circulation of oil flow is formed, as shown in Figure 7, Figure 8.
12)Flow control is carried out to circulation of oil flow by adjusting flow speed controller, the first Buchholz relay 10 is examined It tests.
13)It such as examines the first Buchholz relay 10 qualified, then first closes first and examine into the inspection of solenoid 12 and first Go out solenoid 13, oil inlet pipe 14 will be examined and the insulating oil 2 in flowline 15 is examined to put to examining in cycle oil storage tank 23, closes Stop inspection module 24, inspection man makees to terminate, and removes and examines oil inlet pipe 14 and inspection flowline 15.
14)The first qualified Buchholz relay 10 is examined to switch to spare Buchholz relay at this time.
15)Such as 10 disqualified upon inspection of the first Buchholz relay, then inspection module 24 is first closed, by the first Buchholz relay 10 And institute's connecting pipe interior insulation oil 2 is all put to inspection cycle oil storage tank 23 in examining.
16)Underproof first Buchholz relay 10 is removed, qualified Buchholz relay is installed.
17)Underproof Buchholz relay is repaired according to the data of detection controller diagnosis, is carried out again after reparation It examines, it is such as qualified, then first use is put down, as that can not repair, does and scraps processing.
18)Open inspection module 24, will examine the insulating oil 2 recycled in oil storage tank 23 squeeze into the first gas for newly installing after In electric appliance 10 and connecting leg.
19)Closing first, which is examined into solenoid 12 and first, verifies solenoid 13, will examine oil inlet pipe 14 and inspection The insulating oil 2 tested in flowline 15 is put to examining in cycle oil storage tank 23, and inspection module 24 is shut down, and replaces Buchholz relay work Terminate, removes and examine oil inlet pipe 14 and inspection flowline 15.
20)This stylish first Buchholz relay 10 for replacing qualification switchs to spare Buchholz relay.
21)The inspection of second Buchholz relay 18 more changes jobs equally by this step operation, as shown in Figure 9.
22)Two Buchholz relays are worked respectively, examine and stand-by state cycle carries out, and are reached and are not had a power failure, do not put Oil X -ray inspection X, replace purpose.
23)When system pressure, which increases to, examines the pressure value of the setting of electro connecting pressure gauge 26 on cycle oil storage tank 23, inspection The safety valve 25 tested on cycle oil storage tank 23 acts, and when below the pressure value that system decompression, pressure release are extremely set, safety valve 25 is certainly It is dynamic to close, the safe normal operation of safeguards system.
24)It is inspection module 24 by pre- above to the operation of the experiment of Buchholz relay and diagnosis and each solenoid valve First setting program is controlled, as shown in Figure 10.
Compared with traditional, disassembly process is oily without putting in transformer body 1, and what is more important no matter examining or Always there is weight watt protection in replacement process, and traditional weight watt that exit protects several hours.

Claims (6)

1. a kind of application method of the dual transformer Buchholz relay device of experiment free of demolition, which is characterized in that the examination free of demolition The dual transformer Buchholz relay device tested includes two Buchholz relays, examines oil inlet pipe, examines flowline and inspection module, One end of each Buchholz relay is equipped with one and works respectively to be examined into solenoid and one into solenoid, each gas relay The other end of device is equipped with the solenoid and one that works out and verifies that solenoid, two solenoids that work out are divided equally respectively Not Lian Tong transformer conservator, two work and are respectively connected to the ontology of transformer into solenoid, examine one end of oil inlet pipe The oil outlet for connecting inspection module is examined the other end correspondence of oil inlet pipe to be examined into solenoid with one and is connected to, described to verify The oil inlet of one end connection inspection module of oil pipe, examines the other end of flowline to correspond to and verifies that solenoid is connected to one;
In use, a Buchholz relay is in working condition, another Buchholz relay is stand-by state, the gas under working condition after Corresponding work of electric appliance opens into solenoid, the solenoid that works out and examines into solenoid, verifies that solenoid closes Close, the Buchholz relay under stand-by state is corresponding to work into solenoid, the solenoid that works out, examine into solenoid and Verify that solenoid is turned off;
When testing to any Buchholz relay, Buchholz relay to be detected is directly entered test status, if to be detected Buchholz relay is in working condition before entering test status, then another Buchholz relay enters work by stand-by state in handoff procedure Make state, the Buchholz relay under test status is corresponding work closed into solenoid, the solenoid that works out and examine into Solenoid verifies that solenoid is opened with after examining oil inlet pipe, flowline being examined to be connected to respectively, inspection module operation, if Inspection result is qualification, then qualified Buchholz relay returns to stand-by state, will be underproof if inspection result is unqualified Insulating oil in Buchholz relay is put to inspection module, replaces Buchholz relay, and inspection module is to the Buchholz relay after replacement Insulating oil is refilled, the Buchholz relay after replacement enters stand-by state, and Buchholz relay enters in working condition front cavity Always it is full of insulating oil;
The application method of the dual transformer Buchholz relay device of the experiment free of demolition includes the following steps:
1)Inspection module is configured in advance, set content includes:Examine experimental procedure, requirement and the judgement of Buchholz relay To the operation order of each solenoid valve under standard and each state;
2)It controls a Buchholz relay to be in working condition, another Buchholz relay is stand-by state;
4)When testing to any Buchholz relay, Buchholz relay to be detected is directly entered test status, if to be detected Buchholz relay enter test status before be in working condition, then another Buchholz relay is entered by stand-by state in handoff procedure Working condition;
5)Under test status, circulation of oil flow flow direction when inspection module is run is:From the oil outlet of inspection module successively through examining Oil inlet pipe, Buchholz relay to be detected, inspection flowline are recycled to the oil inlet of inspection module;
6)Flow velocity and pressure control are carried out to circulation of oil flow by adjusting inspection module, Buchholz relay to be detected is examined It tests, if inspection result is qualification, qualified Buchholz relay returns to stand-by state, and inspection man makees to terminate, inspection module recycling It examines oil inlet pipe and examines the insulating oil in flowline, remove and examine oil inlet pipe and examine flowline, if inspection result is not conform to Lattice then follow the steps 7);
7)It by underproof Buchholz relay, examines oil inlet pipe and the insulating oil in flowline is examined to put to inspection module, replace Qualified Buchholz relay, inspection module refills insulating oil to qualified Buchholz relay after replacement, qualified after replacement Buchholz relay enters stand-by state, and inspection man makees to terminate, and inspection module recycling is examined oil inlet pipe and examined exhausted in flowline Edge oil is removed and examines oil inlet pipe and inspection flowline;
8)Two Buchholz relays alternately enter working condition, and Buchholz relay enters in working condition front cavity to be full of absolutely always Edge oil.
2. a kind of application method of the dual transformer Buchholz relay device of experiment free of demolition according to claim 1, It is characterized in that, the inspection module includes examining cycle oil storage tank and Buchholz relay verification unit, the Buchholz relay inspection Verification certificate member includes circulating pump, flow speed controller and detection controller, and the oil inlet connection of cycle oil storage tank is examined to examine flowline, Examine cycle oil storage tank oil outlet by recycle reservoir delivery valve connect circulating pump oil inlet, the circulating pump it is fuel-displaced Oil inlet pipe is examined in mouthful connection, and the flow speed controller connects circulating pump, the detection controller be separately connected Buchholz relay with Flow speed controller.
3. a kind of application method of the dual transformer Buchholz relay device of experiment free of demolition according to claim 2, It is characterized in that, the inspection cycle oil storage tank is equipped with electro connecting pressure gauge and safety valve, and pressure in oil storage tank is recycled when examining Increase to electro connecting pressure gauge setting pressure value when, safety valve action, pressure release to setting pressure value below after, safety valve close It closes.
4. a kind of application method of the dual transformer Buchholz relay device of experiment free of demolition according to claim 1, It is characterized in that, the inspection module is set in removable vehicle body.
5. a kind of application method of the dual transformer Buchholz relay device of experiment free of demolition according to claim 2, It is characterized in that, the oil outlet of the detection controller control loop pump conveys insulating oil into Buchholz relay to be detected, leads to The flow velocity and pressure for crossing flow speed controller adjustment insulating oil, carry out the different abnormalities of analogue transformer, if in the change of each simulation Under the abnormality of depressor, Buchholz relay to be detected can correspond to and send out correct signal value, then the Buchholz relay Inspection result is qualification, conversely, then unqualified.
6. a kind of application method of the dual transformer Buchholz relay device of experiment free of demolition according to claim 1, It is characterized in that, further includes step:According to the data of inspection module diagnosis to step 7)Underproof gas relay under middle replacement Device is accordingly repaired, and is tested again after reparation, if qualified, as using next time, if can not repair, done and is scrapped place Reason.
CN201710609876.XA 2017-07-25 2017-07-25 A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition Active CN107256787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710609876.XA CN107256787B (en) 2017-07-25 2017-07-25 A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710609876.XA CN107256787B (en) 2017-07-25 2017-07-25 A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition

Publications (2)

Publication Number Publication Date
CN107256787A CN107256787A (en) 2017-10-17
CN107256787B true CN107256787B (en) 2018-10-23

Family

ID=60025180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710609876.XA Active CN107256787B (en) 2017-07-25 2017-07-25 A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition

Country Status (1)

Country Link
CN (1) CN107256787B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110542854B (en) * 2019-09-04 2021-11-30 上海卓电电气有限公司 Online calibration method of gas density relay
CN112504659B (en) * 2020-10-28 2022-11-01 国网山东省电力公司青岛供电公司 Transformer nitrogen-charging fire-extinguishing cut-off valve action threshold value checking system and method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201145734Y (en) * 2007-11-30 2008-11-05 上海市电力公司超高压输变电公司 Gas-actuated relay calibration stand
KR101103817B1 (en) * 2009-10-16 2012-01-06 한전케이피에스 주식회사 Test equipment for buchholz relay
CN202662525U (en) * 2012-06-21 2013-01-09 孙兵 Gas relay device with online detection function
CN103745806B (en) * 2014-01-06 2016-01-06 国家电网公司 A kind of main transformer with intelligent handoff functionality breathes moisture absorption apparatus and using method thereof
CN103996498B (en) * 2014-06-11 2016-08-31 中国能建集团装备有限公司南京技术中心 A kind of maritime transformer station main transformer salt water cooling system

Also Published As

Publication number Publication date
CN107256787A (en) 2017-10-17

Similar Documents

Publication Publication Date Title
CN109752649A (en) A kind of density monitor intelligent checking monitoring device and its tonifying Qi method of calibration
CN106295956B (en) Reliability assessment method considering repairable multi-state complex characteristic of power supply system of nuclear power plant
CN107256787B (en) A kind of the dual transformer Buchholz relay device and application method of experiment free of demolition
CN107478983A (en) A kind of online verifying attachment of main transformer Buchholz relay and its method for inspection
CN108459269A (en) A kind of 10kV pvs (pole-mounted vacuum switch)s state on-line evaluation method and apparatus
CN106610345A (en) Health state monitoring system for spatial environment simulation test equipment
CN110108477A (en) The intelligent bulge test platform and method of nuclear power unit main steam isolation valve solenoid valve
CN104748919A (en) Leak detection device and leak detection method
CN103048616A (en) Live calibration device for SF6 (sulfur hexafluoride) density relay
CN105552883B (en) Triple bus-bar is segmented the control method and system that transformer station is turned paired running by point row
KR101697022B1 (en) Diagnostic analysis device and control method of the intelligent performance high-voltage circuit breaker
CN106120950A (en) A kind of closed cycle water automatically switches the most emergent stable-pressure device
CN109116268A (en) A kind of prepared auto restart quick checking device
CN202693733U (en) Automatic pipeline lift-type voltage-withstanding test platform
CN112305391A (en) Electromagnetic valve performance testing method for AP1000 main steam and main water supply isolation valve
CN106711961A (en) Method for multidimensional evaluation of alternating current filter group breaker operation state
CN104697759A (en) Pressure switch service life test tooling
CN209587657U (en) A kind of fuel cell hydrogen-feeding system pipeline quality detection device
CN204269506U (en) A kind of gas reusing device of sulfur hexafluoride density relay tester
CN203587338U (en) Pressure switch service life detection tooling
CN202649350U (en) Transformer with common fault simulating function
CN103529272B (en) A kind of high tension cable shield circulating current Forecasting Methodology
CN215421397U (en) Air supply pipeline air volume monitoring and alarming device of MT4400 type mining dump truck
CN107422659B (en) Control device for sulfur hexafluoride gas recovery and recharging operation
CN106338593B (en) A kind of transformer special maintenance apparatus and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant