CN107254967A - The construction method that a kind of superposed column built-in fitting is vacantly installed - Google Patents

The construction method that a kind of superposed column built-in fitting is vacantly installed Download PDF

Info

Publication number
CN107254967A
CN107254967A CN201710470756.6A CN201710470756A CN107254967A CN 107254967 A CN107254967 A CN 107254967A CN 201710470756 A CN201710470756 A CN 201710470756A CN 107254967 A CN107254967 A CN 107254967A
Authority
CN
China
Prior art keywords
steel
location
fitting
foundation bolt
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710470756.6A
Other languages
Chinese (zh)
Inventor
朱宝君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201710470756.6A priority Critical patent/CN107254967A/en
Publication of CN107254967A publication Critical patent/CN107254967A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Abstract

The present invention provides the construction method that a kind of superposed column built-in fitting is vacantly installed, and belongs to the hanging field of superposed column built-in fitting, and the invention mainly comprises following several steps:1)Hanging line setting;2)Foundation bolt support makes;3)The fabrication and installation of location-plate;4)The hanging location and installation of pre-embedded anchoring bolts.The construction quality of foundation bolt positioning is ensure that, so as to overcome foundation bolt to be accurately positioned the big mass defect of deviation.

Description

The construction method that a kind of superposed column built-in fitting is vacantly installed
Technical field
The present invention relates to building construction technology, more particularly to the construction method that a kind of superposed column built-in fitting is vacantly installed.
Background technology
Vacantly positioning is fixedly connected simultaneously current superposed column built-in fitting foundation bolt using bar dowel spot welding Screw arbor with nut at both-ends mostly Artificial bracing wire positioning method, because single foundation bolt is longer, the hanging lower section of positioning stage is determined without fulcrum, the accurate of foundation bolt Defect that deviation is big etc. for position, directly affects the installation positioning precision of follow-up steel column.
The content of the invention
In order to solve problem above, the present invention proposes the construction method that a kind of superposed column built-in fitting is vacantly installed.Using This construction method carries out the hanging space orientation of built-in fitting and installed, and solves the pre-buried precision and alignment quality of foundation bolt.
The technical scheme is that:
The construction method that a kind of superposed column built-in fitting is vacantly installed, it is main to include following several steps:
1)Hanging line setting;
2)Foundation bolt support makes;
3)The fabrication and installation of location-plate;
4)The hanging location and installation of pre-embedded anchoring bolts.
Wherein.
1)Hanging line setting
Axis pilot measurement is bound on slab form using BIM modeling auxiliary total powerstation axial line control points, also with principles above By in another azimuth axis also pilot measurement to template, crossing point of axes is made in bracing wire, and with total Station Measured, this space coordinate put is For superposed column built-in fitting foundation bolt centre point spatial value.
2)Foundation bolt support makes
Foundation bolt support mainly makes the upper band steel frame and lower band steel frame, the vertical angle steel of level and diagonal brace angle steel be arrangeding in parallel, Four wide band steels of 6mm thickness 80mm are joined end to end and connect the band steel frame up and down of the side's of being formed shape, perforating and general in the middle part of band steel frame up and down Foundation bolt is arranged in beaten eye, and vertical angle steel is constituted with the angle steel of four L80 × 50 × 6, vertical angle steel with it is flat up and down Steel framework is welded and fixed together, and plane where vertical angle steel and band steel up and down is perpendicular so that up and down band steel and vertical angle steel it Between form cube structure;Diagonal brace angle steel and horizontal corner steel are made using the angle steel of L80 × 50 × 6, horizontal corner steel is welded on down Band steel frame bottom;The upper end of diagonal brace angle steel is welded on upper band steel frame, lower end is welded on horizontal corner steel so that diagonal brace angle Right triangular shape is formed between steel, horizontal corner steel and vertical angle steel.
The spacing deviation of each foundation bolt to the band steel frame line of centres up and down is not more than 2 ㎜, each foundation bolt top Relative relief be not more than 2 ㎜.
3)The fabrication and installation of location-plate
Location-plate is covered in above band steel frame, and location-plate is made of 12mm solid woods, and location-plate is connected with upper band steel frame, makes Used time draws the line between two relative bolts with ink fountain on location-plate, and intersection point carries out mark.
4)The hanging location and installation of pre-embedded anchoring bolts
It is using hoisting machinery that built-in fitting integral hoisting is in place according to control axis, first with total powerstation by post center of circle space coordinate With the intersection point positioned in alignment center of circle on the location-plate of built-in fitting top, line and one center line pair of built-in fitting between two bolts Together, and the datum line of itself and measurement and positioning is made to coincide;Then the absolute altitude of embedded part bolt top surface is measured with spirit level;
According to the line between above bolt to extraction 1.5m control lines on slab form, 3 control points 1,2,3 are set;For Check the positioning accuracy after pre-embedded anchoring bolts are installed;
Consolidated using the split bolt of diameter 18 and the reinforcing bar keel of ellipse diameter HRB400 levels 25 with L-type 12mm steel plate clips connector Fixed connection.
The beneficial effects of the invention are as follows
It is an object of the invention to the construction method that invention superposed column pre-embedded anchoring bolts are vacantly positioned, it is ensured that foundation bolt is fixed The construction quality of position, so as to overcome foundation bolt to be accurately positioned the big mass defect of deviation.
Brief description of the drawings
Fig. 1 is superposed column built-in fitting suspending apparatus structural representation.
Wherein, 1, upper band steel frame, 2, location-plate, 3, diagonal brace angle steel, 4, vertical angle steel, 5, lateral strut, 6, ring-shaped clip, 7th, Screw arbor with nut at both-ends, 8, lower band steel frame, 9, pre-embedded bolt, 10, horizontal corner steel.
Embodiment
More detailed illustrate is carried out to present disclosure below:
It is an object of the invention to the construction method that invention superposed column pre-embedded anchoring bolts are vacantly positioned, it is ensured that foundation bolt is fixed The construction quality of position, so as to overcome foundation bolt to be accurately positioned the big mass defect of deviation.
1st, hanging line setting
Axis pilot measurement is bound on slab form using BIM modeling auxiliary total powerstation axial line control points, also with principles above By in another azimuth axis also pilot measurement to template, crossing point of axes is made in bracing wire, and with total Station Measured, this space coordinate put is For superposed column built-in fitting foundation bolt centre point spatial value.
2nd, foundation bolt support makes
Embedding anchor bolts part is made up of band steel frame, the vertical angle steel of level and diagonal brace angle steel up and down, and foundation bolt support is above and below Band steel frame is connected by the wide band steels of 6mm thickness 80mm(Depending on size of the band steel width of frame according to superposed column), beaten up and down in the middle part of band steel frame Eye(Diameter 20mm)Fixed foundation bolt, vertical angle steel band steel frame will be welded and fixed up and down with the angle steel of 4 L80 × 50 × 6; Diagonal brace angle steel and horizontal corner steel are connected overall with support frame using L80 × 50 × 6.Spacing deviation ≯ 2 of pre-embedded bolt centre to centre ㎜, the ㎜ of the relative relief on pre-embedded bolt top ≯ 2, it is ensured that the installation accuracy of pre-embedded bolt;
Location-plate is covered in above band steel frame, and location-plate is made of 12mm solid woods, and location-plate is connected with band steel, when using By bolt in length and breadth to the midline with ink fountain testing to small plank on small plank, intersection point carries out mark.
4th, the hanging location and installation of pre-embedded anchoring bolts
It is using hoisting machinery that built-in fitting integral hoisting is in place according to control axis, first with total powerstation by post center of circle space coordinate The square small plank intersection point positioned in alignment center of circle to the midline in length and breadth, axis of pitch control line and built-in fitting one are customized with built-in fitting top Bar center line aligns, and the datum line of itself and measurement and positioning is coincide;Then the absolute altitude of embedded part bolt top surface is measured with spirit level;
Vertically and horizontally axis, to extraction 1.5m control lines on slab form, sets 3 control points 1,2,3 more than;For checking Pre-embedded anchoring bolts install after positioning accuracy;
Consolidated using the split bolt of diameter 18 and the reinforcing bar keel of ellipse diameter HRB400 levels 25 with L-type 12mm steel plate clips connector Fixed connection, so as to ensure that the positioning accuracy of built-in fitting.

Claims (5)

1. the construction method that a kind of superposed column built-in fitting is vacantly installed, it is characterised in that
It is main to include following several steps:
1)Hanging line setting;
2)Foundation bolt support makes;
3)The fabrication and installation of location-plate;
4)The hanging location and installation of pre-embedded anchoring bolts.
2. construction method according to claim 1, it is characterised in that
1)Hanging line setting
Axis pilot measurement is bound on slab form using BIM modeling auxiliary total powerstation axial line control points, also with principles above By in another azimuth axis also pilot measurement to template, crossing point of axes is made in bracing wire, and with total Station Measured, this space coordinate put is For superposed column built-in fitting foundation bolt centre point spatial value.
3. construction method according to claim 2, it is characterised in that
2)Foundation bolt support makes
Foundation bolt support mainly makes the upper band steel frame and lower band steel frame, the vertical angle steel of level and diagonal brace angle steel be arrangeding in parallel, Four wide band steels of 6mm thickness 80mm are joined end to end and connect the band steel frame up and down of the side's of being formed shape, perforating and general in the middle part of band steel frame up and down Foundation bolt is arranged in beaten eye, and vertical angle steel is constituted with the angle steel of four L80 × 50 × 6, vertical angle steel with it is flat up and down Steel framework is welded and fixed together, and plane where vertical angle steel and band steel up and down is perpendicular so that up and down band steel and vertical angle steel it Between form cube structure;Diagonal brace angle steel and horizontal corner steel are made using the angle steel of L80 × 50 × 6, horizontal corner steel is welded on down Band steel frame bottom;The upper end of diagonal brace angle steel is welded on upper band steel frame, lower end is welded on horizontal corner steel so that diagonal brace angle Right triangular shape is formed between steel, horizontal corner steel and vertical angle steel;
The spacing deviation of each foundation bolt to the band steel frame line of centres up and down is not more than 2 ㎜, the phase on each foundation bolt top It is not more than 2 ㎜ to the discrepancy in elevation.
4. construction method according to claim 3, it is characterised in that
3)The fabrication and installation of location-plate
Location-plate is covered in above band steel frame, and location-plate is made of 12mm solid woods, and location-plate is connected with upper band steel frame, makes Used time draws the line between two relative bolts with ink fountain on location-plate, and intersection point carries out mark.
5. construction method according to claim 4, it is characterised in that
4)The hanging location and installation of pre-embedded anchoring bolts
It is using hoisting machinery that built-in fitting integral hoisting is in place according to control axis, first with total powerstation by post center of circle space coordinate With the intersection point positioned in alignment center of circle on the location-plate of built-in fitting top, line and one center line pair of built-in fitting between two bolts Together, and the datum line of itself and measurement and positioning is made to coincide;Then the absolute altitude of embedded part bolt top surface is measured with spirit level;
According to the line between above bolt to extraction 1.5m control lines on slab form, 3 control points 1,2,3 are set;For Check the positioning accuracy after pre-embedded anchoring bolts are installed;
Consolidated using the split bolt of diameter 18 and the reinforcing bar keel of ellipse diameter HRB400 levels 25 with L-type 12mm steel plate clips connector Fixed connection.
CN201710470756.6A 2017-06-20 2017-06-20 The construction method that a kind of superposed column built-in fitting is vacantly installed Withdrawn CN107254967A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710470756.6A CN107254967A (en) 2017-06-20 2017-06-20 The construction method that a kind of superposed column built-in fitting is vacantly installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710470756.6A CN107254967A (en) 2017-06-20 2017-06-20 The construction method that a kind of superposed column built-in fitting is vacantly installed

Publications (1)

Publication Number Publication Date
CN107254967A true CN107254967A (en) 2017-10-17

Family

ID=60024575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710470756.6A Withdrawn CN107254967A (en) 2017-06-20 2017-06-20 The construction method that a kind of superposed column built-in fitting is vacantly installed

Country Status (1)

Country Link
CN (1) CN107254967A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10184011A (en) * 1996-12-20 1998-07-14 Sumitomo Forestry Co Ltd Metal tool set for installing anchor bolt
CN102493471A (en) * 2011-12-01 2012-06-13 中建八局大连建设工程有限公司 Suspending installation construction process method of structural foot margin anchor bolt
CN202881968U (en) * 2012-10-18 2013-04-17 山西四建集团有限公司 Factory building bolt embedded precision control structure
CN204326093U (en) * 2014-12-06 2015-05-13 内蒙古兴泰建设集团有限公司 A kind of rigid steel pile locating support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10184011A (en) * 1996-12-20 1998-07-14 Sumitomo Forestry Co Ltd Metal tool set for installing anchor bolt
CN102493471A (en) * 2011-12-01 2012-06-13 中建八局大连建设工程有限公司 Suspending installation construction process method of structural foot margin anchor bolt
CN202881968U (en) * 2012-10-18 2013-04-17 山西四建集团有限公司 Factory building bolt embedded precision control structure
CN204326093U (en) * 2014-12-06 2015-05-13 内蒙古兴泰建设集团有限公司 A kind of rigid steel pile locating support

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李卫华等: "超高层建筑地脚锚栓快速预埋技术", 《钢结构》 *
李邵建: "《欧特克BIM标准丛书 BIM纲要》", 30 November 2015 *

Similar Documents

Publication Publication Date Title
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN108035554B (en) Construction method of section steel column support frame of super high-rise building frame column
CN204703182U (en) Crab-bolt stock
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN204849798U (en) Rag bolt fixed bolster
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN109763569B (en) Construction method of cantilever awning
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
CN103174166A (en) Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof
CN102864934A (en) Construction method of back-bolt type dry hanging stone curtain wall
CN105317052B (en) Tower crane foundation bolt fixing method
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN113653199B (en) Construction method for embedding stiffening anchor plate foundation bolt
CN107254967A (en) The construction method that a kind of superposed column built-in fitting is vacantly installed
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN109201971A (en) For making the positioning device and its construction method of pile foundation steel bar cage
CN210529741U (en) Independent foundation embedded bolt mounting structure
CN107938854A (en) A kind of steel girder erection method using built-in fitting
CN107059913A (en) A kind of reactor built-in fitting supporting construction and method for embedding
CN204825665U (en) Utilize device of laser positioning preparation steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171017