CN107248724B - Power phase shortage detection method when a kind of compressor of air conditioner operation - Google Patents

Power phase shortage detection method when a kind of compressor of air conditioner operation Download PDF

Info

Publication number
CN107248724B
CN107248724B CN201610580122.1A CN201610580122A CN107248724B CN 107248724 B CN107248724 B CN 107248724B CN 201610580122 A CN201610580122 A CN 201610580122A CN 107248724 B CN107248724 B CN 107248724B
Authority
CN
China
Prior art keywords
compressor
current value
current
phase
outdoor controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610580122.1A
Other languages
Chinese (zh)
Other versions
CN107248724A (en
Inventor
周相康
任桂平
金高芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aux Air Conditioning Co Ltd
Original Assignee
Aux Air Conditioning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aux Air Conditioning Co Ltd filed Critical Aux Air Conditioning Co Ltd
Priority to CN201610580122.1A priority Critical patent/CN107248724B/en
Publication of CN107248724A publication Critical patent/CN107248724A/en
Application granted granted Critical
Publication of CN107248724B publication Critical patent/CN107248724B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/08Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for dynamo-electric motors
    • H02H7/09Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for dynamo-electric motors against over-voltage; against reduction of voltage; against phase interruption
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/16Measuring asymmetry of polyphase networks

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

Power phase shortage detection method when being run the invention discloses a kind of compressor of air conditioner, the method includes:Air-conditioning is switched on, and the outdoor controller control compressor is opened;First current sensing means and the second current sensing means obtain the second phase supply lines and the first current value on third phase supply lines and the second current value in real time, and first current value and the second current value are sent to the outdoor controller;The outdoor controller receives first current value and the second current value, and carries out preset calculating;Result of calculation is compared by outdoor controller with preset current threshold, and according to comparison result, control compressor continues on or stops.The beneficial effects of the invention are as follows:(1)Pile defection can be carried out to the compressor in operating status.(2)It is more quick to the pile defection of compressor.

Description

Power phase shortage detection method when a kind of compressor of air conditioner operation
Technical field
The present invention relates to airconditioning control fields, are specifically related to power phase shortage detection side when a kind of compressor of air conditioner operation Method.
Background technology
When the compressor of three phase supply is out of service, if there is one phase phase shortage of power supply, when starting motor, three-phase windings generate Magnetic field can be divided into the rotating excitation field that two equal in magnitude, direction is opposite, their effect is generated with rotor torques are also size It is equal, direction on the contrary, therefore detent torque be zero and cannot start, at this time generally by detect the frequency of three phase supply coil come Detect whether that phase shortage, method are ripe.
The phase shortage when compressor operating of three phase supply, the magnetic field that three-phase windings generate can also be divided into two equal in magnitude, sides To opposite rotating excitation field, but the relative rotation speed for turning to compressor opposite rotating excitation field and rotor is very big, produces in the rotor The frequency of raw induced electromotive force and electric current is almost several times of supply frequency, and rotor induction reactance is very big, and the active component of current is very Small, reverse torque is much smaller than forward torque, and compressor continues to run with, and three phase supply coil has induction electric in this case Gesture can not detect phase shortage situation with the method for detection three phase mains frequency, if not hard stop, long-time phase shortage operates meeting Compressor coil windings are burnt out, compressor permanent damages are caused.
A kind of judgement of transducer air conditioning compressor phase shortage of disclosure of the invention described in application number 201010252018.2 and Guard method, it includes step:(1)The quiescent current of frequency converter is measured in advance;Compressor is set according to quiescent current to lack The current threshold of phase;(2)In frequency converter operating, the current value that stochastical sampling arrives is read, by the current value according to the frequency converter The driving circuit mode of use calculates the current value of three phases of compressor;(3)By step(2)In the three-phase current that is calculated Value is made comparisons with the current threshold respectively, if one current value of any of which is less than the current threshold, judges compressor Phase shortage stops frequency converter and exports and prompt compressor open-phase fault;Otherwise, return to step(2).It needs to detect in real time in this method The each current value and whole of three-phase electricity are judged, and need to set different current thresholds according to different quiescent currents Value, process is complicated, is unfavorable for quick detection when compressor phase shortage.
Invention content
Power phase shortage detection method when being run it is an object of the present invention to provide a kind of compressor of air conditioner so as to fortune The detection of compressor when row is more efficiently quick.
Specifically, the present invention is achieved through the following technical solutions:
Power phase shortage detection method when a kind of compressor of air conditioner operation, the compressor are the compressor of three phase supply, tool There is three phase supply electric wire, concatenates outdoor controller on the first phase power supply electric wire, power in the second phase supply lines and third phase The first current sensing means and the second current sensing means are respectively arranged on line, the method includes the steps:
S1:Air-conditioning is switched on, and the outdoor controller control compressor is opened;
S2:First current sensing means and the second current sensing means obtain the second phase supply lines and third phase power supply in real time The first current value on line and the second current value, and first current value and the second current value are sent to the outdoor unit control Device processed;
S3:The outdoor controller receives first current value and the second current value, and carries out preset calculating;
S4:Result of calculation is compared by outdoor controller with preset current threshold, according to comparison result, control pressure Contracting machine continues on or stops.
Preset calculating described in step S2, specially:
Calculate the absolute value of the difference of first current value and the second current value;
The step S4 is specially:
Outdoor controller judges whether the absolute value of the difference is more than preset current threshold, if it is, control The compressor stops.
The preset current threshold is:The half of higher value in first current value and the second current value.
Power phase shortage detection method when being run the invention discloses a kind of compressor of air conditioner, the method includes:Air-conditioning is opened Machine, the outdoor controller control compressor are opened;First current sensing means and the second current sensing means obtain in real time The first current value on second phase supply lines and third phase supply lines and the second current value, and by first current value and second Current value is sent to the outdoor controller;The outdoor controller receives first current value and the second current value, And carry out preset calculating;Result of calculation is compared by outdoor controller with preset current threshold, according to comparison result, Control compressor continues on or stops.The beneficial effects of the invention are as follows:(1)Compressor in operating status can be lacked Mutually detect.(2)It is more quick to the pile defection of compressor.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is a kind of air-conditioning system structural schematic diagram provided in an embodiment of the present invention;
Fig. 2 is a kind of compressor three-phase electricity attachment structure schematic diagram provided in an embodiment of the present invention;
Fig. 3 is that power phase shortage detection method flow is illustrated when the first compressor of air conditioner provided in an embodiment of the present invention is run Figure;
Fig. 4 is that power phase shortage detection method flow is illustrated when second of compressor of air conditioner provided in an embodiment of the present invention is run Figure.
Reference sign
The connection relation between structure and each component further clearly to illustrate the present invention, gives the following drawings mark Note, and be illustrated.
1, indoor unit;11, indoor heat exchanger;12, indoor machine controller;13, indoor temperature transmitter;14, indoor fan; 2, outdoor unit;21, compressor;22, four-way valve;23, outdoor heat exchanger;24, throttle mechanism;25, outdoor fan;26, gas-liquid point From device;27, outdoor environment temperature sensor;28, outdoor coil temperature sensor;29, muffler;30, high-voltage detecting device; 31, low pressure detection device;32, outdoor controller;33, the first shut-off valve;34, the second shut-off valve;41, the first phase power supply electricity Line;42 second phases power supply electric wire,;43 third phases power supply electric wire,;51, the first current sensing means;52, the second current detecting fills It sets.
Description of symbols through the above attached drawings can be more clearly understood and illustrate this hair in conjunction with the embodiment of the present invention Bright technical solution.
Specific implementation mode
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent and the consistent all embodiments of the present invention.On the contrary, they be only with it is such as appended The example of the consistent device and method of some aspects being described in detail in claims, of the invention.
It is the purpose only merely for description specific embodiment in terminology used in the present invention, is not intended to limit the invention. It is also intended to including majority in the present invention and "an" of singulative used in the attached claims, " described " and "the" Form, unless context clearly shows that other meanings.It is also understood that term "and/or" used herein refers to and wraps Containing one or more associated list items purposes, any or all may be combined.
It will be appreciated that though various information, but this may be described using term first, second, third, etc. in the present invention A little information should not necessarily be limited by these terms.These terms are only used for same type of information being distinguished from each other out.For example, not departing from In the case of the scope of the invention, the first information can also be referred to as the second information, and similarly, the second information can also be referred to as One information.Depending on context, word as used in this " if " can be construed to " ... when " or " when ... When " or " in response to determination ".
The present invention will be described in detail by way of examples below.
A kind of air conditioner, as shown in Figure 1, including indoor unit 1 and outdoor unit 2, the indoor unit 1 includes indoor heat exchanger 11, indoor fan 14, indoor machine controller 12 and indoor temperature transmitter 13, wherein indoor temperature transmitter 13 measure in real time Ambient temperature value, and the temperature value signal is sent to indoor machine controller 12;The outdoor unit 2 includes compressor 21, disappears Sound device 29, high-voltage detecting device 30, four-way valve 22, low pressure detection device 31, gas-liquid separator 26, outdoor heat exchanger 23, outdoor Wind turbine 25, throttle mechanism 24, outdoor environment temperature sensor 27, outdoor coil temperature sensor 28 and outdoor controller 32, the outdoor controller 2 is at least used to control compressor and opens or stop;The air conditioner also has the first shut-off valve 33 With the second shut-off valve 34, the connection for pipeline between air conditioner room unit and outdoor unit;User can control described according to demand The opening and closing of the different valve ports of four-way valve 22, selects air-conditioning to be in refrigeration or refrigeration mode;When at air-conditioning with refrigeration mode, compressor 21 carry out its internal refrigerant the gaseous state of boil down to high temperature and pressure, followed by muffler 29, high-voltage detecting device 30, lead to It crosses the conducting of four-way valve 22 and flow to outdoor heat exchanger 23, the refrigerant becomes medium temperature and medium pressure after the heat exchange of outdoor heat exchanger 23 Liquid, flow through throttle mechanism 24 and indoor heat exchanger 11, the refrigerant vaporization absorption heat of liquid, indoor heat exchanger 11 later The cools air of surrounding, indoor fan 14 blow out the air to turn cold to form cold wind, and gaseous refrigerant flow to four-way valve 22, root It is acted on according to the conducting of four-way valve, after low pressure detection device 31, gas-liquid separator 26, into compressor 21.Similar, When at air-conditioning with heating mode, its internal refrigerant is carried out the gaseous state of boil down to high temperature and pressure by compressor 21, is flowed successively Through muffler 29, high-voltage detecting device 30, indoor heat exchanger 11, by the atmosphere temperature rising around indoor heat exchanger 11, indoor fan 14 will heat up after air blow out to form hot wind, the refrigerant becomes medium temperature and medium pressure after the heat exchange of indoor heat exchanger 11 Liquid, flows through throttle mechanism 24 and outdoor heat exchanger 23 later, and the refrigerant vaporization absorption heat of liquid becomes gaseous state, absorbs week A large amount of heat in air is enclosed, the temperature around outdoor heat exchanger 23 is made to reduce, gaseous refrigerant detects followed by low pressure After device 31, gas-liquid separator 26, into compressor 21.
The compressor of the air-conditioning is the compressor of three phase supply, has three phase supply electric wire, as shown in Fig. 2, L1, L2, L3 indicates three phase mains respectively, and three phase supply electric wire is in this patent with the first phase of noun power supply electric wire, the second phase power supply electric wire Electric wire is powered to show difference with third phase, wherein the first phase power supply electric wire 41 gives the outdoor controller 32 to power, and by institute It states and is picked out in outdoor controller 32, be connected to the compressor 21, the second phase supply lines 42 and third phase supply lines 43 It is respectively connected to the corresponding three-phase electrical interface of compressor, and is divided on the second phase supply lines 42 and third phase supply lines 43 It is not provided with the first current sensing means 51 and the second current sensing means 52, is respectively used to detect the second phase supply lines 42 With the first current value and the second current value on third phase supply lines 43, and first current sensing means and the second electric current Detection device can be communicated with the outdoor controller 32.
Specifically, as shown in figure 3, power phase shortage detection method step is when the compressor of air conditioner is run:
S101:Air-conditioning is switched on, and the outdoor controller control compressor is opened.
S102:First current sensing means and the second current sensing means obtain the second phase supply lines in real time and third phase supplies The first current value on electric wire and the second current value, and first current value and the second current value are sent to the outdoor unit Controller.
S103:The outdoor controller receives first current value and the second current value, and carries out preset calculating.
S104:Result of calculation is compared by outdoor controller with preset current threshold, according to comparison result, control Compressor continues on or stops.
Further, the preset calculating can be:Calculate the difference of first current value and the second current value Absolute value.Later, outdoor controller judges whether the absolute value of the difference is more than in the first current value and the second current value The half of higher value stops if it is, controlling the compressor.
Specifically, as shown in figure 4, the method is specially:
S201:Air-conditioning is switched on, and the outdoor controller control compressor is opened.
S202:First current sensing means and the second current sensing means obtain the second phase supply lines in real time and third phase supplies The first current value on electric wire and the second current value, and first current value and the second current value are sent to the outdoor unit Controller.
S203:The outdoor controller receives first current value and the second current value, and calculates first electricity The absolute value of flow valuve and the difference of the second current value.
S204:Outdoor controller judges whether result of calculation is more than higher value in the first current value and the second current value Half, if it is, control compressor stops, if it is not, then continuing to keep compressor operating.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent substitution, improvement and etc. done should be included within the scope of protection of the invention god.

Claims (2)

1. power phase shortage detection method when a kind of compressor of air conditioner operation, the compressor are the compressor of three phase supply, have Three phase supply electric wire, which is characterized in that outdoor controller is concatenated on the first phase power supply electric wire, in the second phase supply lines and the The first current sensing means and the second current sensing means are respectively arranged on three phase supply line, the method includes the steps:
S1:Air-conditioning is switched on, and the outdoor controller control compressor is opened;
S2:First current sensing means and the second current sensing means obtain on the second phase supply lines and third phase supply lines in real time The first current value and the second current value, and first current value and the second current value are sent to the outdoor unit and controlled Device;
S3:The outdoor controller receives first current value and the second current value, and calculate first current value and The absolute value of the difference of second current value;
S4:Outdoor controller judges whether the absolute value of the difference is more than preset current threshold, if it is, control institute Compressor stopping is stated, if it is not, then continuing to keep the compressor operating.
2. according to the method described in claim 1, it is characterized in that, the preset current threshold is:First current value and The half of higher value in two current values.
CN201610580122.1A 2016-07-22 2016-07-22 Power phase shortage detection method when a kind of compressor of air conditioner operation Active CN107248724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610580122.1A CN107248724B (en) 2016-07-22 2016-07-22 Power phase shortage detection method when a kind of compressor of air conditioner operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610580122.1A CN107248724B (en) 2016-07-22 2016-07-22 Power phase shortage detection method when a kind of compressor of air conditioner operation

Publications (2)

Publication Number Publication Date
CN107248724A CN107248724A (en) 2017-10-13
CN107248724B true CN107248724B (en) 2018-11-13

Family

ID=60016317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610580122.1A Active CN107248724B (en) 2016-07-22 2016-07-22 Power phase shortage detection method when a kind of compressor of air conditioner operation

Country Status (1)

Country Link
CN (1) CN107248724B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108458452A (en) * 2018-03-22 2018-08-28 广东美的制冷设备有限公司 Air conditioner and its control method and computer readable storage medium
CN108444079B (en) * 2018-03-22 2021-10-26 广东美的制冷设备有限公司 Air conditioner, control method thereof, and computer-readable storage medium
CN113391139B (en) * 2021-07-30 2022-12-27 佛山市顺德区美的电子科技有限公司 Open-phase detection method and device for three-phase power input line and air conditioner outdoor unit
CN113884777A (en) * 2021-09-22 2022-01-04 深圳拓邦股份有限公司 Open-phase detection method, circuit and device of three-phase alternating-current power supply and electrical equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101916982A (en) * 2010-08-09 2010-12-15 宁波奥克斯空调有限公司 Judgement and protection method for open phase of frequency-conversion air conditioner compressor
JP2011051695A (en) * 2009-08-31 2011-03-17 Toshiba Elevator Co Ltd Control device of elevator
JP2011247497A (en) * 2010-05-27 2011-12-08 Sanyo Electric Co Ltd Air conditioner
CN102721923A (en) * 2011-03-29 2012-10-10 上海永大电梯设备有限公司 Motor phase loss detection method
CN103376409A (en) * 2012-04-18 2013-10-30 珠海格力电器股份有限公司 Method and circuit for detecting phase loss of three-phase motor
CN103743961A (en) * 2013-12-10 2014-04-23 广东威灵电机制造有限公司 Open-phase detection method and detection apparatus for three-phase permanent magnet synchronous motor
CN105301370A (en) * 2015-08-31 2016-02-03 唐山松下产业机器有限公司 Three-phase AC detection protection device and detection protection method therefor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011051695A (en) * 2009-08-31 2011-03-17 Toshiba Elevator Co Ltd Control device of elevator
JP2011247497A (en) * 2010-05-27 2011-12-08 Sanyo Electric Co Ltd Air conditioner
CN101916982A (en) * 2010-08-09 2010-12-15 宁波奥克斯空调有限公司 Judgement and protection method for open phase of frequency-conversion air conditioner compressor
CN102721923A (en) * 2011-03-29 2012-10-10 上海永大电梯设备有限公司 Motor phase loss detection method
CN103376409A (en) * 2012-04-18 2013-10-30 珠海格力电器股份有限公司 Method and circuit for detecting phase loss of three-phase motor
CN103743961A (en) * 2013-12-10 2014-04-23 广东威灵电机制造有限公司 Open-phase detection method and detection apparatus for three-phase permanent magnet synchronous motor
CN105301370A (en) * 2015-08-31 2016-02-03 唐山松下产业机器有限公司 Three-phase AC detection protection device and detection protection method therefor

Also Published As

Publication number Publication date
CN107248724A (en) 2017-10-13

Similar Documents

Publication Publication Date Title
CN107248724B (en) Power phase shortage detection method when a kind of compressor of air conditioner operation
CN103363620B (en) Control device and heat pump assembly
KR102436704B1 (en) Fan motor driving device and air conditioner including the same
US10344998B2 (en) Air conditioner
CN109863686A (en) The driving method of driving device, air conditioner and motor
EP2789935B1 (en) Drive control device and method of electronic expansion valve
KR101550751B1 (en) Motor control device, motor drive device using the same, compressor, refrigeration device, air conditioner, and motor control method
JP2009216324A (en) Air conditioner
CN109863690A (en) The driving method of driving device, air conditioner and motor
CN105444340A (en) Electrical equipment with filter screen blockage detecting function
WO2016157443A1 (en) Refrigeration cycle device
KR102267353B1 (en) Air conditioner and method thereof
US7404299B2 (en) Apparatus, method and software for use with an air conditioning cycle
CN102457225A (en) Refrigerating apparatus and controller for permanent magnet synchronous motor
CN103208961A (en) Driving device of synchronous motor; refrigeration apparatuses, air conditioners and refrigerators using same; and driving method of synchronous motor
WO2005028972A1 (en) Refrigerant leakage detecting device and refrigerator using the same
CN101946136A (en) Refrigeration equipment
JP5122366B2 (en) Air conditioner
JP5470098B2 (en) Inverter control device and air conditioner using the same
JP2015171203A (en) compressor
JP2010032102A (en) Air conditioner
US11802708B2 (en) Outdoor unit, air conditioner, and operation control method for air conditioner
KR102315586B1 (en) Air conditioner and operrating method thereof
EP2122264A1 (en) Air conditioner
JP5618899B2 (en) Motor control device and air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant