CN107248066A - Calendar-based task management system and method - Google Patents

Calendar-based task management system and method Download PDF

Info

Publication number
CN107248066A
CN107248066A CN201710532624.1A CN201710532624A CN107248066A CN 107248066 A CN107248066 A CN 107248066A CN 201710532624 A CN201710532624 A CN 201710532624A CN 107248066 A CN107248066 A CN 107248066A
Authority
CN
China
Prior art keywords
task
date
day
calendar
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710532624.1A
Other languages
Chinese (zh)
Inventor
王柏华
孙长杰
李照川
赵海兴
江国福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Software Group Co Ltd
Original Assignee
Inspur Software Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Software Group Co Ltd filed Critical Inspur Software Group Co Ltd
Priority to CN201710532624.1A priority Critical patent/CN107248066A/en
Publication of CN107248066A publication Critical patent/CN107248066A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0481Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
    • G06F3/04817Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance using icons

Abstract

The invention discloses a task management system and method based on a calendar, which comprises a calendar module and a task list module which can be displayed side by side, wherein the calendar module is used for displaying dates which comprise year, month and day information, the number of tasks to be completed on the dates is also recorded in the day information, and the current dates are positioned and displayed; and the task list module is used for inputting, modifying or deleting task information and displaying the task information in a list form, wherein the task information is information of tasks required to be completed in the date displayed in the calendar module. Compared with the prior art, the calendar-based task management system and method provided by the invention have the advantages that the start date and the end date of the task are input by selecting the date of the calendar interface, the date selection frame is prevented from popping up, the practicability is high, the application range is wide, and the popularization and application values are good.

Description

A kind of task management system and method based on calendar
Technical field
The present invention relates to computer software application technical field, specifically a kind of task management system based on calendar And method.
Background technology
Currently there are substantial amounts of schedule management software, these softwares mostly provide a variety of views for filling in, Check schedule.For example, with the software of calendar view managing schedule, generally to show the date in the way of moon view, in date square Middle record, display calendar information.
The shortcoming of above schedule management has:
1st, complete calendar information can not be shown in dat frame.
When the 2nd, creating schedule, the relevant window of calendar information typing, interface complicated, troublesome poeration, nothing more are repeatedly ejected The workload of user is added in shape.
In the market there is also substantial amounts of task management software, these softwares mostly interface is complicated, also not with day Interface cohesion is gone through, concept of time is obscured, and bandwagon effect is poor, poor user experience.
In this context, the present invention provides a kind of raising bandwagon effect, task management system and method based on calendar.
The content of the invention
The technical assignment of the present invention is that there is provided a kind of task management system and method based on calendar for above weak point.
A kind of task management system based on calendar, including the calendaring module and task list module that can be displayed side by side, its In,
Calendaring module is used to show date, and the date includes year, month, day information, also records the date at day information and has needed Into task quantity, and locating and displaying current date;
Task list module, typing, modification or deletion mission bit stream simultaneously show that the mission bit stream is calendar by the form of list The information of task completed is needed in the date shown in module.
The calendaring module is showed date in the way of calendar month view, and shows that it is corresponding simultaneously in the date of display What day, solar calendar, lunar calendar, festivals or holidays, the twenty-four solar terms.
In calendaring module, auxiliary unit is also configured with, the auxiliary unit is shown simultaneously with calendaring module, in auxiliary unit It is middle that micro- application entrance is provided, micro- application here for auxiliary completion task application program, the application program include it is micro- chat, it is micro- Postal, micro- disk, micro- know.
The moon where a day period switching module, initial default state, calendar display system date is configured with the calendaring module Part, i.e. of that month date, day period switching module hide, when the date of calendar is switched to its of place month system data by user During its month, day period switching module show, when user selects this day period switching module, day period switching module will be switched on the date Month where system data, and choose system current date.
Being recorded in the task list module for task is divided into same day task and the class of across day task two according to the time, and the same day appoints Between at the beginning of business with the end time within the same day, across day task Start Date and the Close Date time span extremely It is one day, i.e., 24 hour less.
In task list block with tabular form show for the mission bit stream that is associated with current date, i.e. task starts Time is less than or equal to system current date and job end time is more than or equal to the task list of system current date.
In the task list module, following editable unit is configured with:
Same day TU task unit, edit in the form of a list and show task time on the same day, it is corresponding with task time on the same day ought Its task names;
Across day TU task unit, edit in the form of a list and show across day task time, it is corresponding with across day task time across Its task names;
The editor includes typing, modification and deletion action.
Search module is also configured with the task list module, the search module provides task search frame, when user exists In task search frame during incoming task name keyword, the search module is in recorded corresponding mission bit stream of all dates Middle search inter-related task, shows corresponding task information and the corresponding date and time information of task after the completion of search.
A kind of task management method based on calendar, based on above-mentioned task management system, its implementation process is:Pass through calendar first Module shows current date information, then by the typing of task list module, change or delete the date corresponding mission bit stream And show in the form of a list, the mission bit stream that the date and time information that the calendaring module is shown is shown with task list module is side by side Display.
The information shown in the task list module includes same day task and the class of across day mission bit stream two, same day task letter Breath refer at the beginning of task between with the end time within current date, across day task refers to the time span of task at least It is less than or equal to current date for one day and time started and job end time is more than or equal to system current date.
The present invention a kind of task management system and method based on calendar compared to the prior art, with following beneficial effect Really:
A kind of task management system and method based on calendar of the present invention, by the combination of calendar information and mission bit stream, makes User can have a guide look of all tasks related to choosing the date while calendar is checked, conveniently check task relevant information;Make User avoids ejecting various input frames when inputting information, and simplifying interface, convenient operation brings ultimate attainment use body to user Test;Date of the invention by selecting calendar interface, the beginning of incoming task and Close Date, it is to avoid ejection date choice box, It is practical, it is applied widely, with good application value.
Brief description of the drawings
Accompanying drawing 1 is the embodiment schematic diagram of calendaring module.
Accompanying drawing 2 is the instantiation schematic diagram of calendaring module.
Accompanying drawing 3 is the example schematic of task list module.
Accompanying drawing 4 is the instantiation schematic diagram of task list module.
Accompanying drawing 5 is the part-structure schematic diagram of task list module.
Accompanying drawing 6 is calendaring module and the common display schematic diagram of task list module.
Accompanying drawing 7 be task list module in enter row headers editor's schematic diagram.
Accompanying drawing 8 be task list module in carry out across day task title editor's schematic diagram.
Accompanying drawing 9 is progress task time on same day editor schematic diagram in task list module.
Accompanying drawing 10 is the view of show tools bar in task list module.
Accompanying drawing 11 is the schematic diagram after same day task blank line increase in task list module.
Accompanying drawing 12 is search module interface schematic diagram in task list module.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the invention will be further described.
The present invention proposes a set of brand-new software configuration and man-machine interaction method, and it is horizontally-parallel with task list by calendar Displaying side by side, can have a guide look of related all tasks to choosing the date, when task names input, task while calendar is observed Between input and all do not need other pop-up window, software interface is brief, simple to operate, it is natural and tripping to input, and possesses ultimate attainment user Experience.
A kind of task management system based on calendar, including the calendaring module and task list module that can be displayed side by side, its In,
Calendaring module is used to show date, and the date includes year, month, day information, also records the date at day information and has needed Into task quantity, and locating and displaying current date;
Task list module, typing, modification or deletion mission bit stream simultaneously show that the mission bit stream is calendar by the form of list The information of task completed is needed in the date shown in module.
The calendaring module is showed date in the way of calendar month view, and shows that it is corresponding simultaneously in the date of display What day, solar calendar, lunar calendar, festivals or holidays, the twenty-four solar terms.
In calendaring module, auxiliary unit is also configured with, the auxiliary unit is shown simultaneously with calendaring module, in auxiliary unit It is middle that micro- application entrance is provided, micro- application here for auxiliary completion task application program, the application program include it is micro- chat, it is micro- Postal, micro- disk, micro- know.
The moon where a day period switching module, initial default state, calendar display system date is configured with the calendaring module Part, i.e. of that month date, day period switching module hide, when the date of calendar is switched to its of place month system data by user During its month, day period switching module show, when user selects this day period switching module, day period switching module will be switched on the date Month where system data, and choose system current date.
Being recorded in the task list module for task is divided into same day task and the class of across day task two according to the time, and the same day appoints Between at the beginning of business with the end time within the same day, across day task Start Date and the Close Date time span extremely It is one day, i.e., 24 hour less.
In task list block with tabular form show for the mission bit stream that is associated with current date, i.e. task starts Time is less than or equal to system current date and job end time is more than or equal to the task list of system current date.
In the task list module, following editable unit is configured with:
Same day TU task unit, edit in the form of a list and show task time on the same day, it is corresponding with task time on the same day ought Its task names;
Across day TU task unit, edit in the form of a list and show across day task time, it is corresponding with across day task time across Its task names;
The editor includes typing, modification and deletion action.
Search module is also configured with the task list module, the search module provides task search frame, when user exists In task search frame during incoming task name keyword, the search module is in recorded corresponding mission bit stream of all dates Middle search inter-related task, shows corresponding task information and the corresponding date and time information of task after the completion of search.
The modular structure being related in the present invention is shown below by the form of software interface, wherein:Calendaring module is For following calendar interfaces, task list module is following task list interfaces, day as following " the present " projects of period switching module,
Calendar interface layout for upper, middle and lower longitudinal direction layout, be followed successively by from the top down head header area, middle part calendar field, bottom should With the part of inlet region three, such as Fig. 1.
The head header area of calendar interface includes product LOGO, year, the moon, the present, four projects.Calendar field in the middle part of calendar interface Be divided into header area and content regions two parts, header area is calendar header area, be one respectively, two, three, four, five, six, day these Word figure, it is what day to represent the Liege phase;Content regions are date of one month, including solar calendar, lunar calendar, festivals or holidays, 20 The content of four solar term, task message number, totally five aspects.Calendar interface layout bottom includes using the application message of inlet region Application icon, Apply Names two parts content.Calendar interface detailed placement, such as Fig. 2.
On the one hand the product LOGO of calendar interface is the mark of product, while being also the switching switch of the overall font of product. Under default situations, the overall font of product is small font, and product LOGO is clicked on using mouse, and product entirety variant font is big, Product is adjusted to big font state;Reuse mouse and click on product LOGO, product entirety font diminishes, product is adjusted The whole small font state to acquiescence.
" year " that user can click on calendar interface by mouse either " moon " project or passes through scroll-up/down mouse The date of calendar field in the middle part of roller, switching calendar interface.The date of calendar field and calendar interface head in the middle part of calendar interface The date that " year ", " moon " project are represented is always consistent.
" the present " project on calendar interface head is the shortcut of date switching.Initial default state, calendar display system Month where date(It is i.e. of that month)Date, " the present " project on calendar interface head is not shown, when user cuts the date of calendar Where changing to system data during other months in month, " the present " project on calendar interface head is shown.When user uses mouse point When hitting " the present " project on calendar interface head, calendar will be switched to month where system data the date, and choose system current Date.The date chosen is shown with the background color and font color different from other dates.
Task list interface is the longitudinal direction layout of upper, middle and lower, and task on the day of head header area, middle part is followed successively by from the top down Area, across the day part of mission area three in bottom, such as Fig. 2.Wherein, mission area is divided into left and right two parts again on the day of middle part, is the same day respectively Task time area and same day task names area;Across the day mission area in bottom is also classified into left and right two parts, is across the day task date respectively Area and across day task names area, such as Fig. 3.
Task list interface head header area includes:Date, two projects of search button, wherein search button correspondence are searched for Module.Task in task list interface(Including same day task and across day task)Enter edlin and display in rows.Just Task has three blank lines on the day of beginning state, and area shows the morning, afternoon and evening respectively task time on the day of, represents respectively Morning task, three regions of task in afternoon and evening task;Across day task has 11 blank lines, when across day task blank is exercised During with finishing, system finally increases across day task blank line in list automatically.Separate by a dotted line between task row, same day task Area is separated with across day mission area by solid line, and task time, area was separated with task header area by short vertical line.Task list interface Detailed placement, such as Fig. 5.
A kind of task management method based on calendar, based on above-mentioned task management system, its implementation process is:Pass through calendar first Module shows current date information, then by the typing of task list module, change or delete the date corresponding mission bit stream And show in the form of a list, the mission bit stream that the date and time information that the calendaring module is shown is shown with task list module is side by side Display.
The information shown in the task list module includes same day task and the class of across day mission bit stream two, same day task letter Breath refer at the beginning of task between with the end time within current date, across day task refers to the time span of task at least It is less than or equal to current date for one day and time started and job end time is more than or equal to system current date.
In the management method that the present invention is provided, the software interface mentioned with reference to above-described embodiment is given below specific Manage process description:
User clicks on when choosing a certain date of calendar field in the middle part of calendar interface, and being close to calendar interface on the right side of calendar interface shows Task list interface, in task list interface head header area, shows the date currently chosen, the same day times in the middle part of task list Business area lists all same day tasks relevant with choosing the date, is listed in across the day mission area in task list bottom and chooses the date to have All across the day tasks closed(That is, Start Date be less than or equal to choose date and Close Date be more than or equal to choose the date across Its task), such as Fig. 6.
In task list interface, the task header area of blank line is clicked on, mouse flashes, into task title editing mode, Task title is directly inputted by keyboard, when mouse leaves task header area, task creation success.Same day task title is inputted Example such as Fig. 7.During across day task creation, system automatically enters the acquiescence date.Across day task default start date is that system is current Date, the Close Date is question mark(Represent long-range mission).Across day task title input example such as Fig. 8.
In task list interface, task time on same day area, mouse flicker, into task time on same day editing mode are clicked on. Between being directly inputted first by keyboard at the beginning of digital form " when " when, system is automatically replenished input colon(:)Symbol, connects When using " dividing " between at the beginning of input through keyboard digital form, system is automatically replenished wave(~)Symbol;Then key is used The end time of disk input digital form " when " when, system is automatically replenished input colon(:)Symbol, finally using input through keyboard " dividing " of the end time of digital form, the task beginning and ending time on the same day inputs successfully.Task time on same day input example such as Fig. 9.
In task list interface, the Start Date for day task that blows away, Start Date and left side calendar circle across day task are put The background flicker of Middle face calendar field is twice(It is changed into red from white, then white is changed into from red, circulation is twice), point out user By clicking on Start Date of the calendar input in the middle part of the calendar interface of left side across day task.Equally, the end for day task that blows away is put On the date, the background flicker of calendar field twice, points out user to pass through point in the middle part of the Close Date of day task and left side calendar interface Close Date of the calendar input hit in the middle part of the calendar interface of left side across day task.User is by selecting in the middle part of the calendar interface of left side Calendar inputs the Start Date and Close Date across day task.
In task list interface, mouse is moved on certain task, shows task tool bar, clicks on task tool bar most The plus sige icon in left side, increase under the task line blank on the day of task, all task rows below blank line task A line is moved down automatically.Task tool bar exemplary plot, such as Figure 10.Exemplary plot after task increase, such as Figure 11.
In task list interface, the search icon on head is clicked on, task search frame is shown, input is appointed in task search box Business name keyword, may search for inter-related task, such as search box schematic diagram, Figure 12.
The present invention is by horizontally-parallel, arranged side by side against displaying by calendar interface and task list interface, in observation calendar All tasks related to choosing the date can be had a guide look of simultaneously, and task names input, the input of date task time all need not be in addition Pop-up window, software interface is brief, simple to operate, it is natural and tripping to input, and possesses ultimate attainment Consumer's Experience.
A kind of task management system and method based on calendar provided by the present invention are described in detail above.This Apply specific case in text to be set forth the principle and embodiment of the present invention, the explanation of above example is only intended to Help to understand method and its core concept of the invention.It should be pointed out that for those skilled in the art, Without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these are improved and modification also falls Enter in the protection domain of the claims in the present invention.

Claims (10)

1. a kind of task management system based on calendar, it is characterised in that arranged including the calendaring module that can be displayed side by side and task Table module, wherein,
Calendaring module is used to show date, and the date includes year, month, day information, also records the date at day information and has needed Into task quantity, and locating and displaying current date;
Task list module, typing, modification or deletion mission bit stream simultaneously show that the mission bit stream is calendar by the form of list The information of task completed is needed in the date shown in module.
2. a kind of task management system based on calendar according to claim 1, it is characterised in that the calendaring module with The mode of calendar month view shows date, and shows its corresponding what day, solar calendar, lunar calendar, section simultaneously in the date of display Holiday, the twenty-four solar terms.
3. a kind of task management system based on calendar according to claim 1, it is characterised in that in calendaring module, Auxiliary unit is also configured with, the auxiliary unit is shown simultaneously with calendaring module, micro- application entrance is provided in auxiliary unit, here Micro- application be the application program of auxiliary completion task, the application program includes micro- chatting, micro- postal, micro- disk, micro- knowing.
4. a kind of task management system based on calendar according to claim 1, it is characterised in that in the calendaring module Month where a day period switching module, initial default state, calendar display system date, i.e. of that month date are configured with, the date cuts Block is changed the mold to hide, when the date of calendar is switched to other months in month where system data by user, day period switching module It has been shown that, when user selects this day period switching module, day period switching module will be switched to month where system data the date, and Choose system current date.
5. a kind of task management system based on calendar according to claim 1, it is characterised in that the task list mould Being recorded in block for task according to the time be divided at the beginning of the same day task and class of across day task two, same day task between and the end time Within on the same day, it is at least one day, i.e., 24 hour across the Start Date of day task and the time span of Close Date.
6. a kind of task management system based on calendar according to claim 5, it is characterised in that in task list block In with tabular form show for the mission bit stream that is associated with current date, i.e. job start time works as the day before yesterday less than or equal to system Phase and job end time are more than or equal to the task list of system current date.
7. a kind of task management system based on calendar according to claim 5 or 6, it is characterised in that the task row In table module, following editable unit is configured with:
Same day TU task unit, edit in the form of a list and show task time on the same day, it is corresponding with task time on the same day ought Its task names;
Across day TU task unit, edit in the form of a list and show across day task time, it is corresponding with across day task time across Its task names;
The editor includes typing, modification and deletion action.
8. a kind of task management system based on calendar according to claim 7, it is characterised in that the task list mould Search module is also configured with block, the search module provide task search frame, when user in task search box incoming task name When claiming keyword, the search module searches for inter-related task in recorded corresponding mission bit stream of all dates, has searched for Into rear display corresponding task information and the corresponding date and time information of task.
9. a kind of task management method based on calendar, it is characterised in that based on above-mentioned task management system, its implementation process For:Current date information is shown by calendaring module first, then by the typing of task list module, change or delete the date Corresponding mission bit stream simultaneously shows that the date and time information that the calendaring module is shown is shown with task list module in the form of a list Mission bit stream be displayed side by side.
10. a kind of task management method based on calendar according to claim 9, it is characterised in that the task list The information shown in module includes same day task and the class of across day mission bit stream two, between same day mission bit stream refers at the beginning of task With the end time within current date, across day task refers to that the time span of task is at least one day and the time started is less than It is more than or equal to system current date equal to current date and job end time.
CN201710532624.1A 2017-07-03 2017-07-03 Calendar-based task management system and method Pending CN107248066A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710532624.1A CN107248066A (en) 2017-07-03 2017-07-03 Calendar-based task management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710532624.1A CN107248066A (en) 2017-07-03 2017-07-03 Calendar-based task management system and method

Publications (1)

Publication Number Publication Date
CN107248066A true CN107248066A (en) 2017-10-13

Family

ID=60014861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710532624.1A Pending CN107248066A (en) 2017-07-03 2017-07-03 Calendar-based task management system and method

Country Status (1)

Country Link
CN (1) CN107248066A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108121609A (en) * 2017-12-06 2018-06-05 珠海市魅族科技有限公司 The processing method and electronic equipment of a kind of Pending tasks
CN108536356A (en) * 2018-04-18 2018-09-14 平安科技(深圳)有限公司 Seating stand processing method, device and computer readable storage medium
CN109542007A (en) * 2018-11-28 2019-03-29 河北旗馨节能环保科技有限公司 Double mode time-controlling arrangement and duration control method
CN110389808A (en) * 2019-07-26 2019-10-29 上海宝尊电子商务有限公司 Full-expasion date picker applied to quick-view object designs
CN110472940A (en) * 2019-08-12 2019-11-19 Oppo(重庆)智能科技有限公司 Schedule information updates treating method and apparatus, terminal, storage medium
CN110659918A (en) * 2018-06-28 2020-01-07 上海传漾广告有限公司 Optimization method for tracking and analyzing network advertisements
CN111026472A (en) * 2019-10-28 2020-04-17 珠海格力电器股份有限公司 Calendar configuration and date selection method and device, storage medium and electronic equipment
CN111182154A (en) * 2020-01-03 2020-05-19 北京小米移动软件有限公司 Schedule processing method, device and system
CN111292059A (en) * 2020-01-22 2020-06-16 深圳市道旅旅游科技股份有限公司 Date selection method and device, computer equipment and storage medium
CN111798071A (en) * 2019-04-07 2020-10-20 南京杰咖斯信息技术有限公司 Task management method and system
CN112311562A (en) * 2020-10-29 2021-02-02 平安科技(深圳)有限公司 Request response method and device, computer equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102685316A (en) * 2011-12-16 2012-09-19 中兴通讯股份有限公司 Information processing method and information processing terminal which are based on calendar mode
CN105912392A (en) * 2016-04-11 2016-08-31 广东欧珀移动通信有限公司 Method, device and mobile terminal for calendar reminding
CN105959487A (en) * 2016-06-27 2016-09-21 乐视控股(北京)有限公司 Establishing method and device for to-be-handled task in calendar application
CN106056362A (en) * 2016-06-21 2016-10-26 浪潮软件集团有限公司 Cooperative office APP task management method
CN106250992A (en) * 2016-08-03 2016-12-21 乐视控股(北京)有限公司 Task processing method in a kind of mobile electronic device and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102685316A (en) * 2011-12-16 2012-09-19 中兴通讯股份有限公司 Information processing method and information processing terminal which are based on calendar mode
CN105912392A (en) * 2016-04-11 2016-08-31 广东欧珀移动通信有限公司 Method, device and mobile terminal for calendar reminding
CN106056362A (en) * 2016-06-21 2016-10-26 浪潮软件集团有限公司 Cooperative office APP task management method
CN105959487A (en) * 2016-06-27 2016-09-21 乐视控股(北京)有限公司 Establishing method and device for to-be-handled task in calendar application
CN106250992A (en) * 2016-08-03 2016-12-21 乐视控股(北京)有限公司 Task processing method in a kind of mobile electronic device and device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108121609A (en) * 2017-12-06 2018-06-05 珠海市魅族科技有限公司 The processing method and electronic equipment of a kind of Pending tasks
WO2019200759A1 (en) * 2018-04-18 2019-10-24 平安科技(深圳)有限公司 Agent information processing method and device, and computer readable storage medium
CN108536356A (en) * 2018-04-18 2018-09-14 平安科技(深圳)有限公司 Seating stand processing method, device and computer readable storage medium
CN110659918A (en) * 2018-06-28 2020-01-07 上海传漾广告有限公司 Optimization method for tracking and analyzing network advertisements
CN109542007A (en) * 2018-11-28 2019-03-29 河北旗馨节能环保科技有限公司 Double mode time-controlling arrangement and duration control method
CN111798071A (en) * 2019-04-07 2020-10-20 南京杰咖斯信息技术有限公司 Task management method and system
CN110389808A (en) * 2019-07-26 2019-10-29 上海宝尊电子商务有限公司 Full-expasion date picker applied to quick-view object designs
CN110472940A (en) * 2019-08-12 2019-11-19 Oppo(重庆)智能科技有限公司 Schedule information updates treating method and apparatus, terminal, storage medium
CN111026472A (en) * 2019-10-28 2020-04-17 珠海格力电器股份有限公司 Calendar configuration and date selection method and device, storage medium and electronic equipment
CN111182154A (en) * 2020-01-03 2020-05-19 北京小米移动软件有限公司 Schedule processing method, device and system
CN111182154B (en) * 2020-01-03 2022-02-08 北京小米移动软件有限公司 Schedule processing method, device and system
CN111292059A (en) * 2020-01-22 2020-06-16 深圳市道旅旅游科技股份有限公司 Date selection method and device, computer equipment and storage medium
CN111292059B (en) * 2020-01-22 2020-11-27 深圳市道旅旅游科技股份有限公司 Date selection method and device, computer equipment and storage medium
CN112311562A (en) * 2020-10-29 2021-02-02 平安科技(深圳)有限公司 Request response method and device, computer equipment and storage medium
CN112311562B (en) * 2020-10-29 2023-02-28 平安科技(深圳)有限公司 Request response method, device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107248066A (en) Calendar-based task management system and method
US6626959B1 (en) Automatic formatting of pivot table reports within a spreadsheet
US5749083A (en) Document processing system
US7458031B2 (en) System and method for creating customizable nodes in a network diagram
AU2005203409B2 (en) An improved user interface for displaying selectable software functionality controls that are contextually relevant to a selected object
AU2006235850B2 (en) Reviewing editing operations
US6256651B1 (en) Time management workflow software
US5664182A (en) Persistent storage of report objects
US20030229848A1 (en) Table filtering in a computer user interface
US7287233B2 (en) Minimization function for a computer user interface
US20120047434A1 (en) Method to preview an undo/redo list
US7260772B2 (en) System and method for creating a pert chart
JPH09106336A (en) Method for displaying plural display images within display window of information processor
JP2001092825A (en) Device and method for processing information
EP1194872A1 (en) A content management computer system for managing publishing content objects
CN100530172C (en) Electronic document display device and method
US7716578B2 (en) Display method, computer program product and computer system
WO2004102365A2 (en) Displaying view sets of an object for data input
CN106156352A (en) Visual content management method and system
US20030050967A1 (en) Apparatus and method for optimal selection of IP modules for design integration
DE602004003140T2 (en) SYSTEM AND METHODS IN A DATA TABLE FOR MANAGING DELETE OPERATIONS IN RECYCLABLE SCALABLE TEMPERATURE INSTRUMENTS
Cisco Configuring Multiple Records at a Time
Cisco Configuring Multiple Records at a Time
Cisco Configuring Multiple Records at a Time
EP0483040A2 (en) Method for displaying multiple entry data fields on a video screen in an object oriented software program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171013

RJ01 Rejection of invention patent application after publication