- CN107248066A CN107248066A CN201710532624.1A CN201710532624A CN107248066A CN 107248066 A CN107248066 A CN 107248066A CN 201710532624 A CN201710532624 A CN 201710532624A CN 107248066 A CN107248066 A CN 107248066A
- Authority
- CN
- China
- Prior art keywords
- task
- date
- day
- calendar
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000003490 calendering Methods 0.000 claims description 26
- 238000007726 management method Methods 0.000 claims description 26
- 230000004048 modification Effects 0.000 claims description 8
- 238000012986 modification Methods 0.000 claims description 8
- 230000037430 deletion Effects 0.000 claims description 6
- 238000012217 deletion Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 4
- 230000009471 action Effects 0.000 claims description 3
- 230000008859 change Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 11
- 241000699666 Mus <mouse, genus> Species 0.000 description 9
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 6
- 210000001072 colon Anatomy 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0481—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
- G06F3/04817—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance using icons
Abstract
The invention discloses a task management system and method based on a calendar, which comprises a calendar module and a task list module which can be displayed side by side, wherein the calendar module is used for displaying dates which comprise year, month and day information, the number of tasks to be completed on the dates is also recorded in the day information, and the current dates are positioned and displayed; and the task list module is used for inputting, modifying or deleting task information and displaying the task information in a list form, wherein the task information is information of tasks required to be completed in the date displayed in the calendar module. Compared with the prior art, the calendar-based task management system and method provided by the invention have the advantages that the start date and the end date of the task are input by selecting the date of the calendar interface, the date selection frame is prevented from popping up, the practicability is high, the application range is wide, and the popularization and application values are good.
Description
Technical field
The present invention relates to computer software application technical field, specifically a kind of task management system based on calendar
And method.
Background technology
Currently there are substantial amounts of schedule management software, these softwares mostly provide a variety of views for filling in,
Check schedule.For example, with the software of calendar view managing schedule, generally to show the date in the way of moon view, in date square
Middle record, display calendar information.
The shortcoming of above schedule management has:
1st, complete calendar information can not be shown in dat frame.
When the 2nd, creating schedule, the relevant window of calendar information typing, interface complicated, troublesome poeration, nothing more are repeatedly ejected
The workload of user is added in shape.
In the market there is also substantial amounts of task management software, these softwares mostly interface is complicated, also not with day
Interface cohesion is gone through, concept of time is obscured, and bandwagon effect is poor, poor user experience.
In this context, the present invention provides a kind of raising bandwagon effect, task management system and method based on calendar.
The content of the invention
The technical assignment of the present invention is that there is provided a kind of task management system and method based on calendar for above weak point.
A kind of task management system based on calendar, including the calendaring module and task list module that can be displayed side by side, its
In,
Calendaring module is used to show date, and the date includes year, month, day information, also records the date at day information and has needed
Into task quantity, and locating and displaying current date;
Task list module, typing, modification or deletion mission bit stream simultaneously show that the mission bit stream is calendar by the form of list
The information of task completed is needed in the date shown in module.
The calendaring module is showed date in the way of calendar month view, and shows that it is corresponding simultaneously in the date of display
What day, solar calendar, lunar calendar, festivals or holidays, the twenty-four solar terms.
In calendaring module, auxiliary unit is also configured with, the auxiliary unit is shown simultaneously with calendaring module, in auxiliary unit
It is middle that micro- application entrance is provided, micro- application here for auxiliary completion task application program, the application program include it is micro- chat, it is micro-
Postal, micro- disk, micro- know.
The moon where a day period switching module, initial default state, calendar display system date is configured with the calendaring module
Part, i.e. of that month date, day period switching module hide, when the date of calendar is switched to its of place month system data by user
During its month, day period switching module show, when user selects this day period switching module, day period switching module will be switched on the date
Month where system data, and choose system current date.
Being recorded in the task list module for task is divided into same day task and the class of across day task two according to the time, and the same day appoints
Between at the beginning of business with the end time within the same day, across day task Start Date and the Close Date time span extremely
It is one day, i.e., 24 hour less.
In task list block with tabular form show for the mission bit stream that is associated with current date, i.e. task starts
Time is less than or equal to system current date and job end time is more than or equal to the task list of system current date.
In the task list module, following editable unit is configured with:
Same day TU task unit, edit in the form of a list and show task time on the same day, it is corresponding with task time on the same day ought
Its task names;
Across day TU task unit, edit in the form of a list and show across day task time, it is corresponding with across day task time across
Its task names;
The editor includes typing, modification and deletion action.
Search module is also configured with the task list module, the search module provides task search frame, when user exists
In task search frame during incoming task name keyword, the search module is in recorded corresponding mission bit stream of all dates
Middle search inter-related task, shows corresponding task information and the corresponding date and time information of task after the completion of search.
A kind of task management method based on calendar, based on above-mentioned task management system, its implementation process is:Pass through calendar first
Module shows current date information, then by the typing of task list module, change or delete the date corresponding mission bit stream
And show in the form of a list, the mission bit stream that the date and time information that the calendaring module is shown is shown with task list module is side by side
Display.
The information shown in the task list module includes same day task and the class of across day mission bit stream two, same day task letter
Breath refer at the beginning of task between with the end time within current date, across day task refers to the time span of task at least
It is less than or equal to current date for one day and time started and job end time is more than or equal to system current date.
The present invention a kind of task management system and method based on calendar compared to the prior art, with following beneficial effect
Really:
A kind of task management system and method based on calendar of the present invention, by the combination of calendar information and mission bit stream, makes
User can have a guide look of all tasks related to choosing the date while calendar is checked, conveniently check task relevant information;Make
User avoids ejecting various input frames when inputting information, and simplifying interface, convenient operation brings ultimate attainment use body to user
Test;Date of the invention by selecting calendar interface, the beginning of incoming task and Close Date, it is to avoid ejection date choice box,
It is practical, it is applied widely, with good application value.
Brief description of the drawings
Accompanying drawing 1 is the embodiment schematic diagram of calendaring module.
Accompanying drawing 2 is the instantiation schematic diagram of calendaring module.
Accompanying drawing 3 is the example schematic of task list module.
Accompanying drawing 4 is the instantiation schematic diagram of task list module.
Accompanying drawing 5 is the part-structure schematic diagram of task list module.
Accompanying drawing 6 is calendaring module and the common display schematic diagram of task list module.
Accompanying drawing 7 be task list module in enter row headers editor's schematic diagram.
Accompanying drawing 8 be task list module in carry out across day task title editor's schematic diagram.
Accompanying drawing 9 is progress task time on same day editor schematic diagram in task list module.
Accompanying drawing 10 is the view of show tools bar in task list module.
Accompanying drawing 11 is the schematic diagram after same day task blank line increase in task list module.
Accompanying drawing 12 is search module interface schematic diagram in task list module.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the invention will be further described.
The present invention proposes a set of brand-new software configuration and man-machine interaction method, and it is horizontally-parallel with task list by calendar
Displaying side by side, can have a guide look of related all tasks to choosing the date, when task names input, task while calendar is observed
Between input and all do not need other pop-up window, software interface is brief, simple to operate, it is natural and tripping to input, and possesses ultimate attainment user
Experience.
A kind of task management system based on calendar, including the calendaring module and task list module that can be displayed side by side, its
In,
Calendaring module is used to show date, and the date includes year, month, day information, also records the date at day information and has needed
Into task quantity, and locating and displaying current date;
Task list module, typing, modification or deletion mission bit stream simultaneously show that the mission bit stream is calendar by the form of list
The information of task completed is needed in the date shown in module.
The calendaring module is showed date in the way of calendar month view, and shows that it is corresponding simultaneously in the date of display
What day, solar calendar, lunar calendar, festivals or holidays, the twenty-four solar terms.
In calendaring module, auxiliary unit is also configured with, the auxiliary unit is shown simultaneously with calendaring module, in auxiliary unit
It is middle that micro- application entrance is provided, micro- application here for auxiliary completion task application program, the application program include it is micro- chat, it is micro-
Postal, micro- disk, micro- know.
The moon where a day period switching module, initial default state, calendar display system date is configured with the calendaring module
Part, i.e. of that month date, day period switching module hide, when the date of calendar is switched to its of place month system data by user
During its month, day period switching module show, when user selects this day period switching module, day period switching module will be switched on the date
Month where system data, and choose system current date.
Being recorded in the task list module for task is divided into same day task and the class of across day task two according to the time, and the same day appoints
Between at the beginning of business with the end time within the same day, across day task Start Date and the Close Date time span extremely
It is one day, i.e., 24 hour less.
In task list block with tabular form show for the mission bit stream that is associated with current date, i.e. task starts
Time is less than or equal to system current date and job end time is more than or equal to the task list of system current date.
In the task list module, following editable unit is configured with:
Same day TU task unit, edit in the form of a list and show task time on the same day, it is corresponding with task time on the same day ought
Its task names;
Across day TU task unit, edit in the form of a list and show across day task time, it is corresponding with across day task time across
Its task names;
The editor includes typing, modification and deletion action.
Search module is also configured with the task list module, the search module provides task search frame, when user exists
In task search frame during incoming task name keyword, the search module is in recorded corresponding mission bit stream of all dates
Middle search inter-related task, shows corresponding task information and the corresponding date and time information of task after the completion of search.
The modular structure being related in the present invention is shown below by the form of software interface, wherein:Calendaring module is
For following calendar interfaces, task list module is following task list interfaces, day as following " the present " projects of period switching module,
Calendar interface layout for upper, middle and lower longitudinal direction layout, be followed successively by from the top down head header area, middle part calendar field, bottom should
With the part of inlet region three, such as Fig. 1.
The head header area of calendar interface includes product LOGO, year, the moon, the present, four projects.Calendar field in the middle part of calendar interface
Be divided into header area and content regions two parts, header area is calendar header area, be one respectively, two, three, four, five, six, day these
Word figure, it is what day to represent the Liege phase;Content regions are date of one month, including solar calendar, lunar calendar, festivals or holidays, 20
The content of four solar term, task message number, totally five aspects.Calendar interface layout bottom includes using the application message of inlet region
Application icon, Apply Names two parts content.Calendar interface detailed placement, such as Fig. 2.
On the one hand the product LOGO of calendar interface is the mark of product, while being also the switching switch of the overall font of product.
Under default situations, the overall font of product is small font, and product LOGO is clicked on using mouse, and product entirety variant font is big,
Product is adjusted to big font state;Reuse mouse and click on product LOGO, product entirety font diminishes, product is adjusted
The whole small font state to acquiescence.
" year " that user can click on calendar interface by mouse either " moon " project or passes through scroll-up/down mouse
The date of calendar field in the middle part of roller, switching calendar interface.The date of calendar field and calendar interface head in the middle part of calendar interface
The date that " year ", " moon " project are represented is always consistent.
" the present " project on calendar interface head is the shortcut of date switching.Initial default state, calendar display system
Month where date(It is i.e. of that month)Date, " the present " project on calendar interface head is not shown, when user cuts the date of calendar
Where changing to system data during other months in month, " the present " project on calendar interface head is shown.When user uses mouse point
When hitting " the present " project on calendar interface head, calendar will be switched to month where system data the date, and choose system current
Date.The date chosen is shown with the background color and font color different from other dates.
Task list interface is the longitudinal direction layout of upper, middle and lower, and task on the day of head header area, middle part is followed successively by from the top down
Area, across the day part of mission area three in bottom, such as Fig. 2.Wherein, mission area is divided into left and right two parts again on the day of middle part, is the same day respectively
Task time area and same day task names area;Across the day mission area in bottom is also classified into left and right two parts, is across the day task date respectively
Area and across day task names area, such as Fig. 3.
Task list interface head header area includes:Date, two projects of search button, wherein search button correspondence are searched for
Module.Task in task list interface(Including same day task and across day task)Enter edlin and display in rows.Just
Task has three blank lines on the day of beginning state, and area shows the morning, afternoon and evening respectively task time on the day of, represents respectively
Morning task, three regions of task in afternoon and evening task;Across day task has 11 blank lines, when across day task blank is exercised
During with finishing, system finally increases across day task blank line in list automatically.Separate by a dotted line between task row, same day task
Area is separated with across day mission area by solid line, and task time, area was separated with task header area by short vertical line.Task list interface
Detailed placement, such as Fig. 5.
A kind of task management method based on calendar, based on above-mentioned task management system, its implementation process is:Pass through calendar first
Module shows current date information, then by the typing of task list module, change or delete the date corresponding mission bit stream
And show in the form of a list, the mission bit stream that the date and time information that the calendaring module is shown is shown with task list module is side by side
Display.
The information shown in the task list module includes same day task and the class of across day mission bit stream two, same day task letter
Breath refer at the beginning of task between with the end time within current date, across day task refers to the time span of task at least
It is less than or equal to current date for one day and time started and job end time is more than or equal to system current date.
In the management method that the present invention is provided, the software interface mentioned with reference to above-described embodiment is given below specific
Manage process description:
User clicks on when choosing a certain date of calendar field in the middle part of calendar interface, and being close to calendar interface on the right side of calendar interface shows
Task list interface, in task list interface head header area, shows the date currently chosen, the same day times in the middle part of task list
Business area lists all same day tasks relevant with choosing the date, is listed in across the day mission area in task list bottom and chooses the date to have
All across the day tasks closed(That is, Start Date be less than or equal to choose date and Close Date be more than or equal to choose the date across
Its task), such as Fig. 6.
In task list interface, the task header area of blank line is clicked on, mouse flashes, into task title editing mode,
Task title is directly inputted by keyboard, when mouse leaves task header area, task creation success.Same day task title is inputted
Example such as Fig. 7.During across day task creation, system automatically enters the acquiescence date.Across day task default start date is that system is current
Date, the Close Date is question mark(Represent long-range mission).Across day task title input example such as Fig. 8.
In task list interface, task time on same day area, mouse flicker, into task time on same day editing mode are clicked on.
Between being directly inputted first by keyboard at the beginning of digital form " when " when, system is automatically replenished input colon(:)Symbol, connects
When using " dividing " between at the beginning of input through keyboard digital form, system is automatically replenished wave(~)Symbol;Then key is used
The end time of disk input digital form " when " when, system is automatically replenished input colon(:)Symbol, finally using input through keyboard
" dividing " of the end time of digital form, the task beginning and ending time on the same day inputs successfully.Task time on same day input example such as Fig. 9.
In task list interface, the Start Date for day task that blows away, Start Date and left side calendar circle across day task are put
The background flicker of Middle face calendar field is twice(It is changed into red from white, then white is changed into from red, circulation is twice), point out user
By clicking on Start Date of the calendar input in the middle part of the calendar interface of left side across day task.Equally, the end for day task that blows away is put
On the date, the background flicker of calendar field twice, points out user to pass through point in the middle part of the Close Date of day task and left side calendar interface
Close Date of the calendar input hit in the middle part of the calendar interface of left side across day task.User is by selecting in the middle part of the calendar interface of left side
Calendar inputs the Start Date and Close Date across day task.
In task list interface, mouse is moved on certain task, shows task tool bar, clicks on task tool bar most
The plus sige icon in left side, increase under the task line blank on the day of task, all task rows below blank line task
A line is moved down automatically.Task tool bar exemplary plot, such as Figure 10.Exemplary plot after task increase, such as Figure 11.
In task list interface, the search icon on head is clicked on, task search frame is shown, input is appointed in task search box
Business name keyword, may search for inter-related task, such as search box schematic diagram, Figure 12.
The present invention is by horizontally-parallel, arranged side by side against displaying by calendar interface and task list interface, in observation calendar
All tasks related to choosing the date can be had a guide look of simultaneously, and task names input, the input of date task time all need not be in addition
Pop-up window, software interface is brief, simple to operate, it is natural and tripping to input, and possesses ultimate attainment Consumer's Experience.
A kind of task management system and method based on calendar provided by the present invention are described in detail above.This
Apply specific case in text to be set forth the principle and embodiment of the present invention, the explanation of above example is only intended to
Help to understand method and its core concept of the invention.It should be pointed out that for those skilled in the art,
Without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these are improved and modification also falls
Enter in the protection domain of the claims in the present invention.
Claims (10)
1. a kind of task management system based on calendar, it is characterised in that arranged including the calendaring module that can be displayed side by side and task
Table module, wherein,
Calendaring module is used to show date, and the date includes year, month, day information, also records the date at day information and has needed
Into task quantity, and locating and displaying current date;
Task list module, typing, modification or deletion mission bit stream simultaneously show that the mission bit stream is calendar by the form of list
The information of task completed is needed in the date shown in module.
2. a kind of task management system based on calendar according to claim 1, it is characterised in that the calendaring module with
The mode of calendar month view shows date, and shows its corresponding what day, solar calendar, lunar calendar, section simultaneously in the date of display
Holiday, the twenty-four solar terms.
3. a kind of task management system based on calendar according to claim 1, it is characterised in that in calendaring module,
Auxiliary unit is also configured with, the auxiliary unit is shown simultaneously with calendaring module, micro- application entrance is provided in auxiliary unit, here
Micro- application be the application program of auxiliary completion task, the application program includes micro- chatting, micro- postal, micro- disk, micro- knowing.
4. a kind of task management system based on calendar according to claim 1, it is characterised in that in the calendaring module
Month where a day period switching module, initial default state, calendar display system date, i.e. of that month date are configured with, the date cuts
Block is changed the mold to hide, when the date of calendar is switched to other months in month where system data by user, day period switching module
It has been shown that, when user selects this day period switching module, day period switching module will be switched to month where system data the date, and
Choose system current date.
5. a kind of task management system based on calendar according to claim 1, it is characterised in that the task list mould
Being recorded in block for task according to the time be divided at the beginning of the same day task and class of across day task two, same day task between and the end time
Within on the same day, it is at least one day, i.e., 24 hour across the Start Date of day task and the time span of Close Date.
6. a kind of task management system based on calendar according to claim 5, it is characterised in that in task list block
In with tabular form show for the mission bit stream that is associated with current date, i.e. job start time works as the day before yesterday less than or equal to system
Phase and job end time are more than or equal to the task list of system current date.
7. a kind of task management system based on calendar according to claim 5 or 6, it is characterised in that the task row
In table module, following editable unit is configured with:
Same day TU task unit, edit in the form of a list and show task time on the same day, it is corresponding with task time on the same day ought
Its task names;
Across day TU task unit, edit in the form of a list and show across day task time, it is corresponding with across day task time across
Its task names;
The editor includes typing, modification and deletion action.
8. a kind of task management system based on calendar according to claim 7, it is characterised in that the task list mould
Search module is also configured with block, the search module provide task search frame, when user in task search box incoming task name
When claiming keyword, the search module searches for inter-related task in recorded corresponding mission bit stream of all dates, has searched for
Into rear display corresponding task information and the corresponding date and time information of task.
9. a kind of task management method based on calendar, it is characterised in that based on above-mentioned task management system, its implementation process
For:Current date information is shown by calendaring module first, then by the typing of task list module, change or delete the date
Corresponding mission bit stream simultaneously shows that the date and time information that the calendaring module is shown is shown with task list module in the form of a list
Mission bit stream be displayed side by side.
10. a kind of task management method based on calendar according to claim 9, it is characterised in that the task list
The information shown in module includes same day task and the class of across day mission bit stream two, between same day mission bit stream refers at the beginning of task
With the end time within current date, across day task refers to that the time span of task is at least one day and the time started is less than
It is more than or equal to system current date equal to current date and job end time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710532624.1A CN107248066A (en) | 2017-07-03 | 2017-07-03 | Calendar-based task management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710532624.1A CN107248066A (en) | 2017-07-03 | 2017-07-03 | Calendar-based task management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107248066A true CN107248066A (en) | 2017-10-13 |
Family
ID=60014861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710532624.1A Pending CN107248066A (en) | 2017-07-03 | 2017-07-03 | Calendar-based task management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107248066A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108121609A (en) * | 2017-12-06 | 2018-06-05 | 珠海市魅族科技有限公司 | The processing method and electronic equipment of a kind of Pending tasks |
CN108536356A (en) * | 2018-04-18 | 2018-09-14 | 平安科技(深圳)有限公司 | Seating stand processing method, device and computer readable storage medium |
CN109542007A (en) * | 2018-11-28 | 2019-03-29 | 河北旗馨节能环保科技有限公司 | Double mode time-controlling arrangement and duration control method |
CN110389808A (en) * | 2019-07-26 | 2019-10-29 | 上海宝尊电子商务有限公司 | Full-expasion date picker applied to quick-view object designs |
CN110472940A (en) * | 2019-08-12 | 2019-11-19 | Oppo(重庆)智能科技有限公司 | Schedule information updates treating method and apparatus, terminal, storage medium |
CN110659918A (en) * | 2018-06-28 | 2020-01-07 | 上海传漾广告有限公司 | Optimization method for tracking and analyzing network advertisements |
CN111026472A (en) * | 2019-10-28 | 2020-04-17 | 珠海格力电器股份有限公司 | Calendar configuration and date selection method and device, storage medium and electronic equipment |
CN111182154A (en) * | 2020-01-03 | 2020-05-19 | 北京小米移动软件有限公司 | Schedule processing method, device and system |
CN111292059A (en) * | 2020-01-22 | 2020-06-16 | 深圳市道旅旅游科技股份有限公司 | Date selection method and device, computer equipment and storage medium |
CN111798071A (en) * | 2019-04-07 | 2020-10-20 | 南京杰咖斯信息技术有限公司 | Task management method and system |
CN112311562A (en) * | 2020-10-29 | 2021-02-02 | 平安科技(深圳)有限公司 | Request response method and device, computer equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102685316A (en) * | 2011-12-16 | 2012-09-19 | 中兴通讯股份有限公司 | Information processing method and information processing terminal which are based on calendar mode |
CN105912392A (en) * | 2016-04-11 | 2016-08-31 | 广东欧珀移动通信有限公司 | Method, device and mobile terminal for calendar reminding |
CN105959487A (en) * | 2016-06-27 | 2016-09-21 | 乐视控股(北京)有限公司 | Establishing method and device for to-be-handled task in calendar application |
CN106056362A (en) * | 2016-06-21 | 2016-10-26 | 浪潮软件集团有限公司 | Cooperative office APP task management method |
CN106250992A (en) * | 2016-08-03 | 2016-12-21 | 乐视控股(北京)有限公司 | Task processing method in a kind of mobile electronic device and device |
-
2017
- 2017-07-03 CN CN201710532624.1A patent/CN107248066A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102685316A (en) * | 2011-12-16 | 2012-09-19 | 中兴通讯股份有限公司 | Information processing method and information processing terminal which are based on calendar mode |
CN105912392A (en) * | 2016-04-11 | 2016-08-31 | 广东欧珀移动通信有限公司 | Method, device and mobile terminal for calendar reminding |
CN106056362A (en) * | 2016-06-21 | 2016-10-26 | 浪潮软件集团有限公司 | Cooperative office APP task management method |
CN105959487A (en) * | 2016-06-27 | 2016-09-21 | 乐视控股(北京)有限公司 | Establishing method and device for to-be-handled task in calendar application |
CN106250992A (en) * | 2016-08-03 | 2016-12-21 | 乐视控股(北京)有限公司 | Task processing method in a kind of mobile electronic device and device |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108121609A (en) * | 2017-12-06 | 2018-06-05 | 珠海市魅族科技有限公司 | The processing method and electronic equipment of a kind of Pending tasks |
WO2019200759A1 (en) * | 2018-04-18 | 2019-10-24 | 平安科技(深圳)有限公司 | Agent information processing method and device, and computer readable storage medium |
CN108536356A (en) * | 2018-04-18 | 2018-09-14 | 平安科技(深圳)有限公司 | Seating stand processing method, device and computer readable storage medium |
CN110659918A (en) * | 2018-06-28 | 2020-01-07 | 上海传漾广告有限公司 | Optimization method for tracking and analyzing network advertisements |
CN109542007A (en) * | 2018-11-28 | 2019-03-29 | 河北旗馨节能环保科技有限公司 | Double mode time-controlling arrangement and duration control method |
CN111798071A (en) * | 2019-04-07 | 2020-10-20 | 南京杰咖斯信息技术有限公司 | Task management method and system |
CN110389808A (en) * | 2019-07-26 | 2019-10-29 | 上海宝尊电子商务有限公司 | Full-expasion date picker applied to quick-view object designs |
CN110472940A (en) * | 2019-08-12 | 2019-11-19 | Oppo(重庆)智能科技有限公司 | Schedule information updates treating method and apparatus, terminal, storage medium |
CN111026472A (en) * | 2019-10-28 | 2020-04-17 | 珠海格力电器股份有限公司 | Calendar configuration and date selection method and device, storage medium and electronic equipment |
CN111182154A (en) * | 2020-01-03 | 2020-05-19 | 北京小米移动软件有限公司 | Schedule processing method, device and system |
CN111182154B (en) * | 2020-01-03 | 2022-02-08 | 北京小米移动软件有限公司 | Schedule processing method, device and system |
CN111292059A (en) * | 2020-01-22 | 2020-06-16 | 深圳市道旅旅游科技股份有限公司 | Date selection method and device, computer equipment and storage medium |
CN111292059B (en) * | 2020-01-22 | 2020-11-27 | 深圳市道旅旅游科技股份有限公司 | Date selection method and device, computer equipment and storage medium |
CN112311562A (en) * | 2020-10-29 | 2021-02-02 | 平安科技(深圳)有限公司 | Request response method and device, computer equipment and storage medium |
CN112311562B (en) * | 2020-10-29 | 2023-02-28 | 平安科技(深圳)有限公司 | Request response method, device, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107248066A (en) | Calendar-based task management system and method | |
US6626959B1 (en) | Automatic formatting of pivot table reports within a spreadsheet | |
US5749083A (en) | Document processing system | |
US7458031B2 (en) | System and method for creating customizable nodes in a network diagram | |
AU2005203409B2 (en) | An improved user interface for displaying selectable software functionality controls that are contextually relevant to a selected object | |
AU2006235850B2 (en) | Reviewing editing operations | |
US6256651B1 (en) | Time management workflow software | |
US5664182A (en) | Persistent storage of report objects | |
US20030229848A1 (en) | Table filtering in a computer user interface | |
US7287233B2 (en) | Minimization function for a computer user interface | |
US20120047434A1 (en) | Method to preview an undo/redo list | |
US7260772B2 (en) | System and method for creating a pert chart | |
JPH09106336A (en) | Method for displaying plural display images within display window of information processor | |
JP2001092825A (en) | Device and method for processing information | |
EP1194872A1 (en) | A content management computer system for managing publishing content objects | |
CN100530172C (en) | Electronic document display device and method | |
US7716578B2 (en) | Display method, computer program product and computer system | |
WO2004102365A2 (en) | Displaying view sets of an object for data input | |
CN106156352A (en) | Visual content management method and system | |
US20030050967A1 (en) | Apparatus and method for optimal selection of IP modules for design integration | |
DE602004003140T2 (en) | SYSTEM AND METHODS IN A DATA TABLE FOR MANAGING DELETE OPERATIONS IN RECYCLABLE SCALABLE TEMPERATURE INSTRUMENTS | |
Cisco | Configuring Multiple Records at a Time | |
Cisco | Configuring Multiple Records at a Time | |
Cisco | Configuring Multiple Records at a Time | |
EP0483040A2 (en) | Method for displaying multiple entry data fields on a video screen in an object oriented software program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171013 |
|
RJ01 | Rejection of invention patent application after publication |