CN107248048A - A kind of Domestic two finishing flow system and its application process - Google Patents

A kind of Domestic two finishing flow system and its application process Download PDF

Info

Publication number
CN107248048A
CN107248048A CN201710653002.4A CN201710653002A CN107248048A CN 107248048 A CN107248048 A CN 107248048A CN 201710653002 A CN201710653002 A CN 201710653002A CN 107248048 A CN107248048 A CN 107248048A
Authority
CN
China
Prior art keywords
module
design
construction
domestic
mobile terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710653002.4A
Other languages
Chinese (zh)
Inventor
吴华峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710653002.4A priority Critical patent/CN107248048A/en
Publication of CN107248048A publication Critical patent/CN107248048A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Flow system is fitted up the invention discloses a kind of Domestic two, including main management system, the main management system is made up of communication module, design module, construction module and administration module, and two-way signaling is connected successively between the communication module, design module, construction module and administration module.The finishing flow system participant, which is disclosed, browses project progress and information change, and participant is supervision side;Coordination slitless connection between each participant, project progress is linked up in time, and quality is secure.

Description

A kind of Domestic two finishing flow system and its application process
Technical field
The invention belongs to house decoration technical field, and in particular to a kind of Domestic two fits up flow system, and the present invention is same When also relate to the application process that a kind of Domestic two fits up flow.
Background technology
With the improvement of people's living standards, the popular requirement more and more higher to family's living environment, house decoration market Flourish therewith.Due to the complexity and the otherness of finishing peopleware of fitment process, decoration quality and expense are difficult to Control.First, entry threshold is low inside traditional decoration marked, and many people are just already engaged in house ornamentation design even without the independent shop front and applied During work, do not have the process of consumption of guarantee to owner;2nd, workmen distinguishes without specialty, and finishing master worker designer works as simultaneously, There is no standard;3rd, design effect direction is unique, it is impossible to scruple all positions;Finishing material does not know wherefrom purchase or price It is strange high;4th, construction drawing arbitrarily, march into the arena construction, causes many X factors to raise the price temporarily, owner by imperfect construction drawing Dislike is big;5th, the engineering time, which there is not in the minds of standard, owner, does not have budget to allocate the time buying of the soft dress of furniture;6th, encounter problems Link up you and push away me and push away, owner is wasted every time and is docked in many ways the most of the time, and result is generally dissatisfied;7th, material is transported It is defeated uncoordinated with construction speed, cause job site chaotic, multi-party operation danger simultaneously is well imagined.Therefore, we have proposed A kind of new decoration method and new finishing regulatory format.
The content of the invention
It is an object of the invention to provide a kind of Domestic two finishing flow system and its application process, to solve the above-mentioned back of the body The problem of being proposed in scape technology.
To achieve the above object, the present invention provides following technical scheme:A kind of Domestic two fits up flow system, including master Management system, the main management system is made up of communication module, design module, construction module and administration module, the communication mould Two-way signaling is connected successively between block, design module, construction module and administration module.
Further, the communication module includes mobile phone office mobile terminal or computer office mobile terminal.
Further, the design module includes VR experience ends and mobile office end, and the mobile office end is that mobile phone is moved Moved end or computer office mobile terminal.
Further, the construction module and administration module include mobile phone office mobile terminal and monitoring device terminal, described Monitoring device terminal is monitoring camera.
Present invention also offers the application process that a kind of Domestic two fits up flow, comprise the following steps:
S1, Communication with Customer:Using mobile phone office mobile terminal in terms of client tracking communication, increase in time needs assistance personnel to help With docking, client tracking information record type mode and speech pattern records and deposited and multiple spot is sent to immediately while tracking assistance Side;
S2, conceptual design:After the completion of S1, the design of decorating scheme is carried out, designs after decorating scheme, is provided for client 720 degree are fitted up design sketch without dead angle, and panoramic effect experience, 1 are carried out at VR experience end:The effect of 1 reduction house structure finishing;
S3, construction supervision:After the completion of S2, and client is contracted, since signing contract, and system is set up multi-party while online Project under construction, and multi-party information is wirelessly transferred with mobile phone office mobile terminal, engineering arranges process and engineering time automatically, if meeting Factor or national festivals or holidays can not be resisted, system will adjust each side's working time and delivery information, and work progress information is remembered for a long time Record is online, so that owner is checked at any time.
Further, in S1, S2 and S3, while fitting-out work communication is carried out with client, owner, design, material Supplier, construction party are merged online simultaneously, and zero distance is seamless, and mobile phone office mobile terminal information delivery is linked up, design effect, material Both pictures and texts are excellent plus tone information for pattern, construction speed and technique, is permanently kept in line, repeats to check and listen at any time in many ways, right Conceptual design, the collocation of soft dress, finishing material purchase, construction auxiliary material step and construction supervision carry out multiple spot slitless connection.
The technique effect and advantage of the present invention:The finishing flow system participant, which is disclosed, browses project progress and information change Change, participant is supervision side;Coordination slitless connection between each participant, project progress is linked up in time, and quality is secure.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Flow system, including main management system, the master are fitted up the invention provides a kind of Domestic two as shown in Figure 1 Management system is made up of communication module, design module, construction module and administration module, the communication module, design module, construction Two-way signaling is connected successively between module and administration module, and the communication module includes mobile phone office mobile terminal or computer office Mobile terminal, the design module includes VR and experiences end and mobile office end, and the mobile office end is mobile phone mobile terminal or electricity Brain office mobile terminal, the construction module and administration module include mobile phone office mobile terminal and monitoring device terminal, the monitoring Device end is monitoring camera, and participant, which is disclosed, browses project progress and information change, and participant is supervision side;Each Coordination slitless connection between participant, project progress is linked up timely, and quality is secure, client be able to can look at project progress and The information change of finishing.
Present invention also offers the application process that a kind of Domestic two fits up flow, comprise the following steps:
S1, Communication with Customer:Using mobile phone office mobile terminal in terms of client tracking communication, increase in time needs assistance personnel to help With docking, client tracking information record type mode and speech pattern records and deposited and multiple spot is sent to immediately while tracking assistance Side;
S2, conceptual design:After the completion of S1, the design of decorating scheme is carried out, designs after decorating scheme, is provided for client 720 degree are fitted up design sketch without dead angle, and panoramic effect experience, 1 are carried out at VR experience end:The effect of 1 reduction house structure finishing;
S3, construction supervision:After the completion of S2, and client is contracted, since signing contract, and system is set up multi-party while online Project under construction, and multi-party information is wirelessly transferred with mobile phone office mobile terminal, engineering arranges process and engineering time automatically, if meeting Factor or national festivals or holidays can not be resisted, system will adjust each side's working time and delivery information, and work progress information is remembered for a long time Record is online, so that owner is checked at any time.
Specifically, in S1, S2 and S3, while fitting-out work communication is carried out with client, owner, design, material are supplied Business, construction party are answered while merge online, zero distance is seamless mobile phone office mobile terminal information delivery communication, design effect, material sample Both pictures and texts are excellent plus tone information for formula, construction speed and technique, is permanently kept in line, repeats to check and listen at any time in many ways, other side Case design, soft dress collocation, finishing material purchase, construction auxiliary material step and construction supervision carry out multiple spot slitless connection.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic, Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., should be included in the present invention's Within protection domain.

Claims (6)

1. a kind of Domestic two fits up flow system, including main management system, it is characterised in that the main management system is by linking up Module, design module, construction module and administration module composition, the communication module, design module, construction module and administration module Between successively two-way signaling connect.
2. a kind of Domestic two finishing flow system according to claim 1, it is characterised in that:The communication module includes Mobile phone office mobile terminal or computer office mobile terminal.
3. a kind of Domestic two finishing flow system according to claim 1, it is characterised in that:The design module includes VR experiences end and mobile office end, and the mobile office end is mobile phone mobile terminal or computer office mobile terminal.
4. a kind of Domestic two finishing flow system according to claim 1, it is characterised in that:The construction module and prison Tube module includes mobile phone office mobile terminal and monitoring device terminal, and the monitoring device terminal is monitoring camera.
5. the Domestic two described in a kind of claim 1 fits up the application process of flow, it is characterised in that comprise the following steps:
S1, Communication with Customer:Using mobile phone office mobile terminal in terms of client tracking communication, increase in time needs assistance personnel to help With docking, client tracking information record type mode and speech pattern records and deposited and multiple spot is sent to immediately while tracking assistance Side;
S2, conceptual design:After the completion of S1, the design of decorating scheme is carried out, designs after decorating scheme, is provided for client 720 degree are fitted up design sketch without dead angle, and panoramic effect experience, 1 are carried out at VR experience end:The effect of 1 reduction house structure finishing;
S3, construction supervision:After the completion of S2, and client is contracted, since signing contract, and system is set up multi-party while online Project under construction, and multi-party information is wirelessly transferred with mobile phone office mobile terminal, engineering arranges process and engineering time automatically, if meeting Factor or national festivals or holidays can not be resisted, system will adjust each side's working time and delivery information, and work progress information is remembered for a long time Record is online, so that owner is checked at any time.
6. a kind of Domestic two according to claim 5 fits up the application process of flow, it is characterised in that:In S1, S2 and In S3, while fitting-out work communication is carried out with client, owner, design, material supplier, construction party merge online simultaneously, Zero distance is seamless, and mobile phone office mobile terminal information delivery is linked up, and both pictures and texts are excellent for design effect, material pattern, construction speed and technique Plus tone information, line is permanently kept in, repeats to check and listen at any time in many ways, conceptual design, the collocation of soft dress, finishing material are purchased Buy, auxiliary material step of constructing and construction supervision carry out multiple spot slitless connection.
CN201710653002.4A 2017-08-02 2017-08-02 A kind of Domestic two finishing flow system and its application process Pending CN107248048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710653002.4A CN107248048A (en) 2017-08-02 2017-08-02 A kind of Domestic two finishing flow system and its application process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710653002.4A CN107248048A (en) 2017-08-02 2017-08-02 A kind of Domestic two finishing flow system and its application process

Publications (1)

Publication Number Publication Date
CN107248048A true CN107248048A (en) 2017-10-13

Family

ID=60012167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710653002.4A Pending CN107248048A (en) 2017-08-02 2017-08-02 A kind of Domestic two finishing flow system and its application process

Country Status (1)

Country Link
CN (1) CN107248048A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108389138A (en) * 2018-02-11 2018-08-10 上海乐装网络科技有限公司 A kind of finishing platform based on VR technologies
CN109118405A (en) * 2018-07-12 2019-01-01 深圳市建筑设计研究总院有限公司 Speed selects platform and method on a kind of public health space industrialization line
CN109146224A (en) * 2018-06-14 2019-01-04 广东易凌科技股份有限公司 Program of real estate enterprise fully-decorated residence integrated management system under Partnering mode

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090024628A1 (en) * 2007-07-11 2009-01-22 United States Gypsum Company Home management, maintenance, repair, remodeling and redecoration system and method
CN103324995A (en) * 2012-03-20 2013-09-25 常州市家福美装饰工程有限公司 Operating method applied to indoor decoration design and construction
CN105160534A (en) * 2015-08-19 2015-12-16 河南鑫山信息科技有限公司 Home decoration network platform system and use method
CN106408187A (en) * 2016-09-13 2017-02-15 安徽广行物联科技有限公司 Transparent regulation system for interior decoration design and construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090024628A1 (en) * 2007-07-11 2009-01-22 United States Gypsum Company Home management, maintenance, repair, remodeling and redecoration system and method
CN103324995A (en) * 2012-03-20 2013-09-25 常州市家福美装饰工程有限公司 Operating method applied to indoor decoration design and construction
CN105160534A (en) * 2015-08-19 2015-12-16 河南鑫山信息科技有限公司 Home decoration network platform system and use method
CN106408187A (en) * 2016-09-13 2017-02-15 安徽广行物联科技有限公司 Transparent regulation system for interior decoration design and construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108389138A (en) * 2018-02-11 2018-08-10 上海乐装网络科技有限公司 A kind of finishing platform based on VR technologies
CN109146224A (en) * 2018-06-14 2019-01-04 广东易凌科技股份有限公司 Program of real estate enterprise fully-decorated residence integrated management system under Partnering mode
CN109118405A (en) * 2018-07-12 2019-01-01 深圳市建筑设计研究总院有限公司 Speed selects platform and method on a kind of public health space industrialization line

Similar Documents

Publication Publication Date Title
CN107248048A (en) A kind of Domestic two finishing flow system and its application process
CN104794609A (en) Instant communication system capable of supporting enterprise cooperative office
CN104599078A (en) Data stream processing method and system
CN103118114A (en) BIM (building information modeling) collaborative designing system based on cloud servers
CN107316233A (en) A kind of marketing channel shared platform system and method for running
CN106780752A (en) A kind of 3D families DIY finished systems and its application method based on internet
CN111563727A (en) Method and system for multi-person online collaborative editing of 3D house type data
CN206523671U (en) Camera lens module
CN103298143A (en) Method and system for achieving multi-party call and mobile terminal
CN107194112A (en) The method being laid out based on BIM to garden landscape
CN107679722A (en) Decoration construction intelligent monitoring management platform
WO2005081735A3 (en) Method and system for managing transactions in a remote network access system
CN105263068A (en) Virtual dial-up talkback application system, server system and management system
CN203554589U (en) Multi-party video conference communication system base on mobile terminals
CN202041990U (en) Personal loan transaction platform for bank
CN107231374A (en) Deaf person's remote chat method based on online sign language interpreter
CN103188386A (en) Mobile phone safe unlocking method based on mobile phone identification
CN109951303A (en) A kind of Web conference management system and its implementation
CN108133060A (en) A kind of method for precisely matching owner in line decoration
CN205612084U (en) International trade business negotiation table
CN203301527U (en) Cloud server-based building information modeling (BIM) collaborative design device
CN105046410B (en) A kind of communication system and its construction method of hotel in-group member
CN109003320A (en) A kind of cartoon design system Internet-based
CN101777160A (en) B/S (Brower/Server) based Flow for holding consultation and expressing mode
Forzati et al. Twenty years of open fibre network in stockholm: A socio-economic study

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171013