CN107246139A - A kind of hanging basket of architectural engineering work high above the ground - Google Patents

A kind of hanging basket of architectural engineering work high above the ground Download PDF

Info

Publication number
CN107246139A
CN107246139A CN201710119001.1A CN201710119001A CN107246139A CN 107246139 A CN107246139 A CN 107246139A CN 201710119001 A CN201710119001 A CN 201710119001A CN 107246139 A CN107246139 A CN 107246139A
Authority
CN
China
Prior art keywords
suspension platform
pair
steel wire
wire rope
backing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710119001.1A
Other languages
Chinese (zh)
Other versions
CN107246139B (en
Inventor
单士睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Xuchang Confucian Scientific And Technological Information Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang Confucian Scientific And Technological Information Consulting Co Ltd filed Critical Xuchang Confucian Scientific And Technological Information Consulting Co Ltd
Priority to CN201710119001.1A priority Critical patent/CN107246139B/en
Publication of CN107246139A publication Critical patent/CN107246139A/en
Application granted granted Critical
Publication of CN107246139B publication Critical patent/CN107246139B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

The invention discloses a kind of hanging basket of architectural engineering work high above the ground, the one side of suspension platform is provided with the extension extended on the outside of guardrail in its structure, the corresponding guardrail in extension is provided with the breach come in and gone out for workmen, and electric control box is fixed on the side rail of suspension platform, backing plate is provided with the top of suspension platform, the conductive contact on the power circuit of elevator is connected on provided with a pair ohm and one is located between this pair of conductive contact between backing plate and suspension platform, and this pair of conductive contact is separated and is the first helical spring of insulating materials;When adult's both feet are stepped down on the backing plate for the extension for closing on suspension platform, the first helical spring on foregoing a pair of screw threads lead is compressed and the corresponding a pair of conductive contact of each first helical spring is also attracted.The technical problem of " a kind of safety in utilization of the hanging basket of architectural engineering work high above the ground of lifting " is which solved, the work high above the ground risk of workmen can be effectively reduced.

Description

A kind of hanging basket of architectural engineering work high above the ground
Technical field
The present invention relates to a kind of building machinery of architectural engineering work high above the ground, particularly a kind of architectural engineering work high above the ground Hanging basket.
Background technology
Hanging basket is the building machinery of architectural engineering work high above the ground, acts on curtain wall installation, outside Wall Cleaning.Above-mentioned architectural engineering The hanging basket of work high above the ground, it is mainly made up of following part:
One suspension platform, the suspension platform is the work-yard of workmen, and he is pacified by height railing, basket bottom and elevator Four parts are shelved to be connected with combining;
One elevator, the elevator is the power part of suspension platform, and using electronic climbing type structure, elevator is by electromagnetism The driving of brake 3-phase asynchronous motor, driven after turbine and worm and a pair of The gear decelerations steel wire rope conveyer structure make elevator along Load cable moves up and down, so as to drive suspension platform to rise or decline;
One suspended structure, the hitch is to be set up in building top or portal frame, is suspended in midair by steel wire rope The device of platform;
And, an electric control box, the electric control box is the part for controlling suspension platform to move, main element peace On one piece of insulation board, omnipotent pole changer, power supply indicator, start button and emergency stop button device boxboard door-plate On.
Wherein, steel wire rope is in the hanging basket of above-mentioned architectural engineering work high above the ground of the prior art, its suspension framework It is fixed after simply passing through the mounting hole on suspension platform.Slightly inclining once occurs in suspension platform in above-mentioned suspended structure Tiltedly, rock, the length of cable in the mounting hole of suspension platform easily produces mechanical wear with the hole inwall of mounting hole, it is considered to It is metal material to both steel wire rope and suspension platform, therefore both mechanical wear amounts are big, can bury after a long time use Serious potential safety hazard down;Meanwhile, the hanging basket of above-mentioned architectural engineering work high above the ground is only with simple start button and promptly stops Machine button carry out start-up and shut-down control, serious potential safety hazard is equally existed during workmen's non-standard operation, for example when The only single leg of workmen is set foot on when just pressing start button after suspension platform, now because workmen reaction not in time, easily There is the situation that workmen falls from suspension platform.
The content of the invention
A kind of architectural engineering work high above the ground is provided the invention aims to solve above-mentioned the deficiencies in the prior art Hanging basket.
To achieve these goals, a kind of hanging basket of architectural engineering work high above the ground designed by the present invention, an including square The suspension platform of shape, one suspend suspension platform in midair by steel wire rope portal frame, one be located at portal frame on, pass through steel wire rope The electric-controlled switched to the elevator and the start and stop state of a control elevator that drive suspension platform to rise or decline Case processed, guardrail is provided with the periphery of the suspension platform, and the one side of the suspension platform is provided with the extension extended on the outside of guardrail Part, the corresponding guardrail in the extension is provided with the breach come in and gone out for workmen, and the electric control box is fixed To the side rail of suspension platform, it is provided with the top of the suspension platform parallel to the suspension platform, and the area of plane connects The backing plate of the suspension platform is bordering on, is equipped with four angles of the backing plate and extends vertically through the backing plate, and spun by screw thread One locking nut being located above the backing plate carries out spacing screw thread lead, and each screw thread lead all extends to described outstanding Hang on platform, and mutually fixed with it, is socketed on a pair of screw thread leads of the extension of the suspension platform wherein closing on There are a pair ohm of conductive contacts being connected on the power circuit of the elevator and one to be located between this pair of conductive contact, And this pair of conductive contact is separated and is the first helical spring of insulating materials, the conductive contact and the first helical spring It is respectively positioned on backing plate and suspension platform between the two, is covered on a pair of screw thread leads of the extension away from the suspension platform It is connected to second helical spring to strut backing plate and suspension platform;
It is general equivalent to applying one when adult's both feet are stepped down on the backing plate for the extension for closing on the suspension platform 50-100 ㎏ weight is on the backing plate of the side, and the first helical spring on foregoing a pair of screw threads lead is compressed and every The corresponding a pair of conductive contact of individual first helical spring is also attracted.
Above-mentioned middle material, the difference of each spring parameter because of the first helical spring, causes to be applied to and closes on suspension platform Extension backing plate on gravity it is also different.Adult's body weight in view of a normal body condition is generally kept in 50- 100 ㎏ or so, therefore the elasticity system of a pair of first helical springs of the extension of suspension platform need to will be only closed in the application Number carries out adaptability setting(By selecting the material of the first helical spring or each parameter of the first helical spring), just can be real In existing the application " when adult's both feet are stepped down on the backing plate for the extension for closing on the suspension platform, foregoing a pair of spiral shells The first helical spring on line lead is compressed and the corresponding a pair of conductive contact of each first helical spring is also homogeneous The technological means of adhesive ".The Mechanics Calculation content and method that are related to described in above-mentioned part are the public affairs of those skilled in the art Know general knowledge, therefore applicant the above is not described in detail again herein, and the content is nor the required guarantor of the application The technical scheme of shield.
The first helical spring in above-mentioned can be metallic framework, carry out ambroin progress again outside metallic framework encapsulated Processing.
The power circuit that a pair ohm are connected on elevator in a kind of hanging basket of above-mentioned architectural engineering work high above the ground, its structure On conductive contact be to be located at backing plate and suspension platform between the two, and be in separation by the drag effect of the first helical spring State, even if now the start button on electric control box is pressed, elevator will not still drive suspension platform to be lifted.From And so that the hanging basket of said structure is in architectural engineering work high above the ground, workmen only has double-legged step down in close on prolonging for suspension platform When on the backing plate of extending portion point, the first helical spring between a pair of conductive contact is because of the gravity being applied on backing plate(About 50-100 ㎏)Influence and shrink, keep a pair of conductive contact of released state to fit originally, the power circuit of elevator is led Logical, now workmen presses the start button on electric control box, and elevator is just started working, and then drives suspension platform to enter Row lifting.As can be seen here, the hanging basket of said structure is in architectural engineering work high above the ground, and it can be effectively prevented from " construction occur Personnel press start button after single leg sets foot on suspension platform, now because the reaction of workmen is not in time so as to cause constructor Member fallen from suspension platform " situation.
Further, steel wire rope mounting bracket is equipped with the both sides of above-mentioned suspension platform, a pair of steel wire rope mounting brackets are mutual Symmetrically, and in the respective side of each comfortable suspension platform it is centrally located, symmetrical two is equipped with each steel wire rope mounting bracket Individual bellmouth, and the top bore of bellmouth is less than bottom bore, one is equipped with each bellmouth is used to clog this The voussoir of bellmouth, a pair of above-mentioned steel wire rope mounting brackets correspond to two steel wire ropes of portal frame, each steel wire rope mounting bracket respectively Top aperture of one side end of two steel wire ropes of correspondence each from a bellmouth is penetrated, then is passed and consolidated from the top aperture Determine to respective steel wire rope main body, every steel wire rope forms a closed fake, each taper in corresponding bellmouth Voussoir in hole is respectively positioned in its corresponding closed fake, and is matched for clamping tightly the closed rope with the inner hole wall of corresponding bellmouth Circle.
The specific steel wire rope connection structure of portal frame and both suspension platforms is described in above-mentioned further technical scheme, Both hole inwalls of voussoir and bellmouth in above-mentioned steel wire rope connection structure in each bellmouth coordinate snare on voussoir Length of cable clamp so that when there is slight inclination, rocked in suspension platform, it is to avoid every steel wire rope is in steel wire rope mounting bracket On contact part and steel wire rope mounting bracket occur mechanical friction.
A kind of hanging basket for architectural engineering work high above the ground that the present invention is obtained, it is not in " constructor in specifically used Member presses start button after single leg sets foot on suspension platform, now because the reaction of workmen is not in time so as to cause workmen Fallen from suspension platform " situation, usage safety performance is higher;Meanwhile, steel wire rope and suspension platform in the barrel structure Both connective stabilities are good, and the mechanical wear amount of steel wire rope connecting portion can be controlled most to the full extent on suspension platform Small, the use fault rate of hanging basket is relatively low, and the replacement frequency of hanging basket part is equally relatively low, and the overall service life of hanging basket is long.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the hanging basket of architectural engineering work high above the ground in the present invention;
Fig. 2 is close-up schematic view at A in Fig. 1;
Fig. 3 is close-up schematic view at B in Fig. 1;
Fig. 4 is close-up schematic view at C in Fig. 1.
In figure:Suspension platform 1, extension 1-1, steel wire rope 2, portal frame 3, elevator 4, electric control box 5, guardrail 6, Breach 6-1, backing plate 7, locking nut 8, screw thread lead 9, conductive contact 10, the first helical spring 11, the second helical spring 12, Steel wire rope mounting bracket 13, bellmouth 13-1, voussoir 14.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As Figure 1-3, a kind of hanging basket of architectural engineering work high above the ground provided in the present embodiment, an including rectangle Suspension platform 1, one suspend suspension platform in midair by steel wire rope 2 portal frame 3, one be located at portal frame 3 on, pass through steel wire What rope 2 switched to drive the start and stop state of elevator 4 that suspension platform 1 rises or declines and a control elevator 4 Electric control box 5, guardrail 6 is provided with the periphery of the suspension platform 1, and the one side of the suspension platform 1, which is provided with, extends to guardrail 6 The extension 1-1 in outside, guardrail 6 corresponding the extension 1-1 is provided with the breach 6-1 come in and gone out for workmen, And the electric control box 5 is fixed on the side rail 6 of suspension platform 1, the top of the suspension platform 1 be provided with parallel to The suspension platform 1, and the area of plane is equipped with vertical close to the backing plate 7 of the suspension platform 1 on four angles of the backing plate 7 Directly run through the backing plate 7, and the locking nut 8 being located above the backing plate 7 that spun one by screw thread carries out spacing screw thread and is oriented to Post 9, each screw thread lead 9 is all extended on the suspension platform 1, and mutually fixed with it, wherein closing on the suspension platform 1 Extension 1-1 a pair of screw thread leads 9 on be socketed with a pair ohm and be connected on the power circuit of the elevator 4 Conductive contact 10 and one be located between this pair of conductive contact 10, and this pair of conductive contact 10 is separated and to insulate First helical spring 11 of material, the helical spring 11 of conductive contact 10 and first is respectively positioned on both backing plate 7 and suspension platform 1 Between, one is socketed with to strut pad on a pair of screw thread leads 9 of the extension 1-1 away from the suspension platform 1 Second helical spring 12 of plate 7 and suspension platform 1;
When adult's both feet are stepped down on the backing plate 7 for the extension 1-1 for closing on the suspension platform 1, equivalent to application one Individual general 50-100 ㎏ weight is on backing plate 7, and the first helical spring 11 on foregoing a pair of screw threads lead 9 is compressed And the corresponding a pair of conductive contact 10 of each first helical spring 11 is also attracted.
The power line that a pair ohm are connected on elevator 4 in a kind of hanging basket of above-mentioned architectural engineering work high above the ground, its structure Conductive contact 10 on road is to be located at backing plate 7 and suspension platform 1 between the two, and by the drag effect of the first helical spring 11 In released state, even if now the start button on electric control box 5 is pressed, elevator 4 will not still drive suspension platform 1 Lifted.So that the hanging basket of said structure is in architectural engineering work high above the ground, workmen only has both feet to step down in close on When on the extension 1-1 of suspension platform 1 backing plate 7, the first helical spring 11 between a pair of conductive contact 10 is because applying It is added in the gravity on backing plate 7(About 50-100 ㎏)Influence and shrink, keep a pair of conductive contact 10 of released state to be affixed originally Close, the power circuit conducting of elevator 4, now workmen presses the start button on electric control box 5, and elevator 4 is just opened Beginning work, and then drive suspension platform 1 to be lifted.As can be seen here, the hanging basket of said structure is in architectural engineering work high above the ground, It can be effectively prevented from appearance, and " workmen presses start button after single leg sets foot on suspension platform, now because of workmen Reaction not in time so as to causing workmen to be fallen from suspension platform " situation.
Further, as shown in figure 4, both specific steel wire ropes 2 of portal frame 3 described in the present embodiment and suspension platform 1 Attachment structure is as follows:Steel wire rope mounting bracket 13 is equipped with the both sides of the suspension platform 1, a pair of steel wire rope mounting brackets 13 are mutual Symmetrically, and in the respective side of each comfortable suspension platform 1 it is centrally located, is equipped with each steel wire rope mounting bracket 13 symmetrical Two bellmouth 13-1, and bellmouth 13-1 top bore is less than bottom bore, is equipped with each bellmouth 13-1 One voussoir 14 for clogging bellmouth 13-1, a pair of above-mentioned steel wire rope mounting brackets 13 correspond to two of portal frame 3 respectively Steel wire rope 2, a side end of two steel wire ropes 2 of each correspondence of steel wire rope mounting bracket 13 is each from bellmouth 13-1 top Aperture is penetrated, then is passed and be fixed in the respective main body of steel wire rope 2 from the top aperture, and every steel wire rope 2 is in corresponding cone The voussoir 14 formed in the 13-1 of shape hole in a closed fake, each bellmouth 13-1 is respectively positioned on its corresponding closed fake It is interior, and it is matched for clamping tightly the closed fake with corresponding bellmouth 13-1 inner hole wall.
Both voussoir 14 and bellmouth 13-1 hole inwalls in above-mentioned in each bellmouth 13-1 coordinate snare in wedge 2 sections of clampings of steel wire rope on block 14, so that when suspension platform 1 slight inclination occurs, rocked, it is to avoid every steel wire rope 2 is in steel With steel wire rope mounting bracket 13 mechanical friction occurs for the contact part on cord mounting bracket 13.
Specific embodiment described herein is only the design explanation for example to the present invention.Technology belonging to of the invention The technical staff in field can make various modifications or supplement to described specific embodiment or use similar mode Substitute, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.

Claims (2)

1. a kind of hanging basket of architectural engineering work high above the ground, includes the suspension platform of a rectangle, one is suspended in midair by steel wire rope The portal frame of suspension platform, one be located at portal frame on, by steel wire rope to drive suspension platform rise or decline carry The electric control box of the start and stop state switching of the machine of liter and a control elevator, shield is provided with the periphery of the suspension platform Column, it is characterized in that the one side of the suspension platform is provided with the extension extended on the outside of guardrail, the extension is corresponding Guardrail be provided with the breach come in and gone out for workmen, and the electric control box is fixed on the side rail of suspension platform, It is provided with the top of the suspension platform parallel to the suspension platform, and the area of plane is close to the backing plate of the suspension platform, Be equipped with four angles of the backing plate and extend vertically through the backing plate, and by screw thread spin one be located at the backing plate above locking Nut carries out spacing screw thread lead, and each screw thread lead is all extended on the suspension platform, and is mutually fixed with it, its In close on the suspension platform extension a pair of screw thread leads on be socketed with a pair ohm and be connected on the lifting Conductive contact on the power circuit of machine and one are located between this pair of conductive contact, and this pair of conductive contact is separated And be the first helical spring of insulating materials, the conductive contact and the first helical spring are respectively positioned on both backing plate and suspension platform Between, one is socketed with a pair of screw thread leads of the extension away from the suspension platform to strut backing plate with hanging Hang the second helical spring of platform;
When adult's both feet are stepped down on the backing plate for the extension for closing on the suspension platform, foregoing a pair of screw threads lead On the first helical spring compressed and the corresponding a pair of conductive contact of each first helical spring is also attracted.
2. the hanging basket of a kind of architectural engineering work high above the ground according to claim 1, it is characterized in that in above-mentioned suspension platform Both sides are equipped with steel wire rope mounting bracket, and a pair of steel wire rope mounting brackets symmetrically, and are occupied in the respective side of each comfortable suspension platform It is middle to set, two symmetrical bellmouths are equipped with each steel wire rope mounting bracket, and the top bore of bellmouth is less than Bottom bore, is equipped with a voussoir for being used to clog the bellmouth, a pair of above-mentioned steel wire rope mounting brackets in each bellmouth Two steel wire ropes of portal frame are corresponded to respectively, and a side end of two steel wire ropes of each steel wire rope mounting bracket correspondence is each from one The top aperture of bellmouth is penetrated, then is passed and be fixed in respective steel wire rope main body from the top aperture, and every steel wire rope is equal The voussoir formed in corresponding bellmouth in a closed fake, each bellmouth is respectively positioned on its corresponding closed fake It is interior, and it is matched for clamping tightly the closed fake with the inner hole wall of corresponding bellmouth.
CN201710119001.1A 2017-03-02 2017-03-02 A kind of hanging basket of architectural engineering high altitude operation Expired - Fee Related CN107246139B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710119001.1A CN107246139B (en) 2017-03-02 2017-03-02 A kind of hanging basket of architectural engineering high altitude operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710119001.1A CN107246139B (en) 2017-03-02 2017-03-02 A kind of hanging basket of architectural engineering high altitude operation

Publications (2)

Publication Number Publication Date
CN107246139A true CN107246139A (en) 2017-10-13
CN107246139B CN107246139B (en) 2019-06-07

Family

ID=60016476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710119001.1A Expired - Fee Related CN107246139B (en) 2017-03-02 2017-03-02 A kind of hanging basket of architectural engineering high altitude operation

Country Status (1)

Country Link
CN (1) CN107246139B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2328639Y (en) * 1998-04-15 1999-07-14 常德市建筑机械厂 Self height increased and super heavy protective gantry crane
CN101672102A (en) * 2009-10-19 2010-03-17 中铁建设集团有限公司 Steel structural overhead ceiling construction platform
CN203158967U (en) * 2013-03-18 2013-08-28 玉锋实业集团有限公司 Elevator safety protection device
CN104140027A (en) * 2014-07-27 2014-11-12 温建 Two-dimensional work suspension basket
US20150144424A1 (en) * 2005-11-04 2015-05-28 Sky Climber, Llc Suspension work platform hoist system with communication and diagnostic system
GB2538221A (en) * 2015-03-02 2016-11-16 Global Energy Group (Access & Coatings) Ltd Platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2328639Y (en) * 1998-04-15 1999-07-14 常德市建筑机械厂 Self height increased and super heavy protective gantry crane
US20150144424A1 (en) * 2005-11-04 2015-05-28 Sky Climber, Llc Suspension work platform hoist system with communication and diagnostic system
CN101672102A (en) * 2009-10-19 2010-03-17 中铁建设集团有限公司 Steel structural overhead ceiling construction platform
CN203158967U (en) * 2013-03-18 2013-08-28 玉锋实业集团有限公司 Elevator safety protection device
CN104140027A (en) * 2014-07-27 2014-11-12 温建 Two-dimensional work suspension basket
GB2538221A (en) * 2015-03-02 2016-11-16 Global Energy Group (Access & Coatings) Ltd Platform

Also Published As

Publication number Publication date
CN107246139B (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN107010507A (en) A kind of construction material vertical transport mechanical anti-falling dropping control device
CN108675082A (en) Construction material vertical transport fall protection equipment
CN104929355B (en) Shaped form hanging basket
CN107119898A (en) A kind of building construction hanging basket
CN107246139A (en) A kind of hanging basket of architectural engineering work high above the ground
CN107922152B (en) Elevator derailedness detection device
CN107394971A (en) Climbing robot
CN111375154A (en) Tower crane climbing safety belt hanging device and using method thereof
CN108946374B (en) Elevator safety speed limiter
CN207002160U (en) Reduction furnace elevator safety protection device
CN210884838U (en) Elevator traction machine with steel wire rope anti-skid device
JPWO2003106321A1 (en) Counterweight
CN214456201U (en) Tower crane lifting hook convenient to adjust
CN212090570U (en) Tower machine climbing safety belt cable suspension device
CN211597670U (en) Hanging basket safety monitoring system
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN208486641U (en) A kind of parking stall antiswing device of stereo garage
CN206751158U (en) A kind of electromechanical protector for being used for traction sheave or pulley
CN209009920U (en) A kind of building hoist guide rail frame hanging device
CN207684687U (en) A kind of overhead speed limiter tensioning device
CN108643662A (en) A kind of parking stall antiswing device of stereo garage
CN205617870U (en) Protection device that falls is prevented in stereo garage special use
CN106429727B (en) Machineroom-less elevator system
CN205662205U (en) Traction machine fixing device
CN208631975U (en) A kind of anti-off rope device for derrick crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Yufei

Inventor after: Liu Liding

Inventor after: Cong Keke

Inventor after: Dan Shirui

Inventor before: Dan Shirui

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190510

Address after: 511400 Times Building A 401, 312 Dashi Yingbin Road, Panyu District, Guangzhou, Guangdong Province

Applicant after: China Construction Seventh Engineering Division. Corp. Ltd.

Address before: 461000 No. 16 Dongcheng District new industrial park, Xuchang Vocational Technical College, 4336 Dongcheng District Xinxing Road, Xuchang, Henan

Applicant before: Xuchang Confucian scientific and Technological Information Consulting Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

Termination date: 20200302