CN107245954A - 一种中小跨径钢箱梁桥施工方法 - Google Patents
一种中小跨径钢箱梁桥施工方法 Download PDFInfo
- Publication number
- CN107245954A CN107245954A CN201710632635.7A CN201710632635A CN107245954A CN 107245954 A CN107245954 A CN 107245954A CN 201710632635 A CN201710632635 A CN 201710632635A CN 107245954 A CN107245954 A CN 107245954A
- Authority
- CN
- China
- Prior art keywords
- steel box
- girder
- jack
- bridge
- completion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710632635.7A CN107245954B (zh) | 2017-07-28 | 2017-07-28 | 一种中小跨径钢箱梁桥施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710632635.7A CN107245954B (zh) | 2017-07-28 | 2017-07-28 | 一种中小跨径钢箱梁桥施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107245954A true CN107245954A (zh) | 2017-10-13 |
CN107245954B CN107245954B (zh) | 2019-03-01 |
Family
ID=60012012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710632635.7A Active CN107245954B (zh) | 2017-07-28 | 2017-07-28 | 一种中小跨径钢箱梁桥施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107245954B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029571A (zh) * | 2018-08-01 | 2019-07-19 | 中建六局土木工程有限公司 | 一种对称保护永久支座施工方法 |
CN112935635A (zh) * | 2021-01-18 | 2021-06-11 | 中交二航局第四工程有限公司 | 一种支架段钢箱梁全焊接高程控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3393107B2 (ja) * | 2000-04-18 | 2003-04-07 | 鹿島建設株式会社 | 橋桁支承取替え工法 |
RU2295604C2 (ru) * | 2005-06-03 | 2007-03-20 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Способ монтажа неразрезного металлического балочного пролетного строения |
KR20090021727A (ko) * | 2007-08-28 | 2009-03-04 | 이엔이건설주식회사 | 피에스씨 거더를 이용한 장지간 교량 시공방법 |
CN102286924A (zh) * | 2011-06-30 | 2011-12-21 | 石家庄市环城公路建设指挥部办公室 | 一种工序倒置的桥梁施工方法 |
CN106894346A (zh) * | 2017-04-28 | 2017-06-27 | 山西省交通科学研究院 | 一种连续梁桥施工方法 |
-
2017
- 2017-07-28 CN CN201710632635.7A patent/CN107245954B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3393107B2 (ja) * | 2000-04-18 | 2003-04-07 | 鹿島建設株式会社 | 橋桁支承取替え工法 |
RU2295604C2 (ru) * | 2005-06-03 | 2007-03-20 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Способ монтажа неразрезного металлического балочного пролетного строения |
KR20090021727A (ko) * | 2007-08-28 | 2009-03-04 | 이엔이건설주식회사 | 피에스씨 거더를 이용한 장지간 교량 시공방법 |
CN102286924A (zh) * | 2011-06-30 | 2011-12-21 | 石家庄市环城公路建设指挥部办公室 | 一种工序倒置的桥梁施工方法 |
CN106894346A (zh) * | 2017-04-28 | 2017-06-27 | 山西省交通科学研究院 | 一种连续梁桥施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029571A (zh) * | 2018-08-01 | 2019-07-19 | 中建六局土木工程有限公司 | 一种对称保护永久支座施工方法 |
CN112935635A (zh) * | 2021-01-18 | 2021-06-11 | 中交二航局第四工程有限公司 | 一种支架段钢箱梁全焊接高程控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107245954B (zh) | 2019-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108505443B (zh) | 一种不设预拱度的大节段吊装自锚式悬索桥施工方法 | |
CN111778883A (zh) | 一种多跨混凝土刚架拱桥的无偏载快速拆除方法 | |
CN101691813B (zh) | 用于超高结构施工的标高同步补偿装置及方法 | |
CN109972494B (zh) | 一种节段间带铰的大节段吊装自锚式悬索桥设计与施工方法 | |
CN104947604B (zh) | 一种高速铁路900t混凝土箱梁的快速换架施工方法 | |
CN107178042A (zh) | 一种大跨度倒三角型钢管混凝土拱桥钢拱的施工方法 | |
CN107245954B (zh) | 一种中小跨径钢箱梁桥施工方法 | |
CN114781026A (zh) | 一种独斜塔斜拉桥施工控制方法 | |
CN104314009A (zh) | 大节段提升机构及使用方法 | |
CN102758405A (zh) | 一种钢箱梁、混凝土梁结合顶升的工艺 | |
CN201720676U (zh) | 大型构件精确调位装置 | |
CN110656723B (zh) | 用于柱面拱壳屋盖滑移施工的轨道支架 | |
CN206986701U (zh) | 一种钢箱梁桥结构体系转换系统 | |
JP6969646B2 (ja) | 上部工部材運搬設備および上部工部材運搬方法 | |
CN104005392B (zh) | 自升式平台桁架桩腿半圆板更换设备及其更换方法 | |
JP2022009519A (ja) | 上部工部材運搬設備および上部工部材運搬方法 | |
TW201437457A (zh) | 橋梁頂升千斤頂支撐托座 | |
CN108342984B (zh) | 一种滩涂软弱地基栈桥及其安装沉降方法 | |
CN201531118U (zh) | 用于超高结构施工的标高同步补偿装置 | |
CN203846473U (zh) | 自升式平台桁架桩腿半圆板更换设备 | |
CN211228153U (zh) | 钢构桥桥面调平机构 | |
CN112813852B (zh) | 一种在役桥梁桥面沉陷的修复加固方法 | |
CN204402068U (zh) | 用于工业厂房改造的屋架结构荷载快速转移装置 | |
CN217438744U (zh) | 一种三主桁钢桁梁桥顶推施工用桥墩加固装置 | |
CN220284615U (zh) | 一种免开孔铁路单线箱梁架桥机支撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 030032 No.27, Wuluo street, economic and Technological Park, Xiaodian District, Taiyuan City, Shanxi Province Patentee after: Shanxi Transportation Technology Research and Development Co.,Ltd. Address before: 030032 No.27, Wuluo street, economic and Technological Park, Xiaodian District, Taiyuan City, Shanxi Province Patentee before: SHANXI TRAFFIC SCIENCES RESEARCH INSTITUTE Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210630 Address after: 030032 No.27, Wuluo street, economic and Technological Park, Xiaodian District, Taiyuan City, Shanxi Province Patentee after: SHANXI TRAFFIC SCIENCES RESEARCH INSTITUTE Co.,Ltd. Address before: 030006 No. 79 Xuefu street, Shanxi, Taiyuan Patentee before: Shanxi Transportation Research Institute |
|
TR01 | Transfer of patent right |