CN107245954A - 一种中小跨径钢箱梁桥施工方法 - Google Patents

一种中小跨径钢箱梁桥施工方法 Download PDF

Info

Publication number
CN107245954A
CN107245954A CN201710632635.7A CN201710632635A CN107245954A CN 107245954 A CN107245954 A CN 107245954A CN 201710632635 A CN201710632635 A CN 201710632635A CN 107245954 A CN107245954 A CN 107245954A
Authority
CN
China
Prior art keywords
steel box
girder
jack
bridge
completion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710632635.7A
Other languages
English (en)
Other versions
CN107245954B (zh
Inventor
王磊
韩之江
吴佳佳
刘志华
赵雷
汪永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Traffic Sciences Research Institute Co ltd
Shanxi Transportation Technology Research and Development Co Ltd
Original Assignee
Shanxi Province Transport Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201710632635.7A priority Critical patent/CN107245954B/zh
Publication of CN107245954A publication Critical patent/CN107245954A/zh
Application granted granted Critical
Publication of CN107245954B publication Critical patent/CN107245954B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种中小跨径钢箱梁桥施工方法,包括以下步骤:A桥墩施工完成后,搭设辅助墩,设置临时与永久支座;B钢箱梁现场拼接、焊接完成后,吊装至桥位并使结构体系稳定;C撤去临时支座;D在中墩处架设临时墩,临时墩上设置千斤顶;E对钢箱梁进行顶升施工,顶升力及顶升位移符合计算要求;F中跨跨中钢箱梁进行焊接连接完成后,撤去辅助墩;G同时卸除千斤顶荷载,使钢箱梁强迫回落至顶起前位置,结构体系最终内力状态达到一次落架成桥状态。本发明整个过程操作简单、安全、快速;施工过程中结构体系受力明确,可极大改善最终钢箱梁成桥内力状态。

Description

一种中小跨径钢箱梁桥施工方法
技术领域
本发明属于桥梁工程技术领域,具体而言,公开了一种中小跨径钢箱梁桥施工方法。
背景技术
中小跨径钢箱梁桥一般不采用满堂支架施工方法,通过工厂加工、构件运输、现场连接成整体成桥,受现场焊接连接施工过程影响,成桥状态与一次落架状态差异较大。在恒载作用下,个别控制断面内力和一次落架成桥相比不合理,拉应力偏大,在成桥循环荷载作用下,极易出现结构疲劳,对结构承载力和耐久性产生极大影响。
发明内容
本发明所要解决的技术问题是解决中小跨径钢箱梁桥在运营期内结构安全储备低的问题。
一种中小跨径钢箱梁桥施工方法,包括以下步骤:
A、桥墩施工完成后,在中跨跨中处搭设辅助墩,在辅助墩和桥墩上分别设置临时支座与永久支座;
B、钢箱梁在现场进行拼接、焊接完成后,整体吊装至桥位;
C、撤去辅助墩上的临时支座;
D、在边跨中墩位置处架设临时墩,临时墩上设置千斤顶,千斤顶的上和下使用钢板抄平,上钢板与钢箱梁底紧贴;
E、千斤顶对钢箱梁施加顶升力达到顶升位移;
F、焊接中跨跨中钢箱梁,结构体系转换完成后,撤去辅助墩;
G、同时卸除千斤顶荷载,使钢箱梁强迫回落至顶起前位置,撤去临时墩和千斤顶。
优选的,所述步骤C中,撤去临时支座后,钢箱梁处于单悬臂。
优选的,所述步骤E中,千斤顶顶升力其中:q为自重荷载集度,l为结构计算跨径。
优选的,所述步骤E中,千斤顶顶升高度其中:EI为钢箱梁的截面抗弯刚度。
优选的,所述步骤G中,钢箱梁强迫回落高度
本发明使用千斤顶在中墩处对钢箱梁进行顶升施工,钢箱梁最后强迫回落,整个过程操作简单、安全、快速;施工过程中结构体系受力明确,可极大改善最终钢箱梁成桥内力状态。
附图说明
图1为钢箱梁初始安装示意图。
图2为千斤顶位置示意图。
图3为千斤顶顶升施工示意图。
图4为结构体系转换示意图。
图5为结构成桥示意图。
图6为钢箱梁悬臂状态结构内力示意图。
图7为结构体系最终内力示意图。
具体实施方式
为使本领域的技术人员更好地理解本发明的技术方案,下面结合附图对本发明提供的一种中小跨径钢箱梁桥施工方法进行详细描述。
如图1~图7所示,本发明提供一种小跨径钢箱梁桥施工方法,包括以下步骤:
A桥墩2施工完成后,在中跨跨中处搭设辅助墩4,在辅助墩4上设置临时支座8,桥墩2上设置永久支座3,临时支座8顶与永久支座3顶标高平齐;
B钢箱梁1在现场进行拼接、焊接完成后,吊装至桥位,吊装过程中,临时支座8与永久支座3平稳,正确就位,见图1;
C撤去辅助墩4上的临时支座8;
D在边跨中墩2位置处架设临时墩5,临时墩5上设置千斤顶6,千斤顶6上、下使用钢板7抄平,上钢板7与钢箱梁1底紧贴;辅助墩4上临时支座8撤去后,钢箱梁1处于悬臂状态,见图2和图6:
MC=MC’=0 (2)
悬臂端转角:
式中:q为自重荷载集度;
l为结构计算跨径,本实施例中,三跨结构计算跨径都为l;
EI为钢箱梁1截面抗弯刚度。
E千斤顶6对钢箱梁1进行顶升施工,顶升力及顶升位移符合计算要求;千斤顶6顶升施工完成后,中支点B、D顶升位移:
钢箱梁1悬臂端转角:
F焊接中跨跨中钢箱梁1,千斤顶6反力:
结构体系转换完成后,撤去辅助墩4,见图3;
G同时卸除千斤顶6荷载,使钢箱梁1强迫回落至顶起前位置,见图4;撤去临时墩5和千斤顶6,见图5。卸除千斤顶6荷载,中支点B、D强迫位移:
结构体系内引起的累计内力见图7:
得到最终结构体系内力状态,即达到一次落架成桥状态。
可以理解的是,以上实施方式仅仅是为了说明本发明的原理而采用的示例性实施方式,然而本发明并不局限于此。对于本领域内的普通技术人员而言,在不脱离本发明的精神和实质的情况下,可以做出各种变型和改进,这些变型和改进也视为本发明的保护范围。

Claims (5)

1.一种中小跨径钢箱梁桥施工方法,其特征在于,包括以下步骤:
A、桥墩施工完成后,在中跨跨中处搭设辅助墩,在辅助墩和桥墩上分别设置临时支座与永久支座;
B、钢箱梁在现场进行拼接、焊接完成后,整体吊装至桥位;
C、撤去辅助墩上的临时支座;
D、在边跨中墩位置处架设临时墩,临时墩上设置千斤顶,千斤顶的上和下使用钢板抄平,上钢板与钢箱梁底紧贴;
E、千斤顶对钢箱梁施加顶升力达到顶升位移;
F、焊接中跨跨中钢箱梁,结构体系转换完成后,撤去辅助墩;
G、同时卸除千斤顶荷载,使钢箱梁强迫回落至顶起前位置,撤去临时墩和千斤顶。
2.根据权利要求1所述的中小跨径钢箱梁桥施工方法,其特征在于,所述步骤C中,撤去临时支座后,钢箱梁处于单悬臂。
3.根据权利要求2所述的中小跨径钢箱梁桥施工方法,其特征在于,所述步骤E中,千斤顶顶升力其中:q为自重荷载集度,l为结构计算跨径。
4.根据权利要求3所述的中小跨径钢箱梁桥施工方法,其特征在于,所述步骤E中,千斤顶顶升高度其中:EI为钢箱梁的截面抗弯刚度。
5.根据权利要求4所述的中小跨径钢箱梁桥施工方法,其特征在于,所述步骤G中,钢箱梁强迫回落高度
CN201710632635.7A 2017-07-28 2017-07-28 一种中小跨径钢箱梁桥施工方法 Active CN107245954B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710632635.7A CN107245954B (zh) 2017-07-28 2017-07-28 一种中小跨径钢箱梁桥施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710632635.7A CN107245954B (zh) 2017-07-28 2017-07-28 一种中小跨径钢箱梁桥施工方法

Publications (2)

Publication Number Publication Date
CN107245954A true CN107245954A (zh) 2017-10-13
CN107245954B CN107245954B (zh) 2019-03-01

Family

ID=60012012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710632635.7A Active CN107245954B (zh) 2017-07-28 2017-07-28 一种中小跨径钢箱梁桥施工方法

Country Status (1)

Country Link
CN (1) CN107245954B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029571A (zh) * 2018-08-01 2019-07-19 中建六局土木工程有限公司 一种对称保护永久支座施工方法
CN112935635A (zh) * 2021-01-18 2021-06-11 中交二航局第四工程有限公司 一种支架段钢箱梁全焊接高程控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3393107B2 (ja) * 2000-04-18 2003-04-07 鹿島建設株式会社 橋桁支承取替え工法
RU2295604C2 (ru) * 2005-06-03 2007-03-20 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Способ монтажа неразрезного металлического балочного пролетного строения
KR20090021727A (ko) * 2007-08-28 2009-03-04 이엔이건설주식회사 피에스씨 거더를 이용한 장지간 교량 시공방법
CN102286924A (zh) * 2011-06-30 2011-12-21 石家庄市环城公路建设指挥部办公室 一种工序倒置的桥梁施工方法
CN106894346A (zh) * 2017-04-28 2017-06-27 山西省交通科学研究院 一种连续梁桥施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3393107B2 (ja) * 2000-04-18 2003-04-07 鹿島建設株式会社 橋桁支承取替え工法
RU2295604C2 (ru) * 2005-06-03 2007-03-20 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Способ монтажа неразрезного металлического балочного пролетного строения
KR20090021727A (ko) * 2007-08-28 2009-03-04 이엔이건설주식회사 피에스씨 거더를 이용한 장지간 교량 시공방법
CN102286924A (zh) * 2011-06-30 2011-12-21 石家庄市环城公路建设指挥部办公室 一种工序倒置的桥梁施工方法
CN106894346A (zh) * 2017-04-28 2017-06-27 山西省交通科学研究院 一种连续梁桥施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029571A (zh) * 2018-08-01 2019-07-19 中建六局土木工程有限公司 一种对称保护永久支座施工方法
CN112935635A (zh) * 2021-01-18 2021-06-11 中交二航局第四工程有限公司 一种支架段钢箱梁全焊接高程控制方法

Also Published As

Publication number Publication date
CN107245954B (zh) 2019-03-01

Similar Documents

Publication Publication Date Title
CN108505443B (zh) 一种不设预拱度的大节段吊装自锚式悬索桥施工方法
CN111778883A (zh) 一种多跨混凝土刚架拱桥的无偏载快速拆除方法
CN101691813B (zh) 用于超高结构施工的标高同步补偿装置及方法
CN109972494B (zh) 一种节段间带铰的大节段吊装自锚式悬索桥设计与施工方法
CN104947604B (zh) 一种高速铁路900t混凝土箱梁的快速换架施工方法
CN107178042A (zh) 一种大跨度倒三角型钢管混凝土拱桥钢拱的施工方法
CN107245954B (zh) 一种中小跨径钢箱梁桥施工方法
CN114781026A (zh) 一种独斜塔斜拉桥施工控制方法
CN104314009A (zh) 大节段提升机构及使用方法
CN102758405A (zh) 一种钢箱梁、混凝土梁结合顶升的工艺
CN201720676U (zh) 大型构件精确调位装置
CN110656723B (zh) 用于柱面拱壳屋盖滑移施工的轨道支架
CN206986701U (zh) 一种钢箱梁桥结构体系转换系统
JP6969646B2 (ja) 上部工部材運搬設備および上部工部材運搬方法
CN104005392B (zh) 自升式平台桁架桩腿半圆板更换设备及其更换方法
JP2022009519A (ja) 上部工部材運搬設備および上部工部材運搬方法
TW201437457A (zh) 橋梁頂升千斤頂支撐托座
CN108342984B (zh) 一种滩涂软弱地基栈桥及其安装沉降方法
CN201531118U (zh) 用于超高结构施工的标高同步补偿装置
CN203846473U (zh) 自升式平台桁架桩腿半圆板更换设备
CN211228153U (zh) 钢构桥桥面调平机构
CN112813852B (zh) 一种在役桥梁桥面沉陷的修复加固方法
CN204402068U (zh) 用于工业厂房改造的屋架结构荷载快速转移装置
CN217438744U (zh) 一种三主桁钢桁梁桥顶推施工用桥墩加固装置
CN220284615U (zh) 一种免开孔铁路单线箱梁架桥机支撑装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 030032 No.27, Wuluo street, economic and Technological Park, Xiaodian District, Taiyuan City, Shanxi Province

Patentee after: Shanxi Transportation Technology Research and Development Co.,Ltd.

Address before: 030032 No.27, Wuluo street, economic and Technological Park, Xiaodian District, Taiyuan City, Shanxi Province

Patentee before: SHANXI TRAFFIC SCIENCES RESEARCH INSTITUTE Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210630

Address after: 030032 No.27, Wuluo street, economic and Technological Park, Xiaodian District, Taiyuan City, Shanxi Province

Patentee after: SHANXI TRAFFIC SCIENCES RESEARCH INSTITUTE Co.,Ltd.

Address before: 030006 No. 79 Xuefu street, Shanxi, Taiyuan

Patentee before: Shanxi Transportation Research Institute

TR01 Transfer of patent right