CN107245696A - A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap - Google Patents

A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap Download PDF

Info

Publication number
CN107245696A
CN107245696A CN201710259879.5A CN201710259879A CN107245696A CN 107245696 A CN107245696 A CN 107245696A CN 201710259879 A CN201710259879 A CN 201710259879A CN 107245696 A CN107245696 A CN 107245696A
Authority
CN
China
Prior art keywords
screw tap
steel alloy
titanium
alloy screw
nitride film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710259879.5A
Other languages
Chinese (zh)
Inventor
张钧
李长鸣
田红花
王晓阳
张连永
张正贵
王美涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang University
Original Assignee
Shenyang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang University filed Critical Shenyang University
Priority to CN201710259879.5A priority Critical patent/CN107245696A/en
Publication of CN107245696A publication Critical patent/CN107245696A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/06Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the coating material
    • C23C14/0641Nitrides
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/0021Reactive sputtering or evaporation
    • C23C14/0036Reactive sputtering
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/24Vacuum evaporation
    • C23C14/32Vacuum evaporation by explosion; by evaporation and subsequent ionisation of the vapours, e.g. ion-plating
    • C23C14/325Electric arc evaporation
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/34Sputtering
    • C23C14/3464Sputtering using more than one target

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physical Vapour Deposition (AREA)

Abstract

A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap, it is related to a kind of preparation method of alloy screw tap, determination including target, the plated film locular wall arc source position of different height and different azimuth is placed in as cathode arc source target and alternating using 2 titanium-aluminum alloy targets and 2 titanium-niobium alloy targets, the selection of steel alloy screw tap and pre-treatment, the placement of steel alloy screw tap, the determination of coating process, when coating chamber back end vacuum reaches 1 × 10‑3When handkerchief, temperature reach 240 ~ 300 DEG C, coating chamber is filled with argon gas, its pressure is reached 2 × 10‑1Handkerchief, starts 4 arc sources, carries out Ions Bombardment, and arc current is respectively placed in 55A, and the time is 15 minutes, and bombardment bias is reduced to 300 volts from 400V average rates;Reduction is biased into 120V.Present invention determine that a whole set of special coated film deposition technique, making the plating titanium aluminium niobium nitride film steel alloy screw tap of preparation has that adhesive force is strong, hardness is high, service life is long.

Description

A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap
Technical field
The present invention relates to a kind of preparation method of steel alloy screw tap, more particularly to a kind of plating titanium aluminium niobium nitride film is closed The preparation method of golden steel wire cone.
Background technology
Multi-arc ion coating be it is a kind of provided with it is multiple can while the vacuum PVD technology in the cathode vaporation source evaporated, With the distinguishing feature such as deposition velocity is fast, morphology is fine and close, adhesive force is strong, uniformity is good.The technology is applied to nitride film The preparation of layer, and in TiN, (Ti, Al) N, (Ti, Cr) N, what is succeeded in terms of the preparation of layer of nitride film such as (Ti, Zr) N should With.
And the adhesive force of hard reaction film and alloy steel matrix is poor the problem of be one universal, although in alloy steel matrix Multicomponent nitride reaction film layer prepared by upper use multi sphere ion plating technology, adhesive force is generally capable of up to 30-70N, still difficult The need for meeting as the wear-resisting film layer of screw tap.
As hard reaction film, hardness is undoubtedly an important indicator.The titanium nitride film hardness generally used can be Between HV1600-2200, not only hardness number is relatively low, while fluctuation range is larger, it is difficult to ensure stability and repeatability.
The content of the invention
It is an object of the invention to provide a kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap, this method Plating titanium aluminium niobium nitride film steel alloy screw tap is prepared using multi sphere ion plating technology, it is determined that 2 aluminum titanium alloy targets and 2 titaniums Niobium alloy target is used as cathode arc source target;A whole set of special coated film deposition technique is determined, the plating titanium aluminium niobium of preparation is nitrogenized Thing film steel alloy screw tap has that adhesive force is strong, hardness is high, service life is long.
The purpose of the present invention is achieved through the following technical solutions:
A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap, methods described includes:
The determination of target, using 2 titanium-aluminum alloy targets and 2 titanium-niobium alloy targets are as cathode arc source target and are alternately placed in difference The plated film locular wall arc source position of height and different azimuth, target purity reaches ensures 4 arcs always in 99.95%, coating process Start while source;
The selection and pre-treatment of steel alloy screw tap, the commercial common alloy steel screw tap of selection are being put into coating chamber as plated film matrix Carry out before plated film, using metal detergent screw tap is carried out it is conventional deoil, decontamination processing, and carry out surface fine polishing, Finally carry out ultrasonic wave with acetone, ethanol respectively to clean, be placed in drying box in 200 DEG C of drying in case deposition;
The placement of steel alloy screw tap, keeps steel alloy screw tap to be in the cylindrical region that 4 cathode arc source targets are surrounded and rotates On formula work rest, and screw tap is kept flat, perpendicular to garden cylinder, meanwhile, screw tap distance between two tips plated film locular wall reaches 25 centimetres, in plating In membrane process, work rest rotation is always maintained at;
The determination of coating process, the coating process for obtaining plating titanium aluminium niobium nitride film steel alloy screw tap and using, works as coating chamber Back end vacuum reaches 1 × 10-3When handkerchief, temperature reach 240 ~ 300 DEG C, coating chamber is filled with argon gas, its pressure is reached 2 × 10-1 Handkerchief, starts 4 arc sources, carries out Ions Bombardment, and arc current is respectively placed in 55A, and the time is 15 minutes, and bombardment is biased from 400V average rates It is reduced to 300 volts;Reduction is biased into 120V, keeps 4 arc source arc currents to be respectively placed in 55A constant, carry out transition zone deposition 8 ~ 10 minutes;It is that 120V is constant to keep 4 arc source arc currents to be respectively placed in 55A, bias, gradually uniform reduction argon flow amount, simultaneously Gradually it is filled with reacting gas N2, keep coating chamber vacuum to exist(2.5±0.1)×10-1Handkerchief, when 50 ~ 55 minutes, argon gas Flow is reduced to 0, and nitrogen flow reaches maximum, and coating chamber vacuum is remained as(2.5±0.1)×10-1Handkerchief.
A kind of preparation method of described plating titanium aluminium niobium nitride film steel alloy screw tap, the aluminium of the titanium-aluminum alloy target with The atomic percent of titanium is 55:45.
A kind of preparation method of described plating titanium aluminium niobium nitride film steel alloy screw tap, the titanium of the titanium-niobium alloy target with The atomic percent of niobium is 65:35.
A kind of preparation method of described plating titanium aluminium niobium nitride film steel alloy screw tap, the rotating speed of the work rest rotation For 6 revs/min.
Advantages of the present invention is with effect:
The present invention is to provide a kind of method that use multi sphere ion plating technology prepares plating titanium aluminium niobium nitride film steel alloy screw tap. This method determines 2 aluminum titanium alloy targets and 2 titanium-niobium alloy targets as cathode arc source target;A whole set of special plated film is determined Depositing operation, makes the plating titanium aluminium niobium nitride film steel alloy screw tap of preparation compared with uncoated steel alloy screw tap, with attached Put forth effort strong(≥150N), hardness it is high(≥HV3500), service life it is long(Improve 4-8 times)The advantages of.
Present invention determine that determining that multi-arc ion coating is used as the preparation for preparing plating titanium aluminium niobium nitride film steel alloy screw tap Technology, it is determined that target and arc source quantity, it is determined that the selection and pre-treatment of steel alloy screw tap, it is determined that steel alloy screw tap Modes of emplacement, it is determined that coating process, so as to ensure that the superficial film composition of plating titanium aluminium niobium nitride film steel alloy screw tap Consecutive variations, reduce the internal stress of film layer, so as to be realized while ensure that high adhesion force, high rigidity, long life, And with good stability.
Embodiment
With reference to embodiment, the present invention is described in detail.
The method that the use multi sphere ion plating technology that the present invention is provided prepares plating titanium aluminium niobium nitride film steel alloy screw tap Include successively:1)The determination of deposition technique;2)Target and arc source determination of amount;3)The selection of steel alloy screw tap and preceding place Reason;4)The placement of steel alloy screw tap; 5)The determination of coating process.
The determination of deposition technique, refers to present invention determine that multi-arc ion coating is as plating titanium aluminium niobium nitride film alloy-steel wire The technology of preparing of cone.The determination of target, refers to using 2 titanium-aluminum alloy targets(The atomic percent of aluminium and titanium is 55:45)With 2 Titanium-niobium alloy target(The atomic percent of titanium and niobium is 65:35)As cathode arc source target and alternately it is placed in different height and difference The plated film locular wall arc source position in orientation, target purity reaches to be ensured to open while 4 arc sources always in 99.95%, coating process It is dynamic.The selection and pre-treatment of steel alloy screw tap, refer to select commercial common alloy steel screw tap as plated film matrix, are being put into plated film Room is carried out before plated film, using metal detergent screw tap is carried out it is conventional deoil, decontamination processing, and carry out at surface fine polishing Reason, finally carries out ultrasonic wave with acetone, ethanol respectively and cleans, and is placed in drying box in 200 DEG C of drying in case deposition.Steel alloy screw tap Placement, refer to keep steel alloy screw tap to be on the cylindrical region internal rotation type work rest that 4 cathode arc source targets are surrounded, And screw tap is kept flat, perpendicular to garden cylinder, meanwhile, screw tap distance between two tips plated film locular wall reaches 25 centimetres, in coating process, one Straight to keep work rest rotation, rotating speed is 6 revs/min.The determination of coating process, refers to close to obtain plating titanium aluminium niobium nitride film The coating process that golden steel wire is bored and used.The first step, when coating chamber back end vacuum reaches 1 × 10-3Handkerchief, temperature reach 240 ~ 300 DEG C when, coating chamber is filled with argon gas, its pressure is reached 2 × 10-1Handkerchief, starts 4 arc sources, carries out Ions Bombardment, arc current point 55A is not placed in, and the time is 15 minutes, and bombardment bias is reduced to 300 volts from 400V average rates;Second step, reduction is biased into 120V, protects Holding 4 arc source arc currents, to be respectively placed in 55A constant, carries out transition zone and deposits 8 ~ 10 minutes;3rd step, keeps 4 arc source arc electricity It is that 120V is constant that stream, which is respectively placed in 55A, bias, gradually uniform reduction argon flow amount, while being gradually filled with reacting gas N2, keep Coating chamber vacuum exists(2.5±0.1)×10-1Handkerchief, when 50 ~ 55 minutes, argon flow amount is reduced to 0, and nitrogen flow reaches most Greatly, coating chamber vacuum is remained as(2.5±0.1)×10-1Handkerchief.
Embodiment 1
The preparation of plating titanium aluminium niobium nitride film 9SiCr steel alloy screw taps, its method is,
1)The determination of deposition technique, determines multi-arc ion coating as preparing plating titanium aluminium niobium nitride film 9SiCr steel alloy screw taps Technology of preparing.
2)The determination of target, using 2 titanium-aluminum alloy targets(The atomic percent of aluminium and titanium is 55:45)Closed with 2 titanium niobiums Gold target(The atomic percent of titanium and niobium is 65:35)It is placed in as cathode arc source target and alternately different height and different azimuth Plated film locular wall arc source position, target purity reaches to be ensured to start while 4 arc sources always in 99.95%, coating process.
3)The selection and pre-treatment of steel alloy screw tap, selection 9SiCr steel alloys screw tap are being put into plated film as plated film matrix Room is carried out before plated film, 9SiCr alloy-steel wire coning rows is routinely deoiled using metal detergent, decontamination processing, and carries out surface Fine polishing, finally carries out ultrasonic wave with acetone, ethanol respectively and cleans, and is placed in drying box in 200 DEG C of drying in case deposition.
4)The placement of steel alloy screw tap, keeps 9SiCr steel alloys screw tap to be in the cylinder that 4 cathode arc source targets are surrounded On the internal rotation type work rest of region, and screw tap is kept flat, perpendicular to garden cylinder, meanwhile, screw tap distance between two tips plated film locular wall reaches 25 centimetres, in coating process, work rest rotation is always maintained at, rotating speed is 6 revs/min.
5)The determination of coating process, refers to obtaining titanium aluminium niobium nitride plated film 9SiCr steel alloys screw tap and using Coating process.The first step, when coating chamber back end vacuum reaches 1 × 10-3When handkerchief, temperature reach 260 DEG C, coating chamber is filled with argon Gas, makes its pressure reach 2 × 10-1Handkerchief, starts 4 arc sources, carries out Ions Bombardment, and arc current is respectively placed in 55A, and the time is 15 points Clock, bombardment bias is reduced to 300 volts from 400V average rates;Second step, reduction is biased into 120V, keeps 4 arc source arc current difference It is placed in 55A constant, carries out transition zone and deposit 8 minutes;3rd step, 4 arc source arc currents of holding are respectively placed in 55A, bias and are 120V is constant, gradually uniform reduction argon flow amount, while being gradually filled with reacting gas N2, keep coating chamber vacuum to exist(2.5± 0.1)×10-1Handkerchief, when 50 minutes, argon flow amount is reduced to 0, and nitrogen flow reaches maximum, and coating chamber vacuum is remained as (2.5±0.1)×10-1Handkerchief.
The titanium aluminium niobium nitride plated film 9SiCr steel alloy screw taps prepared using the above method, hardness reaches HV3680, attachment Power reaches 175N, and processing 45# steel nuts reach 3300,5.6 times are improved than the life-span before non-plated film.
Embodiment 2
The preparation of the steel alloy screw tap of plating titanium aluminium niobium nitride film 6542, its method is,
1)The determination of deposition technique, determines multi-arc ion coating as preparing the steel alloy screw tap of plating titanium aluminium niobium nitride film 6542 Technology of preparing.
2)The determination of target, using 2 titanium-aluminum alloy targets(The atomic percent of aluminium and titanium is 55:45)Closed with 2 titanium niobiums Gold target(The atomic percent of titanium and niobium is 65:35)It is placed in as cathode arc source target and alternately different height and different azimuth Plated film locular wall arc source position, target purity reaches to be ensured to start while 4 arc sources always in 99.95%, coating process.
3)The selection and pre-treatment of steel alloy screw tap, 6542 steel alloy screw taps of selection are being put into plated film as plated film matrix Room is carried out before plated film, 6542 alloy-steel wire coning rows is routinely deoiled using metal detergent, decontamination processing, and carries out surface essence Fine polishing is handled, and finally carrying out ultrasonic wave with acetone, ethanol respectively cleans, and is placed in drying box in 200 DEG C of drying in case deposition.
4)The placement of steel alloy screw tap, keeps 6542 steel alloy screw taps to be in the cylinder that 4 cathode arc source targets are surrounded On the internal rotation type work rest of region, and screw tap is kept flat, perpendicular to garden cylinder, meanwhile, screw tap distance between two tips plated film locular wall reaches 25 centimetres, in coating process, work rest rotation is always maintained at, rotating speed is 6 revs/min.
5)The determination of coating process, refers to obtaining the plating that the steel alloy screw tap of titanium aluminium niobium nitride plated film 6542 is used Membrane process.The first step, when coating chamber back end vacuum reaches 1 × 10-3When handkerchief, temperature reach 280 DEG C, coating chamber is filled with argon gas, Its pressure is set to reach 2 × 10-1Handkerchief, starts 4 arc sources, carries out Ions Bombardment, and arc current is respectively placed in 55A, and the time is 15 minutes, Bombardment bias is reduced to 300 volts from 400V average rates;Second step, reduction is biased into 120V, keeps 4 arc source arc currents to be respectively placed in 55A is constant, carries out transition zone and deposits 10 minutes;3rd step, keeps 4 arc source arc currents to be respectively placed in 55A, bias as 120V not Become, gradually uniform reduction argon flow amount, while being gradually filled with reacting gas N2, keep coating chamber vacuum to exist(2.5±0.1)× 10-1Handkerchief, when 55 minutes, argon flow amount is reduced to 0, and nitrogen flow reaches maximum, and coating chamber vacuum is remained as(2.5± 0.1)×10-1Handkerchief.
The steel alloy screw tap of titanium aluminium niobium nitride plated film 6542 prepared using the above method, hardness reaches HV3730, attachment Power reaches 175N, and processing 45# steel nuts reach 6510,7 times are improved than the life-span before non-plated film.

Claims (4)

1. a kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap, it is characterised in that methods described includes:
The determination of target, using 2 titanium-aluminum alloy targets and 2 titanium-niobium alloy targets are as cathode arc source target and are alternately placed in difference The plated film locular wall arc source position of height and different azimuth, target purity reaches ensures 4 arcs always in 99.95%, coating process Start while source;
The selection and pre-treatment of steel alloy screw tap, the commercial common alloy steel screw tap of selection are being put into coating chamber as plated film matrix Carry out before plated film, using metal detergent screw tap is carried out it is conventional deoil, decontamination processing, and carry out surface fine polishing, Finally carry out ultrasonic wave with acetone, ethanol respectively to clean, be placed in drying box in 200 DEG C of drying in case deposition;
The placement of steel alloy screw tap, keeps steel alloy screw tap to be in the cylindrical region that 4 cathode arc source targets are surrounded and rotates On formula work rest, and screw tap is kept flat, perpendicular to garden cylinder, meanwhile, screw tap distance between two tips plated film locular wall reaches 25 centimetres, in plating In membrane process, work rest rotation is always maintained at;
The determination of coating process, the coating process for obtaining plating titanium aluminium niobium nitride film steel alloy screw tap and using, works as coating chamber Back end vacuum reaches 1 × 10-3When handkerchief, temperature reach 240 ~ 300 DEG C, coating chamber is filled with argon gas, its pressure is reached 2 ' 10-1 Handkerchief, starts 4 arc sources, carries out Ions Bombardment, and arc current is respectively placed in 55A, and the time is 15 minutes, and bombardment is biased from 400V average rates It is reduced to 300 volts;Reduction is biased into 120V, keeps 4 arc source arc currents to be respectively placed in 55A constant, carry out transition zone deposition 8 ~ 10 minutes;It is that 120V is constant to keep 4 arc source arc currents to be respectively placed in 55A, bias, gradually uniform reduction argon flow amount, simultaneously Gradually it is filled with reacting gas N2, keep coating chamber vacuum to exist(2.5±0.1)×10-1Handkerchief, when 50 ~ 55 minutes, argon gas Flow is reduced to 0, and nitrogen flow reaches maximum, and coating chamber vacuum is remained as(2.5±0.1)×10-1Handkerchief.
2. a kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap according to claim 1, its feature exists In the aluminium of the titanium-aluminum alloy target and the atomic percent of titanium are 55:45.
3. a kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap according to claim 1, its feature exists In the titanium of the titanium-niobium alloy target and the atomic percent of niobium are 65:35.
4. a kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap according to claim 1, its feature exists In the rotating speed of the work rest rotation is 6 revs/min.
CN201710259879.5A 2017-04-20 2017-04-20 A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap Pending CN107245696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710259879.5A CN107245696A (en) 2017-04-20 2017-04-20 A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710259879.5A CN107245696A (en) 2017-04-20 2017-04-20 A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap

Publications (1)

Publication Number Publication Date
CN107245696A true CN107245696A (en) 2017-10-13

Family

ID=60017248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710259879.5A Pending CN107245696A (en) 2017-04-20 2017-04-20 A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap

Country Status (1)

Country Link
CN (1) CN107245696A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331363A (en) * 2019-08-19 2019-10-15 丹阳河工工具有限公司 A kind of processing method in screw tap surface industrial titanizing

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210309A (en) * 2006-12-30 2008-07-02 沈阳大学 Method for preparing (TiAlZr)N ultra-hard coating by employing multiple arc ion plating
CN101230448A (en) * 2008-01-31 2008-07-30 沈阳大学 Method for preparing multi-arc ion plating aluminium titanium chrome silicon yttrium nitride multi-component ultra-hard reaction film
CN101626861A (en) * 2007-06-08 2010-01-13 Osg株式会社 Hard coat covers the manufacture method of screw tap and hard coat covering screw tap
CN103572220A (en) * 2013-10-28 2014-02-12 沈阳大学 Method for preparing nitrogen0gradient hard reaction membrane of titanium aluminum niobium nitride (TiAlNbN)
CN106011752A (en) * 2016-07-15 2016-10-12 沈阳大学 Preparation method of hard metal film

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210309A (en) * 2006-12-30 2008-07-02 沈阳大学 Method for preparing (TiAlZr)N ultra-hard coating by employing multiple arc ion plating
CN101626861A (en) * 2007-06-08 2010-01-13 Osg株式会社 Hard coat covers the manufacture method of screw tap and hard coat covering screw tap
CN101230448A (en) * 2008-01-31 2008-07-30 沈阳大学 Method for preparing multi-arc ion plating aluminium titanium chrome silicon yttrium nitride multi-component ultra-hard reaction film
CN103572220A (en) * 2013-10-28 2014-02-12 沈阳大学 Method for preparing nitrogen0gradient hard reaction membrane of titanium aluminum niobium nitride (TiAlNbN)
CN106011752A (en) * 2016-07-15 2016-10-12 沈阳大学 Preparation method of hard metal film

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331363A (en) * 2019-08-19 2019-10-15 丹阳河工工具有限公司 A kind of processing method in screw tap surface industrial titanizing

Similar Documents

Publication Publication Date Title
CN103668095B (en) A kind of high power pulse plasma enhancing combined magnetic-controlled sputter deposition apparatus and using method thereof
RU2678492C1 (en) Device for producing a composite film of multi-element alloy
CN101230448B (en) Method for preparing multi-arc ion plating aluminium titanium chrome silicon yttrium nitride multi-component ultra-hard reaction film
JP5856148B2 (en) PVD hybrid method for depositing mixed crystal layers
US8541101B2 (en) Coating, article coated with coating, and method for manufacturing article
CN101709450B (en) Method for preparing zirconium-titanium-aluminum-nitrogen nitride gradient hard reaction film
CN106011752B (en) A kind of preparation method of metal hard films
JP6245576B2 (en) Drill with covering
KR102095344B1 (en) Coated cutting tool
CN107217238A (en) A kind of preparation method of titanium-aluminum-zirconium nitride plated film carbide drill
US8795840B2 (en) Coated article and method for making the same
CN109778119A (en) A kind of Ni-CrSiN wear-and corrosion-resistant coating and preparation method thereof
CN106048539B (en) A kind of preparation method of Titanium aln precipitation composite ganoine film
KR20140027167A (en) High power impulse magnetron sputtering method providing enhanced ionization of the sputtered particles and apparatus for its implementation
CN107245696A (en) A kind of preparation method of plating titanium aluminium niobium nitride film steel alloy screw tap
WO2013000990A1 (en) Cathodic arc deposition
US10465278B2 (en) Coating containing macroparticles and cathodic arc process of making the coating
US20120308810A1 (en) Coated article and method for making the same
CN108823544A (en) Based on nitridation titanium compound film and preparation method thereof
CN101591766B (en) Method for preparing titanium-aluminum-zirconium nitride multicomponent hard reaction gradient film
CN106987801A (en) A kind of preparation method of titanium chromium nitride plated film steel alloy screw tap
CN107245699A (en) A kind of preparation method of titanium chromium aln precipitation plated film carbide drill
CN106048518B (en) A kind of preparation method of metal nitride composite ganoine film
CN106987802A (en) A kind of preparation method of titanium chromium aln precipitation plated film steel alloy screw tap
CN107217230A (en) A kind of preparation method of titanium aluminium niobium nitride plated film tungsten carbide tap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171013

RJ01 Rejection of invention patent application after publication