CN107238149A - Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner - Google Patents

Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner Download PDF

Info

Publication number
CN107238149A
CN107238149A CN201710534453.6A CN201710534453A CN107238149A CN 107238149 A CN107238149 A CN 107238149A CN 201710534453 A CN201710534453 A CN 201710534453A CN 107238149 A CN107238149 A CN 107238149A
Authority
CN
China
Prior art keywords
top cover
air
installing mechanism
screw
pressure strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710534453.6A
Other languages
Chinese (zh)
Inventor
谭畅
李德权
刘毓乾
鲍振东
赵纯可
郑海强
周宝魁
孙任格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Gree Intelligent Equipment Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201710534453.6A priority Critical patent/CN107238149A/en
Publication of CN107238149A publication Critical patent/CN107238149A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/56Casing or covers of separate outdoor units, e.g. fan guards

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

The invention provides a top cover installation mechanism and an air conditioner external unit assembly device, wherein the top cover installation mechanism comprises: the pressing device is positioned above the air conditioner assembly line and used for pressing a top cover of the air conditioner external unit positioned on the air conditioner assembly line to the top of a shell of the air conditioner external unit; the screw mounting device is provided with a screw clamping part for clamping a screw, and the screw clamping part is rotatably arranged so as to screw the screw clamped by the screw clamping part on the top cover compressed by the compressing device. The top cover mounting mechanism solves the problem that the mode for mounting the top cover of the air conditioner outdoor unit in the prior art is low in efficiency.

Description

Top cover installing mechanism and air-conditioning outdoor unit assembling equipment
Technical field
Field is assembled the present invention relates to air-conditioning, is set in particular to a kind of top cover installing mechanism and air-conditioning outdoor unit assembling It is standby.
Background technology
At present, in the assembling process of outdoor machine of air-conditioner, it is necessary to complete the installation of outdoor machine of air-conditioner, the top cover of outdoor machine of air-conditioner and top It is fitted by what screw was fixedly connected between portion's housing.
However, top cover is fixed on the mounting means on top shell by utilization screw of the prior art, before screwing Need first by each screw correspondence on top cover, then artificial by more than, screw, efficiency of assembling is relatively low;And spiral shell occurs Nail twists phenomenon not in place, causes assembling unqualified, or the staff's screw having is twisted too tight, causes top cover locally generation Stress, influences service life.
The content of the invention
It is existing to solve it is a primary object of the present invention to provide a kind of top cover installing mechanism and air-conditioning outdoor unit assembling equipment The problem of mode of the top cover of installation outdoor machine of air-conditioner in technology is less efficient.
To achieve these goals, according to an aspect of the invention, there is provided a kind of top cover installing mechanism, including:Pressure Tight device, pressing device is located at the top of air-conditioning assembly production chain, for by the outdoor machine of air-conditioner on air-conditioning assembly production chain Top cover be pressed on the case top of outdoor machine of air-conditioner;Screw mounting device, screw mounting device has the spiral shell for clamp screws Clamping part is followed closely, screw clamping portion is rotatably arranged with top cover of the screw-driving clamped after being compressed through pressing device On.
Further, pressing device includes:Pressure strip, pressure strip is set movably in a vertical direction, to compress air-conditioning The top cover of outer machine.
Further, pressing device also includes:Driver, driver is connected with pressure strip, to drive pressure strip along vertically Move in direction.
Further, driver is piston cylinder, and pressure strip is arranged on the piston rod of piston cylinder, so that pressure strip is in piston Vertically moved under the drive of bar.
Further, pressing device also includes:Pylon, the cylinder body of piston cylinder is arranged on pylon, the work of piston cylinder Stopper rod is vertically telescopically set.
Further, pylon, which includes setting up between two overhead supports being oppositely arranged, two overhead supports, installation Beam, the cylinder body of piston cylinder is arranged on mounting rail.
Further, pressing device also includes guide rod, and telescopic direction of the guide rod along piston rod is movably located in On mounting rail, one end of guide rod is connected with pressure strip.
Further, the cushion for being contacted with top cover is provided with pressure strip.
Further, top cover installing mechanism also includes:Top cover grasping mechanism, top cover grasping mechanism, which has, to be used to connect with top cover The top cover crawl section connect, to capture top cover and place it in the case top of outdoor machine of air-conditioner.
There is provided a kind of air-conditioning outdoor unit assembling equipment, including air-conditioning outdoor unit assembling flowing water according to another aspect of the present invention Line and top cover installing mechanism, top cover installing mechanism are above-mentioned top cover installing mechanism.
Top cover installing mechanism in the present invention includes pressing device and screw mounting device, and pressing device is assembled positioned at air-conditioning The top of streamline, screw mounting device have for clamp screws screw clamping portion, screw clamping portion rotatably arranged with, So, when installing the top cover of outdoor machine of air-conditioner, the top cover of outdoor machine of air-conditioner is pressed on to the shell of outdoor machine of air-conditioner first with pressing device At the top of body, recycle gripping to have the screw mounting device of screw by screw-driving on the housing of top cover and outdoor machine of air-conditioner, just may be used More easily to realize the installation of top cover, thus solve it is of the prior art installation outdoor machine of air-conditioner top cover mode efficiency compared with Low the problem of.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and of the invention shows Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the structural representation of the embodiment of the top cover installing mechanism according to the present invention;
Fig. 2 shows the front view of the top cover installing mechanism in Fig. 1;And
Fig. 3 shows the side view of the top cover installing mechanism in Fig. 1.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
10th, pressing device;20th, pressure strip;30th, driver;40th, pylon;41st, overhead support;42nd, mounting rail;50th, lead To bar;60th, cushion.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
It is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
The invention provides a kind of top cover installing mechanism, Fig. 1 to Fig. 3 is refer to, the top cover installing mechanism includes:Compress dress 10 are put, pressing device 10 is located at the top of air-conditioning assembly production chain, for by the outdoor machine of air-conditioner on air-conditioning assembly production chain Top cover be pressed on the case top of outdoor machine of air-conditioner;Screw mounting device, screw mounting device has the spiral shell for clamp screws Clamping part is followed closely, screw clamping portion is rotatably arranged with top of the screw-driving clamped after being compressed through pressing device 10 Cover.
Top cover installing mechanism in the present invention includes pressing device 10 and screw mounting device, and pressing device 10 is located at air-conditioning The top of assembly production chain, screw mounting device has the screw clamping portion for clamp screws, and screw clamping portion is rotationally Set, so, when installing the top cover of outdoor machine of air-conditioner, the top cover of outdoor machine of air-conditioner is pressed on outside air-conditioning first with pressing device 10 The case top of machine, recycles and grips the screw mounting device for having screw by screw-driving in top cover and the housing of outdoor machine of air-conditioner On, just the installation of top cover can be more easily realized, so as to solve the side of the top cover of installation outdoor machine of air-conditioner of the prior art The problem of formula is less efficient.
In order to realize the compression to top cover, as shown in Figure 1 to Figure 3, pressing device 10 includes:Pressure strip 20, pressure strip 20 Set movably in a vertical direction, to compress the top cover of outdoor machine of air-conditioner.
Pressure strip 20 in the present embodiment is set movably in a vertical direction, so, when outdoor machine of air-conditioner is moved to compression During the lower section of device 10, pressure strip 20 is moved down to compress the top cover at the top of outdoor machine of air-conditioner, and pressure strip 20 compresses top cover and made a reservation for After time, pressure strip 20 is moved up, and outdoor machine of air-conditioner is continued to move on air-conditioning outdoor unit assembling streamline, when outdoor machine of air-conditioner is moved to spiral shell Follow closely behind the position where erecting device, screw mounting device is by the spiral shell in the screw placement to top cover clamped by its screws clamp portion In nail, now the screw hole of top cover is alignd with the screw hole of housing, therefore screw is located on top cover and housing.It is basic herein On, just can be by screw-driving on the housing of top cover and outdoor machine of air-conditioner by rotating screw clamping portion.
Preferably, top cover installing mechanism also includes positioner, and positioner, which has, is used for the neighboring with top cover and sky The limiting section for adjusting the outer peripheral face of the housing of outer machine to contact so that top cover neighboring and outdoor machine of air-conditioner housing outer peripheral face pair Together, and then the respective screws hole of housing of screw hole and outdoor machine of air-conditioner on top cover is made to align.
In order to realize the driving to pressure strip, as shown in Figure 1 to Figure 3, pressing device 10 also includes:Driver 30, driving Device 30 is connected with pressure strip 20, to drive pressure strip 20 vertically to move.
Specifically, driver 30 is piston cylinder, and pressure strip 20 is arranged on the piston rod of piston cylinder, so that pressure strip 20 exists Vertically moved under the drive of piston rod.By the way that driver 30 is set into piston cylinder, pressure can be more easily driven Tight plate 20 is moved.
In order to realize the support to piston cylinder, as shown in Figure 1 to Figure 3, pressing device 10 also includes:Pylon 40, piston The cylinder body of cylinder is arranged on pylon 40, and the piston rod of piston cylinder is vertically telescopically set.
In the present embodiment, pylon 40 is included between two overhead supports 41 being oppositely arranged, two overhead supports 41 Erection has mounting rail 42, and the cylinder body of piston cylinder is arranged on mounting rail 42.
Preferably, two overhead supports 41 are respectively provided with two longerons be arrangeding in parallel, and two longerons are vertically set, Crossbeam is provided between two longerons, the two ends of crossbeam are connected with a corresponding longeron respectively, the two ends of mounting rail 42 respectively with The crossbeam connection of two overhead supports.
In order to realize the installation of pylon 40, pylon 40 also includes tie-beam, and tie-beam is horizontally disposed, two Longeron is connected with tie-beam.
In the present embodiment, pressing device 10 also includes guide rod 50, and guide rod 50 is removable along the telescopic direction of piston rod It is located in dynamicly on mounting rail 42, one end of guide rod 50 is connected with pressure strip 20.
The present embodiment can more easily realize the guiding to pressure strip 20 by setting guide rod 50.Preferably, pacify Linear bearing is provided with dress beam 42, guide rod 50 is located in linear bearing.Preferably, guide rod 50 is two, and two are led It is located at the opposite sides of piston rod to bar.
In order to realize the buffering between pressure strip 20 and top cover, the damage that collided between pressure strip 20 and top cover is prevented, As shown in Figure 1 to Figure 3, the cushion 60 for being contacted with top cover is provided with pressure strip 20.
In the present embodiment, top cover installing mechanism also includes:Top cover grasping mechanism, top cover grasping mechanism, which has, to be used for and top The top cover crawl section of connection is covered, to capture top cover and place it in the case top of outdoor machine of air-conditioner.
Top cover grasping mechanism in the present embodiment includes actuating arm, and top cover crawl section is arranged on actuating arm, passes through driving The driving of arm captures the movement between station and top cover release station in top cover.Preferably, top cover crawl section is sucker.It is preferred that Ground, top cover crawl section is sponge sucker.
Present invention also offers a kind of air-conditioning outdoor unit assembling equipment, including air-conditioning outdoor unit assembling streamline and top cover fitting machine Structure, top cover installing mechanism is above-mentioned top cover installing mechanism.
In the present embodiment, air-conditioning outdoor unit assembling streamline includes flow line bracket and the biography on flow line bracket Dynamic roller, live-roller is multiple, conveying direction arrangement of multiple transmission rods along air-conditioning outdoor unit assembling streamline, to transmit outside air-conditioning Machine.Preferably, the board for carrying outdoor machine of air-conditioner is provided with multiple live-rollers.
As can be seen from the above description, the above embodiments of the present invention realize following technique effect:
Top cover installing mechanism in the present invention includes pressing device 10 and screw mounting device, and pressing device 10 is located at air-conditioning The top of assembly production chain, screw mounting device has the screw clamping portion for clamp screws, and screw clamping portion is rotationally Set, so, when installing the top cover of outdoor machine of air-conditioner, the top cover of outdoor machine of air-conditioner is pressed on outside air-conditioning first with pressing device 10 The case top of machine, recycles and grips the screw mounting device for having screw by screw-driving in top cover and the housing of outdoor machine of air-conditioner On, just the installation of top cover can be more easily realized, so as to solve the side of the top cover of installation outdoor machine of air-conditioner of the prior art The problem of formula is less efficient.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, " Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so that presently filed embodiment described herein for example can be with except herein Order beyond those of diagram or description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that Be to cover it is non-exclusive include, for example, containing process, method, system, product or the equipment of series of steps or unit not Be necessarily limited to those steps or the unit clearly listed, but may include not list clearly or for these processes, side The intrinsic other steps of method, product or equipment or unit.
For the ease of description, space relative terms can be used herein, such as " ... on ", " ... top ", " ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation levied.It should be appreciated that space relative terms are intended to comprising the orientation except device described in figure Outside different azimuth in use or operation.If for example, the device in accompanying drawing is squeezed, be described as " in other devices It will be positioned as " under other devices or construction after the device of part or construction top " or " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.The device can also other different modes positioning (being rotated by 90 ° or in other orientation), and And respective explanations are made to the relative description in space used herein above.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of top cover installing mechanism, it is characterised in that including:
Pressing device (10), the pressing device (10) is located at the top of air-conditioning assembly production chain, for that will be located at the air-conditioning The top cover of outdoor machine of air-conditioner on assembly production chain is pressed on the case top of the outdoor machine of air-conditioner;
Screw mounting device, the screw mounting device has the screw clamping portion for clamp screws, the screw clamping portion Rotatably arranged with the screw-driving clamped is on the top cover after being compressed through the pressing device (10).
2. top cover installing mechanism according to claim 1, it is characterised in that the pressing device (10) includes:
Pressure strip (20), the pressure strip (20) is set movably in a vertical direction, to compress the top cover of the outdoor machine of air-conditioner.
3. top cover installing mechanism according to claim 2, it is characterised in that the pressing device (10) also includes:
Driver (30), the driver (30) is connected with the pressure strip (20), to drive the pressure strip (20) along vertical Move in direction.
4. top cover installing mechanism according to claim 3, it is characterised in that the driver (30) is piston cylinder, described Pressure strip (20) is arranged on the piston rod of the piston cylinder, so that drive lower edge of the pressure strip (20) in the piston rod Vertical direction is moved.
5. top cover installing mechanism according to claim 4, it is characterised in that the pressing device (10) also includes:
Pylon (40), the cylinder body of the piston cylinder is arranged on the pylon (40), and the piston rod edge of the piston cylinder is perpendicular Nogata is to telescopically setting.
6. top cover installing mechanism according to claim 5, it is characterised in that the pylon (40) includes two and set relatively Being set up between the overhead support (41) put, two overhead supports (41) has mounting rail (42), and the cylinder body of the piston cylinder is arranged on On the mounting rail (42).
7. top cover installing mechanism according to claim 6, it is characterised in that the pressing device (10) also includes guide rod (50), telescopic direction of the guide rod (50) along the piston rod is movably located on the mounting rail (42), described One end of guide rod (50) is connected with the pressure strip (20).
8. top cover installing mechanism according to claim 2, it is characterised in that be provided with the pressure strip (20) for The cushion (60) of the top cover contact.
9. top cover installing mechanism according to claim 1, it is characterised in that the top cover installing mechanism also includes:
Top cover grasping mechanism, the top cover grasping mechanism has the top cover crawl section for being used for being connected with the top cover, to capture State top cover and place it in the case top of the outdoor machine of air-conditioner.
10. a kind of air-conditioning outdoor unit assembling equipment, including air-conditioning outdoor unit assembling streamline and top cover installing mechanism, it is characterised in that The top cover installing mechanism is the top cover installing mechanism any one of claim 1 to 9.
CN201710534453.6A 2017-07-03 2017-07-03 Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner Pending CN107238149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710534453.6A CN107238149A (en) 2017-07-03 2017-07-03 Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710534453.6A CN107238149A (en) 2017-07-03 2017-07-03 Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner

Publications (1)

Publication Number Publication Date
CN107238149A true CN107238149A (en) 2017-10-10

Family

ID=59990257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710534453.6A Pending CN107238149A (en) 2017-07-03 2017-07-03 Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner

Country Status (1)

Country Link
CN (1) CN107238149A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4151759B2 (en) * 2002-08-28 2008-09-17 本田技研工業株式会社 Work positioning device
CN201279675Y (en) * 2008-10-28 2009-07-29 荆州神电实业有限公司 Rapid adjustment mechanism for multi-shaft screw down apparatus
CN202317638U (en) * 2011-11-17 2012-07-11 国耀(肇庆)精密机械制造有限公司 Installation equipment for automobile headlight reflector
CN203696404U (en) * 2013-11-18 2014-07-09 浙江佳卫锁业有限公司 Automatic bolt heading mechanism for lock box assembly
CN203726114U (en) * 2014-02-24 2014-07-23 深圳市海目星激光科技有限公司 Novel screw hitting device
CN205437745U (en) * 2015-12-25 2016-08-10 天津津海明科技发展有限公司 A panel kludge that is used for screw and product to clamp automatically
CN206286791U (en) * 2016-12-27 2017-06-30 苏州博众精工科技有限公司 A kind of electromagnetic levitation type compensating squeeze head

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4151759B2 (en) * 2002-08-28 2008-09-17 本田技研工業株式会社 Work positioning device
CN201279675Y (en) * 2008-10-28 2009-07-29 荆州神电实业有限公司 Rapid adjustment mechanism for multi-shaft screw down apparatus
CN202317638U (en) * 2011-11-17 2012-07-11 国耀(肇庆)精密机械制造有限公司 Installation equipment for automobile headlight reflector
CN203696404U (en) * 2013-11-18 2014-07-09 浙江佳卫锁业有限公司 Automatic bolt heading mechanism for lock box assembly
CN203726114U (en) * 2014-02-24 2014-07-23 深圳市海目星激光科技有限公司 Novel screw hitting device
CN205437745U (en) * 2015-12-25 2016-08-10 天津津海明科技发展有限公司 A panel kludge that is used for screw and product to clamp automatically
CN206286791U (en) * 2016-12-27 2017-06-30 苏州博众精工科技有限公司 A kind of electromagnetic levitation type compensating squeeze head

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李治国: "《现代生产管理基础》", 31 January 1986, 吉林人民出版社 *

Similar Documents

Publication Publication Date Title
CN207039062U (en) Compound clamping device and the cable crusing robot that cable crusing robot uses
CN109217167B (en) Composite clamping device for cable inspection robot and cable inspection robot
CN105182014B (en) A kind of transformer test mounting and clamping system
CN109877867A (en) Clamp and robot with same
CN107734909A (en) One kind is easy to pcb board fixing device for installing
CN108994561A (en) Clamp apparatus
CN108328326A (en) A kind of grabbing device for high voltage cable disk packaging
CN204777632U (en) Robot
CN106799728A (en) A kind of passive compliance device
CN110900628B (en) Automatic obstacle-crossing inspection robot
CN107433534A (en) A kind of panel fixture positioner
CN208913499U (en) Pipe fitting installation device
CN107238149A (en) Top cap installation mechanism and outer quick-witted equipment of assembling of air conditioner
CN109968545A (en) A kind of window exterior wall drilling equipment
CN106099744B (en) A kind of high-tension cable inspection arch maintenance robot
CN108896293A (en) A kind of multistation adjustable angle test device
CN208887902U (en) A kind of multistation adjustable angle test device
CN209409342U (en) A kind of nylon pipe joint automatic installation apparatus
CN208267786U (en) A kind of down-hole oil tube flexibility centralizer
CN206505988U (en) Enter shell force feed device
CN211638882U (en) Automatic strip penetrating machine for aluminum alloy profile heat insulation strip
CN210997605U (en) Adjustable fixture for processing subway safety door frame material
CN209632813U (en) High-voltage line clamping device in a kind of power plant
CN208814175U (en) feeding mechanism
CN207983236U (en) A kind of DR component heights adjustment tooling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171010